Introduction It is best to price that new project on a Fixed Fee or a Time and Materials basis?  Perhaps we should structure it on a Cost Plus basis, a Revenue Sharing model, or maybe Commission based?  What are the advantages of each to an agency?  From a client perspective, what are the pros and cons of each? There are many factors in determining which pricing methodology to use such as client preferences, agency preferences, campaign objectives, and scope details. This article describes each methodology, focusing on the pros and cons from both the client and agency point of views.
Pricing Methodologies Fixed Fee Client pays a flat rate that is agreed to in-advance based on a pre-determined scope.  This is also known as Flat Rate pricing. The price is based solely on the budgeted cost. The client pays the same amount, regardless of how much work it took the agency to complete the project. Client POV (point of view): The upside of a fixed fee contract is that the costs are locked in and cannot change without client approval. Also scope (that is, the work) that they are getting in-return is locked. The downside is that if the agreed scope changes, then the client can expect a Change Order for additional monies. Agency POV: The upside of a fixed fee arrangement is that if the agency can bring in the project under-budget, then the underage amount is added to the agency’s profitability.  However the downside is that if the project goes over budget, then the overage goes against the agency’s profitability (possibly resulting in a loss). It is crucial that the project is priced correctly, preferably using bottom-up pricing and from looking at historicals.  The Statement of Work needs to have enough details to protect the agency if the scope changes; it is important to include both what is and what is not included. Thus the agency is responsible for the monetary risk.
Pricing Methodologies Time and Materials (T&M) Client pays based on the actual time spent, usually based on an hourly, daily or weekly rate card. For example, if the agency works 10 hours, then the client pays them 10 hours. If they work 50 hours, then the client pays them for 50 hours, and so forth. Client POV: Open-ended Time and Materials contracts are quite risky to clients since there are no caps to the costs. To control this, it is important to include “do not exceed” caps, either on a project or monthly-basis. With a T&M structure, the clients should request weekly cost management reports that provide the estimated variance at compliance. This numbers tells if the project is projected to come in under- or over-budget, and is equal to the estimate at completion (which is equal to the actual costs incurred to-date plus the estimated to completion costs) compared against the budget at completion. Agency POV: For close-ended T&M projects, it is important that the “do not exceed” number is not too low, otherwise it becomes a losing proposition for the agency since with a Fixed Fee with a cap contract, the agency carries all of the risk but they have no upside. For T&M contracts, the rate card can be a source of many issues. The rate card needs to be developed from a cost-plus basis so that it reflects your resource costs (including benefits) + overhead + profit. There are many types of rate cards. The rate card may be role-based (each role, e.g., Art Director, has a specific rate), tiered (roles are bundled into groups by seniority, e.g., directors, and each group has a specific rate) or blended rates (a single flat rate that is applied to all resources, regardless of cost).  The rate card needs to be updated every year based on your real costs, or it can quickly become out-of-date. This can become a problem for legacy, multi-year clients who want to control (and frequently lower) their costs. It is recommended that you build into long-term contracts a clause that allows you to update your rate card based on certain parameters. Otherwise you will find yourself locked into rates from 1998.
Pricing Methodologies Cost Plus For cost plus projects, the fee is based your expected costs for the specific assigned resources. The cost is derived from taking the resource costs (the actual salaries) of your team + overhead + profit. Cost Plus pricing is usually based on a Fixed Fee but it can be structured into as a Time or Materials contract. Client POV: cost plus fees can be complex as there is no defined public rate card. The client should ensure that the agency is not pricing the project using senior resources (and senior rates) and swapping in junior staff without adjusting the rate card. This is solved by obtaining a list of specific resources assigned to the project, so that the agency cannot easily swap out resources later on with more junior