SlideShare a Scribd company logo
1 of 28
Download to read offline
1
One stop.
Worldwide sourcing.
Eine Adresse.
Weltweite Märkte.
christian.santner@dragonsourcing.com | Tel: +43 664 88518030
About Dragon Sourcing
2
We offer procurement services that deliver value
from emerging markets, both for export and for
localisation requirements
Relevant category experience includes:
Capex, Components, Transportation, Services, Raw
Materials, Packaging, Promotional, & MRO.
Key Services:
•  Procurement Intelligence
to deliver insight into categories and markets, and
support effective procurement decisions.
•  Global Sourcing
to deliver sustainable value from sourcing goods and
services from emerging markets.
•  Procurement Outsourcing
and setup of international procurement offices to
increase productivity and decrease overheads.
•  Capability Assessment

of your international procurement operations to
identify and implement practical opportunities for
improvements
•  70 staff globally
•  15 locations across Asia, Latin America,
Middle East, Europe & US.
•  Headquarters in Shanghai (45 staff)
•  Private ownership since 2004
•  Turnover: $7.5m (managed spend ~$1.2b)
© 2018 Dragon Sourcing. All rights reserved.
London
Paris Graz
Ljubljana
Warsaw
Budapest
Istanbul
Tel Aviv
Mumbai
Shanghai
Hong Kong
Ho Chi Min City
Bangkok
Jakarta
Johannesburg
Melbourne
Sao Paulo
Mexico City
Houston
Addis Ababa
Prague Kiev
Bucharest
Riga
Manila
Lagos
Buenos Aires
Nairobi
Brussels
Santiago
Novosibirsk
Myanmar
Cambodia
Rome
MadridMilan
Ø  Unsere Teams sind ideal verteilt, um genau auf die Bedürfnisse unserer Kunden eingehen zu können.
Büros von Dragon Sourcing Vertragspartnern
Sales-, Key Account Management und Projektbüros
Einkaufsbüros
© 2018 Dragon Sourcing. All rights reserved.
Unser Netzwerk
Service and Pricing
Dragon	
  Sourcing	
  -­‐	
  Service	
  Offerings	
   Pricing	
  
	
  	
   DS	
  Inhouse	
   Outsourced	
   Standard	
   Comment	
  
Market	
  Intelligence	
  
Procurement	
  Intelligence	
   x	
   	
  	
  
Fixed	
  fees	
  according	
  to	
  price	
  list	
  
	
  	
  
Should	
  Cost	
  Model	
   x	
   	
  	
   	
  	
  
Supplier	
  Financial	
  Assessment	
   x	
   	
  	
   	
  	
  
Supplier	
  Supply	
  Chain	
  
Assessment	
  
x	
   	
  	
   	
  	
  
Supplier	
  Ethics	
  Assessment	
   x	
   	
  	
   	
  	
  
Category	
  ExecuBve	
  Dashboard	
   x	
   	
  	
   	
  	
  
Country	
  and	
  
Manufacturing	
  Site	
  
EvaluaBon	
  
Country	
  SelecBon	
   x	
   	
  	
  
Customized	
  fixed	
  fees	
  based	
  client's	
  
needs	
  
	
  	
  
Country/Region/City	
  Analysis	
   x	
   	
  	
   	
  	
  
Factory	
  ramp	
  up	
  support	
   x	
   	
  	
   	
  	
  
Global	
  Sourcing	
  
PorHolio	
  Analysis	
  &	
  Category	
  
PrioriBzaBon	
  
x	
   	
  	
  
Fixed	
  fees	
  according	
  to	
  price	
  list	
  
We	
  can	
  offer	
  performance	
  related	
  deals	
  
(gain	
  sharing,	
  commissions,	
  trading).	
  Deals	
  
are	
  structured	
  on	
  a	
  case	
  by	
  case	
  basis	
  
based	
  on	
  (1)	
  spend	
  value,	
  (2)	
  types	
  of	
  
categories	
  and	
  (3)	
  nature	
  of	
  the	
  work	
  
required	
  by	
  the	
  client	
  
IdenBficaBon	
  of	
  potenBal	
  
suppliers	
  (RFI	
  process)	
  
x	
   	
  	
  
Measuring	
  cost	
  compeBBveness	
  
of	
  suppliers	
  (RFQ	
  process)	
  
x	
   	
  	
  
AudiBng	
   x	
   x	
   For	
  Long-­‐term	
  Projects	
  /	
  High	
  workload	
  
Projects,	
  we	
  move	
  away	
  from	
  our	
  
standard	
  pricing	
  approach	
  based	
  on	
  #	
  of	
  
categories	
  and	
  #	
  of	
  countries	
  to	
  adopt	
  a	
  
team-­‐based	
  pricing	
  	
  
Sample	
  development	
  and	
  tesBng	
   x	
   x	
  
Supplier	
  development	
  	
   x	
   x	
  
Contract	
  negoBaton	
   x	
   	
  	
  
Procurement	
  OperaBons	
  
QC	
  Management	
   x	
  	
   x	
  	
  
Fixed	
  fee	
  based	
  on	
  daily	
  billing	
  rate	
   	
  	
  
LogisBcs	
  Management	
   x	
   	
  	
  
Payment	
  /	
  Invoice	
  management	
   x	
   	
  	
  
Outsourcing	
  
Interim	
  Management	
   x	
  (Buyers)	
   x	
  (SQE,	
  SDE)	
   Fixed	
  fee	
  based	
  on	
  monthly	
  billing	
  rate	
   	
  	
  
