SlideShare a Scribd company logo
1 of 29
Download to read offline
ENGR. M.A. RASHID TIPU,CFPS
Certified Fire Protection Specialist
Ba-08, South Badda, Gulshan, (Behind of shooting club)
Dhaka-1212, Bangladesh.
Mobile:-01717-432054, 01670-212478
PROJECT NAME AND ADDRESS
OCCUPANCY CLASSIFICATION
BUILDING TYPE
PREPARED BY
APPROVED BY
DEPARTMENT OF
FIRE SERVICE & CIVIL DEFENSE
38-46, ROAD-KAZI-ALAUDDIN ROAD,
SIDDIQUE BAZAR, DHAKA 1000
WE KILL FIRE BEFORE IT KILLS YOU
R.C.C BUILDING
MART ENGINEERING & CONSULTANCY
HOTLINE:-01717-432054, 01670-212478
PROPOSED FIRE SAFETY PLAN DRAWING
OWNER'S NAME
D-1
Ref No:MEC:Dhaka:December:2021:18
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING.
BUILDING DEVELOPER OWNER
AT SATARKUL,DHAKA
ABUL KALAM AZAD
(6250+4000)KVA ELECTRICAL SUB-STATION
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO
INDEX-1
1
DESCRIPTION
COVER PAGE
INDEX-1
MASTER LAYOUT PLAN
ALL FLOOR NAME & AREA-1
GOOGLE MAP
GENERAL NOTE
SEMI BASEMENT FLOOR PLAN-CHEMOTHERAPY,CAR PARKING FOR COLLEGE STAFF ,
CAR PARKING FOR HOSPITAL STAFF
SECTION OF UNITED MEDICAL COLLEGE & HOSPITAL
BASEMENT PLAN- CAR PARKING AREA
7TH FLOOR PLAN-VIP,DELUXE,DOUBLE BED,SINGLE CABIN ,EXAM HALL AREA
8TH FLOOR PLAN-VIP,DELUXE,DOUBLE SINGLE CABIN AREA
LIGHTING PROTECTION SYSTEM
PROPOSED FIRE ALARM RISER DIAGRAM-2
9TH FLOOR PLAN-VIP CABIN,DELUXE ,DOUBLE BED CABIN ,SINGLE CABIN AREA
Roof Floor plan
GROUND FLOOR PLAN-CONSULTANT ROOM ,AMBULANCE PARKING ,ATM BOOTH ,MAMMOGRAPHY ,
ULTRA SONOGRAM ,X-RAY ,FLUOROSCOPY ,MRI ,CT SCAN AREA
GROUND FLOOR - PROPOSED 5000KVA ELECTRICAL SUB-STATION
1ST FLOOR PLAN-OPD 1 - Consulant room,Endoscopy ,Ultrasonogram,Food court ,Admin office,
Department office,Professor Room,Associate Professor Room,Assistant Professor Room,Lecturer Room ,
Meeting Room,Students Common (Boy's),Students Common (Girl's
2ND FLOOR PLAN(CARDIAC)-O.T,O.T RECOVERY ,O.T. Holding,Cath Lab,Cath Recovery,Cath ,Holding,CICU ,
CCU,Cardiac HDU,Hemodialysis ,Department office,Professor Room,Associate Professor Room,Assistant Professor Room,Dissection Hall ,
Dead body preservation ,Anatomy museum ,Anatomy lecturer room ,Medical education unit ,Histology Lab, Tutorial Room Area
3RD FLOOR PLAN(GENERAL)-O.T.,O.T HOLDING,RECOVERY,ICU,HDU,GENERAL WARD,DAY CARE,
DEPARTMENT OFFICE,PROFESSOR,ASSOCIATE PROFESSOR ,ASSISTANCE PROFESSOR,
COMMUNITY MEDICINE MUSEUM,BIOCHEMISTRY LAB,PHYSIOLOGY LAB,OSCE ,TUTORIAL ROOM AREA
4TH FLOOR PLAN(MATERNITY)-DEPARTMENT OFFICE,PROFESSOR,ASSOCIATE
PROFESSOR,PATHOLOGY LAB,MICROBIOLOGY,TUTORIAL ,O.T,NICU,PICU,LABOUR,PRE
