EXCAVATION & TRANSPORTATION OF HEAVILY OIL
CONTAMINATED SOIL TO LANDFILL IN NORTH KUWAIT
AREA
Alghanim International
Fouad Alghanim & Sons Group Of Companies
Salah Bakry
Lead GIS Specialist
Project Activities Summery
and Contaminated Soil
Volume Calculation Methods
Excavation and Transportation of Heavily Oil Contaminated Soil to Landfill in North Kuwait Area
Overall Project Process Chart
UXO
BAC
Temporary Facility &
Gatch roads
Anomaly Avoidance
(FEIA, SSC, GT, TS)
Mechanical Excavation,
Sifting & Screening
(CSP)
UXO Geophysical Survey
(DOL, WOL, New Asphalt Rd,
Tarcrete, Access Gatch Rd, Coastal
Trench-Remediation areas)
Landmine Clearance
(Mechanical Demining)
(Coastal Trench – Minefield
Access Areas
Coastal Oil Deposits)
Ground Proofing (Mechanical
Technical Survey)
(Coastal Trench – Trench line & Oil
Spill Work areas)
Delineation of present boundary of
contaminated areas
Site Ground-Truthing
Satellite Image analysis & Field
Verification
Manual Slit Trenching
(1.0 m W * 1.5 m D)
Above & Underground utilities
GroundTruthing/Pre
-condition Survey
Total area of contaminated feature Depth of contaminated soil
Volume of Contaminated Soil
UXO
Removal of
Scrap
(From area to be
excavated)
Excavation & Transportation
Disposal of
Scrap
(Collect &
dispose)
Trial Pit
Excavation
(1m w * 1.5m L
* 2.5m D)
(Understand the
contamination
profile in the
field)
Field Density Testing
Density of soil for different
features (Kg/m3
)
Excavation & Loading
(Excavate the contaminated
soil)
(To mixing area –
WOL, WHP)
(To Landfill area)
Transportation Weighbridge /
Barcode Screening
Weighbridge /
Barcode Screening
Compaction & Testing
(90-95% of the maximum density of
the modified proctor)
Compliance Monitoring
(TPH < 5000 mg/Kg
Restoration / Backfilling
Weight of Soil
(Ton)
Volume of Soil (m3
)
Features
Oil Lakes (Dry & Wet)
Contaminated Soil Piles
Tarcrete
Coastal trench
Coastal Oil Deposits
Wellhead Pits
FEIA
QRA
PHSER # 3
PHSER # 4
PHSER # 5
HSE Studies Topographic Survey
Topo survey
Ground Elevation, Road/Pipe
crossings, existing utilities/facilities,
vegetation
Pre-Site Soil Characterisation
Sample collection & Analysis
Sample collection, analysis & soil
logging & analysis – Profile of
contamination, Thickness of
contamination layers, and depth of
contamination
Field Density Testing
Estimate soil volume before excavation
- Prepare Data to use it for volume Estimation
Excavation Zones
Boundary
Topographic
Surface Level
Contaminated Soil
Depth
Excavation Zones
Boundary
Topographic
Surface Level
Contaminated Soil
Depth
Software
- ArcGIS 10.1
Submission
- Report
- Shapefile for Excavation
zones attached with report
Software
- AutoCAD & Surfer
Submission
- Report
- Drawings for NGL & Contour
- Drawing for Utilities
Software :
- Surfer & ArcGIS
Submission:
- Report
- Shapefile for sampling
Locations
- Surfer Grids for Uber surface
and lower Surface
- The final inputs for volume calculation :
L1
L2
L3
Volume Calculation for Dry Lake ,example Zone 3 Area 1D
Methods 1 Using Upper and Lower Grids
1. Step 1 :
• To clip sampling data inside or close to excavation zone boundary
Sampling points and CIC Sampling points using ArcGIS
- Step 2 :
• To open zone3 Shapefile in Surfer ( to get fixed extent coordinates )
-Map
-New
-Base Map
- Step3:
• Save shapefile zone as BLN file in surfer to use it to Blanked (Clip)
other grids.
- File
-Export
-BLN File
- Step4:
• Create Upper surface Grid for Elevation from Topographic Survey
Level Spot points
- Grid
- Data
- Open NGL Excel file
- Select X,Y,Z
- Gridding Method
Kriging
- Fix Grid line
Geometry for Zone3
Extent
- Spacing 1X1 m
- Step4:
• Output grid for Upper surface
- Step5:
• Blanked ( clip ) Upper Surface Grid using Zone 3 BLN file
- Grid
- Blank
- Select grid to
blank
- Select BLN
- Step5:
• Output Upper Grid Blanked
- Step6:
• Create Grid from Lower Surface from:
Upper Surface Elevation – Contamination Depth = Lower Surface Elevation
- Grid
- Excel Cutoff Data
- Select Zone3
-Use X,Y, Contamination Level
- Use Same geometry and
spacing that used for Upper
surface
- Step7:
• planked ( clip ) Lower Grid using Zone 3 BLN file
- Grid
- Blank
- Select grid to
blank
- Select BLN
- Step7:
• Output Lower Grid Blanked
- Step8:
• Estimated Volume :
- Grid
- volume
- Select Upper
Surface
- Select Lower Surface
- Step8:
• Output Volume report
• Volume (Trapezoidal Rule) = 39854.94 m³
• Step1: Same methods
• Step2: Same methods
• Step3: Same methods
• Step 4: to create only 1 Grid from
(cutoff value selected by
environmental Team from Sampling
log)
Volume Calculation for Dry Lake ,example Zone 3 Area 1D
Methods 2 Using one grid created from Cutoff Value
Step 4: Output Grid
Excavation Depth
As total Contamination
value , not Elevation
value
- Step5:
• Calculate Volume : 38357
- Grid
- Volume
- Select upper surface from
Cutoff Grid
- Constant value is 0
- Grid
- Volume
- Step8:
• Output Volume report
• Volume (Trapezoidal Rule) = 38357.75 m³
Volume calculation for Contaminated Piles
• Export Topographic Survey data for Piles in excel file X,Y,Z
• Create surfer grid for each pile grid 5X5 or 1X1 m related to piles
boundary
• Create contour in surfer 0.1 m interval
• Show piles grid in 3D with contour
• Select contour line for base of pile
• Calculate volume from grid ( consider pile grid as Upper Surface and
base contour as constant Z value
• Pile Contour and 3D
- Base contour is 36.5
- So
- Grid
- Volume
- Piles grid is Upper surface
- Constant Z = 36.5