IPO	
  Management	
   x	
   	
  	
   Fixed	
  fees	
  based	
  on	
  team	
  size	
  
Performance	
  related	
  deals	
  are	
  possible	
  to	
  
be	
  craPed	
  on	
  a	
  case	
  by	
  case	
  basis	
  
Our Clients
Automotive
Energy/Chemicals
Consumer GoodsIndustrial Products
Kunden
Food & Beverage Construction
Government
DIY
Service
Heavy Machinery
Pharma / Medical
Retail
Packaging
Manufacturing Location Analysis
Analysis Approach in 3 Stages
45
Country Selection
Country Analysis
Region and City Analysis
2
1
3
© 2018 Dragon Sourcing. All rights reserved.
•  Macro Analysis: Simple Score Card with basic indicators fitting client’s business case
•  Detailed Analysis: Detailed Score Card with specific indicators for client’s business case
46
TAIWAN
FUJIAN
GUANGDONG
The analysis focused on the 2 pre-selected cities, Xiamen and Shenzhen,
with the objective to establish a preference among these 2 options
Client
Preliminary
Considerations
•  Development of the area
•  Direct sea access
•  Air Access from Europe
•  Proximity and access to
Taiwan
Xiamen
Shenzhen
Client
Pre-selected Cities
•  Xiamen
•  Shenzhen
People Republic of China
© 2018 Dragon Sourcing. All rights reserved.
Information from multiple sources were used to analyze each of the 2
options in terms of cost and convenience
•  Shenzhen bureau of trade & industry information center
•  Shenzhen council for the promotion of International
investment
•  Shenzhen Administrative bureau of free trade zones
•  Administrative of local taxation of Shenzhen municipality
•  Guangdong province price information website
Information Sources
•  Xiamen Foreign Investment Bureau
•  China council for the promotion of
International trade – Xiamen office
•  Xiamen Price bureau website
•  Interviews with General Managers of western companies already located in Shenzhen or Xiamen
•  Various others (Sea shipment companies and sea forwarders, Airlines schedule, etc.)
COST RELATED CRITERIA
•  Existing building rent / Land cost
•  Labor cost
•  Shipment cost
•  Utilities costs
•  Taxes
CONVENIENCE RELATED CRITERIA
•  Infrastructure / local traffic
•  Safety
•  Local authorities attitude
•  Utilities supply quality
•  Labor "manageability"
•  Air access to/from The Netherlands & Taiwan
•  Seaport convenience
© 2018 Dragon Sourcing. All rights reserved.
48
Cost related criteria
CRITERIA INDICATOR / PRACTICAL MEASURE
Building cost
Rental cost/m²
Land cost
Labor cost
Minimum wages level set by local government
Actual average wages for the typical worker profile
Other employment related costs: insurances and other
charges, allowance, etc…
Sea shipment cost Freight cost to respectively Rotterdam and Los Angeles
Utilities Utilities cost
Taxes Local taxes
© 2018 Dragon Sourcing. All rights reserved.
49
In summary, the cost difference between the 2 cities can at this stage be
estimated between -230k€ and +80k€
Shenzhen Xiamen Difference / Comment
Building / Land
Potentially -310k€
in "downtown"
areas
Could represent around 310k€/year
[50-30] x 13 000 x 12 = 3 120 000 RMB = 310 k€
Labor Insignificant difference
Container shipping +80k€ 30 containers/month (45% Rotterdam, 35% LA)
Utilities
Electricity
+5% during peak
hours
-1% over 24 hours
Water -17%
We may need to clarify the importance
of water and gas consumption
Gas +124%
Taxes No difference
© 2018 Dragon Sourcing. All rights reserved.
50
Convenience related criteria
CONVENIENCE RELATED CRITERIA
• Infrastructure / ease to get around
• Safety
• Local authorities attitude
• Utilities supply quality
• Labor "manageability"
• Air access to/from Germany & Taiwan
• Seaport convenience
© 2018 Dragon Sourcing. All rights reserved.
51
We surveyed 13 GMs of Western companies with factories in Shenzhen or
Xiamen to assess convenience criteria and complete unavailable information
37 General Managers
from Western
companies with a factory
located either in
Shenzhen or Xiamen
invited to respond to the
questionnaire through a
phone interview
23 questions survey
covering:
• Road Infrastructure
• Safety
• Local Authorities
• Utilities supply
• Labor
• 13 participants to the
survey
• 7 from Shenzhen
• 6 from Xiamen
• 30-45 minutes phone
interview with each of
them for comments on
their answers
• Statistical assessment
of soft criteria through
the satisfaction level of
people in these 2
locations
• Complement when no
available information
© 2018 Dragon Sourcing. All rights reserved.
52
Despite Shenzhen slightly better sea shipping and air travel services, Xiamen is
clearly a better place to be than Shenzhen, from a convenience point of view
Shenzhen Xiamen Difference / Comment
Infrastructure / Ease to get around Clear advantage to Xiamen
Safety
Responses to the survey don't reflect the
danger often associate to Shenzhen
Local authorities attitude
Small difference on the average, but
significant on support to companies,
efficiency and corruption
Utilities supply quality Clear advantage to Xiamen
Labor "manageability"
Clear advantage to Xiamen, mostly due to
the higher weight of "local" workers
Air access Benefit from Hong Kong proximity
Seaport convenience Mostly due to shorter lead-time to Europe
Very Good Good Fair Bad Very Bad
53
In conclusion, Xiamen appears to most likely be a better option for an
assembly plant in China
Shenzhen Xiamen Comment
Cost + + +
•  Only certainty on sea shipping (~80k€/year)
•  Building would actually be cheaper in
Xiamen should client decide to pick a
"downtown" location (estimated ~310k€/year)
Convenience + +
•  Sea shipping and air travel services are
Xiamen only identified weaknesses
Considering:
•  The importance given by client to most of the convenience criteria
•  The cost difference that can either be in favor of Xiamen, or represent in the worst case
~80k€ per year
We consider Xiamen is most likely a better option for client
© 2018 Dragon Sourcing. All rights reserved.
Manufacturing Location Analysis
Beispiel Äthiopien
Industrial Zones
Industrial Zones Current Operational Status
Selected for
next stage of
analysis
1 Operational
2 Operational
3 IZ Under Construction- No companies present yet
4 Govt. studying feasibility- awaiting external funds to commence construction
5 IZ Under Construction- No companies present yet
6 Govt. studying feasibility- awaiting external funds to commence construction
7 Govt. studying feasibility- awaiting external funds to commence construction
8 Govt. studying feasibility- awaiting external funds to commence construction
9 IZ not fully complete- very few companies present
10 Govt. studying feasibility- awaiting external funds to commence construction
11 IZ Under Construction- No companies present yet
12 IZ not fully complete- very few companies present
13 IZ not fully complete- very few companies present
13 Industrial Zones have been identified
but only 2 are operational
55
Selected for further analysis (only IZs already operational)
Not selected for further analysis
© 2018 Dragon Sourcing. All rights reserved.
Of the 2 industrial zones that are immediately operational,
X is the preferred option
