   A large number of sidewalks in need of repair
    ◦ Damage from right-of-way trees = City
      responsibility
    ◦ Damage from property trees = Property owner
      responsibility
    ◦ Worn out pavers, sewer and other issues = Property
      owner responsibility (generally)
   Minimal City budget, minimal City staffing
    result in no proactive initiatives, limited
    reactive resources
   Report issues to DPW on line or through PEDS
    (publicworks@atlantaga.gov or www.peds.org)
   Possible involvement of Parks regarding trees
   Receive inspection within 72 hours, unless tree
    involvement
   Receive price quote thereafter
    ◦ Standard 50 foot sidewalk costs about $1000, which
      may be partially paid by the City depending on tree
      damage
   Property owner contracts with the City and pays
    the City for repair
   Inefficient because repairs are not bundled
   Wait
   To privately contract sidewalk repair, City
    requires:
    ◦ A large bond
    ◦ Architect or Engineer stamped drawings
    ◦ Complete building permit process (hours in City
      Hall)
   We contacted 11 contractors and NONE were
    willing to undertake sidewalk repair for a
    homeowner unless part of a major
    construction project. They can’t cover the
    cost of taking the sidewalk through the City
    for the $1000 standard sidewalk price.
   VHCA had a 50% cost matching program of
    up to $500 for sidewalk replacement
   There were few takers (less than 20 in 3
    years)
   Some of those funded were doing sidewalks
    anyway
   The worst sidewalks – those the VHCA would
    target – did not necessarily get repaired
   Program was discontinued
   Is there a better way?
1.    Identify bad spots on Virginia and North
      Highland
     1. Committee evaluation by address with photos
     2. Open request to neighborhood got a good response
2.    Identify property owners from tax records and
      White Pages (done)
3.    Provide information about the process to
      property owners (started)
4.    Ask property owners individually to initiate
      repairs with the City (started)
5.    Ask the Board for funding to incent repairs
6.    Track the process with property owners so the
      City gets to these repairs
   Identify a few blocks to bundle for repairs
   Select the bundle using clear criteria
    ◦ Larger streets first – traffic light controlled
    ◦ Through streets with probably pedestrian traffic
    ◦ High proportion of broken sidewalks
   Prepare information for property owners
    about the process (draft in progress)
   Sidewalk committee set criteria and identified
    broken sidewalks on several potential bundles
   Sidewalk committee put out a public request to
    identify bad sections and combined the work of
    the committee and public input for a total of
    about 100 sidewalk segments
   Sidewalk committee selected St. Charles and
    Barnett near St. Charles as the first bundle
    (hopefully more bundles will follow)
   To receive the list, together with photos, email
    pegberg1111@gmail.com
   Alex Wan hosted a conference call with the
    Committee and agreed to talk to DPW about a
    bundled inspection with a committee member
   Next steps depend on the City’s willingness to
    work on a bundle with us
    ◦ If yes, we get pricing for each property in the bundle
      from the City and offer to work with each homeowner
      individually to get the bundle assembled
    ◦ If no, we contact each homeowner and ask them to start
      the process with the City, track the process with them,
      and encourage the City to notice the opportunity to save
      money by bundling construction
   Most of the sidewalks at issue have some right-of-
    way tree involvement and therefore at least partial
    City funding
   As the bundle takes shape, VHCA will work on a
    program to pay a share of the property owner’s
    portion of the cost
   Shared 3-ways, not necessarily evenly, the property
    owner potentially gets a $1000 improvement for
    $500 or less if they participate in the bundle
   Propose funding incentives this to the Board when the
    structure of the funding is defined. However, the
    Board is tracking the Committee’s progress
   A formal funding request is planned and will have to
    be approved prior to committing any funds
   Fix the worst primary artery sidewalks
   Fix a first bundle of sidewalks in the
    community
   Structure a program that we can repeat
   Get more sidewalks fixed
   Get the most for VHCA sidewalk dollars

More Related Content

Viewers also liked

бунин и.а. листопад
бунин и.а. листопадбунин и.а. листопад
бунин и.а. листопад
МКОУ СОШ № 1 г. Сим
 
Звук ы. Буква ы
Звук ы. Буква ыЗвук ы. Буква ы
Звук ы. Буква ы
МКОУ СОШ № 1 г. Сим
 