More Related Content

What's hot

L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionDon W. Lewis
 
Hydrology TEP Flood Mapping Quick Guide
Hydrology TEP Flood Mapping Quick GuideHydrology TEP Flood Mapping Quick Guide
Hydrology TEP Flood Mapping Quick GuideEmmanuel Mathot
 
Smart mobility homepage localization
Smart mobility homepage localizationSmart mobility homepage localization
Smart mobility homepage localizationhabbang
 
GEP Diapason services for differential interferograms generation
GEP Diapason services for differential interferograms generationGEP Diapason services for differential interferograms generation
GEP Diapason services for differential interferograms generationEmmanuel Mathot
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialVR M
 
Network analysis and Geocoding.
Network analysis and Geocoding.Network analysis and Geocoding.
Network analysis and Geocoding.Habiba28
 
Using HEC-RAS to assess flash floods risk in arid regions
Using HEC-RAS to assess flash floods risk in arid regionsUsing HEC-RAS to assess flash floods risk in arid regions
Using HEC-RAS to assess flash floods risk in arid regionsAhmed Saleh, Ph.D
 
Open Source Routing Machine - FOSS4G 2016 Bonn
Open Source Routing Machine - FOSS4G 2016 BonnOpen Source Routing Machine - FOSS4G 2016 Bonn
Open Source Routing Machine - FOSS4G 2016 BonnJohan
 
Uses of vehicle emissions remote sensing data for emission factor development
Uses of vehicle emissions remote sensing data for emission factor developmentUses of vehicle emissions remote sensing data for emission factor development
Uses of vehicle emissions remote sensing data for emission factor developmentIES / IAQM
 
Gis for Oilspill Response Model
Gis for Oilspill Response ModelGis for Oilspill Response Model
Gis for Oilspill Response ModelAndrew Zolnai
 
Dr Glyn Rhys-Tyler - Road vehicle exhaust emissions; 'an age of uncertainty' ...
Dr Glyn Rhys-Tyler - Road vehicle exhaust emissions; 'an age of uncertainty' ...Dr Glyn Rhys-Tyler - Road vehicle exhaust emissions; 'an age of uncertainty' ...
Dr Glyn Rhys-Tyler - Road vehicle exhaust emissions; 'an age of uncertainty' ...IES / IAQM
 
