CITOOLKIT
RAID Log
Using the RAID Log to Monitor your Project
R A I D
citoolkit.com
In the life cycle of any project, many things may arise along the way which
can affect the project’s outcome and timeline.
RAID Log 2
Things like material shortages
and issues with suppliers may
have a negative impact on
your project and may result in
failure to produce the project
deliverables.
citoolkit.com
Definition
A RAID Log is a project management tool used to store several project
information in one place.
RAID Log 3
citoolkit.com
Uses
Serves as a central repository for all . . .
RAID Log 4
RISKS
ISSUES
ASSUMPTIONS
DEPENDENCIES
Keeps track of everything happening in your project
citoolkit.com
Benefits
RAID Log 5
Useful document in regular project
meetings and for audit purposes.
Allows to engage with upper
management and ask their support
where necessary.
Keeps your project organized and on
track and makes the information
easier to store and retrieve.
Gives confidence to all project
stakeholders that the project is under
control and being monitored.
citoolkit.com
Risks
A risk is something that will have a negative impact on the project if it
happens.
RAID Log 6
R A I D
Refers to the combined likelihood that an event
will occur and the impact on the project if it
occurs.
An example of a project risk is a possible
shortage in staff that could delay completion of
the project.
citoolkit.com
Risks
Can lead to quality, delay or cost problems.
RAID Log 7
Cost Delivery
Quality
CUSTOMER
SATISFACTION
R A I D
This can cause a significant
impact on customer
satisfaction in various ways
including quality problems,
delays, communication
breakdown, and customer
experience.
citoolkit.com
Risks
• Risks are often ranked by their Risk Priority Numbers (RPNs).
• The RPN is typically calculated using a formula that considers the severity
of the risk, the likelihood of its occurrence, and the detectability of the
risk before it causes harm.
RAID Log 8
R A I D
A plan should then
be developed to
mitigate risks with
high RPN
citoolkit.com
Assumptions
Events and circumstances which are expected to happen during
project life cycle of the project.
RAID Log 9
R A I D
Assumptions can turn into risks if they
negatively impacts the ability to deliver the
project.
Project assumptions must be documented as early as possible in the project planning phase
to ensure that all the stakeholders are working under the same set of assumptions
citoolkit.com
Assumptions - Examples
1. The project team will have access to
needed systems and resources.
2. Staff in a particular department will be
available for the project all the time.
3. Staff in another department will not
participate in the project at certain
times.
RAID Log 10
R A I D
citoolkit.com
Assumptions – Assumptions Analysis
RAID Log 11
R A I D
Allows questioning the
assumptions
Helps discover problematic
assumptions
citoolkit.com
Issues
Unanticipated incidents that cause the project to become out of
alignment.
RAID Log 12
R A I D
Occur during the life cycle of the
project
Affect the project's set goals, cost or
schedule
They are risks that have already
happened
citoolkit.com
Issues - Example
A security breach that resulted in an unauthorized access of data or
loss of valuable data.
RAID Log 13
R A I D
citoolkit.com
Issues
When issues arise, you should be ready to deal with them, otherwise
they may result in a poor delivery of the project, or even failure.
RAID Log 14
R A I D
Monitor issues from start to resolution!
citoolkit.com
Dependencies
Those activities which need to start or be completed for the project to
proceed successfully.
RAID Log 15
R A I D
Gantt charts can be useful to identify
and visualize the dependencies in
your project.
Dependencies may arise during the project and need to be logged as soon as
they are noticed.
citoolkit.com
Dependencies - Examples
RAID Log 16
R A I D
Conducting a
study prior to
the selection of
a subcontractor
or supplier.
Installing the
software before
training people
on how to use it.
citoolkit.com
Dependencies vs. Decision
The ‘D’ in the RAID acronym may also refer to Decisions that should be
made throughout the project in order to achieve the project goals.
RAID Log 17
citoolkit.com
Project Management
Active management of the RAID log elements is one of the key roles of the
project manager.
RAID Log 18
It should drive to take the
necessary actions in order to
ensure successful execution of
the project.
citoolkit.com
Approach
A good practice is to create a RAID log at the beginning of each project.
Then regularly review and update it as necessary through regular project
meetings.
RAID Log 19
RAID Log can be used as a main source
for your status reporting.
citoolkit.com
Example
This is an example of a RAID log which summarizes the details of a supply
chain project.
RAID Log 20
RAID Category Description Impact Owner Priority
ISSUE Vendor master data is outdated A . N Low
ISSUE Absence of procurement policies A . N Negligible
ASSUMPTION
Information is available prior
the approval process
I . H Moderate
RISK Long supply delivery time
Impact on the project
schedule
A . N Critical
ASSUMPTION
Proper material and service
quality inspection
C . D High
ISSUE
Absence of preventive
maintenance plan
M . S Moderate
RISK
Inability to do required
maintenance on time
Impact on the project
schedule and cost
M . S High
citoolkit.com
RAID Dashboard
RAID Log 21
A way to summarize all the logging.
Allows project team to review all relevant
information related to a project at a glance.
There are many tools that can help manage and
track the log.
citoolkit.com
RAID Dashboard Example
RAID Log 22
High
1 High
1 High
0 High
0
Moderate
0 Moderate
1 Moderate
1 Moderate
0
Low
0 Low
0 Low
1 Low
0
Negligible
0 Negligible
0 Negligible
1 Negligible
0
Risks Assumptions Issues Dependencies
Critical
1 Critical
0 Critical
0 Critical
0
2 2 3 0
citoolkit.com
Further Information
RAID Log 23
Risks and issues need to
be given more attention
and to be dealt with
decisively.
Assumptions and
dependencies could later
be turned into risks when
more time is taken to
analyze them.
Assumptions and
dependencies could later
be turned into risks when
more time is taken to
analyze them.
© Copyright Citoolkit.com. All Rights Reserved.
CITOOLKIT
Made with by
The Continuous Improvement Toolkit
www.citoolkit.com

