Uganda’s Electricity
Strategy
2025- 2035
CONTENTS
Current Situation................................................................................................................................ 2
From Surplus to Deficit ....................................................................................................................... 2
The Strategic Imperatives.................................................................................................................... 3
CURRENT SITUATION
Uganda currently boosts of a combined electricity capacity of 2022.7 MW (inclusive of Karuma, an asset
under construction). The bulk of this supply is from the hydropower dams, with the bagasse, oil fired and
solar powered plants acting as supplements. Based on the average energy factor of Uganda’s hydro-power
dams, the adjusted electricity capacity stands at 1720MW of electricity. Furthermore, factoring in the
planned maintenance factor, final adjusted electricity capacity of Uganda comes to 1462MW of electricity.
The final adjustment factor for the distribution and transmission losses brings Uganda’s realized capacity
at 1243MW of electricity.
This Electricity strategy document has considered the realized capacity of 1243MW of electricity as the
planning baseline. The current peak maximum demand stands at 893 MW, thus a surplus of only 350MW.
The objective of this document is to make an urgent call for accelerated investment in the electricity
infrastructure to combat a crisis in the ten-year period 2025-2035. As of 2024, this is the electricity
situation of Uganda.
Realized
Electricity
Capacity (2024)
1243MW
Maximum Peak
Demand (2024)
893MW
Surplus 350MW
FROM SURPLUS TO DEFICIT
Although Uganda could claim a 350MW surplus, Ortega Group projects that this will soon convert into a
deficit in the period 2025 to 2030.
1. Growing Population
Uganda’s current population is estimated at 48 million people and is projected to reach 69 million by 2030.
Domestic usage accounts for 22% of Uganda’s electricity demand thus a current domestic demand of
196.46MW. By 2030, this domestic demand will grow to 300MW.
2. Industrialization Requirements
We have combined the demand requirements of the commercial, medium industrial, large industrial, extra
large industrial and street lighting thus giving a 78% contribution to electricity demand. This combined
demand currently stands at 696.54MW. By 2035, this requirement according to our energy model is
expected to have grown to 8885MW.
3. The New Demand
Thus, the combined electricity demand in Uganda in 2035 is estimated at 9185MW. This takes into
consideration the growing commercial and industrial requirements, the growth in domestic consumption
and the other requirements around street lighting. Does Uganda have a plan for addressing this gap? Does
Uganda plan to invest ahead of this demand?
THE STRATEGIC IMPERATIVES
At a current realized capacity of 1243MW, Uganda needs to add an extra 7942MW to its grid in the next 10
years to meet its projected demand of 9185MW. To do this, Uganda’s strategy must be underpinned by
both the time and cost factor. Time (because all energy projects take more than 8 years from inception to
commissioning), cost (because Uganda must figure out a financing strategy for these infrastructure
projects). Ortega Group recommends the below electricity strategic imperatives:
1. Accelerate Investment in Large Capacity Generation (1000MW and above)
Uganda must accelerate investment in a large capacity generation project. That’s to say, Uganda should
prioritize generation projects that are going to deliver no less than 1000MW. Ayago project should be sized
upwards from 840MW into the tune of 1000MW and fast-tracked for a ground-breaking in 2025. Phase One
of the Buyende Nuclear Power Plant should also be prioritized to guarantee the 2000MW delivery. Uganda
must deliberately rethink all planned power projects that deliver less than 500MW. The country must make
this trade-off, with stretched power factors of 0.9.
2. Urgently embark on the Overhaul and Expansion of the Transmission and Distribution Lines
Uganda experiences some of the highest transmission and distribution losses, averaging more than 18%.
This implies that 18% of the electricity that’s generated, is lost along the way. First, Uganda must prioritize
and approve distribution at high voltage of 66KV over the long distances. Uganda’s transmission network
stands at 2569.8 kilometres of electric lines while the distribution network is at 45,423.1 km. As a result,
several distribution lines are also used as transmission lines, resulting in inefficiencies and losses. Uganda
must fast-track the two-way transmission rings around Northern Tanzania, Southern Sudan, and DRC
Congo. In particular, the 400KV Lake Victoria Ring should take priority.
3. Constitute a Uganda Electricity Strategy Cross-Functional Team (CFT)
Given the risk in delaying the infrastructure investment, Uganda should urgently constitute an electricity
strategy cross-functional team. This team should consist of all the key players in the electricityvalue chain,
inclusive of the financing players. This CFT will help overcome the siloed working that contributes to most
of the delays in implementation. The mandate of this CFT should run till 2035 with a quarterly review and
report to the Cabinet on progress.
This Strategic Outlook has been compiled and produced by:
www.ortegagroupug.com
+256 781754358
Email: ortegagrouplimited@gmail.com

More Related Content

Similar to Uganda Electricity Strategy- An Outlook.pdf

Energy distribution in Pakistan
Energy distribution in PakistanEnergy distribution in Pakistan
Energy distribution in PakistanUzma Fatima Ch.
 