Dr James Tate - Better estimation of vehicle emissions for modelling - DMUG17
Dr James Tate - Better estimation of vehicle emissions for modelling - DMUG17Dr James Tate - Better estimation of vehicle emissions for modelling - DMUG17
Dr James Tate - Better estimation of vehicle emissions for modelling - DMUG17IES / IAQM
 
Using ArcMap’s Network Analyst to Model Emergency Service Response Routes Dur...
Using ArcMap’s Network Analyst to Model Emergency Service Response Routes Dur...Using ArcMap’s Network Analyst to Model Emergency Service Response Routes Dur...
Using ArcMap’s Network Analyst to Model Emergency Service Response Routes Dur...COGS Presentations
 
Why do I Need SURFsara Cloud Facility in My Research?
Why do I Need SURFsara Cloud Facility in My Research?Why do I Need SURFsara Cloud Facility in My Research?
Why do I Need SURFsara Cloud Facility in My Research?Ali Abbasi
 
State of OSRM - SOTM 2016
State of OSRM - SOTM 2016State of OSRM - SOTM 2016
State of OSRM - SOTM 2016Johan
 
GISImplementationInDesignWorkflows
GISImplementationInDesignWorkflowsGISImplementationInDesignWorkflows
GISImplementationInDesignWorkflowsZeev Somer
 

What's hot (20)

ajju final project
ajju final projectajju final project
ajju final project
 
Tanveer_Standard C.V_Out Side_2015
Tanveer_Standard C.V_Out Side_2015Tanveer_Standard C.V_Out Side_2015
Tanveer_Standard C.V_Out Side_2015
 
L1 Planning for Earthwork Construction
L1 Planning for Earthwork ConstructionL1 Planning for Earthwork Construction
L1 Planning for Earthwork Construction
 
Hydrology TEP Flood Mapping Quick Guide
Hydrology TEP Flood Mapping Quick GuideHydrology TEP Flood Mapping Quick Guide
Hydrology TEP Flood Mapping Quick Guide
 
Smart mobility homepage localization
Smart mobility homepage localizationSmart mobility homepage localization
Smart mobility homepage localization
 
GEP Diapason services for differential interferograms generation
GEP Diapason services for differential interferograms generationGEP Diapason services for differential interferograms generation
GEP Diapason services for differential interferograms generation
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - Tutorial
 
Network analysis and Geocoding.
Network analysis and Geocoding.Network analysis and Geocoding.
Network analysis and Geocoding.
 
Using HEC-RAS to assess flash floods risk in arid regions
Using HEC-RAS to assess flash floods risk in arid regionsUsing HEC-RAS to assess flash floods risk in arid regions
Using HEC-RAS to assess flash floods risk in arid regions
 
Open Source Routing Machine - FOSS4G 2016 Bonn
Open Source Routing Machine - FOSS4G 2016 BonnOpen Source Routing Machine - FOSS4G 2016 Bonn
Open Source Routing Machine - FOSS4G 2016 Bonn
 
Uses of vehicle emissions remote sensing data for emission factor development
Uses of vehicle emissions remote sensing data for emission factor developmentUses of vehicle emissions remote sensing data for emission factor development
Uses of vehicle emissions remote sensing data for emission factor development
 
Gis for Oilspill Response Model
Gis for Oilspill Response ModelGis for Oilspill Response Model
Gis for Oilspill Response Model
 
Dr Glyn Rhys-Tyler - Road vehicle exhaust emissions; 'an age of uncertainty' ...
Dr Glyn Rhys-Tyler - Road vehicle exhaust emissions; 'an age of uncertainty' ...Dr Glyn Rhys-Tyler - Road vehicle exhaust emissions; 'an age of uncertainty' ...
Dr Glyn Rhys-Tyler - Road vehicle exhaust emissions; 'an age of uncertainty' ...
 