More Related Content

Similar to Using the RAID Log to Monitor Your Project

Introduction of Secure Software Development Lifecycle
Introduction of Secure Software Development LifecycleIntroduction of Secure Software Development Lifecycle
Introduction of Secure Software Development LifecycleRishi Kant
 
Project design considerations for integration of oem skid equipment with plan...
Project design considerations for integration of oem skid equipment with plan...Project design considerations for integration of oem skid equipment with plan...
Project design considerations for integration of oem skid equipment with plan...IntelligentManufacturingInstitute
 
Implement Data Ware House
Implement Data Ware HouseImplement Data Ware House
Implement Data Ware Housebhuphender
 
DevSecCon Boston 2018: Technical debt - why I love it by Mike Bursell
DevSecCon Boston 2018: Technical debt - why I love it by Mike BursellDevSecCon Boston 2018: Technical debt - why I love it by Mike Bursell
DevSecCon Boston 2018: Technical debt - why I love it by Mike BursellDevSecCon
 
Process Quality Management, Human Resources, Quality Assurance
Process Quality Management, Human Resources, QualityAssuranceProcess Quality Management, Human Resources, QualityAssurance
Process Quality Management, Human Resources, Quality AssuranceReem Alattas
 
Project Management Success Series: Part Three
Project Management Success Series: Part ThreeProject Management Success Series: Part Three
Project Management Success Series: Part ThreeJill Hogue
 
Project Management Sample
Project Management SampleProject Management Sample
Project Management SampleRavi Nakulan
 
S1: Predix ISV Partner Program (Predix Transform 2016)
S1: Predix ISV Partner Program (Predix Transform 2016)S1: Predix ISV Partner Program (Predix Transform 2016)
S1: Predix ISV Partner Program (Predix Transform 2016)Predix
 
Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Skillogic Solutions
 
Project Charter Components: The Power of the One-Page Document
Project Charter Components: The Power of the One-Page DocumentProject Charter Components: The Power of the One-Page Document
Project Charter Components: The Power of the One-Page DocumentCIToolkit
 
IBM i Development: Increase Accuracy and Efficiency with SEQUEL's ABSTRACT a...
 IBM i Development: Increase Accuracy and Efficiency with SEQUEL's ABSTRACT a... IBM i Development: Increase Accuracy and Efficiency with SEQUEL's ABSTRACT a...
IBM i Development: Increase Accuracy and Efficiency with SEQUEL's ABSTRACT a...HelpSystems
 
8.project management chapter 8
8.project management chapter 88.project management chapter 8
8.project management chapter 8Warui Maina
 
Ten Things You Should not Forget in Mainframe Security
Ten Things You Should not Forget in Mainframe Security Ten Things You Should not Forget in Mainframe Security
Ten Things You Should not Forget in Mainframe Security CA Technologies
 