OP,NURSERY,RECOVERY,BABY RESUSCITATION,DOUBLE,SINGLE BED AREAPLAN)
5TH FLOOR PLAN-FORENSIC LAB,FORENSIC LECTURE,COMPUTER,TEACHER
LOUNGE,LIBRARY,TUTORIAL,WARD BED AREA
6TH FLOOR PLAN-VIP,DELUXE,DOUBLE BED,SINGLE CABIN ,EXAM HALL
,CHAIRMAN,MANAGING,OPSE,BOARD ,ADMIN ,OFFICE AREA
PROPOSED POSITIVE SUCTION FIRE PUMP DETAILS
PROPOSED POSITIVE SUCTION FIRE HYDRANT SCHEMATIC DIAGRAM
PROPOSED FIRE ALARM RISER DIAGRAM-1
PROPOSED SINGLE LINE DIAGRAM(SLD)
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 02
SL. NO
ALL FLOOR NAME & AREA
FLOOR NAME FLOOR AREA
TOTAL AREA=
OCCUPANCY
01 94450 sft
GROUND FLOOR PLAN
617,957 sft
TOTAL AREA = 617,957 SFT
BASEMENT FLOOR PLAN
SEMI-BASEMENT FLOOR PLAN
1ST FLOOR PLAN
2ND FLOOR PLAN
3RD FLOOR PLAN
4TH FLOOR PLAN
5TH FLOOR PLAN
6TH FLOOR PLAN
7TH FLOOR PLAN
8TH FLOOR PLAN
9TH FLOOR PLAN
ROOF FLOOR PLAN
02
03
04
05
06
07
08
09
10
11
12
13
88865 sft
57715 sft
58241 sft
58562 sft
56184 sft
55022 sft
48805 sft
48486 sft
47681 sft
47672 sft
47124 sft
3600 sft
CAR PARKING AREA
CHEMOTHERAPY,CAR PARKING FOR COLLEGE STAFF ,
CAR PARKING FOR HOSPITAL STAFF
CONSULTANT ROOM ,AMBULANCE PARKING ,ATM BOOTH ,MAMMOGRAPHY ,
ULTRA SONOGRAM ,X-RAY ,FLUOROSCOPY ,MRI ,CT SCAN AREA
Consulant room,Endoscopy ,Ultrasonogram,Food court ,Admin office,Department office,
Professor Room,Associate Professor Room,Assistant Professor Room,Lecturer Room ,
Meeting Room,Students Common (Boy's),Students Common (Girl's
O.T,O.T RECOVERY ,O.T. Holding,Cath Lab,Cath Recovery,Cath ,Holding,CICU ,CCU,Cardiac HDU,
Hemodialysis ,Department office,Professor Room,Associate Professor Room,Assistant Professor Room,Dissection Hall ,
Dead body preservation ,Anatomy museum ,Anatomy lecturer room ,Medical education unit ,Histology Lab,
Tutorial Room Area
O.T.,O.T HOLDING,RECOVERY,ICU,HDU,GENERAL WARD,DAY CARE,DEPARTMENT OFFICE,PROFESSOR,
ASSOCIATE PROFESSOR ,ASSISTANCE PROFESSOR,COMMUNITY MEDICINE MUSEUM,BIOCHEMISTRY
LAB,PHYSIOLOGY LAB,OSCE ,TUTORIAL ROOM AREA
DEPARTMENT OFFICE,PROFESSOR,ASSOCIATE PROFESSOR,PATHOLOGY LAB,
MICROBIOLOGY,TUTORIAL ,O.T,NICU,PICU,LABOUR,PRE OP,NURSERY,RECOVERY,
BABY RESUSCITATION,DOUBLE,SINGLE BED AREAPLAN)
FORENSIC LAB,FORENSIC LECTURE,COMPUTER,
TEACHER LOUNGE,LIBRARY,TUTORIAL,WARD BED AREA
VIP,DELUXE,DOUBLE BED,SINGLE CABIN ,EXAM HALL
,CHAIRMAN,MANAGING,OPSE,BOARD ,ADMIN ,OFFICE AREA
VIP,DELUXE,DOUBLE BED,SINGLE CABIN ,EXAM HALL AREA
VIP,DELUXE,DOUBLE SINGLE CABIN AREA
VIP CABIN,DELUXE ,DOUBLE BED CABIN ,SINGLE CABIN AREA
STAIR,LOBBY
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING.