The Analogues R-Package - Ramirez-Villegas
The Analogues R-Package - Ramirez-VillegasThe Analogues R-Package - Ramirez-Villegas
The Analogues R-Package - Ramirez-Villegas
 
Dr James Tate - Better estimation of vehicle emissions for modelling - DMUG17
Dr James Tate - Better estimation of vehicle emissions for modelling - DMUG17Dr James Tate - Better estimation of vehicle emissions for modelling - DMUG17
Dr James Tate - Better estimation of vehicle emissions for modelling - DMUG17
 
Using ArcMap’s Network Analyst to Model Emergency Service Response Routes Dur...
Using ArcMap’s Network Analyst to Model Emergency Service Response Routes Dur...Using ArcMap’s Network Analyst to Model Emergency Service Response Routes Dur...
Using ArcMap’s Network Analyst to Model Emergency Service Response Routes Dur...
 
Traffic light design
Traffic light designTraffic light design
Traffic light design
 
Why do I Need SURFsara Cloud Facility in My Research?
Why do I Need SURFsara Cloud Facility in My Research?Why do I Need SURFsara Cloud Facility in My Research?
Why do I Need SURFsara Cloud Facility in My Research?
 
State of OSRM - SOTM 2016
State of OSRM - SOTM 2016State of OSRM - SOTM 2016
State of OSRM - SOTM 2016
 
GISImplementationInDesignWorkflows
GISImplementationInDesignWorkflowsGISImplementationInDesignWorkflows
GISImplementationInDesignWorkflows
 

Similar to Contaminated Soil Volume calculation

Pillar 4 Information and Data
Pillar 4 Information and DataPillar 4 Information and Data
Pillar 4 Information and DataStankovic G
 
Chapter 4 earth work and quantities new
Chapter 4 earth work and quantities newChapter 4 earth work and quantities new
Chapter 4 earth work and quantities newBashaFayissa1
 
Petroleum lunch seminar 30.10.2014
Petroleum lunch seminar 30.10.2014Petroleum lunch seminar 30.10.2014
Petroleum lunch seminar 30.10.2014Geodata AS
 
Earthwork Volume Calculation Methods
Earthwork Volume Calculation MethodsEarthwork Volume Calculation Methods
Earthwork Volume Calculation Methodsriyasood003
 
Earthwork notes
Earthwork notesEarthwork notes
Earthwork notesAdilen Del
 
Global mapper tutorial Jimma University Ethiopia
Global mapper tutorial Jimma University EthiopiaGlobal mapper tutorial Jimma University Ethiopia
Global mapper tutorial Jimma University Ethiopiachala hailu
 
SImulating Past Flood Event using Nays 2D Flood
SImulating Past Flood Event using Nays 2D FloodSImulating Past Flood Event using Nays 2D Flood
SImulating Past Flood Event using Nays 2D FloodPutika Ashfar Khoiri
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaGlobal CCS Institute
 
Application of Remote Sensing in Civil Engineering
Application of Remote Sensing in Civil EngineeringApplication of Remote Sensing in Civil Engineering
Application of Remote Sensing in Civil EngineeringIEI GSC
 
FANDS-LLC /IGPE form and content of reports to clients
FANDS-LLC /IGPE  form and content of reports to clientsFANDS-LLC /IGPE  form and content of reports to clients
FANDS-LLC /IGPE form and content of reports to clientsFands-llc
 
Easter Desert Project
Easter Desert ProjectEaster Desert Project
Easter Desert ProjectIwl Pcu
 
ZEB1 for Mining - Webinar - Henno - 28 September 2015
ZEB1 for Mining - Webinar - Henno - 28 September 2015ZEB1 for Mining - Webinar - Henno - 28 September 2015
ZEB1 for Mining - Webinar - Henno - 28 September 2015Henno Morkel
 

Similar to Contaminated Soil Volume calculation (20)

Pillar 4 Information and Data
Pillar 4 Information and DataPillar 4 Information and Data
Pillar 4 Information and Data
 
Lecture three.pptx
Lecture three.pptxLecture three.pptx
Lecture three.pptx
 
Chapter 4 earth work and quantities new
Chapter 4 earth work and quantities newChapter 4 earth work and quantities new
Chapter 4 earth work and quantities new
 
Petroleum lunch seminar 30.10.2014
Petroleum lunch seminar 30.10.2014Petroleum lunch seminar 30.10.2014
Petroleum lunch seminar 30.10.2014
 