56
Parameters X Industrial Zone Y Industry Zone
Developer Government Chinese company Group
Area
Phase I: 156 hectares fully complete and sold out
Phase II: 186 hectares, construction in progress and is expected
to be complete by the end of 2015. Booking open for Phase II
Phase I: 233 hectares
Phase II: IZ in talks with the Govt. for additional 260 hectares
for phase II expansion
Tax Holiday for Investors
Yes
(Up to 2-7 years depending on case-by case approval by Govt.)
Yes
(Up to 2-7 years depending on case-by case approval by
Govt.)
Focus Industries
Textiles, Garments and leather products (including footwear)
sectors
Textiles, Garment, Shoe, Construction materials, Electrical
equipment, Engineering material equipment manufacturing
and Food processing factories
Companies Present 1. 
1. 
Factory Rent USD 1 per square meter in Phase II (Under construction) USD 2 per square meter
Available buildings for rent (L&R
requires a building with floor
space 20,000 sqm)
2 types of buildings in phase II being constructed: 5,000 sqm area
buildings and 10,100 sqm buildings. No buildings available
anymore of Phase I.
Buildings available with 10,688 sqm area in Phase I.
Closeness to Addis Ababa airport/
Djibouti sea port
15 km East of Addis Ababa 37 Km East of Addis Ababa
Shortlisted Industrial Zone
Recommendation
Yes
(Cheaper rental cost & closer to Addis Ababa)
No
(Rental more expensive, IZ focus is multi industry and
further from Addis Ababa)
© 2018 Dragon Sourcing. All rights reserved.
Detailed Analysis – Location Analysis of X
(1) Building & (2) Legal Entity (3) Tax and (4) Electricity
57
Parameters Industrial Zone
Section Sub-section X
X - Location
Land Available (hectares) 156 Hectares in Phase I & 186 hectares in Phase II
Location 15 km east to Addis
Developer Ethiopian Government
Time to set up a factory
Six months to a year (estimated time to construct factory by the tenant) from the time
company is registered and lease signed
Special Economic Zone Yes, no import duty and export duty for products manufactured for 100% export.
Monthly Rent per square meter
IZ provides building at a rent of USD 1/m2 for 5 years and for the next 5 years at USD 1.25/
m2. Tenants have the option of building their own plant as well
Floor space of available buildings 2 buildings at 5,000 sqm each and one at 10,100 sqm
Security Deposit USD 25,000
Lease Option
Investing companies have the option of building their own building by leasing land from the
Govt. in X. Land is usually leased out for a period of 70 years at a one time payment of USD
11.55 per square meter (period of lease and price per square meter subject to case by case
approval by the authorities). Price per square meter can be paid in full or over a period of 20
years including interest charges.
Maintenance Cost to the IZ None. All utility costs will be paid by the tenants themselves directly to the service providers
Legal Paper work time for registering company in Ethiopia 10 business days from the time lease is signed
Tax
VAT 15%
Corporate Income Tax Holiday
2-7 years depending on case by case approval by the authorities based on the level of
investment and projection of the growth in exports by the investing company
Expat salary income tax holiday Up to two years
Electricity (Govt. Rates) High voltage Consumers for over 400 KW per month USD 0.038/KW (ETB 0.77/KW)
© 2018 Dragon Sourcing. All rights reserved.
Detailed Analysis – Location Analysis
(6) Workforce – 2/2
Parameters Industrial Zones
Section Sub-section X
Workforce
Termination cost to employer
3 months salary as termination cost to be paid by the employer of 3 months notice not provided- normal
working practice in Ethiopia
Yearly bonus
Depends on the profit gained by the employer and based on its own policy, not stipulated by the
Government
Lean period Major religions are Christianity and Islam - Christmas time and Ramadan time are lean period
Indicative Time to
Recruit a worker
(number of days)
Operator 30-45 days
Technician 30-45 days
Supervisor 30-45 days
Engineer 30-45 days
Manager 30-45 days
Plant Manager 30-45 days
Indicative Total
Cost to the
Company per
worker category in
USD
Operator (2 years experience) USD 50 excluding mandatory 11% pension fund and 3% health insurance
Technician (2 years experience) USD 50 excluding mandatory 11% pension fund and 3% health insurance
Supervisor (3-5 years experience) USD 100 excluding mandatory 11% pension fund and 3% health insurance
Engineer (5 years experience) USD 350 excluding mandatory 11% pension fund and 3% health insurance
Manager (5 years experience) USD 550 excluding mandatory 11% pension fund and 3% health insurance
Plant Manager (5 years experience) USD 550 excluding mandatory 11% pension fund and 3% health insurance
58
© 2018 Dragon Sourcing. All rights reserved.
We have interviewed industry experts:
Summarized Feedback
Yarn Category:
•  Ethiopian spinning mills seem to be producing only 100% cotton yarn or viscose yarn.
•  Spinning mills are producing yarn either for self consumption if they are integrated mills or supplying limited volume outside to regular
clients.
•  Supply of cotton yarn to the local market is not sufficient hence garment companies or local suppliers are also importing cotton yarn.
30-40% of the cotton processed in Ethiopia is from local suppliers, rest is imported.
•  Local cotton price should be competitive, length of fibers and chemical composition often lack in quality.
•  Spinning mills are not producing man made yarns like Elastane, Polyamide, etc. so garment companies are directly importing or
buying man made yarns from the local importers.
Corrugated boxes Category:
•  Number of manufacturers is limited, small to medium scale manufacturers are available with limited flexibility to make customized size.
•  Suppliers’ capacity utilization seems very high leaving little room for new clients.
•  Local textile companies are buying the corrugated boxes from local manufacturers only but the supply is not easy and needs to be
followed aggressively to ensure on time delivery.
•  Manufacturers requesting 100% payment in advance before starting the production and almost every time do not comply with the
deadline.
•  Delays are happening due to frequent power cuts.
General comments
•  Ethiopian suppliers speak little English and the communication is mostly happening in local languages.
•  Ethiopian suppliers rather want to have face2face B2B relationships, and are rather weak in internet communication.
•  Importing yarn to Ethiopia will be cheaper only if the end purpose is for exports as the raw material can be imported under duty & tax
exemption.
•  Ethiopian companies are importing yarn from different markets globally.
•  Larger textile companies in Ethiopia try to be intensively vertically integrated, due to the difficult local supply situation.
© 2018 Dragon Sourcing. All rights reserved.
ANALYSIS OF TOTAL COSTS IN
ETHIOPIA VS CHINA VS CZECH
REP
60
© 2018 Dragon Sourcing. All rights reserved.
61
Level	
   #	
  of	
  staff	
   CN	
   CZ	
   ETH	
  