staff. Agency POV: The cost plus relationship removes much of the rate card risk from pricing projects since the fees are based on the actual resource costs. As a comparison, T&M rate cards are based on an approximated resource cost since salaries are not the same across each title (e.g., even though Art Directors all share the same title, they are paid different salaries). The downside is that the cost plus rate card requires a much greater level of security and it needs to be kept confidential since the rate card can be used to calculate actual salaries. This makes tracking actual costs more difficult. It is also important to develop a cohesive strategy for how your organization will determine cost plus pricing so that there is consistency. For example, you need to ensure that you have standard overhead percentages and that your profitability targets deals with variables such as using full time versus freelance staff.
Pricing Methodologies Revenue Sharing The Revenue Sharing model is that the agency is paid based on the brand’s actual revenue. While it may seem simpler, it is actually much more difficult to implement. Client POV: the client needs to ensure that the agency is working across all of the client’s brands as driven by the client, and not just the most profitability ones. Also the contract terms should be structured so that the agency is compensated based on campaign results, and not just the brand’s pulling power especially since a well-known brand will generate a certain amount of revenue, regardless of any campaigns that are in-market. Agency POV: Sales can take a hit for a number of reasons, regardless of how effective a campaign is, which can have severe revenue impacts. For example, there could be a recession that kills the economy, production issues that limit inventory and subsequently sales, recalls, and bad press (e.g., Toyota’s pedal acceleration issues from November 2009 – July 2010). Also agencies will tend to avoid unproven mediums or those where the ROI is hard to measure. This can limit the brand’s exposure to newer forms of advertising such as Mobile, Facebook and Twitter.
Pricing Methodologies Commission Based (Percentage of Ad Spend) The percentage of ad spend pricing is a commission model where the agency is compensated based on the total ad spend. The range varies slightly, typically from 12-15%. Client POV: Commission based pricing controls costs and is very similar to the fix fee structure. The downside is that the client needs to ensure that the campaigns are effective as it can be too easy for the agencies to minimize their spend and under-deliver. The agency may not put their “A” team on your campaign. This is because the agency fees are limited, which means that budgets are constrained, as opposed to a bottom-up costing approach where you develop costs based on expected work. Commission based pricing does not work with newer forms of advertising where the ad spend is very small (or non-existent) but the cost to develop and maintain the campaign can be expensive (e.g., Facebook applications). Agency POV: since the fees are capped, it can be difficult meeting the campaign objectives within the price range. This works best for the “bread and butter” accounts that are not pushing the creative edge. The agency will also look for ways to be as economical as possible. It may mean developing fewer concepts, or re-using executions from previous campaigns.
What about retainers? Retainers are the holy-grail for agencies.  Most agencies strive for long-term retainers where the revenue is projectable over a long period (the longer, the better). This is the dream of any COO. Retainers bring financial stability and everything that comes with that including greater independence from holding companies, ability to hire, ability to free up money for training, parties and perks, ability to win awards, and ability to attract the best people and other clients. The opposite of a retainer are small, stand-alone projects, each of which has to be pitched and won. This can be expensive, time consuming, and is hard to predict. To clients, the main benefit that retainers provide is preferential pricing and consistent staffing on their accounts. When structuring the retainer, it needs to include provisions for how to reconcile hours, the frequency of reconciliations, and if there are underages or overages, how will those be dealt with (e.g., do you rollover underages and can be overages be billed?). All of the pricing methodologies mentioned earlier can be structured under a retainer.
Feedback Would love to hear about what works and more importantly, what does not work for you. For more articles like this, visit peopleprocessandprofit.com All rights reserved © 2010 by Barry Goldberg