Presentation sayed
Presentation sayedPresentation sayed
Presentation sayed
 
WATERSHED ANALYSIS .pptx
WATERSHED ANALYSIS .pptxWATERSHED ANALYSIS .pptx
WATERSHED ANALYSIS .pptx
 
Earthwork Volume Calculation Methods
Earthwork Volume Calculation MethodsEarthwork Volume Calculation Methods
Earthwork Volume Calculation Methods
 
Gis
GisGis
Gis
 
Earthwork notes
Earthwork notesEarthwork notes
Earthwork notes
 
Global mapper tutorial Jimma University Ethiopia
Global mapper tutorial Jimma University EthiopiaGlobal mapper tutorial Jimma University Ethiopia
Global mapper tutorial Jimma University Ethiopia
 
‘ZEB1 For Mining’
‘ZEB1 For Mining’ ‘ZEB1 For Mining’
‘ZEB1 For Mining’
 
Well logging
Well loggingWell logging
Well logging
 
SImulating Past Flood Event using Nays 2D Flood
SImulating Past Flood Event using Nays 2D FloodSImulating Past Flood Event using Nays 2D Flood
SImulating Past Flood Event using Nays 2D Flood
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
 
Potentiel3.0 hydro
Potentiel3.0 hydroPotentiel3.0 hydro
Potentiel3.0 hydro
 
Application of Remote Sensing in Civil Engineering
Application of Remote Sensing in Civil EngineeringApplication of Remote Sensing in Civil Engineering
Application of Remote Sensing in Civil Engineering
 
FANDS-LLC /IGPE form and content of reports to clients
FANDS-LLC /IGPE  form and content of reports to clientsFANDS-LLC /IGPE  form and content of reports to clients
FANDS-LLC /IGPE form and content of reports to clients
 
Easter Desert Project
Easter Desert ProjectEaster Desert Project
Easter Desert Project
 
ZEB1 for Mining - Webinar - Henno - 28 September 2015
ZEB1 for Mining - Webinar - Henno - 28 September 2015ZEB1 for Mining - Webinar - Henno - 28 September 2015
ZEB1 for Mining - Webinar - Henno - 28 September 2015
 
Site grading.pptx
Site grading.pptxSite grading.pptx
Site grading.pptx
 

Recently uploaded

Capacity Building in oil palm trade and sustainability
Capacity Building in oil palm trade and sustainabilityCapacity Building in oil palm trade and sustainability
Capacity Building in oil palm trade and sustainabilityCIFOR-ICRAF
 
Supporting Farmer Transition to Produce Deforestation-Free Coffee
Supporting Farmer Transition to Produce Deforestation-Free CoffeeSupporting Farmer Transition to Produce Deforestation-Free Coffee
Supporting Farmer Transition to Produce Deforestation-Free CoffeeCIFOR-ICRAF
 
Save the Environment - Environ Craft
Save the Environment -     Environ CraftSave the Environment -     Environ Craft
Save the Environment - Environ Craftenvironcraft
 
Green Giraffe Advisory: Offshore wind market today.pdf
Green Giraffe Advisory: Offshore wind market today.pdfGreen Giraffe Advisory: Offshore wind market today.pdf
Green Giraffe Advisory: Offshore wind market today.pdfOECD Environment
 
How do TOPCon Solar Cells/Solar Panel Work?
How do TOPCon Solar Cells/Solar Panel Work?How do TOPCon Solar Cells/Solar Panel Work?
How do TOPCon Solar Cells/Solar Panel Work?Bluebird Solar Pvt. Ltd.
 
"Solid waste Fill Site Analysis: Proximities & Parameters"
"Solid waste Fill Site Analysis: Proximities & Parameters""Solid waste Fill Site Analysis: Proximities & Parameters"
"Solid waste Fill Site Analysis: Proximities & Parameters"KeerthireddyNussi
 
4th Earthquake Drill Narraative Report.docx
4th Earthquake Drill Narraative Report.docx4th Earthquake Drill Narraative Report.docx
4th Earthquake Drill Narraative Report.docxJeneroseBaldoza
 
How Long Does It Take Jackfruit To Bear Fruit?
How Long Does It Take Jackfruit To Bear Fruit?How Long Does It Take Jackfruit To Bear Fruit?
How Long Does It Take Jackfruit To Bear Fruit?EvergladesFarm
 
Purva Tranquillity best living place in East Bangalore
Purva Tranquillity best living place in East BangalorePurva Tranquillity best living place in East Bangalore
Purva Tranquillity best living place in East BangaloreNikki Harris
 