Weaver	
   100	
  
Technician	
   10	
  
Supervisor	
   10	
  
Engineer	
   10	
  
Manager	
   5	
  
STAFF
COMPARISON OF LABOR COST PER MONTH
© 2018 Dragon Sourcing. All rights reserved.
63
RAILWAY PLAN
© 2018 Dragon Sourcing. All rights reserved.
64
MEETING 16
INDUSTRY MINISTER
Meeting with: Tadesse HAILE, State Minister, Ministry of Industry
Meeting notes:
•  Goal is to make cotton available at a competitive price from in and outside of Ethiopia
•  New railway will bring “50% improvement of land transport price”
•  80% of Ethiopian people live in the highlands
•  Proposed to move into Awassa IZ, there are 34 sheds under construction and already 22 of them are occupied/booked
•  There are only 12 sheds remaining for new investors
•  In order to get the sheds, the investor needs to submit its proposal
•  Government wants to subsidize the transport to Awassa, so that cost is similar than from Addis
•  Comparable quality and quantity of labor available in Awassa
•  Airport in Awassa needs 1,5 years to be finished
•  IZ in Awassa will be finished mid of 2016
•  8 Companies which have booked in Awassa:
1.  PVH - US - Garments
2.  Arvind - India - Garments
3.  Wuxi - China
4.  …
© 2018 Dragon Sourcing. All rights reserved.
Summary
© 2018 Dragon Sourcing. All rights reserved.
•  Mehrstufiger Prozess hilft, sich über die eingenen Anforderungen eines neuen
Standortes klar zu werden
•  Exakten Kostenvergleich schaffen wenn möglich auf Basis Produkt-Kosten,
welche verlagert werden sollen (inkl. Umfassender Import- und Export-
Kalkulation)
•  Lokale Vorteile/Incentives genau prüfen
•  Sehr hilfreich sind zahlreiche konkrete Einschätzungen von erfahrenen
Managern vor Ort als ausgewerte Umfrage zusätzlich zur Datenbasis
One stop.
Worldwide sourcing.
Eine Adresse.
Weltweite Märkte.
DI (FH) Christian Santner
Director Germany, Austria and Switzerland
christian.santner@dragonsourcing.com
Dragon Sourcing
Germany, Austria and Switzerland
Kohldorf 79 | 8323 Sankt Marein bei Graz
Austria
T: +43 664 88518030
F: +43 316 2311238882
Dragon Sourcing Ltd. Headquarter
7/F Hong Kong Trade Centre
161-7 Des Voeux Rd Central
Hong Kong SAR
T: +852 91 80 40 57
F: +852 25 80 24 26
www.dragonsourcing.com

More Related Content

Similar to Analysis of Manufacturing Location by Dragon Sourcing

A Low Cost Alternative - Vietnam the new offshore location
A Low Cost Alternative - Vietnam the new offshore locationA Low Cost Alternative - Vietnam the new offshore location
A Low Cost Alternative - Vietnam the new offshore locationoffshoreviet
 
Brac presentation 9 10 13 final
Brac presentation 9 10 13 finalBrac presentation 9 10 13 final
Brac presentation 9 10 13 finalTim Feemster
 
Stefano Cancellara “Score More with Network Powered Sourcing”
Stefano Cancellara “Score More with Network Powered Sourcing”Stefano Cancellara “Score More with Network Powered Sourcing”
Stefano Cancellara “Score More with Network Powered Sourcing”Elemica
 
Automating Transportation and Logistics
Automating Transportation and LogisticsAutomating Transportation and Logistics
Automating Transportation and LogisticsBarcoding, Inc.
 
Cscmp 2014 new rules for winning - 23rd annual study on trends
Cscmp 2014   new rules for winning - 23rd annual study on trendsCscmp 2014   new rules for winning - 23rd annual study on trends
Cscmp 2014 new rules for winning - 23rd annual study on trendsKarl B. Manrodt, Ph.D.
 
Measuring Customer level profitability & Price formation in Telcos
Measuring Customer level profitability & Price formation in TelcosMeasuring Customer level profitability & Price formation in Telcos
Measuring Customer level profitability & Price formation in TelcosPradeep Kandage
 
George Mokhbat V SCTC day cloud 24 feb16
George Mokhbat V SCTC day cloud 24 feb16George Mokhbat V SCTC day cloud 24 feb16
George Mokhbat V SCTC day cloud 24 feb16Agustin Argelich Casals
 
Checklist for selecting vietnam software outsourcing vendor
Checklist for selecting vietnam software outsourcing vendorChecklist for selecting vietnam software outsourcing vendor
Checklist for selecting vietnam software outsourcing vendorTMA Solutions
 
Aftermarket2012 cargotec malcolmyoull
Aftermarket2012 cargotec malcolmyoullAftermarket2012 cargotec malcolmyoull
Aftermarket2012 cargotec malcolmyoullCopperberg
 
Case Study-Indirect China Strategic Sourcing
Case Study-Indirect China Strategic SourcingCase Study-Indirect China Strategic Sourcing
Case Study-Indirect China Strategic SourcingJohn William
 
GSM Operator Selection for a Call Center Investment by Using AHP
GSM Operator Selection for a Call Center Investment by Using AHPGSM Operator Selection for a Call Center Investment by Using AHP
GSM Operator Selection for a Call Center Investment by Using AHPÖzcan Çavuşoğlu, Ph.D.(Cand.)
 
IFMA's World Workplace: Perspectives on the FM Market Development
IFMA's World Workplace: Perspectives on the FM Market DevelopmentIFMA's World Workplace: Perspectives on the FM Market Development
IFMA's World Workplace: Perspectives on the FM Market DevelopmentISS Group
 
Global emerging markets sourcing through procurement sub contractors
Global emerging markets sourcing through procurement sub contractorsGlobal emerging markets sourcing through procurement sub contractors
Global emerging markets sourcing through procurement sub contractorsJohn William
 
Offshoring to Vietnam - Sourcing Interest Group Forum
Offshoring to Vietnam - Sourcing Interest Group ForumOffshoring to Vietnam - Sourcing Interest Group Forum
Offshoring to Vietnam - Sourcing Interest Group Forumvietho2015
 
TransProSoft
TransProSoftTransProSoft
TransProSoftudayanroy
 
Udeeps online presentation 12 2016
Udeeps online presentation 12 2016Udeeps online presentation 12 2016
Udeeps online presentation 12 2016Jean-Marc Galea
 
CBN SALES PRESENTATION
CBN SALES PRESENTATIONCBN SALES PRESENTATION
CBN SALES PRESENTATIONCBN2014
 
logistics industry and pestle and marketing mix swot analyis of it
logistics industry and pestle and marketing mix swot analyis of itlogistics industry and pestle and marketing mix swot analyis of it
logistics industry and pestle and marketing mix swot analyis of itPratik Louhar
 

Similar to Analysis of Manufacturing Location by Dragon Sourcing (20)

A Low Cost Alternative - Vietnam the new offshore location
A Low Cost Alternative - Vietnam the new offshore locationA Low Cost Alternative - Vietnam the new offshore location
A Low Cost Alternative - Vietnam the new offshore location
 
Brac presentation 9 10 13 final
Brac presentation 9 10 13 finalBrac presentation 9 10 13 final
Brac presentation 9 10 13 final
 