Согласные звуки з, зь. Буквы зз. Урок 2
Согласные звуки з, зь. Буквы зз. Урок 2Согласные звуки з, зь. Буквы зз. Урок 2
Согласные звуки з, зь. Буквы зз. Урок 2
МКОУ СОШ № 1 г. Сим
 
Согласные звуки н, буквы Нн
Согласные звуки н, буквы НнСогласные звуки н, буквы Нн
Согласные звуки н, буквы Нн
МКОУ СОШ № 1 г. Сим
 
Hands on-social-media-introduction-by-anyssa
Hands on-social-media-introduction-by-anyssaHands on-social-media-introduction-by-anyssa
Hands on-social-media-introduction-by-anyssa
Anyssa Jane
 
Confeccion camisa
Confeccion camisaConfeccion camisa
Confeccion camisa
Jimmy Uribe
 
Письмо букв Вв
Письмо букв ВвПисьмо букв Вв
Письмо букв Вв
МКОУ СОШ № 1 г. Сим
 
Indian Product Companies M&A Scenario
Indian Product Companies M&A ScenarioIndian Product Companies M&A Scenario
Indian Product Companies M&A Scenario
prematura
 
Что это за листья
Что это за листьяЧто это за листья
Что это за листья
МКОУ СОШ № 1 г. Сим
 
Are Communities Empowering People or Reinforcing Dominations ?
Are Communities  Empowering People or  Reinforcing Dominations ?Are Communities  Empowering People or  Reinforcing Dominations ?
Are Communities Empowering People or Reinforcing Dominations ?
Louis-David Benyayer
 
Econ322 le1 inleiding
Econ322 le1 inleidingEcon322 le1 inleiding
Web 2.0 for health promotion reviewing the current evidence
Web 2.0 for health promotion  reviewing the current evidenceWeb 2.0 for health promotion  reviewing the current evidence
Web 2.0 for health promotion reviewing the current evidenceGiuseppe Fattori
 
Seppilli salute e sanità beni comuni
Seppilli salute e sanità beni comuniSeppilli salute e sanità beni comuni
Seppilli salute e sanità beni comuni
Giuseppe Fattori
 
7. manajemen proyek
7. manajemen proyek7. manajemen proyek
7. manajemen proyek
Nadia Rahmatul Ummah
 
Sykemittari
SykemittariSykemittari
Sykemittari
Tero Peltola
 
Quechua 6 b,c
Quechua 6 b,cQuechua 6 b,c
Quechua 6 b,c
Delia LOYOLA MAGUIÑO
 
Official Rules V Vespa The Resistance 2012
Official Rules V Vespa The Resistance 2012Official Rules V Vespa The Resistance 2012
Official Rules V Vespa The Resistance 2012
kittinha
 
Dimiourgontas mia sxol_theat_parastasi
Dimiourgontas mia sxol_theat_parastasiDimiourgontas mia sxol_theat_parastasi
Dimiourgontas mia sxol_theat_parastasi
Eleni Papadopoulou
 

Viewers also liked (20)

бунин и.а. листопад
бунин и.а. листопадбунин и.а. листопад
бунин и.а. листопад
 
Звук ы. Буква ы
Звук ы. Буква ыЗвук ы. Буква ы
Звук ы. Буква ы
 
Kiểm tra 1 tiết lớp 11 lần 3
Kiểm tra 1 tiết lớp 11 lần 3Kiểm tra 1 tiết lớp 11 lần 3
Kiểm tra 1 tiết lớp 11 lần 3
 
Согласные звуки з, зь. Буквы зз. Урок 2
Согласные звуки з, зь. Буквы зз. Урок 2Согласные звуки з, зь. Буквы зз. Урок 2
Согласные звуки з, зь. Буквы зз. Урок 2
 
Согласные звуки н, буквы Нн
Согласные звуки н, буквы НнСогласные звуки н, буквы Нн
Согласные звуки н, буквы Нн
 
Hands on-social-media-introduction-by-anyssa
Hands on-social-media-introduction-by-anyssaHands on-social-media-introduction-by-anyssa
Hands on-social-media-introduction-by-anyssa
 