Monitoring songbirds' online market
Monitoring songbirds' online market Monitoring songbirds' online market
Monitoring songbirds' online market CIFOR-ICRAF
 
Item 7. Discussion on PWB 2023-24 work related to adaptation
Item 7. Discussion on PWB 2023-24 work related to adaptationItem 7. Discussion on PWB 2023-24 work related to adaptation
Item 7. Discussion on PWB 2023-24 work related to adaptationOECD Environment
 
Incentive Scheme for Smallholders
Incentive Scheme for Smallholders Incentive Scheme for Smallholders
Incentive Scheme for Smallholders CIFOR-ICRAF
 
Item 2.b The transformative effects of the Paris Agreement
Item 2.b The transformative effects of the Paris AgreementItem 2.b The transformative effects of the Paris Agreement
Item 2.b The transformative effects of the Paris AgreementOECD Environment
 
Green Horizons: Ecotourism Conference 2024 in Amsterdam
Green Horizons: Ecotourism Conference 2024 in AmsterdamGreen Horizons: Ecotourism Conference 2024 in Amsterdam
Green Horizons: Ecotourism Conference 2024 in AmsterdamDIGITALCONFEX
 
Personal Protective Equipment OSHA Regulations
Personal Protective Equipment OSHA RegulationsPersonal Protective Equipment OSHA Regulations
Personal Protective Equipment OSHA RegulationsATI Construction Products
 
Third OECD-DOE Workshop Photo slide show.pdf
Third OECD-DOE Workshop Photo slide show.pdfThird OECD-DOE Workshop Photo slide show.pdf
Third OECD-DOE Workshop Photo slide show.pdfOECD Environment
 
Item 2. a Update from the Secretariat
Item 2. a Update from the SecretariatItem 2. a Update from the Secretariat
Item 2. a Update from the SecretariatOECD Environment
 
Ecosystem and their types ||Environmental Science||.pdf
Ecosystem and their types ||Environmental Science||.pdfEcosystem and their types ||Environmental Science||.pdf
Ecosystem and their types ||Environmental Science||.pdfMUKUL GAUR
 
Pathways to sustainable trade and system dynamic simulation
Pathways to sustainable trade and system dynamic simulationPathways to sustainable trade and system dynamic simulation
Pathways to sustainable trade and system dynamic simulationCIFOR-ICRAF
 

Recently uploaded (20)

Capacity Building in oil palm trade and sustainability
Capacity Building in oil palm trade and sustainabilityCapacity Building in oil palm trade and sustainability
Capacity Building in oil palm trade and sustainability
 
Supporting Farmer Transition to Produce Deforestation-Free Coffee
Supporting Farmer Transition to Produce Deforestation-Free CoffeeSupporting Farmer Transition to Produce Deforestation-Free Coffee
Supporting Farmer Transition to Produce Deforestation-Free Coffee
 
Save the Environment - Environ Craft
Save the Environment -     Environ CraftSave the Environment -     Environ Craft
Save the Environment - Environ Craft
 
Green Giraffe Advisory: Offshore wind market today.pdf
Green Giraffe Advisory: Offshore wind market today.pdfGreen Giraffe Advisory: Offshore wind market today.pdf
Green Giraffe Advisory: Offshore wind market today.pdf
 
How do TOPCon Solar Cells/Solar Panel Work?
How do TOPCon Solar Cells/Solar Panel Work?How do TOPCon Solar Cells/Solar Panel Work?
How do TOPCon Solar Cells/Solar Panel Work?
 
"Solid waste Fill Site Analysis: Proximities & Parameters"
"Solid waste Fill Site Analysis: Proximities & Parameters""Solid waste Fill Site Analysis: Proximities & Parameters"
"Solid waste Fill Site Analysis: Proximities & Parameters"
 
4th Earthquake Drill Narraative Report.docx
4th Earthquake Drill Narraative Report.docx4th Earthquake Drill Narraative Report.docx
4th Earthquake Drill Narraative Report.docx
 
How Long Does It Take Jackfruit To Bear Fruit?
How Long Does It Take Jackfruit To Bear Fruit?How Long Does It Take Jackfruit To Bear Fruit?
How Long Does It Take Jackfruit To Bear Fruit?
 