Energy sector of pakistan
Energy sector of pakistanEnergy sector of pakistan
Energy sector of pakistanOwais Hassan
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Kachinga-Wankunda Phiri
 
Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...
Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...
Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...Celestial Light
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantL'Obel Solar Power System
 
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...IRJET Journal
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsDr. Oliver Massmann
 
Afghanistan-Renewable-Energy-Policy-English-and-Dari.pdf
Afghanistan-Renewable-Energy-Policy-English-and-Dari.pdfAfghanistan-Renewable-Energy-Policy-English-and-Dari.pdf
Afghanistan-Renewable-Energy-Policy-English-and-Dari.pdfJanPan7
 
Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)Nieza Noordin
 
South African Electricity Sector
South African Electricity SectorSouth African Electricity Sector
South African Electricity Sectorlmaurer
 
NATIONAL RENEWABLE ENERGY AND ENERGY EFFICIENCY POLICY (NREEEP)
NATIONAL RENEWABLE ENERGY AND ENERGY EFFICIENCY POLICY (NREEEP)NATIONAL RENEWABLE ENERGY AND ENERGY EFFICIENCY POLICY (NREEEP)
NATIONAL RENEWABLE ENERGY AND ENERGY EFFICIENCY POLICY (NREEEP)Nigeria Alternative Energy Expo
 
TRANSIENT STABILITY ANALYSIS
TRANSIENT STABILITY ANALYSISTRANSIENT STABILITY ANALYSIS
TRANSIENT STABILITY ANALYSISJeff taly
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014Headway Solar
 
Overview of solar power generation in india
Overview of solar power generation in indiaOverview of solar power generation in india
Overview of solar power generation in indiaBinit Das
 
$MER 1H20 Briefing Presentation
$MER 1H20 Briefing Presentation$MER 1H20 Briefing Presentation
$MER 1H20 Briefing PresentationZarr Pacificador
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Headway Solar
 

Similar to Uganda Electricity Strategy- An Outlook.pdf (20)

Energy distribution in Pakistan
Energy distribution in PakistanEnergy distribution in Pakistan
Energy distribution in Pakistan
 
Energy sector of pakistan
Energy sector of pakistanEnergy sector of pakistan
Energy sector of pakistan
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16
 
Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...
Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...
Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plant
 
9-Energy
9-Energy9-Energy
9-Energy
 
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key Highlights
 
Afghanistan-Renewable-Energy-Policy-English-and-Dari.pdf
Afghanistan-Renewable-Energy-Policy-English-and-Dari.pdfAfghanistan-Renewable-Energy-Policy-English-and-Dari.pdf
Afghanistan-Renewable-Energy-Policy-English-and-Dari.pdf
 
Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)Energy Malaysia Volume 6 (1)
Energy Malaysia Volume 6 (1)
 
South African Electricity Sector
South African Electricity SectorSouth African Electricity Sector
South African Electricity Sector
 
NATIONAL RENEWABLE ENERGY AND ENERGY EFFICIENCY POLICY (NREEEP)
NATIONAL RENEWABLE ENERGY AND ENERGY EFFICIENCY POLICY (NREEEP)NATIONAL RENEWABLE ENERGY AND ENERGY EFFICIENCY POLICY (NREEEP)
NATIONAL RENEWABLE ENERGY AND ENERGY EFFICIENCY POLICY (NREEEP)
 
TRANSIENT STABILITY ANALYSIS
TRANSIENT STABILITY ANALYSISTRANSIENT STABILITY ANALYSIS
TRANSIENT STABILITY ANALYSIS
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
Recommendations and solutions to remove some barriers to the deployment of sm...
Recommendations and solutions to remove some barriers to the deployment of sm...Recommendations and solutions to remove some barriers to the deployment of sm...
Recommendations and solutions to remove some barriers to the deployment of sm...
 
Overview of solar power generation in india
Overview of solar power generation in indiaOverview of solar power generation in india
Overview of solar power generation in india
 
21PESGM2656.pptx
21PESGM2656.pptx21PESGM2656.pptx
21PESGM2656.pptx
 
$MER 1H20 Briefing Presentation
$MER 1H20 Briefing Presentation$MER 1H20 Briefing Presentation
$MER 1H20 Briefing Presentation
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015
 
Small & medium wind strategy report
Small & medium wind strategy reportSmall & medium wind strategy report
Small & medium wind strategy report
 

Recently uploaded

VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companiesprashantbhati354
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfMichael Silva
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdfAdnet Communications
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawlmakika9823
 
Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfGale Pooley
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionMuhammadHusnain82237
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesMarketing847413
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Roomdivyansh0kumar0
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdfHenry Tapper
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designsegoetzinger
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Roomdivyansh0kumar0
 

Recently uploaded (20)

VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companies
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdf
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
 
Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024
 
🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdf
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th edition
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast Slides
 
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jodhpur Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jodhpur Park 👉 8250192130 Available With Room
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdf
 
Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designs
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
 

Uganda Electricity Strategy- An Outlook.pdf

  • 1. Uganda’s Electricity Strategy 2025- 2035 CONTENTS Current Situation................................................................................................................................ 2 From Surplus to Deficit ....................................................................................................................... 2 The Strategic Imperatives.................................................................................................................... 3
  • 2. CURRENT SITUATION Uganda currently boosts of a combined electricity capacity of 2022.7 MW (inclusive of Karuma, an asset under construction). The bulk of this supply is from the hydropower dams, with the bagasse, oil fired and solar powered plants acting as supplements. Based on the average energy factor of Uganda’s hydro-power dams, the adjusted electricity capacity stands at 1720MW of electricity. Furthermore, factoring in the planned maintenance factor, final adjusted electricity capacity of Uganda comes to 1462MW of electricity. The final adjustment factor for the distribution and transmission losses brings Uganda’s realized capacity at 1243MW of electricity. This Electricity strategy document has considered the realized capacity of 1243MW of electricity as the planning baseline. The current peak maximum demand stands at 893 MW, thus a surplus of only 350MW. The objective of this document is to make an urgent call for accelerated investment in the electricity infrastructure to combat a crisis in the ten-year period 2025-2035. As of 2024, this is the electricity situation of Uganda. Realized Electricity Capacity (2024) 1243MW Maximum Peak Demand (2024) 893MW Surplus 350MW FROM SURPLUS TO DEFICIT Although Uganda could claim a 350MW surplus, Ortega Group projects that this will soon convert into a deficit in the period 2025 to 2030. 1. Growing Population Uganda’s current population is estimated at 48 million people and is projected to reach 69 million by 2030. Domestic usage accounts for 22% of Uganda’s electricity demand thus a current domestic demand of 196.46MW. By 2030, this domestic demand will grow to 300MW. 2. Industrialization Requirements We have combined the demand requirements of the commercial, medium industrial, large industrial, extra large industrial and street lighting thus giving a 78% contribution to electricity demand. This combined demand currently stands at 696.54MW. By 2035, this requirement according to our energy model is expected to have grown to 8885MW. 3. The New Demand Thus, the combined electricity demand in Uganda in 2035 is estimated at 9185MW. This takes into consideration the growing commercial and industrial requirements, the growth in domestic consumption and the other requirements around street lighting. Does Uganda have a plan for addressing this gap? Does Uganda plan to invest ahead of this demand?
  • 3. THE STRATEGIC IMPERATIVES At a current realized capacity of 1243MW, Uganda needs to add an extra 7942MW to its grid in the next 10 years to meet its projected demand of 9185MW. To do this, Uganda’s strategy must be underpinned by both the time and cost factor. Time (because all energy projects take more than 8 years from inception to commissioning), cost (because Uganda must figure out a financing strategy for these infrastructure projects). Ortega Group recommends the below electricity strategic imperatives: 1. Accelerate Investment in Large Capacity Generation (1000MW and above) Uganda must accelerate investment in a large capacity generation project. That’s to say, Uganda should prioritize generation projects that are going to deliver no less than 1000MW. Ayago project should be sized upwards from 840MW into the tune of 1000MW and fast-tracked for a ground-breaking in 2025. Phase One of the Buyende Nuclear Power Plant should also be prioritized to guarantee the 2000MW delivery. Uganda must deliberately rethink all planned power projects that deliver less than 500MW. The country must make this trade-off, with stretched power factors of 0.9. 2. Urgently embark on the Overhaul and Expansion of the Transmission and Distribution Lines Uganda experiences some of the highest transmission and distribution losses, averaging more than 18%. This implies that 18% of the electricity that’s generated, is lost along the way. First, Uganda must prioritize and approve distribution at high voltage of 66KV over the long distances. Uganda’s transmission network stands at 2569.8 kilometres of electric lines while the distribution network is at 45,423.1 km. As a result, several distribution lines are also used as transmission lines, resulting in inefficiencies and losses. Uganda must fast-track the two-way transmission rings around Northern Tanzania, Southern Sudan, and DRC Congo. In particular, the 400KV Lake Victoria Ring should take priority. 3. Constitute a Uganda Electricity Strategy Cross-Functional Team (CFT) Given the risk in delaying the infrastructure investment, Uganda should urgently constitute an electricity strategy cross-functional team. This team should consist of all the key players in the electricityvalue chain, inclusive of the financing players. This CFT will help overcome the siloed working that contributes to most of the delays in implementation. The mandate of this CFT should run till 2035 with a quarterly review and report to the Cabinet on progress.
  • 4. This Strategic Outlook has been compiled and produced by: www.ortegagroupug.com +256 781754358 Email: ortegagrouplimited@gmail.com