Confeccion camisa
Confeccion camisaConfeccion camisa
Confeccion camisa
 
Письмо букв Вв
Письмо букв ВвПисьмо букв Вв
Письмо букв Вв
 
Indian Product Companies M&A Scenario
Indian Product Companies M&A ScenarioIndian Product Companies M&A Scenario
Indian Product Companies M&A Scenario
 
Что это за листья
Что это за листьяЧто это за листья
Что это за листья
 
Are Communities Empowering People or Reinforcing Dominations ?
Are Communities  Empowering People or  Reinforcing Dominations ?Are Communities  Empowering People or  Reinforcing Dominations ?
Are Communities Empowering People or Reinforcing Dominations ?
 
Econ322 le1 inleiding
Econ322 le1 inleidingEcon322 le1 inleiding
Econ322 le1 inleiding
 
Pertemuan 6
Pertemuan 6Pertemuan 6
Pertemuan 6
 
Web 2.0 for health promotion reviewing the current evidence
Web 2.0 for health promotion  reviewing the current evidenceWeb 2.0 for health promotion  reviewing the current evidence
Web 2.0 for health promotion reviewing the current evidence
 
Seppilli salute e sanità beni comuni
Seppilli salute e sanità beni comuniSeppilli salute e sanità beni comuni
Seppilli salute e sanità beni comuni
 
7. manajemen proyek
7. manajemen proyek7. manajemen proyek
7. manajemen proyek
 
Sykemittari
SykemittariSykemittari
Sykemittari
 
Quechua 6 b,c
Quechua 6 b,cQuechua 6 b,c
Quechua 6 b,c
 
Official Rules V Vespa The Resistance 2012
Official Rules V Vespa The Resistance 2012Official Rules V Vespa The Resistance 2012
Official Rules V Vespa The Resistance 2012
 
Dimiourgontas mia sxol_theat_parastasi
Dimiourgontas mia sxol_theat_parastasiDimiourgontas mia sxol_theat_parastasi
Dimiourgontas mia sxol_theat_parastasi
 

Similar to VHCA presentation on sidewalks Feb 13, 2012

Sidewalk Task Force presentation on recommended reforms
Sidewalk Task Force presentation on recommended reformsSidewalk Task Force presentation on recommended reforms
Sidewalk Task Force presentation on recommended reforms
PEDS
 
Cnu Sustainable Networks Donohue (05 18 09)
Cnu   Sustainable Networks   Donohue (05 18 09)Cnu   Sustainable Networks   Donohue (05 18 09)
Cnu Sustainable Networks Donohue (05 18 09)
Congress for the New Urbanism
 
Session 23: Bringing Sidewalk Maintenance Up to Scale
Session 23: Bringing Sidewalk Maintenance Up to ScaleSession 23: Bringing Sidewalk Maintenance Up to Scale
Session 23: Bringing Sidewalk Maintenance Up to Scale
Sharon Roerty
 
Item # 7 - 2022 Street Maintenance Program
Item # 7 - 2022 Street Maintenance ProgramItem # 7 - 2022 Street Maintenance Program
Item # 7 - 2022 Street Maintenance Program
ahcitycouncil
 
Item # 5 - Water Main Installation HDD
Item # 5 - Water Main Installation HDDItem # 5 - Water Main Installation HDD
Item # 5 - Water Main Installation HDD
ahcitycouncil
 
Item # 1a - 3.22.21 CC Minutes
Item # 1a - 3.22.21 CC MinutesItem # 1a - 3.22.21 CC Minutes
Item # 1a - 3.22.21 CC Minutes
ahcitycouncil
 
Item # 1a - September 11, 2023 City Council Meeting Minutes
Item # 1a - September 11, 2023  City Council Meeting MinutesItem # 1a - September 11, 2023  City Council Meeting Minutes
Item # 1a - September 11, 2023 City Council Meeting Minutes
ahcitycouncil
 
4'16'13 sidewalk task force presentation final
4'16'13 sidewalk task force presentation final4'16'13 sidewalk task force presentation final
4'16'13 sidewalk task force presentation final
PEDS
 
Beaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forwebBeaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forweb
fregoneseassociates
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter Project
City of Salina
 