Purva Tranquillity best living place in East Bangalore
Purva Tranquillity best living place in East BangalorePurva Tranquillity best living place in East Bangalore
Purva Tranquillity best living place in East Bangalore
 
Monitoring songbirds' online market
Monitoring songbirds' online market Monitoring songbirds' online market
Monitoring songbirds' online market
 
Item 7. Discussion on PWB 2023-24 work related to adaptation
Item 7. Discussion on PWB 2023-24 work related to adaptationItem 7. Discussion on PWB 2023-24 work related to adaptation
Item 7. Discussion on PWB 2023-24 work related to adaptation
 
Incentive Scheme for Smallholders
Incentive Scheme for Smallholders Incentive Scheme for Smallholders
Incentive Scheme for Smallholders
 
Item 2.b The transformative effects of the Paris Agreement
Item 2.b The transformative effects of the Paris AgreementItem 2.b The transformative effects of the Paris Agreement
Item 2.b The transformative effects of the Paris Agreement
 
Green Horizons: Ecotourism Conference 2024 in Amsterdam
Green Horizons: Ecotourism Conference 2024 in AmsterdamGreen Horizons: Ecotourism Conference 2024 in Amsterdam
Green Horizons: Ecotourism Conference 2024 in Amsterdam
 
Personal Protective Equipment OSHA Regulations
Personal Protective Equipment OSHA RegulationsPersonal Protective Equipment OSHA Regulations
Personal Protective Equipment OSHA Regulations
 
Third OECD-DOE Workshop Photo slide show.pdf
Third OECD-DOE Workshop Photo slide show.pdfThird OECD-DOE Workshop Photo slide show.pdf
Third OECD-DOE Workshop Photo slide show.pdf
 
International Day of Forests 2024
International Day of Forests 2024International Day of Forests 2024
International Day of Forests 2024
 
Item 2. a Update from the Secretariat
Item 2. a Update from the SecretariatItem 2. a Update from the Secretariat
Item 2. a Update from the Secretariat
 
Ecosystem and their types ||Environmental Science||.pdf
Ecosystem and their types ||Environmental Science||.pdfEcosystem and their types ||Environmental Science||.pdf
Ecosystem and their types ||Environmental Science||.pdf
 
Pathways to sustainable trade and system dynamic simulation
Pathways to sustainable trade and system dynamic simulationPathways to sustainable trade and system dynamic simulation
Pathways to sustainable trade and system dynamic simulation
 