Stefano Cancellara “Score More with Network Powered Sourcing”
Stefano Cancellara “Score More with Network Powered Sourcing”Stefano Cancellara “Score More with Network Powered Sourcing”
Stefano Cancellara “Score More with Network Powered Sourcing”
 
Automating Transportation and Logistics
Automating Transportation and LogisticsAutomating Transportation and Logistics
Automating Transportation and Logistics
 
Cscmp 2014 new rules for winning - 23rd annual study on trends
Cscmp 2014   new rules for winning - 23rd annual study on trendsCscmp 2014   new rules for winning - 23rd annual study on trends
Cscmp 2014 new rules for winning - 23rd annual study on trends
 
Measuring Customer level profitability & Price formation in Telcos
Measuring Customer level profitability & Price formation in TelcosMeasuring Customer level profitability & Price formation in Telcos
Measuring Customer level profitability & Price formation in Telcos
 
George Mokhbat V SCTC day cloud 24 feb16
George Mokhbat V SCTC day cloud 24 feb16George Mokhbat V SCTC day cloud 24 feb16
George Mokhbat V SCTC day cloud 24 feb16
 
Checklist for selecting vietnam software outsourcing vendor
Checklist for selecting vietnam software outsourcing vendorChecklist for selecting vietnam software outsourcing vendor
Checklist for selecting vietnam software outsourcing vendor
 
Aftermarket2012 cargotec malcolmyoull
Aftermarket2012 cargotec malcolmyoullAftermarket2012 cargotec malcolmyoull
Aftermarket2012 cargotec malcolmyoull
 
Case Study-Indirect China Strategic Sourcing
Case Study-Indirect China Strategic SourcingCase Study-Indirect China Strategic Sourcing
Case Study-Indirect China Strategic Sourcing
 
GSM Operator Selection for a Call Center Investment by Using AHP
GSM Operator Selection for a Call Center Investment by Using AHPGSM Operator Selection for a Call Center Investment by Using AHP
GSM Operator Selection for a Call Center Investment by Using AHP
 
Final1[1]
Final1[1]Final1[1]
Final1[1]
 
IFMA's World Workplace: Perspectives on the FM Market Development
IFMA's World Workplace: Perspectives on the FM Market DevelopmentIFMA's World Workplace: Perspectives on the FM Market Development
IFMA's World Workplace: Perspectives on the FM Market Development
 
Global emerging markets sourcing through procurement sub contractors
Global emerging markets sourcing through procurement sub contractorsGlobal emerging markets sourcing through procurement sub contractors
Global emerging markets sourcing through procurement sub contractors
 
Offshoring to Vietnam - Sourcing Interest Group Forum
Offshoring to Vietnam - Sourcing Interest Group ForumOffshoring to Vietnam - Sourcing Interest Group Forum
Offshoring to Vietnam - Sourcing Interest Group Forum
 
TransProSoft
TransProSoftTransProSoft
TransProSoft
 
Go to Market Assessment Services
Go to Market Assessment ServicesGo to Market Assessment Services
Go to Market Assessment Services
 
Udeeps online presentation 12 2016
Udeeps online presentation 12 2016Udeeps online presentation 12 2016
Udeeps online presentation 12 2016
 
CBN SALES PRESENTATION
CBN SALES PRESENTATIONCBN SALES PRESENTATION
CBN SALES PRESENTATION
 
logistics industry and pestle and marketing mix swot analyis of it
logistics industry and pestle and marketing mix swot analyis of itlogistics industry and pestle and marketing mix swot analyis of it
logistics industry and pestle and marketing mix swot analyis of it
 

More from John William

Sheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudySheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudyJohn William
 
Sanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief StudySanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief StudyJohn William
 
Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​John William
 
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EUNewsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EUJohn William
 
Phenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyPhenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyJohn William
 
Study on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in VietnamStudy on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in VietnamJohn William
 
Study on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in BrazilStudy on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in BrazilJohn William
 
Study on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in EthiopiaStudy on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in EthiopiaJohn William
 
Sourcing Opportunities in Malaysia
Sourcing Opportunities in MalaysiaSourcing Opportunities in Malaysia
Sourcing Opportunities in MalaysiaJohn William
 
Study on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in PakistanStudy on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in PakistanJohn William
 
Case Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South AfricaCase Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South AfricaJohn William
 
Case Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in MyanmarCase Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in MyanmarJohn William
 
Study on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in IndonesiaStudy on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in IndonesiaJohn William
 
Battery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon SourcingBattery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon SourcingJohn William
 
Gear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingGear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingJohn William
 
Slewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingSlewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingJohn William
 
Decorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon SourcingDecorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon SourcingJohn William
 
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case StudySafety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case StudyJohn William
 
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing  FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing John William
 

More from John William (20)

Sheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case StudySheet Metal Fabrication & Machining Parts Case Study
Sheet Metal Fabrication & Machining Parts Case Study
 
Sanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief StudySanitizer & Disinfectants During COVID 19 – A Brief Study
Sanitizer & Disinfectants During COVID 19 – A Brief Study
 
Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​Cooling Towel Sourcing Project​ ​- Case Study​
Cooling Towel Sourcing Project​ ​- Case Study​
 
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EUNewsletter on PPE: Classification of PPE and CE Certification Process in EU
Newsletter on PPE: Classification of PPE and CE Certification Process in EU
 
Newsletter on PPE
Newsletter on PPENewsletter on PPE
Newsletter on PPE
 
Phenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case StudyPhenolic Resin Sourcing Project Case Study
Phenolic Resin Sourcing Project Case Study
 
Study on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in VietnamStudy on Sourcing Opportunities in Vietnam
Study on Sourcing Opportunities in Vietnam
 
Study on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in BrazilStudy on Sourcing Opportunities in Brazil
Study on Sourcing Opportunities in Brazil
 
Study on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in EthiopiaStudy on Sourcing Opportunities in Ethiopia
Study on Sourcing Opportunities in Ethiopia
 
Sourcing Opportunities in Malaysia
Sourcing Opportunities in MalaysiaSourcing Opportunities in Malaysia
Sourcing Opportunities in Malaysia
 
Study on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in PakistanStudy on Sourcing Opportunities in Pakistan
Study on Sourcing Opportunities in Pakistan
 
Case Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South AfricaCase Study on Sourcing Opportunities in South Africa
Case Study on Sourcing Opportunities in South Africa
 
Case Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in MyanmarCase Study on Sourcing Opportunities in Myanmar
Case Study on Sourcing Opportunities in Myanmar
 
Study on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in IndonesiaStudy on Sourcing Opportunities in Indonesia
Study on Sourcing Opportunities in Indonesia
 
Battery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon SourcingBattery Sourcing Case Study by Dragon Sourcing
Battery Sourcing Case Study by Dragon Sourcing
 