PEDS Sidewalk Forum presentation 7/30/2013
PEDS Sidewalk Forum presentation 7/30/2013PEDS Sidewalk Forum presentation 7/30/2013
PEDS Sidewalk Forum presentation 7/30/2013
PEDS
 
Local Govt Policy Sheet - August EC
Local Govt Policy Sheet - August ECLocal Govt Policy Sheet - August EC
Local Govt Policy Sheet - August EC
James Touchton, MPA
 
June 19, 2014 City Managers Meeting- Storm Water
June 19, 2014 City Managers Meeting- Storm Water June 19, 2014 City Managers Meeting- Storm Water
June 19, 2014 City Managers Meeting- Storm Water
Contract Cities
 
CDFP Maguire 2104 P3 8 6-2014 final
CDFP Maguire 2104 P3 8 6-2014 finalCDFP Maguire 2104 P3 8 6-2014 final
CDFP Maguire 2104 P3 8 6-2014 final
Christine Maguire, AICP, EDFP
 
Downtown & Infill Tax Increment Districts
Downtown & Infill Tax Increment DistrictsDowntown & Infill Tax Increment Districts
Downtown & Infill Tax Increment Districts
Vierbicher
 
History of Solar Energy in San Antoni
History of Solar Energy in San AntoniHistory of Solar Energy in San Antoni
History of Solar Energy in San Antoni
Solar San Antonio
 
Shadbrook Annual Meeting November, 2009
Shadbrook Annual Meeting  November, 2009  Shadbrook Annual Meeting  November, 2009
Shadbrook Annual Meeting November, 2009
shadbrookpres
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
RamaChilamkurthy
 
Item # 1a January 24, 2022 City Council Meeting Minutes
Item # 1a   January 24, 2022 City Council Meeting MinutesItem # 1a   January 24, 2022 City Council Meeting Minutes
Item # 1a January 24, 2022 City Council Meeting Minutes
ahcitycouncil
 
Solar-friendly Permitting and Zoning
Solar-friendly Permitting and ZoningSolar-friendly Permitting and Zoning
Solar-friendly Permitting and Zoning
SolarizeWC
 

Similar to VHCA presentation on sidewalks Feb 13, 2012 (20)

Sidewalk Task Force presentation on recommended reforms
Sidewalk Task Force presentation on recommended reformsSidewalk Task Force presentation on recommended reforms
Sidewalk Task Force presentation on recommended reforms
 
Cnu Sustainable Networks Donohue (05 18 09)
Cnu   Sustainable Networks   Donohue (05 18 09)Cnu   Sustainable Networks   Donohue (05 18 09)
Cnu Sustainable Networks Donohue (05 18 09)
 
Session 23: Bringing Sidewalk Maintenance Up to Scale
Session 23: Bringing Sidewalk Maintenance Up to ScaleSession 23: Bringing Sidewalk Maintenance Up to Scale
Session 23: Bringing Sidewalk Maintenance Up to Scale
 
Item # 7 - 2022 Street Maintenance Program
Item # 7 - 2022 Street Maintenance ProgramItem # 7 - 2022 Street Maintenance Program
Item # 7 - 2022 Street Maintenance Program
 
Item # 5 - Water Main Installation HDD
Item # 5 - Water Main Installation HDDItem # 5 - Water Main Installation HDD
Item # 5 - Water Main Installation HDD
 
Item # 1a - 3.22.21 CC Minutes
Item # 1a - 3.22.21 CC MinutesItem # 1a - 3.22.21 CC Minutes
Item # 1a - 3.22.21 CC Minutes
 
Item # 1a - September 11, 2023 City Council Meeting Minutes
Item # 1a - September 11, 2023  City Council Meeting MinutesItem # 1a - September 11, 2023  City Council Meeting Minutes
Item # 1a - September 11, 2023 City Council Meeting Minutes
 
4'16'13 sidewalk task force presentation final
4'16'13 sidewalk task force presentation final4'16'13 sidewalk task force presentation final
4'16'13 sidewalk task force presentation final
 
Beaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forwebBeaverton civic plan city council 030111 forweb
Beaverton civic plan city council 030111 forweb
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter Project
 
PEDS Sidewalk Forum presentation 7/30/2013
PEDS Sidewalk Forum presentation 7/30/2013PEDS Sidewalk Forum presentation 7/30/2013
PEDS Sidewalk Forum presentation 7/30/2013
 
