Early experiments started in 2014 with Traffic Police as they are engaged in the management of traffic of the city. Through better design, signal timing could be reduced, pedestrian safety could be increased and public space could be created. With help of chalk, paint and bollards, these experiments have been transformative. CGM team helped create more of such quick turnaround projects in 6 cities. Here is a compilation of the main ones.
7. Of 3 traffic lanes, one lane was converted to Parallel Parking. Parking became more organized.
Previously existing parking space became walkable space.
8. People found it easy to cycle in the new space that was created.
35. Before – heavily congested street with vehicle parking and honking,
pedestrians finding difficult to walk, shop
36. Removal of median where it was obstructing the free movement of
people
Bollards at cross roads and potted plants all along the street
Tactical Implementation Work was completed ‘Over-night’
37. Implementation of 1 km stretch - through ‘Tactile Urbanism’ Method: May 2019
Street closed for vehicles.
57. Presentation at ‘Urban Mobility India 2019’ at Lucknow, Session chaired by Hon’ble Chairman,
Sabarmati Riverfront DCL. Project presented by Commissioner, North Delhi Municipal Corporation
58. ‘Urban Mobility India Commendable initiative award 2019’ under the
category of ‘Best Non-Motorised Transport Project’
59. Junction transformed to traffic managed and walkable space
Stage 1 Transformation
Thank you.