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 03
MEANS OF EGRESS
BASIC REQUIREMENTS FOR MEANS OF EGRESS
For any storey with only two exits, the maximum occupant load should not exceed 500 people.
For any storey with only three exits, the maximum occupant load should not exceed 1000 people.
For rooms with more than 49 occupants, doors must swing in the direction of egress
(i.e. the doors must swing out of the room).
For areas with more than 49 occupants, doors should be equipped with panic hardware (crash
bars).
[Ref: STANDARD: ACCORD STANDARD PART 6 SECTION 6.5]
PORTABLE FIRE EXTINGUISHERS
Ref: Portable f re extinguishers shall be installed throughout all new and existing facilities in
accordance with BNBC Part 4 Section 4.10 and NFPA 10.
Spacing: Extinguishers shall be placed so that maximum travel distance to the nearest unit
shall not exceed 30 m (100 ft).
Mounting height:
a. Fire extinguishers having a gross weight not exceeding 18.14 kg (40 lb) shall be installed
so that the top of the f re extinguisher is not more than 1.53 m (5 ft) above the f oor
(NFPA 10 6.1.3.8).
b. Fire extinguishers having a gross weight greater than 18.14 kg (40 lb) (except wheeled
types) shall be installed so that the top of the f re extinguisher is not more than 1.07 m
(3_ ft) above the f oor (NFPA 10 6.1.3.8).
6.13.2:
Common Path of Travel. The common path of egress travel shall not exceed 23 m (75 ft).
Where the building is provided with a complete automatic sprinkler system, the common
path of egress travel shall not exceed 30 m (100 ft). The common path of egress travel
for Group H (storage) occupancies with not more than 30 occupants shall not exceed 30
m (100 ft). The common path of egress travel for Group J (high hazard) occupancies
shall not exceed 8 m (25 ft).
General Note:
Travel Distance.
References: As per BNBC & NFPA ( Accord, Alliance)
6.131 :
General. Travel distance to reach an exit for new and existing shall not exceed the
values listed in BNBC Part 4 Section 3.15.1 unless the requirements of 6.13.1.1 or
6.13.1.2 can be met.
6.13.1.1:
Travel distance limitations for G2 (RMG factories) shall be increased to 60 m (200 ft)
where a complete automatic fire detection system, portable fire extinguishers, and
standpipe system are provided in ac
6.13.1.2:
Travel distance limitations for G2 (RMG factories) shall be increased to 122 m (400 ft)
where a complete automatic sprinkler system, automatic fire alarm system, and portable
fire extinguishers are provided in accordance with this Standard.cordance with this
Standard.
Exit doors must not be equipped with locking hardware that would allow an
occupant to be
locked inside the room or space. Exit doors should also not be equipped with
secondary
locking devices, such as a deadbolt or slide bolt, etc. It should be possible to
open any
designated exit door using a single motion, without the use of a key, tool, or
special
knowledge.
Each occupant must be provided with at least 4mm of egress width for exit
doors. For
example, if the exit door is 32 inches wide, a maximum of 200 occupants could
egress
through that door. Stairs require 8mm per person. The rules for minimum
number of exits
still apply.
Occupant load is also limited by the size of the room, and depends on how the
room is being
used. (See occupant load below.)
[REF: STANDARD: ACCORD STANDARD PART 6
SECTION 6.5]
Minimum Widths:
Structural Element
Exit doors (existing)
Exit doors (New)
Aisles
Corridors
Stairs (existing)
Stairs (New)
Stair Landings (existing)
Ramps
Fire Resistance Rating
0.8m (32in.)
1m (40 in)
0.9m (36in)
1.1m (44in)
0.9m (36in)
1.5m (59in)
0.9m (36in)
1.1m (44in)
Ref: BNBC Part 1-5
2.5.1.5 When the basement or ground floor of a
building of Occupancy A is used wholly or partly for
generator
or electrical substation, the walls and floors
surrounding such use shall be of at least Type I-B
construction.