Gear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon SourcingGear Box Case Study by Dragon Sourcing
Gear Box Case Study by Dragon Sourcing
 
Slewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingSlewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon Sourcing
 
Decorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon SourcingDecorative Pots Case Study by Dragon Sourcing
Decorative Pots Case Study by Dragon Sourcing
 
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case StudySafety Vest, Cotton Bags, College Bags Sourcing Project Case Study
Safety Vest, Cotton Bags, College Bags Sourcing Project Case Study
 
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing  FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
FAN Induction Motors Sourcing Project Case Study by Dragon Sourcing
 

Recently uploaded

Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdftaxlinkcpa
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一Fir La
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...Kumaran637735
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberAgent, Inc.
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 

Recently uploaded (20)

Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdf
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 

Analysis of Manufacturing Location by Dragon Sourcing

  • 1. 1 One stop. Worldwide sourcing. Eine Adresse. Weltweite Märkte. christian.santner@dragonsourcing.com | Tel: +43 664 88518030
  • 2. About Dragon Sourcing 2 We offer procurement services that deliver value from emerging markets, both for export and for localisation requirements Relevant category experience includes: Capex, Components, Transportation, Services, Raw Materials, Packaging, Promotional, & MRO. Key Services: •  Procurement Intelligence to deliver insight into categories and markets, and support effective procurement decisions. •  Global Sourcing to deliver sustainable value from sourcing goods and services from emerging markets. •  Procurement Outsourcing and setup of international procurement offices to increase productivity and decrease overheads. •  Capability Assessment
 of your international procurement operations to identify and implement practical opportunities for improvements •  70 staff globally •  15 locations across Asia, Latin America, Middle East, Europe & US. •  Headquarters in Shanghai (45 staff) •  Private ownership since 2004 •  Turnover: $7.5m (managed spend ~$1.2b) © 2018 Dragon Sourcing. All rights reserved.
  • 3. London Paris Graz Ljubljana Warsaw Budapest Istanbul Tel Aviv Mumbai Shanghai Hong Kong Ho Chi Min City Bangkok Jakarta Johannesburg Melbourne Sao Paulo Mexico City Houston Addis Ababa Prague Kiev Bucharest Riga Manila Lagos Buenos Aires Nairobi Brussels Santiago Novosibirsk Myanmar Cambodia Rome MadridMilan Ø  Unsere Teams sind ideal verteilt, um genau auf die Bedürfnisse unserer Kunden eingehen zu können. Büros von Dragon Sourcing Vertragspartnern Sales-, Key Account Management und Projektbüros Einkaufsbüros © 2018 Dragon Sourcing. All rights reserved. Unser Netzwerk
  • 4. Service and Pricing Dragon  Sourcing  -­‐  Service  Offerings   Pricing       DS  Inhouse   Outsourced   Standard   Comment   Market  Intelligence   Procurement  Intelligence   x       Fixed  fees  according  to  price  list       Should  Cost  Model   x           Supplier  Financial  Assessment   x           Supplier  Supply  Chain   Assessment   x           Supplier  Ethics  Assessment   x           Category  ExecuBve  Dashboard   x           Country  and   Manufacturing  Site   EvaluaBon   Country  SelecBon   x       Customized  fixed  fees  based  client's   needs       Country/Region/City  Analysis   x           Factory  ramp  up  support   x           Global  Sourcing   PorHolio  Analysis  &  Category   PrioriBzaBon   x       Fixed  fees  according  to  price  list   We  can  offer  performance  related  deals   (gain  sharing,  commissions,  trading).  Deals   are  structured  on  a  case  by  case  basis   based  on  (1)  spend  value,  (2)  types  of   categories  and  (3)  nature  of  the  work   required  by  the  client   IdenBficaBon  of  potenBal   suppliers  (RFI  process)   x       Measuring  cost  compeBBveness   of  suppliers  (RFQ  process)   x       AudiBng   x   x   For  Long-­‐term  Projects  /  High  workload   Projects,  we  move  away  from  our   standard  pricing  approach  based  on  #  of   categories  and  #  of  countries  to  adopt  a   team-­‐based  pricing     Sample  development  and  tesBng   x   x   Supplier  development     x   x   Contract  negoBaton   x       Procurement  OperaBons   QC  Management   x     x     Fixed  fee  based  on  daily  billing  rate       LogisBcs  Management   x       Payment  /  Invoice  management   x       Outsourcing   Interim  Management   x  (Buyers)   x  (SQE,  SDE)   Fixed  fee  based  on  monthly  billing  rate       IPO  Management   x       Fixed  fees  based  on  team  size   Performance  related  deals  are  possible  to   be  craPed  on  a  case  by  case  basis  
  • 6. Kunden Food & Beverage Construction Government DIY Service Heavy Machinery Pharma / Medical Retail Packaging
  • 8. Analysis Approach in 3 Stages 45 Country Selection Country Analysis Region and City Analysis 2 1 3 © 2018 Dragon Sourcing. All rights reserved. •  Macro Analysis: Simple Score Card with basic indicators fitting client’s business case •  Detailed Analysis: Detailed Score Card with specific indicators for client’s business case
  • 9. 46 TAIWAN FUJIAN GUANGDONG The analysis focused on the 2 pre-selected cities, Xiamen and Shenzhen, with the objective to establish a preference among these 2 options Client Preliminary Considerations •  Development of the area •  Direct sea access •  Air Access from Europe •  Proximity and access to Taiwan Xiamen Shenzhen Client Pre-selected Cities •  Xiamen •  Shenzhen People Republic of China © 2018 Dragon Sourcing. All rights reserved.
  • 10. Information from multiple sources were used to analyze each of the 2 options in terms of cost and convenience •  Shenzhen bureau of trade & industry information center •  Shenzhen council for the promotion of International investment •  Shenzhen Administrative bureau of free trade zones •  Administrative of local taxation of Shenzhen municipality •  Guangdong province price information website Information Sources •  Xiamen Foreign Investment Bureau •  China council for the promotion of International trade – Xiamen office •  Xiamen Price bureau website •  Interviews with General Managers of western companies already located in Shenzhen or Xiamen •  Various others (Sea shipment companies and sea forwarders, Airlines schedule, etc.) COST RELATED CRITERIA •  Existing building rent / Land cost •  Labor cost •  Shipment cost •  Utilities costs •  Taxes CONVENIENCE RELATED CRITERIA •  Infrastructure / local traffic •  Safety •  Local authorities attitude •  Utilities supply quality •  Labor "manageability" •  Air access to/from The Netherlands & Taiwan •  Seaport convenience © 2018 Dragon Sourcing. All rights reserved.
