SlideShare a Scribd company logo
1 of 19
RCC FOUNDATION
METHODOLOGY FOR CONSTRUCTION OF R.C.C FOUNDATION
SURVEY & SETTING OUT
• Survey department will establish baselines and benchmarks from which co-
ordinates and elevations will be taken to set out the foundation works.
CHECKLIST AS PER QAP
EXCAVATION
• Excavation will be executed in open cut to the size, slope and
elevation as per drawing.
• Excavation will be carried out with excavator and soil loaded into
dumper and transported to stockpile area.
• The final bottom level of foundation will be checked by survey
team and surface will be trimmed as per the size and shape.
PCC
• Bottom of the excavation should be dry and tamped in uniform level before
placing lean concrete blinding layer.
• After inspection of the prepared foundation level, blinding concrete will be laid.
PLACING OF REINFORCEMENT
• Reinforcement shall be bent and fixed in position shown in the
drawings.
• Cover block shall be provided and required support for reinforcement
will be ensured.
• Spacing, Lab length and cover to the reinforcement shall be as per
drawing.
• The cover shall in no case be reduced by more than one third of the
specified cover or 5 mm, whichever is less.
• Any embedded items, fixtures etc., to be fixed as per drawing with
proper support to avoid dislocation during concrete pouring.
• Reinforcement shall be properly stored in firm, levelled ground at-least
above 150mm from ground to avoid contact with water, oil, grease,
slush/ mud which will reduce the bonding with concrete.
CHECKILIST AS PER QAP
FORM WORK
• The formwork shall be designed and constructed to the shapes, lines and dimensions
shown on the drawings. All forms shall be sufficiently watertight to prevent leakage
of mortar.
• Formwork shall be aligned vertically and horizontally with line and level as per
drawing.
• Rigid support to be ensured to withstand load during pouring of concrete.
• Formwork interior surface shall be properly lubricated by oil for ease for removal and
good surface finish.
• Damaged formwork shall not be used for shuttering works.
• Proper working platform to be provided for safe moving of manpower for
consolidation of concrete.
• Formwork shall be removed in such a manner as would not cause any shock or
vibration that would damage the concrete.
CHECKLIST AS PER QAP
FORMWORK REMOVAL DURATION
PLACING OF CONCRETE
• Before placing the concrete in trenches or on sub-grade or sub base, the sub-grade/ sub
base shall be cleaned of all injurious or foreign matter, watered and well consolidated, if
necessary.
• The concrete shall be deposited as nearly as possible in its final position to avoid re-
handling.
• The concrete shall be placed and compacted before setting commences and should not be
subsequently disturbed.
• Methods of placing should be such as to prevent segregation.
• Care shall be taken to avoid displacement of reinforcement or movement of formwork
during placing.
• Concrete shall not be allowed to free fall of height more than 1.5m to prevent segregation.
CONSOLIDATION OF CONCRETE
• Concrete shall be placed in a layers and each layer shall be thoroughly compacted and
fully worked around the reinforcement, around embedded fixtures and into the corners
of the formwork.
• The concrete shall be consolidated by means of internal vibrators vertically into it.
• Vibrator shall not be moved laterally to spread the concrete. Shovel/ spade shall be
used to move the concrete from one place to other.
•
FINISHING METHODS
• Screeding
• Floating
CHECKLIST AS PER QAP
POST CONCRETE FINISH
• Immediately after stripping the formwork, all concrete shall be carefully inspected
for any defective work and defects either removed or made good before the
concrete has thoroughly hardened.
CHECKLIST AS PER QAP
CURING OF CONCRETE
• Exposed surfaces of concrete shall be kept continuously in a damp or wet condition by covering
with layer of sacking, canvas, Hessian or similar materials or a layer of sand or by ponding for at
least seven days from the date of placing of concrete.
• Approved curing compounds may be used in lieu of moist curing.
• Such compounds shall be applied to all exposed surfaces of the concrete as soon as
possible after the concrete has set.
CHECKLIST AS PER QAP
BACKFILLING
• Backfilling will be carried out upto top of the
foundation level in loose layers not more than
250mm in thickness.
• Suitable vibrator/ rollers will be used to achieve
the 90-95% compaction as per MDD of the soil
used in each layer.
• Density test will be carried out for each layer to
confirm the compaction requirement.

More Related Content

Similar to RCC foundation methodology & process.pptx

Construction of well foundation
Construction of well foundation Construction of well foundation
Construction of well foundation dilip patidar
 
Aim for quality in construction
Aim for quality in constructionAim for quality in construction
Aim for quality in constructionpracticalanswerssl
 
Building construction
Building constructionBuilding construction
Building constructionnhmurad
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionShyam Anandjiwala
 
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresEXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresShivananda Roy
 
Module 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxModule 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxChinnuNinan
 
selfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptxselfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptxARUNKUMARC39
 
Slip form Construction Technology
Slip form Construction TechnologySlip form Construction Technology
Slip form Construction TechnologyDarshit
 
self-compacting concrete
self-compacting concrete self-compacting concrete
self-compacting concrete Sreekutty S
 
Construction practices and quality control
Construction practices and quality controlConstruction practices and quality control
Construction practices and quality controlSIBENDU SURAJEET JENA
 
siddhant .construction field visit.pptx
siddhant .construction field visit.pptxsiddhant .construction field visit.pptx
siddhant .construction field visit.pptxSiddhantAshokSuryawa
 
Box Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxBox Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxcharantinku6799
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptVaibhavSoni742163
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptHarshKumarEname
 