Local Govt Policy Sheet - August EC
Local Govt Policy Sheet - August ECLocal Govt Policy Sheet - August EC
Local Govt Policy Sheet - August EC
 
June 19, 2014 City Managers Meeting- Storm Water
June 19, 2014 City Managers Meeting- Storm Water June 19, 2014 City Managers Meeting- Storm Water
June 19, 2014 City Managers Meeting- Storm Water
 
CDFP Maguire 2104 P3 8 6-2014 final
CDFP Maguire 2104 P3 8 6-2014 finalCDFP Maguire 2104 P3 8 6-2014 final
CDFP Maguire 2104 P3 8 6-2014 final
 
Downtown & Infill Tax Increment Districts
Downtown & Infill Tax Increment DistrictsDowntown & Infill Tax Increment Districts
Downtown & Infill Tax Increment Districts
 
History of Solar Energy in San Antoni
History of Solar Energy in San AntoniHistory of Solar Energy in San Antoni
History of Solar Energy in San Antoni
 
Shadbrook Annual Meeting November, 2009
Shadbrook Annual Meeting  November, 2009  Shadbrook Annual Meeting  November, 2009
Shadbrook Annual Meeting November, 2009
 
Hearst community meeting 10.02.18 pn_3-30pm
Hearst community meeting   10.02.18 pn_3-30pmHearst community meeting   10.02.18 pn_3-30pm
Hearst community meeting 10.02.18 pn_3-30pm
 
Item # 1a January 24, 2022 City Council Meeting Minutes
Item # 1a   January 24, 2022 City Council Meeting MinutesItem # 1a   January 24, 2022 City Council Meeting Minutes
Item # 1a January 24, 2022 City Council Meeting Minutes
 
Solar-friendly Permitting and Zoning
Solar-friendly Permitting and ZoningSolar-friendly Permitting and Zoning
Solar-friendly Permitting and Zoning
 

Recently uploaded

JOH pide al juez Castel 40 años como sentencia mínima
JOH pide al juez Castel 40 años como sentencia mínimaJOH pide al juez Castel 40 años como sentencia mínima
JOH pide al juez Castel 40 años como sentencia mínima
AlexisTorres963861
 
On the Wrong Track | Recent Increasing Train Accidents in India | News
On the Wrong Track | Recent Increasing Train Accidents in India | NewsOn the Wrong Track | Recent Increasing Train Accidents in India | News
On the Wrong Track | Recent Increasing Train Accidents in India | News
Harsh Kumar
 
Polarised Media Framing of Climate Protests
Polarised Media Framing of Climate ProtestsPolarised Media Framing of Climate Protests
Polarised Media Framing of Climate Protests
Axel Bruns
 
Why We Chose ScyllaDB over DynamoDB for "User Watch Status"
Why We Chose ScyllaDB over DynamoDB for "User Watch Status"Why We Chose ScyllaDB over DynamoDB for "User Watch Status"
Why We Chose ScyllaDB over DynamoDB for "User Watch Status"
ScyllaDB
 
Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...
Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...
Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...
The Lifesciences Magazine
 
bombay-hc-hamare-baraah-film-june-19.pdf
bombay-hc-hamare-baraah-film-june-19.pdfbombay-hc-hamare-baraah-film-june-19.pdf
bombay-hc-hamare-baraah-film-june-19.pdf
bhavenpr
 
ACSA confirms operational readiness ahead the arrival of Heads of State at OR...
ACSA confirms operational readiness ahead the arrival of Heads of State at OR...ACSA confirms operational readiness ahead the arrival of Heads of State at OR...
ACSA confirms operational readiness ahead the arrival of Heads of State at OR...
SABC News
 
bombay-hc-hamare-baraah-film-June-6.pdfde
bombay-hc-hamare-baraah-film-June-6.pdfdebombay-hc-hamare-baraah-film-June-6.pdfde
bombay-hc-hamare-baraah-film-June-6.pdfde
bhavenpr
 
一比一原版(ocu学位证书)俄克拉荷马城市大学毕业证如何办理
一比一原版(ocu学位证书)俄克拉荷马城市大学毕业证如何办理一比一原版(ocu学位证书)俄克拉荷马城市大学毕业证如何办理
一比一原版(ocu学位证书)俄克拉荷马城市大学毕业证如何办理
uahwhod
 