  • 11. 48 Cost related criteria CRITERIA INDICATOR / PRACTICAL MEASURE Building cost Rental cost/m² Land cost Labor cost Minimum wages level set by local government Actual average wages for the typical worker profile Other employment related costs: insurances and other charges, allowance, etc… Sea shipment cost Freight cost to respectively Rotterdam and Los Angeles Utilities Utilities cost Taxes Local taxes © 2018 Dragon Sourcing. All rights reserved.
  • 12. 49 In summary, the cost difference between the 2 cities can at this stage be estimated between -230k€ and +80k€ Shenzhen Xiamen Difference / Comment Building / Land Potentially -310k€ in "downtown" areas Could represent around 310k€/year [50-30] x 13 000 x 12 = 3 120 000 RMB = 310 k€ Labor Insignificant difference Container shipping +80k€ 30 containers/month (45% Rotterdam, 35% LA) Utilities Electricity +5% during peak hours -1% over 24 hours Water -17% We may need to clarify the importance of water and gas consumption Gas +124% Taxes No difference © 2018 Dragon Sourcing. All rights reserved.
  • 13. 50 Convenience related criteria CONVENIENCE RELATED CRITERIA • Infrastructure / ease to get around • Safety • Local authorities attitude • Utilities supply quality • Labor "manageability" • Air access to/from Germany & Taiwan • Seaport convenience © 2018 Dragon Sourcing. All rights reserved.
  • 14. 51 We surveyed 13 GMs of Western companies with factories in Shenzhen or Xiamen to assess convenience criteria and complete unavailable information 37 General Managers from Western companies with a factory located either in Shenzhen or Xiamen invited to respond to the questionnaire through a phone interview 23 questions survey covering: • Road Infrastructure • Safety • Local Authorities • Utilities supply • Labor • 13 participants to the survey • 7 from Shenzhen • 6 from Xiamen • 30-45 minutes phone interview with each of them for comments on their answers • Statistical assessment of soft criteria through the satisfaction level of people in these 2 locations • Complement when no available information © 2018 Dragon Sourcing. All rights reserved.
  • 15. 52 Despite Shenzhen slightly better sea shipping and air travel services, Xiamen is clearly a better place to be than Shenzhen, from a convenience point of view Shenzhen Xiamen Difference / Comment Infrastructure / Ease to get around Clear advantage to Xiamen Safety Responses to the survey don't reflect the danger often associate to Shenzhen Local authorities attitude Small difference on the average, but significant on support to companies, efficiency and corruption Utilities supply quality Clear advantage to Xiamen Labor "manageability" Clear advantage to Xiamen, mostly due to the higher weight of "local" workers Air access Benefit from Hong Kong proximity Seaport convenience Mostly due to shorter lead-time to Europe Very Good Good Fair Bad Very Bad
  • 16. 53 In conclusion, Xiamen appears to most likely be a better option for an assembly plant in China Shenzhen Xiamen Comment Cost + + + •  Only certainty on sea shipping (~80k€/year) •  Building would actually be cheaper in Xiamen should client decide to pick a "downtown" location (estimated ~310k€/year) Convenience + + •  Sea shipping and air travel services are Xiamen only identified weaknesses Considering: •  The importance given by client to most of the convenience criteria •  The cost difference that can either be in favor of Xiamen, or represent in the worst case ~80k€ per year We consider Xiamen is most likely a better option for client © 2018 Dragon Sourcing. All rights reserved.
  • 18. Industrial Zones Industrial Zones Current Operational Status Selected for next stage of analysis 1 Operational 2 Operational 3 IZ Under Construction- No companies present yet 4 Govt. studying feasibility- awaiting external funds to commence construction 5 IZ Under Construction- No companies present yet 6 Govt. studying feasibility- awaiting external funds to commence construction 7 Govt. studying feasibility- awaiting external funds to commence construction 8 Govt. studying feasibility- awaiting external funds to commence construction 9 IZ not fully complete- very few companies present 10 Govt. studying feasibility- awaiting external funds to commence construction 11 IZ Under Construction- No companies present yet 12 IZ not fully complete- very few companies present 13 IZ not fully complete- very few companies present 13 Industrial Zones have been identified but only 2 are operational 55 Selected for further analysis (only IZs already operational) Not selected for further analysis © 2018 Dragon Sourcing. All rights reserved.
  • 19. Of the 2 industrial zones that are immediately operational, X is the preferred option 56 Parameters X Industrial Zone Y Industry Zone Developer Government Chinese company Group Area Phase I: 156 hectares fully complete and sold out Phase II: 186 hectares, construction in progress and is expected to be complete by the end of 2015. Booking open for Phase II Phase I: 233 hectares Phase II: IZ in talks with the Govt. for additional 260 hectares for phase II expansion Tax Holiday for Investors Yes (Up to 2-7 years depending on case-by case approval by Govt.) Yes (Up to 2-7 years depending on case-by case approval by Govt.) Focus Industries Textiles, Garments and leather products (including footwear) sectors Textiles, Garment, Shoe, Construction materials, Electrical equipment, Engineering material equipment manufacturing and Food processing factories Companies Present 1.  1.  Factory Rent USD 1 per square meter in Phase II (Under construction) USD 2 per square meter Available buildings for rent (L&R requires a building with floor space 20,000 sqm) 2 types of buildings in phase II being constructed: 5,000 sqm area buildings and 10,100 sqm buildings. No buildings available anymore of Phase I. Buildings available with 10,688 sqm area in Phase I. Closeness to Addis Ababa airport/ Djibouti sea port 15 km East of Addis Ababa 37 Km East of Addis Ababa Shortlisted Industrial Zone Recommendation Yes (Cheaper rental cost & closer to Addis Ababa) No (Rental more expensive, IZ focus is multi industry and further from Addis Ababa) © 2018 Dragon Sourcing. All rights reserved.