What scrum masters and product owners should know about software quality and ...
What scrum masters and product owners should know about software quality and ...What scrum masters and product owners should know about software quality and ...
What scrum masters and product owners should know about software quality and ...STX Next
 
Women in Innovation - Risk Register: What Could Possibly Go Wrong
Women in Innovation - Risk Register: What Could Possibly Go WrongWomen in Innovation - Risk Register: What Could Possibly Go Wrong
Women in Innovation - Risk Register: What Could Possibly Go WrongKTN
 
Strategies to limit project timeline and cost in medical devices
Strategies to limit project timeline and cost in medical devicesStrategies to limit project timeline and cost in medical devices
Strategies to limit project timeline and cost in medical devicesJanel Heilbrunn
 
OSMC 2022 | Scaling SLOs with K8s and Cloud-native Observability by George Ha...
OSMC 2022 | Scaling SLOs with K8s and Cloud-native Observability by George Ha...OSMC 2022 | Scaling SLOs with K8s and Cloud-native Observability by George Ha...
OSMC 2022 | Scaling SLOs with K8s and Cloud-native Observability by George Ha...NETWAYS
 
Introduction Software and Software Engineering
Introduction Software and Software EngineeringIntroduction Software and Software Engineering
Introduction Software and Software Engineeringinfinitetechnology20
 

Similar to Using the RAID Log to Monitor Your Project (20)

03_AgilePM.pptx
03_AgilePM.pptx03_AgilePM.pptx
03_AgilePM.pptx
 
Introduction of Secure Software Development Lifecycle
Introduction of Secure Software Development LifecycleIntroduction of Secure Software Development Lifecycle
Introduction of Secure Software Development Lifecycle
 
Project design considerations for integration of oem skid equipment with plan...
Project design considerations for integration of oem skid equipment with plan...Project design considerations for integration of oem skid equipment with plan...
Project design considerations for integration of oem skid equipment with plan...
 
Implement Data Ware House
Implement Data Ware HouseImplement Data Ware House
Implement Data Ware House
 
DevSecCon Boston 2018: Technical debt - why I love it by Mike Bursell
DevSecCon Boston 2018: Technical debt - why I love it by Mike BursellDevSecCon Boston 2018: Technical debt - why I love it by Mike Bursell
DevSecCon Boston 2018: Technical debt - why I love it by Mike Bursell
 
Process Quality Management, Human Resources, Quality Assurance
Process Quality Management, Human Resources, QualityAssuranceProcess Quality Management, Human Resources, QualityAssurance
Process Quality Management, Human Resources, Quality Assurance
 
Project Management Success Series: Part Three
Project Management Success Series: Part ThreeProject Management Success Series: Part Three
Project Management Success Series: Part Three
 
Project Management Sample
Project Management SampleProject Management Sample
Project Management Sample
 
S1: Predix ISV Partner Program (Predix Transform 2016)
S1: Predix ISV Partner Program (Predix Transform 2016)S1: Predix ISV Partner Program (Predix Transform 2016)
S1: Predix ISV Partner Program (Predix Transform 2016)
 
Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5
 
Project Charter Components: The Power of the One-Page Document
Project Charter Components: The Power of the One-Page DocumentProject Charter Components: The Power of the One-Page Document
Project Charter Components: The Power of the One-Page Document
 
IBM i Development: Increase Accuracy and Efficiency with SEQUEL's ABSTRACT a...
 IBM i Development: Increase Accuracy and Efficiency with SEQUEL's ABSTRACT a... IBM i Development: Increase Accuracy and Efficiency with SEQUEL's ABSTRACT a...
IBM i Development: Increase Accuracy and Efficiency with SEQUEL's ABSTRACT a...
 
8.project management chapter 8
8.project management chapter 88.project management chapter 8
8.project management chapter 8
 
Ten Things You Should not Forget in Mainframe Security
Ten Things You Should not Forget in Mainframe Security Ten Things You Should not Forget in Mainframe Security
Ten Things You Should not Forget in Mainframe Security
 
What scrum masters and product owners should know about software quality and ...
What scrum masters and product owners should know about software quality and ...What scrum masters and product owners should know about software quality and ...
What scrum masters and product owners should know about software quality and ...
 