21062024_First India Newspaper Jaipur.pdf
21062024_First India Newspaper Jaipur.pdf21062024_First India Newspaper Jaipur.pdf
21062024_First India Newspaper Jaipur.pdf
FIRST INDIA
 
List of ministers in Modi 3.0 2024 india
List of ministers in Modi 3.0 2024 indiaList of ministers in Modi 3.0 2024 india
List of ministers in Modi 3.0 2024 india
hamwarclique
 
Call Girls In Chandigarh Book Me Monika:- 6350257716 | For Hot Moments Direct...
Call Girls In Chandigarh Book Me Monika:- 6350257716 | For Hot Moments Direct...Call Girls In Chandigarh Book Me Monika:- 6350257716 | For Hot Moments Direct...
Call Girls In Chandigarh Book Me Monika:- 6350257716 | For Hot Moments Direct...
vikramkumar98756
 
Bombay-hc-hamare-baraah-order-june-7.pdf
Bombay-hc-hamare-baraah-order-june-7.pdfBombay-hc-hamare-baraah-order-june-7.pdf
Bombay-hc-hamare-baraah-order-june-7.pdf
bhavenpr
 
Call Girls In Surat Book Me Monika:- 7737669865 | For Hot Moments Direct Cash...
Call Girls In Surat Book Me Monika:- 7737669865 | For Hot Moments Direct Cash...Call Girls In Surat Book Me Monika:- 7737669865 | For Hot Moments Direct Cash...
Call Girls In Surat Book Me Monika:- 7737669865 | For Hot Moments Direct Cash...
naagimvidio
 
projet de traité négocié à Istanbul (anglais).pdf
projet de traité négocié à Istanbul (anglais).pdfprojet de traité négocié à Istanbul (anglais).pdf
projet de traité négocié à Istanbul (anglais).pdf
EdouardHusson
 
The Impact of Imperial Mode of Living on Migration.pdf
The Impact of Imperial Mode of Living on Migration.pdfThe Impact of Imperial Mode of Living on Migration.pdf
The Impact of Imperial Mode of Living on Migration.pdf
blueshagoo1
 
一比一原版(uc学位证书)辛辛那提大学毕业证如何办理
一比一原版(uc学位证书)辛辛那提大学毕业证如何办理一比一原版(uc学位证书)辛辛那提大学毕业证如何办理
一比一原版(uc学位证书)辛辛那提大学毕业证如何办理
uahwhod
 
#WenguiGuo#WashingtonFarm Guo Wengui Wolf son ambition exposed to open a far...
#WenguiGuo#WashingtonFarm  Guo Wengui Wolf son ambition exposed to open a far...#WenguiGuo#WashingtonFarm  Guo Wengui Wolf son ambition exposed to open a far...
#WenguiGuo#WashingtonFarm Guo Wengui Wolf son ambition exposed to open a far...
rittaajmal71
 
AK-Rajan-Committee-Report-on-NEET-1.pdfs
AK-Rajan-Committee-Report-on-NEET-1.pdfsAK-Rajan-Committee-Report-on-NEET-1.pdfs
AK-Rajan-Committee-Report-on-NEET-1.pdfs
bhavenpr
 
24062024_First India Newspaper Jaipur.pdf
24062024_First India Newspaper Jaipur.pdf24062024_First India Newspaper Jaipur.pdf
24062024_First India Newspaper Jaipur.pdf
FIRST INDIA
 

Recently uploaded (20)

JOH pide al juez Castel 40 años como sentencia mínima
JOH pide al juez Castel 40 años como sentencia mínimaJOH pide al juez Castel 40 años como sentencia mínima
JOH pide al juez Castel 40 años como sentencia mínima
 
On the Wrong Track | Recent Increasing Train Accidents in India | News
On the Wrong Track | Recent Increasing Train Accidents in India | NewsOn the Wrong Track | Recent Increasing Train Accidents in India | News
On the Wrong Track | Recent Increasing Train Accidents in India | News
 
Polarised Media Framing of Climate Protests
Polarised Media Framing of Climate ProtestsPolarised Media Framing of Climate Protests
Polarised Media Framing of Climate Protests
 