Contaminated Soil Volume calculation

  • 1. EXCAVATION & TRANSPORTATION OF HEAVILY OIL CONTAMINATED SOIL TO LANDFILL IN NORTH KUWAIT AREA Alghanim International Fouad Alghanim & Sons Group Of Companies Salah Bakry Lead GIS Specialist Project Activities Summery and Contaminated Soil Volume Calculation Methods
  • 2. Excavation and Transportation of Heavily Oil Contaminated Soil to Landfill in North Kuwait Area Overall Project Process Chart UXO BAC Temporary Facility & Gatch roads Anomaly Avoidance (FEIA, SSC, GT, TS) Mechanical Excavation, Sifting & Screening (CSP) UXO Geophysical Survey (DOL, WOL, New Asphalt Rd, Tarcrete, Access Gatch Rd, Coastal Trench-Remediation areas) Landmine Clearance (Mechanical Demining) (Coastal Trench – Minefield Access Areas Coastal Oil Deposits) Ground Proofing (Mechanical Technical Survey) (Coastal Trench – Trench line & Oil Spill Work areas) Delineation of present boundary of contaminated areas Site Ground-Truthing Satellite Image analysis & Field Verification Manual Slit Trenching (1.0 m W * 1.5 m D) Above & Underground utilities GroundTruthing/Pre -condition Survey Total area of contaminated feature Depth of contaminated soil Volume of Contaminated Soil UXO Removal of Scrap (From area to be excavated) Excavation & Transportation Disposal of Scrap (Collect & dispose) Trial Pit Excavation (1m w * 1.5m L * 2.5m D) (Understand the contamination profile in the field) Field Density Testing Density of soil for different features (Kg/m3 ) Excavation & Loading (Excavate the contaminated soil) (To mixing area – WOL, WHP) (To Landfill area) Transportation Weighbridge / Barcode Screening Weighbridge / Barcode Screening Compaction & Testing (90-95% of the maximum density of the modified proctor) Compliance Monitoring (TPH < 5000 mg/Kg Restoration / Backfilling Weight of Soil (Ton) Volume of Soil (m3 ) Features Oil Lakes (Dry & Wet) Contaminated Soil Piles Tarcrete Coastal trench Coastal Oil Deposits Wellhead Pits FEIA QRA PHSER # 3 PHSER # 4 PHSER # 5 HSE Studies Topographic Survey Topo survey Ground Elevation, Road/Pipe crossings, existing utilities/facilities, vegetation Pre-Site Soil Characterisation Sample collection & Analysis Sample collection, analysis & soil logging & analysis – Profile of contamination, Thickness of contamination layers, and depth of contamination Field Density Testing
  • 3. Estimate soil volume before excavation - Prepare Data to use it for volume Estimation Excavation Zones Boundary Topographic Surface Level Contaminated Soil Depth
  • 4. Excavation Zones Boundary Topographic Surface Level Contaminated Soil Depth Software - ArcGIS 10.1 Submission - Report - Shapefile for Excavation zones attached with report Software - AutoCAD & Surfer Submission - Report - Drawings for NGL & Contour - Drawing for Utilities Software : - Surfer & ArcGIS Submission: - Report - Shapefile for sampling Locations - Surfer Grids for Uber surface and lower Surface - The final inputs for volume calculation : L1 L2 L3
  • 5. Volume Calculation for Dry Lake ,example Zone 3 Area 1D Methods 1 Using Upper and Lower Grids 1. Step 1 : • To clip sampling data inside or close to excavation zone boundary Sampling points and CIC Sampling points using ArcGIS
  • 6. - Step 2 : • To open zone3 Shapefile in Surfer ( to get fixed extent coordinates ) -Map -New -Base Map
  • 7. - Step3: • Save shapefile zone as BLN file in surfer to use it to Blanked (Clip) other grids. - File -Export -BLN File
  • 8. - Step4: • Create Upper surface Grid for Elevation from Topographic Survey Level Spot points - Grid - Data - Open NGL Excel file - Select X,Y,Z - Gridding Method Kriging - Fix Grid line Geometry for Zone3 Extent - Spacing 1X1 m
  • 9. - Step4: • Output grid for Upper surface
  • 10. - Step5: • Blanked ( clip ) Upper Surface Grid using Zone 3 BLN file - Grid - Blank - Select grid to blank - Select BLN
  • 11. - Step5: • Output Upper Grid Blanked
  • 12. - Step6: • Create Grid from Lower Surface from: Upper Surface Elevation – Contamination Depth = Lower Surface Elevation - Grid - Excel Cutoff Data - Select Zone3 -Use X,Y, Contamination Level - Use Same geometry and spacing that used for Upper surface
  • 13. - Step7: • planked ( clip ) Lower Grid using Zone 3 BLN file - Grid - Blank - Select grid to blank - Select BLN
  • 14. - Step7: • Output Lower Grid Blanked
  • 15. - Step8: • Estimated Volume : - Grid - volume - Select Upper Surface - Select Lower Surface
  • 16. - Step8: • Output Volume report • Volume (Trapezoidal Rule) = 39854.94 m³
  • 17. • Step1: Same methods • Step2: Same methods • Step3: Same methods • Step 4: to create only 1 Grid from (cutoff value selected by environmental Team from Sampling log) Volume Calculation for Dry Lake ,example Zone 3 Area 1D Methods 2 Using one grid created from Cutoff Value
  • 18. Step 4: Output Grid Excavation Depth As total Contamination value , not Elevation value
  • 19. - Step5: • Calculate Volume : 38357 - Grid - Volume - Select upper surface from Cutoff Grid - Constant value is 0
  • 20. - Grid - Volume - Step8: • Output Volume report • Volume (Trapezoidal Rule) = 38357.75 m³
  • 21. Volume calculation for Contaminated Piles • Export Topographic Survey data for Piles in excel file X,Y,Z • Create surfer grid for each pile grid 5X5 or 1X1 m related to piles boundary • Create contour in surfer 0.1 m interval • Show piles grid in 3D with contour • Select contour line for base of pile • Calculate volume from grid ( consider pile grid as Upper Surface and base contour as constant Z value
  • 22. • Pile Contour and 3D - Base contour is 36.5 - So - Grid - Volume - Piles grid is Upper surface - Constant Z = 36.5