TYPE I-B--Fire Resistive Non-Combustible (Commonly
found in mid-rise office & Group R buildings).
2 Hr. Exterior Walls*
2 Hr. Structural Frame
2 Hr. Ceiling/Floor Separation
1 Hr. Ceiling/Roof Assembly
General Note
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 04
GOOGLE MAP
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 05
FIRE
LIFT
FIRE
LIFT
FIRE
LIFT
FIRE
STAIR
FIRE LIFT
FIRE
STAIR,
PROPOSED
10 STORIED BUILDING
Property Line
18 .29 m W i d e R o a d
12.
19
m
W
i
d
e
R
o
a
d
EMERGENCY
ENTRANCE
PARKING
IN/OUT
PARKING
IN/OUT
PROPOSED 10 STORIED BUILDING
AUDITORIUM
Green Space
GROUND FLOOR
SOFT PAVE AREA
18.34m
30.06m
34.76m
35.58m
Green Space
Soft
Pave Area
Green
Space
Footpath
3.64m
4.62m
30.05m
6.21m
34.06m
10.06m
6.24m
15.83m
4.56m
10.38m
13.94m
O P E N T E R R A C E
O P E N T E R R A C E O P E N C O U R T Y A R R D
O P E N T E R R A C E
O P E N T E R R A C E
Green Space
Basement Slab
(Open To sky)
WASA MAIN WATER SUPPLY RUN
EXISTING 11KV+ 440V POWER LINE
Property Line
Ramp
Green
Space
Medical College
Entry OPD
(Free)
100.33m
113.03m
104.02m
34.04m 7.37m
FIRE
STAIR
FIRE
LIFT
FIRE
STAIR
22.75m
+0.30m
Guard Room
Height 2.50m
34.09m
LEVEL
+34.59 m
LEVEL
+34.59 m
LEVEL
+23.47 m
LEVEL
+23.47 m
LEVEL
+23.47 m
LEVEL
+19.81 m
10 STORIED BUILDING
10 STORIED BUILDING
Hospital Main Entry/Exit
DOWN
TO
SEMI
BASEMENT
(Slope
-
1:
9.10)
E
N
T
R
Y
UP
TO
GROUND
FLOOR
(Slope
-
1:
12)
DN
TO
SEMI
BASEMENT
(Slope
-
1:
9.13)
EXIT
U
P
T
O
G
R
O
U
N
D
F
L
O
O
R
(
S
l
o
p
e
-
1
:
9
.
5
2
)
U
P
T
O
G
R
O
U
N
D
F
L
O
O
R
(
S
l
o
p
e
-
1
:
9
.
52
)
Guard Room
Height 2.50m
DN
DN TO ROAD
(Slope - 1: 8)
Green
Space
Green Space
Green Space
Green
Space
Green Space
GLASS CANOPY
4.37m
7.11m
8.78m
LEVEL+1.52m
LEVEL
+1.67m
LEVEL
+0.60m
LEVEL
-1.98m
LEVEL
-1.98m
LEVEL
+1.52m
LEVEL
+1.52m
LEVEL ±0"
LEVEL
+1.52m
LEVEL
+0.91m
LEVEL
±0"
LEVEL
±0"
Softr
Pave Area
Green Space
Green Space
SW Septic Tank
SW
Septic
Tank
WASA MAIN SEWERAGE LINE RUN
GAS LINE
WASA
MAIN
WATER
SUPPLY
RUN
EXISTING
11KV+
440V
POWER
LINE
WASA
MAIN
SEWERAGE
LINE
RUN
GAS
LINE
6.22m
6.12m
7.29m
3.99m
7.64m
Semi Basment
Slab outline
ETP/STP
Raw Water Tank
Fire Water Tank
Fire & Plumbing
Water Pump Room
Raw Water,Soft
Water,Row Water
Treatment Plant
Soft Water
Tank
8.02m
6.12m
28.63m
Semi
Basement
Floor
Line
Basement Floor Line
Basement Floor Line
Green
Space
Ramp Down To
Semi Basment
4.82 m W i d e I n t e r n a l R o a d
GREEN
SPACE
Balcony Excluded
DN TO
SEMI BASMENT
Sky Light Sky Light
Sky Light
Guard Room
Height 2.50m
18.29
m
12.19m
Soft pave
Green
Space
4.57m
4.57m
4.57m
4
.