Why We Chose ScyllaDB over DynamoDB for "User Watch Status"
Why We Chose ScyllaDB over DynamoDB for "User Watch Status"Why We Chose ScyllaDB over DynamoDB for "User Watch Status"
Why We Chose ScyllaDB over DynamoDB for "User Watch Status"
 
Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...
Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...
Federal Authorities Urge Vigilance Amid Bird Flu Outbreak | The Lifesciences ...
 
bombay-hc-hamare-baraah-film-june-19.pdf
bombay-hc-hamare-baraah-film-june-19.pdfbombay-hc-hamare-baraah-film-june-19.pdf
bombay-hc-hamare-baraah-film-june-19.pdf
 
ACSA confirms operational readiness ahead the arrival of Heads of State at OR...
ACSA confirms operational readiness ahead the arrival of Heads of State at OR...ACSA confirms operational readiness ahead the arrival of Heads of State at OR...
ACSA confirms operational readiness ahead the arrival of Heads of State at OR...
 
bombay-hc-hamare-baraah-film-June-6.pdfde
bombay-hc-hamare-baraah-film-June-6.pdfdebombay-hc-hamare-baraah-film-June-6.pdfde
bombay-hc-hamare-baraah-film-June-6.pdfde
 
一比一原版(ocu学位证书)俄克拉荷马城市大学毕业证如何办理
一比一原版(ocu学位证书)俄克拉荷马城市大学毕业证如何办理一比一原版(ocu学位证书)俄克拉荷马城市大学毕业证如何办理
一比一原版(ocu学位证书)俄克拉荷马城市大学毕业证如何办理
 
21062024_First India Newspaper Jaipur.pdf
21062024_First India Newspaper Jaipur.pdf21062024_First India Newspaper Jaipur.pdf
21062024_First India Newspaper Jaipur.pdf
 
List of ministers in Modi 3.0 2024 india
List of ministers in Modi 3.0 2024 indiaList of ministers in Modi 3.0 2024 india
List of ministers in Modi 3.0 2024 india
 
Call Girls In Chandigarh Book Me Monika:- 6350257716 | For Hot Moments Direct...
Call Girls In Chandigarh Book Me Monika:- 6350257716 | For Hot Moments Direct...Call Girls In Chandigarh Book Me Monika:- 6350257716 | For Hot Moments Direct...
Call Girls In Chandigarh Book Me Monika:- 6350257716 | For Hot Moments Direct...
 
Bombay-hc-hamare-baraah-order-june-7.pdf
Bombay-hc-hamare-baraah-order-june-7.pdfBombay-hc-hamare-baraah-order-june-7.pdf
Bombay-hc-hamare-baraah-order-june-7.pdf
 
Call Girls In Surat Book Me Monika:- 7737669865 | For Hot Moments Direct Cash...
Call Girls In Surat Book Me Monika:- 7737669865 | For Hot Moments Direct Cash...Call Girls In Surat Book Me Monika:- 7737669865 | For Hot Moments Direct Cash...
Call Girls In Surat Book Me Monika:- 7737669865 | For Hot Moments Direct Cash...
 
projet de traité négocié à Istanbul (anglais).pdf
projet de traité négocié à Istanbul (anglais).pdfprojet de traité négocié à Istanbul (anglais).pdf
projet de traité négocié à Istanbul (anglais).pdf
 
The Impact of Imperial Mode of Living on Migration.pdf
The Impact of Imperial Mode of Living on Migration.pdfThe Impact of Imperial Mode of Living on Migration.pdf
The Impact of Imperial Mode of Living on Migration.pdf
 
一比一原版(uc学位证书)辛辛那提大学毕业证如何办理
一比一原版(uc学位证书)辛辛那提大学毕业证如何办理一比一原版(uc学位证书)辛辛那提大学毕业证如何办理
一比一原版(uc学位证书)辛辛那提大学毕业证如何办理
 
#WenguiGuo#WashingtonFarm Guo Wengui Wolf son ambition exposed to open a far...
#WenguiGuo#WashingtonFarm  Guo Wengui Wolf son ambition exposed to open a far...#WenguiGuo#WashingtonFarm  Guo Wengui Wolf son ambition exposed to open a far...
#WenguiGuo#WashingtonFarm Guo Wengui Wolf son ambition exposed to open a far...
 