More Related Content

What's hot

Pricing Strategies
Pricing StrategiesPricing Strategies
Pricing Strategiespilgrry
 
Pricing techniques for profit maximization
Pricing techniques for profit maximizationPricing techniques for profit maximization
Pricing techniques for profit maximizationskillsdeveloper
 
Marketing Chapter 21
Marketing Chapter 21Marketing Chapter 21
Marketing Chapter 21WanBK Leo
 
Cost plus and Incremental pricing method
Cost plus and Incremental pricing  methodCost plus and Incremental pricing  method
Cost plus and Incremental pricing methodIndra Prasad Pyakurel
 
Marketing management an asian perspective- pricing strategy-doan
Marketing management an asian perspective- pricing strategy-doanMarketing management an asian perspective- pricing strategy-doan
Marketing management an asian perspective- pricing strategy-doanTa Khai
 
Pricing method
Pricing methodPricing method
Pricing methodapurv1993
 
Pricing vs quality strategy
Pricing vs quality strategyPricing vs quality strategy
Pricing vs quality strategyPavankumar H K
 
Effective Pricing Strategies for eCommerce
Effective Pricing Strategies for eCommerceEffective Pricing Strategies for eCommerce
Effective Pricing Strategies for eCommerceeTailing India
 
Price Adaptation-Geographical pricing PPT
Price Adaptation-Geographical pricing PPTPrice Adaptation-Geographical pricing PPT
Price Adaptation-Geographical pricing PPTSuvadeep Chatterjee
 
Geographical pricing strategy
Geographical pricing strategyGeographical pricing strategy
Geographical pricing strategyPavankumar H K
 
pricing theory and procedure, pricing policies and practices
pricing theory and procedure, pricing policies and practicespricing theory and procedure, pricing policies and practices
pricing theory and procedure, pricing policies and practicesupamadas
 

What's hot (20)

Pricing methods
Pricing methodsPricing methods
Pricing methods
 
Pricing Strategies
Pricing StrategiesPricing Strategies
Pricing Strategies
 
Pricing techniques for profit maximization
Pricing techniques for profit maximizationPricing techniques for profit maximization
Pricing techniques for profit maximization
 
Pricing Strategies
Pricing StrategiesPricing Strategies
Pricing Strategies
 
Marketing Chapter 21
Marketing Chapter 21Marketing Chapter 21
Marketing Chapter 21
 
Cost plus and Incremental pricing method
Cost plus and Incremental pricing  methodCost plus and Incremental pricing  method
Cost plus and Incremental pricing method
 
Pricing
PricingPricing
Pricing
 
Marketing management an asian perspective- pricing strategy-doan
Marketing management an asian perspective- pricing strategy-doanMarketing management an asian perspective- pricing strategy-doan
Marketing management an asian perspective- pricing strategy-doan
 
Pricing method
Pricing methodPricing method
Pricing method
 
Pricing vs quality strategy
Pricing vs quality strategyPricing vs quality strategy
Pricing vs quality strategy
 
Pricing policy
Pricing policyPricing policy
Pricing policy
 
Effective Pricing Strategies for eCommerce
Effective Pricing Strategies for eCommerceEffective Pricing Strategies for eCommerce
Effective Pricing Strategies for eCommerce
 
Price Adaptation-Geographical pricing PPT
Price Adaptation-Geographical pricing PPTPrice Adaptation-Geographical pricing PPT
Price Adaptation-Geographical pricing PPT
 
Pricing techniques
Pricing techniquesPricing techniques
Pricing techniques
 
Pricing practices
Pricing practicesPricing practices
Pricing practices
 
Pricing strategies
Pricing strategiesPricing strategies
Pricing strategies
 
Pricing decision
Pricing decisionPricing decision
Pricing decision
 
Geographical pricing strategy
Geographical pricing strategyGeographical pricing strategy
Geographical pricing strategy
 
pricing theory and procedure, pricing policies and practices
pricing theory and procedure, pricing policies and practicespricing theory and procedure, pricing policies and practices
pricing theory and procedure, pricing policies and practices
 
Pricing strategies
Pricing strategiesPricing strategies
Pricing strategies
 

Viewers also liked

Should business move to the cloud
Should business move to  the cloud Should business move to  the cloud
Should business move to the cloud Zulkifflee Sofee
 
Pricing methods..
Pricing methods..Pricing methods..
Pricing methods..Sujith Nair
 