6
0
m
4
.
6
1
m
Soft Pave
Green Space
3.10m
6.11m
O P E N
C O U R T Y A R R D Balcony
Excluded
Balcony
Excluded
Balcony
Excluded
Balcony
Excluded
Balcony
Excluded
110.8
3m
Soft pave
Soft pave
GROUND FLOOR
SOFT PAVE AREA
Soft Pave
Soft Pave
Garbage bin
LEVEL
+5.33 m
Fire Stair
Fire Stair
Fire Stair
Fire Stair
18.68m
LEVEL
+27.28 m
LEVEL
+5.33 m
LEVEL+5.33m
95.67m
Sky Light
N MASTER PLAN
Fire water tank
Basement Floor
47'-5''X41'-11''
=219,095.745 US GALLON
Fire pump room
Basement Floor
41'-10''X19'-2''
Fire Stair
Fire LIFT
Generator
Generator
ROOM
FIRE ALARM
CONTROL ROOM
TRANSFORMER
ROOM
Switchgear
Room
Box
Hose
Box
Hose
Box
Hose
Box
Hose
4-Ø65x150 FIRE
DEPARTMENT
CONNECTION
PILLAR HYDRANT
WITH HOSE BOX
PILLAR HYDRANT
WITH HOSE BOX
PILLAR HYDRANT
WITH HOSE BOX
PILLAR
HYDRANT
WITH
HOSE
BOX
4-Ø65x150 FIRE
DEPARTMENT
CONNECTION
AMBULANCE
AREA
SCALE - 1:100
Pillar Hydrant & Hose Connection
4 way(65mmX150) Fire Department
Connection
Q.T
SYMBOL SYMBOL NAME
07
02
Box
Hose
Box
Hose
Box
Hose
PILLAR HYDRANT
WITH HOSE BOX
Box
Hose
PILLAR
HYDRANT
WITH
HOSE
BOX
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 06
±0"
Road Level
+5'-6"
Floor Level
-6'-6"
Basment -01
Level
-17'-0"
Basment -02
Level
Sky Light
±0"
Road Level
-18'-4"
Basment -02
Level
-8'-4"
Basment -01
Level
-22'-0"
Basment -02
Level
Soft water tank
ETP
-22'-0"
Basment -02
Level
-3'-6" Internal
Road Level
+5'-6"
Floor Level
+17'-6"
Floor Level
+24'-6"
Floor Level
+36'-6"
Floor Level
+48'-6"
Floor Level
+60'-6"
Floor Level
+72'-6"
Floor Level
+84'-6"
Floor Level
+96'-6"
Floor Level
+108'-6"
Floor Level
+5'-6"
Floor Level
-6'-6"
Basment -01
Level
+5'-6"
Floor Level
SECTION OF UNITED MEDICAL COLLEGE & HOSPITAL
ELLIPS
ELLIPS 1.4 (AIR TERMINAL)
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 07
PRAYER SPACE (FEMALE)
8.74mX11.51m
PRAYER SPACE (MALE)
22.58mX11.94m
DRIVER'S
WAITING
JANITOR
3.01mX2.03m
UP
DRIVER'S TOILET
7.43mX7.34m
08 .STP
DRIVER'S WAITING
21.87mX3.96m
30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI
30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI
30-___-HI 30-___-HI 30-___-HI 30-___-HI
30-___-HI
30-___-HI
30-___-HI
30-___-HI
30-___-HI
30-___-HI
30-___-HI
30-___-HI
30-___-HI
30-___-HI
3
0
-
_
_
_
-
H
I
3
0
-
_
_
_
-
H
I
3
0
-
_
_
_
-
H
I
3
0
-
_
_
_
-
H
I
3
0
-
_
_
_
-
H
I
3
0
-
_
_
_
-
H
I
3
0
-
_
_
_
-
H
I
3
0
-
_
_
_
-
H
I
3
0
-
_
_
_
-
H
I
3
0
-
_
_
_
-
H
I
DN