AK-Rajan-Committee-Report-on-NEET-1.pdfs
AK-Rajan-Committee-Report-on-NEET-1.pdfsAK-Rajan-Committee-Report-on-NEET-1.pdfs
AK-Rajan-Committee-Report-on-NEET-1.pdfs
 
24062024_First India Newspaper Jaipur.pdf
24062024_First India Newspaper Jaipur.pdf24062024_First India Newspaper Jaipur.pdf
24062024_First India Newspaper Jaipur.pdf
 

VHCA presentation on sidewalks Feb 13, 2012

  • 2. A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property trees = Property owner responsibility ◦ Worn out pavers, sewer and other issues = Property owner responsibility (generally)  Minimal City budget, minimal City staffing result in no proactive initiatives, limited reactive resources
  • 3. Report issues to DPW on line or through PEDS (publicworks@atlantaga.gov or www.peds.org)  Possible involvement of Parks regarding trees  Receive inspection within 72 hours, unless tree involvement  Receive price quote thereafter ◦ Standard 50 foot sidewalk costs about $1000, which may be partially paid by the City depending on tree damage  Property owner contracts with the City and pays the City for repair  Inefficient because repairs are not bundled  Wait
  • 4. To privately contract sidewalk repair, City requires: ◦ A large bond ◦ Architect or Engineer stamped drawings ◦ Complete building permit process (hours in City Hall)  We contacted 11 contractors and NONE were willing to undertake sidewalk repair for a homeowner unless part of a major construction project. They can’t cover the cost of taking the sidewalk through the City for the $1000 standard sidewalk price.
  • 5. VHCA had a 50% cost matching program of up to $500 for sidewalk replacement  There were few takers (less than 20 in 3 years)  Some of those funded were doing sidewalks anyway  The worst sidewalks – those the VHCA would target – did not necessarily get repaired  Program was discontinued  Is there a better way?
  • 6. 1. Identify bad spots on Virginia and North Highland 1. Committee evaluation by address with photos 2. Open request to neighborhood got a good response 2. Identify property owners from tax records and White Pages (done) 3. Provide information about the process to property owners (started) 4. Ask property owners individually to initiate repairs with the City (started) 5. Ask the Board for funding to incent repairs 6. Track the process with property owners so the City gets to these repairs
  • 7. Identify a few blocks to bundle for repairs  Select the bundle using clear criteria ◦ Larger streets first – traffic light controlled ◦ Through streets with probably pedestrian traffic ◦ High proportion of broken sidewalks  Prepare information for property owners about the process (draft in progress)
  • 8. Sidewalk committee set criteria and identified broken sidewalks on several potential bundles  Sidewalk committee put out a public request to identify bad sections and combined the work of the committee and public input for a total of about 100 sidewalk segments  Sidewalk committee selected St. Charles and Barnett near St. Charles as the first bundle (hopefully more bundles will follow)  To receive the list, together with photos, email pegberg1111@gmail.com
  • 9. Alex Wan hosted a conference call with the Committee and agreed to talk to DPW about a bundled inspection with a committee member  Next steps depend on the City’s willingness to work on a bundle with us ◦ If yes, we get pricing for each property in the bundle from the City and offer to work with each homeowner individually to get the bundle assembled ◦ If no, we contact each homeowner and ask them to start the process with the City, track the process with them, and encourage the City to notice the opportunity to save money by bundling construction
  • 10. Most of the sidewalks at issue have some right-of- way tree involvement and therefore at least partial City funding  As the bundle takes shape, VHCA will work on a program to pay a share of the property owner’s portion of the cost  Shared 3-ways, not necessarily evenly, the property owner potentially gets a $1000 improvement for $500 or less if they participate in the bundle  Propose funding incentives this to the Board when the structure of the funding is defined. However, the Board is tracking the Committee’s progress  A formal funding request is planned and will have to be approved prior to committing any funds
  • 11. Fix the worst primary artery sidewalks  Fix a first bundle of sidewalks in the community  Structure a program that we can repeat  Get more sidewalks fixed  Get the most for VHCA sidewalk dollars