Case Studies (Questions and Answers)
Case Studies (Questions and Answers)Case Studies (Questions and Answers)
Case Studies (Questions and Answers)113068
 
T19 performance testing effort - estimation or guesstimation revised
T19   performance testing effort - estimation or guesstimation revisedT19   performance testing effort - estimation or guesstimation revised
T19 performance testing effort - estimation or guesstimation revisedTEST Huddle
 
How to Create Your Own Knowledge Base
How to Create Your Own Knowledge BaseHow to Create Your Own Knowledge Base
How to Create Your Own Knowledge BaseEllyssa Kroski
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & AbandonmentStatoil
 
Video camera basic functions... shot types ..aspect ratio
Video camera basic functions... shot types ..aspect ratioVideo camera basic functions... shot types ..aspect ratio
Video camera basic functions... shot types ..aspect ratioPTV
 
Introduction to Cassandra: Replication and Consistency
Introduction to Cassandra: Replication and ConsistencyIntroduction to Cassandra: Replication and Consistency
Introduction to Cassandra: Replication and ConsistencyBenjamin Black
 
Strengths, weaknesses, opportunities and threats
Strengths, weaknesses, opportunities and threatsStrengths, weaknesses, opportunities and threats
Strengths, weaknesses, opportunities and threatsweshall217
 
PCI Compliance for Dummies
PCI Compliance for DummiesPCI Compliance for Dummies
PCI Compliance for DummiesLiberteks
 
Should Businesses Move to the Cloud
Should Businesses Move to the CloudShould Businesses Move to the Cloud
Should Businesses Move to the Cloudnhainisaini
 
Production and operations managment notes
Production and operations managment notesProduction and operations managment notes
Production and operations managment notesWasim Arshad
 
Internet architecture
Internet architectureInternet architecture
Internet architectureNaman Rastogi
 
Persuasive Speech Presentation (completed)
Persuasive Speech Presentation (completed)Persuasive Speech Presentation (completed)
Persuasive Speech Presentation (completed)Nicholas Tan
 
Compensation Management
Compensation ManagementCompensation Management
Compensation Managementdwnload
 
Exponential Organizations - Why new organizations are 10x better, faster and ...
Exponential Organizations - Why new organizations are 10x better, faster and ...Exponential Organizations - Why new organizations are 10x better, faster and ...
Exponential Organizations - Why new organizations are 10x better, faster and ...Yuri van Geest
 

Viewers also liked (20)

Should business move to the cloud
Should business move to  the cloud Should business move to  the cloud
Should business move to the cloud
 
Pricing methods..
Pricing methods..Pricing methods..
Pricing methods..
 
Case Studies (Questions and Answers)
Case Studies (Questions and Answers)Case Studies (Questions and Answers)
Case Studies (Questions and Answers)
 
T19 performance testing effort - estimation or guesstimation revised
T19   performance testing effort - estimation or guesstimation revisedT19   performance testing effort - estimation or guesstimation revised
T19 performance testing effort - estimation or guesstimation revised
 
Review questions
Review questionsReview questions
Review questions
 
How to Create Your Own Knowledge Base
How to Create Your Own Knowledge BaseHow to Create Your Own Knowledge Base
How to Create Your Own Knowledge Base
 
Plug & Abandonment
Plug & AbandonmentPlug & Abandonment
Plug & Abandonment
 
Media Strategy: BMW
Media Strategy: BMWMedia Strategy: BMW
Media Strategy: BMW
 
Video camera basic functions... shot types ..aspect ratio
Video camera basic functions... shot types ..aspect ratioVideo camera basic functions... shot types ..aspect ratio
Video camera basic functions... shot types ..aspect ratio
 
Pcmm presentation
Pcmm presentationPcmm presentation
Pcmm presentation
 
Introduction to Cassandra: Replication and Consistency
Introduction to Cassandra: Replication and ConsistencyIntroduction to Cassandra: Replication and Consistency
Introduction to Cassandra: Replication and Consistency
 