Women in Innovation - Risk Register: What Could Possibly Go Wrong
Women in Innovation - Risk Register: What Could Possibly Go WrongWomen in Innovation - Risk Register: What Could Possibly Go Wrong
Women in Innovation - Risk Register: What Could Possibly Go Wrong
 
Enterprise Agile at Lockheed Martin - 4th February 2014
Enterprise Agile at Lockheed Martin - 4th February 2014Enterprise Agile at Lockheed Martin - 4th February 2014
Enterprise Agile at Lockheed Martin - 4th February 2014
 
Strategies to limit project timeline and cost in medical devices
Strategies to limit project timeline and cost in medical devicesStrategies to limit project timeline and cost in medical devices
Strategies to limit project timeline and cost in medical devices
 
OSMC 2022 | Scaling SLOs with K8s and Cloud-native Observability by George Ha...
OSMC 2022 | Scaling SLOs with K8s and Cloud-native Observability by George Ha...OSMC 2022 | Scaling SLOs with K8s and Cloud-native Observability by George Ha...
OSMC 2022 | Scaling SLOs with K8s and Cloud-native Observability by George Ha...
 
Introduction Software and Software Engineering
Introduction Software and Software EngineeringIntroduction Software and Software Engineering
Introduction Software and Software Engineering
 

More from CIToolkit

Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsCIToolkit
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingCIToolkit
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsCIToolkit
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisCIToolkit
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsCIToolkit
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementCIToolkit
 
Flowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsFlowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsCIToolkit
 
Yokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingYokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingCIToolkit
 
Value Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines ValueValue Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines ValueCIToolkit
 
The Main Components of an Effective Visual Management System
The Main Components of an Effective Visual Management SystemThe Main Components of an Effective Visual Management System
The Main Components of an Effective Visual Management SystemCIToolkit
 
Process Charts and Process Sequence Charts: Tools for Process Improvement
Process Charts and Process Sequence Charts: Tools for Process ImprovementProcess Charts and Process Sequence Charts: Tools for Process Improvement
Process Charts and Process Sequence Charts: Tools for Process ImprovementCIToolkit
 

More from CIToolkit (20)

Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-Making
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data Sets
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram Analysis
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data Insights
 
Leveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous ImprovementLeveraging Gap Analysis for Continuous Improvement
Leveraging Gap Analysis for Continuous Improvement
 
Flowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of FlowchartsFlowcharting: The Three Common Types of Flowcharts
Flowcharting: The Three Common Types of Flowcharts
 
Yokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice SharingYokoten: Enhancing Performance through Best Practice Sharing
Yokoten: Enhancing Performance through Best Practice Sharing
 
Value Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines ValueValue Analysis: How Lean Thinking Defines Value
Value Analysis: How Lean Thinking Defines Value
 
The Main Components of an Effective Visual Management System
The Main Components of an Effective Visual Management SystemThe Main Components of an Effective Visual Management System
The Main Components of an Effective Visual Management System
 
Process Charts and Process Sequence Charts: Tools for Process Improvement
Process Charts and Process Sequence Charts: Tools for Process ImprovementProcess Charts and Process Sequence Charts: Tools for Process Improvement
Process Charts and Process Sequence Charts: Tools for Process Improvement
 

Recently uploaded

Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 

Recently uploaded (13)

Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 

Using the RAID Log to Monitor Your Project

  • 1. CITOOLKIT RAID Log Using the RAID Log to Monitor your Project R A I D
  • 2. citoolkit.com In the life cycle of any project, many things may arise along the way which can affect the project’s outcome and timeline. RAID Log 2 Things like material shortages and issues with suppliers may have a negative impact on your project and may result in failure to produce the project deliverables.
  • 3. citoolkit.com Definition A RAID Log is a project management tool used to store several project information in one place. RAID Log 3
  • 4. citoolkit.com Uses Serves as a central repository for all . . . RAID Log 4 RISKS ISSUES ASSUMPTIONS DEPENDENCIES Keeps track of everything happening in your project
  • 5. citoolkit.com Benefits RAID Log 5 Useful document in regular project meetings and for audit purposes. Allows to engage with upper management and ask their support where necessary. Keeps your project organized and on track and makes the information easier to store and retrieve. Gives confidence to all project stakeholders that the project is under control and being monitored.
  • 6. citoolkit.com Risks A risk is something that will have a negative impact on the project if it happens. RAID Log 6 R A I D Refers to the combined likelihood that an event will occur and the impact on the project if it occurs. An example of a project risk is a possible shortage in staff that could delay completion of the project.
  • 7. citoolkit.com Risks Can lead to quality, delay or cost problems. RAID Log 7 Cost Delivery Quality CUSTOMER SATISFACTION R A I D This can cause a significant impact on customer satisfaction in various ways including quality problems, delays, communication breakdown, and customer experience.
  • 8. citoolkit.com Risks • Risks are often ranked by their Risk Priority Numbers (RPNs). • The RPN is typically calculated using a formula that considers the severity of the risk, the likelihood of its occurrence, and the detectability of the risk before it causes harm. RAID Log 8 R A I D A plan should then be developed to mitigate risks with high RPN
  • 9. citoolkit.com Assumptions Events and circumstances which are expected to happen during project life cycle of the project. RAID Log 9 R A I D Assumptions can turn into risks if they negatively impacts the ability to deliver the project. Project assumptions must be documented as early as possible in the project planning phase to ensure that all the stakeholders are working under the same set of assumptions
  • 10. citoolkit.com Assumptions - Examples 1. The project team will have access to needed systems and resources. 2. Staff in a particular department will be available for the project all the time. 3. Staff in another department will not participate in the project at certain times. RAID Log 10 R A I D
  • 11. citoolkit.com Assumptions – Assumptions Analysis RAID Log 11 R A I D Allows questioning the assumptions Helps discover problematic assumptions
  • 12. citoolkit.com Issues Unanticipated incidents that cause the project to become out of alignment. RAID Log 12 R A I D Occur during the life cycle of the project Affect the project's set goals, cost or schedule They are risks that have already happened
  • 13. citoolkit.com Issues - Example A security breach that resulted in an unauthorized access of data or loss of valuable data. RAID Log 13 R A I D
  • 14. citoolkit.com Issues When issues arise, you should be ready to deal with them, otherwise they may result in a poor delivery of the project, or even failure. RAID Log 14 R A I D Monitor issues from start to resolution!
  • 15. citoolkit.com Dependencies Those activities which need to start or be completed for the project to proceed successfully. RAID Log 15 R A I D Gantt charts can be useful to identify and visualize the dependencies in your project. Dependencies may arise during the project and need to be logged as soon as they are noticed.
  • 16. citoolkit.com Dependencies - Examples RAID Log 16 R A I D Conducting a study prior to the selection of a subcontractor or supplier. Installing the software before training people on how to use it.
  • 17. citoolkit.com Dependencies vs. Decision The ‘D’ in the RAID acronym may also refer to Decisions that should be made throughout the project in order to achieve the project goals. RAID Log 17
  • 18. citoolkit.com Project Management Active management of the RAID log elements is one of the key roles of the project manager. RAID Log 18 It should drive to take the necessary actions in order to ensure successful execution of the project.
  • 19. citoolkit.com Approach A good practice is to create a RAID log at the beginning of each project. Then regularly review and update it as necessary through regular project meetings. RAID Log 19 RAID Log can be used as a main source for your status reporting.
  • 20. citoolkit.com Example This is an example of a RAID log which summarizes the details of a supply chain project. RAID Log 20 RAID Category Description Impact Owner Priority ISSUE Vendor master data is outdated A . N Low ISSUE Absence of procurement policies A . N Negligible ASSUMPTION Information is available prior the approval process I . H Moderate RISK Long supply delivery time Impact on the project schedule A . N Critical ASSUMPTION Proper material and service quality inspection C . D High ISSUE Absence of preventive maintenance plan M . S Moderate RISK Inability to do required maintenance on time Impact on the project schedule and cost M . S High
  • 21. citoolkit.com RAID Dashboard RAID Log 21 A way to summarize all the logging. Allows project team to review all relevant information related to a project at a glance. There are many tools that can help manage and track the log.
  • 22. citoolkit.com RAID Dashboard Example RAID Log 22 High 1 High 1 High 0 High 0 Moderate 0 Moderate 1 Moderate 1 Moderate 0 Low 0 Low 0 Low 1 Low 0 Negligible 0 Negligible 0 Negligible 1 Negligible 0 Risks Assumptions Issues Dependencies Critical 1 Critical 0 Critical 0 Critical 0 2 2 3 0
  • 23. citoolkit.com Further Information RAID Log 23 Risks and issues need to be given more attention and to be dealt with decisively. Assumptions and dependencies could later be turned into risks when more time is taken to analyze them. Assumptions and dependencies could later be turned into risks when more time is taken to analyze them.
  • 24. © Copyright Citoolkit.com. All Rights Reserved. CITOOLKIT Made with by The Continuous Improvement Toolkit www.citoolkit.com