  • 20. Detailed Analysis – Location Analysis of X (1) Building & (2) Legal Entity (3) Tax and (4) Electricity 57 Parameters Industrial Zone Section Sub-section X X - Location Land Available (hectares) 156 Hectares in Phase I & 186 hectares in Phase II Location 15 km east to Addis Developer Ethiopian Government Time to set up a factory Six months to a year (estimated time to construct factory by the tenant) from the time company is registered and lease signed Special Economic Zone Yes, no import duty and export duty for products manufactured for 100% export. Monthly Rent per square meter IZ provides building at a rent of USD 1/m2 for 5 years and for the next 5 years at USD 1.25/ m2. Tenants have the option of building their own plant as well Floor space of available buildings 2 buildings at 5,000 sqm each and one at 10,100 sqm Security Deposit USD 25,000 Lease Option Investing companies have the option of building their own building by leasing land from the Govt. in X. Land is usually leased out for a period of 70 years at a one time payment of USD 11.55 per square meter (period of lease and price per square meter subject to case by case approval by the authorities). Price per square meter can be paid in full or over a period of 20 years including interest charges. Maintenance Cost to the IZ None. All utility costs will be paid by the tenants themselves directly to the service providers Legal Paper work time for registering company in Ethiopia 10 business days from the time lease is signed Tax VAT 15% Corporate Income Tax Holiday 2-7 years depending on case by case approval by the authorities based on the level of investment and projection of the growth in exports by the investing company Expat salary income tax holiday Up to two years Electricity (Govt. Rates) High voltage Consumers for over 400 KW per month USD 0.038/KW (ETB 0.77/KW) © 2018 Dragon Sourcing. All rights reserved.
  • 21. Detailed Analysis – Location Analysis (6) Workforce – 2/2 Parameters Industrial Zones Section Sub-section X Workforce Termination cost to employer 3 months salary as termination cost to be paid by the employer of 3 months notice not provided- normal working practice in Ethiopia Yearly bonus Depends on the profit gained by the employer and based on its own policy, not stipulated by the Government Lean period Major religions are Christianity and Islam - Christmas time and Ramadan time are lean period Indicative Time to Recruit a worker (number of days) Operator 30-45 days Technician 30-45 days Supervisor 30-45 days Engineer 30-45 days Manager 30-45 days Plant Manager 30-45 days Indicative Total Cost to the Company per worker category in USD Operator (2 years experience) USD 50 excluding mandatory 11% pension fund and 3% health insurance Technician (2 years experience) USD 50 excluding mandatory 11% pension fund and 3% health insurance Supervisor (3-5 years experience) USD 100 excluding mandatory 11% pension fund and 3% health insurance Engineer (5 years experience) USD 350 excluding mandatory 11% pension fund and 3% health insurance Manager (5 years experience) USD 550 excluding mandatory 11% pension fund and 3% health insurance Plant Manager (5 years experience) USD 550 excluding mandatory 11% pension fund and 3% health insurance 58 © 2018 Dragon Sourcing. All rights reserved.
  • 22. We have interviewed industry experts: Summarized Feedback Yarn Category: •  Ethiopian spinning mills seem to be producing only 100% cotton yarn or viscose yarn. •  Spinning mills are producing yarn either for self consumption if they are integrated mills or supplying limited volume outside to regular clients. •  Supply of cotton yarn to the local market is not sufficient hence garment companies or local suppliers are also importing cotton yarn. 30-40% of the cotton processed in Ethiopia is from local suppliers, rest is imported. •  Local cotton price should be competitive, length of fibers and chemical composition often lack in quality. •  Spinning mills are not producing man made yarns like Elastane, Polyamide, etc. so garment companies are directly importing or buying man made yarns from the local importers. Corrugated boxes Category: •  Number of manufacturers is limited, small to medium scale manufacturers are available with limited flexibility to make customized size. •  Suppliers’ capacity utilization seems very high leaving little room for new clients. •  Local textile companies are buying the corrugated boxes from local manufacturers only but the supply is not easy and needs to be followed aggressively to ensure on time delivery. •  Manufacturers requesting 100% payment in advance before starting the production and almost every time do not comply with the deadline. •  Delays are happening due to frequent power cuts. General comments •  Ethiopian suppliers speak little English and the communication is mostly happening in local languages. •  Ethiopian suppliers rather want to have face2face B2B relationships, and are rather weak in internet communication. •  Importing yarn to Ethiopia will be cheaper only if the end purpose is for exports as the raw material can be imported under duty & tax exemption. •  Ethiopian companies are importing yarn from different markets globally. •  Larger textile companies in Ethiopia try to be intensively vertically integrated, due to the difficult local supply situation. © 2018 Dragon Sourcing. All rights reserved.
  • 23. ANALYSIS OF TOTAL COSTS IN ETHIOPIA VS CHINA VS CZECH REP 60 © 2018 Dragon Sourcing. All rights reserved.
  • 24. 61 Level   #  of  staff   CN   CZ   ETH   Weaver   100   Technician   10   Supervisor   10   Engineer   10   Manager   5   STAFF COMPARISON OF LABOR COST PER MONTH © 2018 Dragon Sourcing. All rights reserved.
  • 25. 63 RAILWAY PLAN © 2018 Dragon Sourcing. All rights reserved.
  • 26. 64 MEETING 16 INDUSTRY MINISTER Meeting with: Tadesse HAILE, State Minister, Ministry of Industry Meeting notes: •  Goal is to make cotton available at a competitive price from in and outside of Ethiopia •  New railway will bring “50% improvement of land transport price” •  80% of Ethiopian people live in the highlands •  Proposed to move into Awassa IZ, there are 34 sheds under construction and already 22 of them are occupied/booked •  There are only 12 sheds remaining for new investors •  In order to get the sheds, the investor needs to submit its proposal •  Government wants to subsidize the transport to Awassa, so that cost is similar than from Addis •  Comparable quality and quantity of labor available in Awassa •  Airport in Awassa needs 1,5 years to be finished •  IZ in Awassa will be finished mid of 2016 •  8 Companies which have booked in Awassa: 1.  PVH - US - Garments 2.  Arvind - India - Garments 3.  Wuxi - China 4.  … © 2018 Dragon Sourcing. All rights reserved.
  • 27. Summary © 2018 Dragon Sourcing. All rights reserved. •  Mehrstufiger Prozess hilft, sich über die eingenen Anforderungen eines neuen Standortes klar zu werden •  Exakten Kostenvergleich schaffen wenn möglich auf Basis Produkt-Kosten, welche verlagert werden sollen (inkl. Umfassender Import- und Export- Kalkulation) •  Lokale Vorteile/Incentives genau prüfen •  Sehr hilfreich sind zahlreiche konkrete Einschätzungen von erfahrenen Managern vor Ort als ausgewerte Umfrage zusätzlich zur Datenbasis
  • 28. One stop. Worldwide sourcing. Eine Adresse. Weltweite Märkte. DI (FH) Christian Santner Director Germany, Austria and Switzerland christian.santner@dragonsourcing.com Dragon Sourcing Germany, Austria and Switzerland Kohldorf 79 | 8323 Sankt Marein bei Graz Austria T: +43 664 88518030 F: +43 316 2311238882 Dragon Sourcing Ltd. Headquarter 7/F Hong Kong Trade Centre 161-7 Des Voeux Rd Central Hong Kong SAR T: +852 91 80 40 57 F: +852 25 80 24 26 www.dragonsourcing.com