Strengths, weaknesses, opportunities and threats
Strengths, weaknesses, opportunities and threatsStrengths, weaknesses, opportunities and threats
Strengths, weaknesses, opportunities and threats
 
PCI Compliance for Dummies
PCI Compliance for DummiesPCI Compliance for Dummies
PCI Compliance for Dummies
 
Should Businesses Move to the Cloud
Should Businesses Move to the CloudShould Businesses Move to the Cloud
Should Businesses Move to the Cloud
 
Production and operations managment notes
Production and operations managment notesProduction and operations managment notes
Production and operations managment notes
 
CVS case
CVS caseCVS case
CVS case
 
Internet architecture
Internet architectureInternet architecture
Internet architecture
 
Persuasive Speech Presentation (completed)
Persuasive Speech Presentation (completed)Persuasive Speech Presentation (completed)
Persuasive Speech Presentation (completed)
 
Compensation Management
Compensation ManagementCompensation Management
Compensation Management
 
Exponential Organizations - Why new organizations are 10x better, faster and ...
Exponential Organizations - Why new organizations are 10x better, faster and ...Exponential Organizations - Why new organizations are 10x better, faster and ...
Exponential Organizations - Why new organizations are 10x better, faster and ...
 

Similar to Pricing methodology 101

Three simple but effective automatic enrolment pricing plans
Three simple but effective automatic enrolment pricing plansThree simple but effective automatic enrolment pricing plans
Three simple but effective automatic enrolment pricing plansRachel Hynes
 
How to help gear your company towards cutting the right costs
How to help gear your company towards cutting the right costsHow to help gear your company towards cutting the right costs
How to help gear your company towards cutting the right costswilliamsjohnseoexperts
 
Warc briefing agency_remuneration
Warc briefing agency_remunerationWarc briefing agency_remuneration
Warc briefing agency_remunerationAdCMO
 
Pricing and-estimating-masterclass-
Pricing and-estimating-masterclass-Pricing and-estimating-masterclass-
Pricing and-estimating-masterclass-nirosuganya
 
Client Relationship implemntation practice ppt.ppt
Client Relationship implemntation practice ppt.pptClient Relationship implemntation practice ppt.ppt
Client Relationship implemntation practice ppt.pptetebarkhmichale
 
SMU MBA Solved Assignment MK0015
SMU MBA Solved Assignment MK0015SMU MBA Solved Assignment MK0015
SMU MBA Solved Assignment MK0015Revlon
 
Cost cutting measures
Cost cutting measuresCost cutting measures
Cost cutting measuresVarun Sharma
 
How to create a SaaS sales compensation plan.
How to create a SaaS sales compensation plan.How to create a SaaS sales compensation plan.
How to create a SaaS sales compensation plan.Married2Growth
 
Advertising communication and Agency
Advertising communication and AgencyAdvertising communication and Agency
Advertising communication and Agencysudeeplimaye
 
Pricing Seminar Ln Aug 5th 2009 Linked In Version
Pricing Seminar Ln Aug 5th 2009 Linked In VersionPricing Seminar Ln Aug 5th 2009 Linked In Version
Pricing Seminar Ln Aug 5th 2009 Linked In VersionRobert_Sawhney
 
[eBook for Job Sites] Expanding your Job Site to Include a Pay-for-Performanc...
[eBook for Job Sites] Expanding your Job Site to Include a Pay-for-Performanc...[eBook for Job Sites] Expanding your Job Site to Include a Pay-for-Performanc...
[eBook for Job Sites] Expanding your Job Site to Include a Pay-for-Performanc...Appcast
 
Paying the ad_agency
Paying the ad_agencyPaying the ad_agency
Paying the ad_agencyAdCMO
 
Pragmatic Cost Optimisation
Pragmatic Cost OptimisationPragmatic Cost Optimisation
Pragmatic Cost OptimisationGareth Stone
 