Similar to RCC foundation methodology & process.pptx (20)

Construction of well foundation
Construction of well foundation Construction of well foundation
Construction of well foundation
 
Aim for quality in construction
Aim for quality in constructionAim for quality in construction
Aim for quality in construction
 
Building construction
Building constructionBuilding construction
Building construction
 
Dishant ppt
Dishant pptDishant ppt
Dishant ppt
 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
 
Work check list
Work check listWork check list
Work check list
 
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining StructuresEXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
EXCAVATION FOR FOUNDATION - Methods & Temporary Earth Retaining Structures
 
Module 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptxModule 1 - Jacking techniques.pptx
Module 1 - Jacking techniques.pptx
 
FOUNDATION
FOUNDATIONFOUNDATION
FOUNDATION
 
selfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptxselfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptx
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
Production of concrete
Production of concreteProduction of concrete
Production of concrete
 
Slip form Construction Technology
Slip form Construction TechnologySlip form Construction Technology
Slip form Construction Technology
 
self-compacting concrete
self-compacting concrete self-compacting concrete
self-compacting concrete
 
Construction practices and quality control
Construction practices and quality controlConstruction practices and quality control
Construction practices and quality control
 
siddhant .construction field visit.pptx
siddhant .construction field visit.pptxsiddhant .construction field visit.pptx
siddhant .construction field visit.pptx
 
Box Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxBox Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptx
 
Precast concrete
Precast concretePrecast concrete
Precast concrete
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).ppt
 
MODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).pptMODULE 4 Special Concrete (1).ppt
MODULE 4 Special Concrete (1).ppt
 

Recently uploaded

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 

Recently uploaded (20)

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 

RCC foundation methodology & process.pptx

  • 1. RCC FOUNDATION METHODOLOGY FOR CONSTRUCTION OF R.C.C FOUNDATION
  • 2. SURVEY & SETTING OUT • Survey department will establish baselines and benchmarks from which co- ordinates and elevations will be taken to set out the foundation works.
  • 4. EXCAVATION • Excavation will be executed in open cut to the size, slope and elevation as per drawing. • Excavation will be carried out with excavator and soil loaded into dumper and transported to stockpile area. • The final bottom level of foundation will be checked by survey team and surface will be trimmed as per the size and shape.
  • 5. PCC • Bottom of the excavation should be dry and tamped in uniform level before placing lean concrete blinding layer. • After inspection of the prepared foundation level, blinding concrete will be laid.
  • 6. PLACING OF REINFORCEMENT • Reinforcement shall be bent and fixed in position shown in the drawings. • Cover block shall be provided and required support for reinforcement will be ensured. • Spacing, Lab length and cover to the reinforcement shall be as per drawing. • The cover shall in no case be reduced by more than one third of the specified cover or 5 mm, whichever is less. • Any embedded items, fixtures etc., to be fixed as per drawing with proper support to avoid dislocation during concrete pouring. • Reinforcement shall be properly stored in firm, levelled ground at-least above 150mm from ground to avoid contact with water, oil, grease, slush/ mud which will reduce the bonding with concrete.
  • 8. FORM WORK • The formwork shall be designed and constructed to the shapes, lines and dimensions shown on the drawings. All forms shall be sufficiently watertight to prevent leakage of mortar. • Formwork shall be aligned vertically and horizontally with line and level as per drawing. • Rigid support to be ensured to withstand load during pouring of concrete. • Formwork interior surface shall be properly lubricated by oil for ease for removal and good surface finish. • Damaged formwork shall not be used for shuttering works. • Proper working platform to be provided for safe moving of manpower for consolidation of concrete. • Formwork shall be removed in such a manner as would not cause any shock or vibration that would damage the concrete.
  • 11. PLACING OF CONCRETE • Before placing the concrete in trenches or on sub-grade or sub base, the sub-grade/ sub base shall be cleaned of all injurious or foreign matter, watered and well consolidated, if necessary. • The concrete shall be deposited as nearly as possible in its final position to avoid re- handling. • The concrete shall be placed and compacted before setting commences and should not be subsequently disturbed. • Methods of placing should be such as to prevent segregation. • Care shall be taken to avoid displacement of reinforcement or movement of formwork during placing. • Concrete shall not be allowed to free fall of height more than 1.5m to prevent segregation.
  • 12. CONSOLIDATION OF CONCRETE • Concrete shall be placed in a layers and each layer shall be thoroughly compacted and fully worked around the reinforcement, around embedded fixtures and into the corners of the formwork. • The concrete shall be consolidated by means of internal vibrators vertically into it. • Vibrator shall not be moved laterally to spread the concrete. Shovel/ spade shall be used to move the concrete from one place to other. •
  • 15. POST CONCRETE FINISH • Immediately after stripping the formwork, all concrete shall be carefully inspected for any defective work and defects either removed or made good before the concrete has thoroughly hardened.
  • 17. CURING OF CONCRETE • Exposed surfaces of concrete shall be kept continuously in a damp or wet condition by covering with layer of sacking, canvas, Hessian or similar materials or a layer of sand or by ponding for at least seven days from the date of placing of concrete. • Approved curing compounds may be used in lieu of moist curing. • Such compounds shall be applied to all exposed surfaces of the concrete as soon as possible after the concrete has set.
  • 19. BACKFILLING • Backfilling will be carried out upto top of the foundation level in loose layers not more than 250mm in thickness. • Suitable vibrator/ rollers will be used to achieve the 90-95% compaction as per MDD of the soil used in each layer. • Density test will be carried out for each layer to confirm the compaction requirement.