Waterfield MMCi Practicum - DHTS Financial Model Transition
Waterfield MMCi Practicum - DHTS Financial Model TransitionWaterfield MMCi Practicum - DHTS Financial Model Transition
Waterfield MMCi Practicum - DHTS Financial Model TransitionJustin Waterfield
 
Ammad awan glasgow - role of financial management in the efficiency of financ...
Ammad awan glasgow - role of financial management in the efficiency of financ...Ammad awan glasgow - role of financial management in the efficiency of financ...
Ammad awan glasgow - role of financial management in the efficiency of financ...AmmadAwanGlasgow
 

Similar to Pricing methodology 101 (20)

The do’s and don’ts of developing your auto enrolment pricing strategy
The do’s and don’ts of developing your auto enrolment pricing strategyThe do’s and don’ts of developing your auto enrolment pricing strategy
The do’s and don’ts of developing your auto enrolment pricing strategy
 
Three simple but effective automatic enrolment pricing plans
Three simple but effective automatic enrolment pricing plansThree simple but effective automatic enrolment pricing plans
Three simple but effective automatic enrolment pricing plans
 
How to help gear your company towards cutting the right costs
How to help gear your company towards cutting the right costsHow to help gear your company towards cutting the right costs
How to help gear your company towards cutting the right costs
 
Warc briefing agency_remuneration
Warc briefing agency_remunerationWarc briefing agency_remuneration
Warc briefing agency_remuneration
 
Pricing and-estimating-masterclass-
Pricing and-estimating-masterclass-Pricing and-estimating-masterclass-
Pricing and-estimating-masterclass-
 
Where to build cost model
Where to build cost modelWhere to build cost model
Where to build cost model
 
Client Relationship implemntation practice ppt.ppt
Client Relationship implemntation practice ppt.pptClient Relationship implemntation practice ppt.ppt
Client Relationship implemntation practice ppt.ppt
 
SMU MBA Solved Assignment MK0015
SMU MBA Solved Assignment MK0015SMU MBA Solved Assignment MK0015
SMU MBA Solved Assignment MK0015
 
Cost cutting measures
Cost cutting measuresCost cutting measures
Cost cutting measures
 
How to create a SaaS sales compensation plan.
How to create a SaaS sales compensation plan.How to create a SaaS sales compensation plan.
How to create a SaaS sales compensation plan.
 
Advertising communication and Agency
Advertising communication and AgencyAdvertising communication and Agency
Advertising communication and Agency
 
Pricing Seminar Ln Aug 5th 2009 Linked In Version
Pricing Seminar Ln Aug 5th 2009 Linked In VersionPricing Seminar Ln Aug 5th 2009 Linked In Version
Pricing Seminar Ln Aug 5th 2009 Linked In Version
 
[eBook for Job Sites] Expanding your Job Site to Include a Pay-for-Performanc...
[eBook for Job Sites] Expanding your Job Site to Include a Pay-for-Performanc...[eBook for Job Sites] Expanding your Job Site to Include a Pay-for-Performanc...
[eBook for Job Sites] Expanding your Job Site to Include a Pay-for-Performanc...
 
Paying the ad_agency
Paying the ad_agencyPaying the ad_agency
Paying the ad_agency
 
BBA
BBABBA
BBA
 
Pragmatic Cost Optimisation
Pragmatic Cost OptimisationPragmatic Cost Optimisation
Pragmatic Cost Optimisation
 
Peer growth.pdf
Peer growth.pdfPeer growth.pdf
Peer growth.pdf
 
Waterfield MMCi Practicum - DHTS Financial Model Transition
Waterfield MMCi Practicum - DHTS Financial Model TransitionWaterfield MMCi Practicum - DHTS Financial Model Transition
Waterfield MMCi Practicum - DHTS Financial Model Transition
 
Pereira diamond benefits management model - Q&A
Pereira diamond benefits management model - Q&APereira diamond benefits management model - Q&A
Pereira diamond benefits management model - Q&A
 
Ammad awan glasgow - role of financial management in the efficiency of financ...
Ammad awan glasgow - role of financial management in the efficiency of financ...Ammad awan glasgow - role of financial management in the efficiency of financ...
Ammad awan glasgow - role of financial management in the efficiency of financ...
 

Recently uploaded

Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 

Recently uploaded (20)

Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 

Pricing methodology 101

  • 1. Pricing Methodologies 101: Pricing projects profitably
  • 2. Introduction It is best to price that new project on a Fixed Fee or a Time and Materials basis? Perhaps we should structure it on a Cost Plus basis, a Revenue Sharing model, or maybe Commission based? What are the advantages of each to an agency? From a client perspective, what are the pros and cons of each? There are many factors in determining which pricing methodology to use such as client preferences, agency preferences, campaign objectives, and scope details. This article describes each methodology, focusing on the pros and cons from both the client and agency point of views.
  • 3. Pricing Methodologies Fixed Fee Client pays a flat rate that is agreed to in-advance based on a pre-determined scope.  This is also known as Flat Rate pricing. The price is based solely on the budgeted cost. The client pays the same amount, regardless of how much work it took the agency to complete the project. Client POV (point of view): The upside of a fixed fee contract is that the costs are locked in and cannot change without client approval. Also scope (that is, the work) that they are getting in-return is locked. The downside is that if the agreed scope changes, then the client can expect a Change Order for additional monies. Agency POV: The upside of a fixed fee arrangement is that if the agency can bring in the project under-budget, then the underage amount is added to the agency’s profitability.  However the downside is that if the project goes over budget, then the overage goes against the agency’s profitability (possibly resulting in a loss). It is crucial that the project is priced correctly, preferably using bottom-up pricing and from looking at historicals.  The Statement of Work needs to have enough details to protect the agency if the scope changes; it is important to include both what is and what is not included. Thus the agency is responsible for the monetary risk.
  • 4. Pricing Methodologies Time and Materials (T&M) Client pays based on the actual time spent, usually based on an hourly, daily or weekly rate card. For example, if the agency works 10 hours, then the client pays them 10 hours. If they work 50 hours, then the client pays them for 50 hours, and so forth. Client POV: Open-ended Time and Materials contracts are quite risky to clients since there are no caps to the costs. To control this, it is important to include “do not exceed” caps, either on a project or monthly-basis. With a T&M structure, the clients should request weekly cost management reports that provide the estimated variance at compliance. This numbers tells if the project is projected to come in under- or over-budget, and is equal to the estimate at completion (which is equal to the actual costs incurred to-date plus the estimated to completion costs) compared against the budget at completion. Agency POV: For close-ended T&M projects, it is important that the “do not exceed” number is not too low, otherwise it becomes a losing proposition for the agency since with a Fixed Fee with a cap contract, the agency carries all of the risk but they have no upside. For T&M contracts, the rate card can be a source of many issues. The rate card needs to be developed from a cost-plus basis so that it reflects your resource costs (including benefits) + overhead + profit. There are many types of rate cards. The rate card may be role-based (each role, e.g., Art Director, has a specific rate), tiered (roles are bundled into groups by seniority, e.g., directors, and each group has a specific rate) or blended rates (a single flat rate that is applied to all resources, regardless of cost).  The rate card needs to be updated every year based on your real costs, or it can quickly become out-of-date. This can become a problem for legacy, multi-year clients who want to control (and frequently lower) their costs. It is recommended that you build into long-term contracts a clause that allows you to update your rate card based on certain parameters. Otherwise you will find yourself locked into rates from 1998.
  • 5. Pricing Methodologies Cost Plus For cost plus projects, the fee is based your expected costs for the specific assigned resources. The cost is derived from taking the resource costs (the actual salaries) of your team + overhead + profit. Cost Plus pricing is usually based on a Fixed Fee but it can be structured into as a Time or Materials contract. Client POV: cost plus fees can be complex as there is no defined public rate card. The client should ensure that the agency is not pricing the project using senior resources (and senior rates) and swapping in junior staff without adjusting the rate card. This is solved by obtaining a list of specific resources assigned to the project, so that the agency cannot easily swap out resources later on with more junior staff. Agency POV: The cost plus relationship removes much of the rate card risk from pricing projects since the fees are based on the actual resource costs. As a comparison, T&M rate cards are based on an approximated resource cost since salaries are not the same across each title (e.g., even though Art Directors all share the same title, they are paid different salaries). The downside is that the cost plus rate card requires a much greater level of security and it needs to be kept confidential since the rate card can be used to calculate actual salaries. This makes tracking actual costs more difficult. It is also important to develop a cohesive strategy for how your organization will determine cost plus pricing so that there is consistency. For example, you need to ensure that you have standard overhead percentages and that your profitability targets deals with variables such as using full time versus freelance staff.
  • 6. Pricing Methodologies Revenue Sharing The Revenue Sharing model is that the agency is paid based on the brand’s actual revenue. While it may seem simpler, it is actually much more difficult to implement. Client POV: the client needs to ensure that the agency is working across all of the client’s brands as driven by the client, and not just the most profitability ones. Also the contract terms should be structured so that the agency is compensated based on campaign results, and not just the brand’s pulling power especially since a well-known brand will generate a certain amount of revenue, regardless of any campaigns that are in-market. Agency POV: Sales can take a hit for a number of reasons, regardless of how effective a campaign is, which can have severe revenue impacts. For example, there could be a recession that kills the economy, production issues that limit inventory and subsequently sales, recalls, and bad press (e.g., Toyota’s pedal acceleration issues from November 2009 – July 2010). Also agencies will tend to avoid unproven mediums or those where the ROI is hard to measure. This can limit the brand’s exposure to newer forms of advertising such as Mobile, Facebook and Twitter.
  • 7. Pricing Methodologies Commission Based (Percentage of Ad Spend) The percentage of ad spend pricing is a commission model where the agency is compensated based on the total ad spend. The range varies slightly, typically from 12-15%. Client POV: Commission based pricing controls costs and is very similar to the fix fee structure. The downside is that the client needs to ensure that the campaigns are effective as it can be too easy for the agencies to minimize their spend and under-deliver. The agency may not put their “A” team on your campaign. This is because the agency fees are limited, which means that budgets are constrained, as opposed to a bottom-up costing approach where you develop costs based on expected work. Commission based pricing does not work with newer forms of advertising where the ad spend is very small (or non-existent) but the cost to develop and maintain the campaign can be expensive (e.g., Facebook applications). Agency POV: since the fees are capped, it can be difficult meeting the campaign objectives within the price range. This works best for the “bread and butter” accounts that are not pushing the creative edge. The agency will also look for ways to be as economical as possible. It may mean developing fewer concepts, or re-using executions from previous campaigns.
  • 8. What about retainers? Retainers are the holy-grail for agencies. Most agencies strive for long-term retainers where the revenue is projectable over a long period (the longer, the better). This is the dream of any COO. Retainers bring financial stability and everything that comes with that including greater independence from holding companies, ability to hire, ability to free up money for training, parties and perks, ability to win awards, and ability to attract the best people and other clients. The opposite of a retainer are small, stand-alone projects, each of which has to be pitched and won. This can be expensive, time consuming, and is hard to predict. To clients, the main benefit that retainers provide is preferential pricing and consistent staffing on their accounts. When structuring the retainer, it needs to include provisions for how to reconcile hours, the frequency of reconciliations, and if there are underages or overages, how will those be dealt with (e.g., do you rollover underages and can be overages be billed?). All of the pricing methodologies mentioned earlier can be structured under a retainer.
  • 9. Feedback Would love to hear about what works and more importantly, what does not work for you. For more articles like this, visit peopleprocessandprofit.com All rights reserved © 2010 by Barry Goldberg