DN
ABULATION & TOILET (MALE)
6.82mX3.30m
DRIVER'S TOILET
4.78mX3.83m
METAL WORKSHOP
8.86mX12.40m
MEDICAL RECORD STORE
6.93mX12.52m
UP
UP
UP
UP
TO
SEMIBASEMENT
(Slope
:
1:
8)
UP
UP
TO
SEMIBASEMENT
(Slope
:
1:8.03)
UP
04.SOFT WATER TANK
06.RAW WATER,SOFT
WATER,RO WATER
TREATMENT PLANT
13.FIRE & PLUMBING
WATER PUMP ROOM
1.RAW WATER TANK
02.FIRE WATER TANK
Level - 6.71m
D R I V E W A Y D R I V E W A Y
D
R
I
V
E
W
A
Y
D R I V E W A Y
D R I V E W A Y
D R I V E W A Y
D R I V E W A Y
D R I V E W A Y
D R I V E W A Y
D R I V E W A Y
D R I V E W A Y
D R I V E W A Y
D
R
I
V
E
W
A
Y
D
R
I
V
E
W
A
Y
STORE
4.80mX4.80m
ABLUTION & TOILET
5.03mX2.49m
- 5.18m
Floor Level
-5.59m
Floor Level
- 5.18m
Floor Level
- 5.18m
Floor Level
UP
Level -17'-0"
4"X2" Gutter work
4"X2" Gutter work
4"X2" Gutter work
18'-0"
I
B
-5.59m
Floor Level
ETP
Level - 6.71m
Level - 6.71m
Level - 6.71m
Level - 6.71m Level - 6.71m
Level - 5.18m
2.44X4.78m
LIFT
2.95X5.38m
2.95X5.38m
LIFT
2.90X5.28m
LIFT
5.28X2.90m
Level - 5.18m
Level - 5.59m
- 5.18m
Floor Level
- 5.18m
Floor Level
- 5.18m
Floor Level
- 5.18m
Floor Level
4.98m
14.48m 5.44m 9.78m
12.80m
12.80m
12.80m
9.19m
14.85m 5.42m
9.19m
S
N
W
E
SCALE - 1:100
25.78m
ABLUTION
4.16mX1.68m
Symbol Description
Legend:
Q.T
Heat Detector
Addressable Output Module
ABC
CO2 Extinguisher (ABC & CO2)
00
02
26
Horn With Light 20
16
K-5.6, EC, 68°,Sidewall Sprinkler
22
05
Double Fire Door 2 Rated
Single Fire Door 2 Rated
Ø150mm Sprinkler & Standpipe Riser 05
06
09
07
Ex:S-5.6
68°
AS PER
DRAWING
EXIT
F
Emergency Light
Manual call points
4 -Hour Fire Rated Wall
Sprinkler K- 11.2 802
48
F.H.C
Addressable Input Module
AIM
11
Class II Hose Connection
Floor Area:94450sft
K-5.6, SR, 68°, Upright Sprinkler
5.6,68°
U
Landing Valve (Ø65) 02
6W
Speaker
PA SPEAKER 08
Fire water tank
47'-5''X41'-11''
=219,095.745 US GALLON
13.Fire
pump room
41'-10''X19'-2''
FIRE STAIR-1
23'-2"X14'-2"
EXIT
EXIT
EXIT
FIRE STAIR -2
23'-8"X14'-2"
FIRE
STAIR
23'-2"X14'-2"
SAFETY LOBBY
SAFETY
LOBBY
SAFETY LOBBY
SAFETY LOBBY
SAFETY LOBBY
SAFETY LOBBY
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
BASEMENT
SLOPE : 1: 8
92'-4"x18'-0"
BASEMENT
SLOPE : 1: 8
16'-5"x16'-0"
BASEMENT
SLOPE : 1: 8
92'-0"x8'-0"
BASEMENT
SLOPE : 1: 8
16'-8"x16'-0"
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
F
F
F
F
F
F
F
MECHANICAL
VENTILATION
2 HOUR FIRE RATED
SEPARATION WALL
SMOKE CURTAIN
2 HOUR FIRE RATED
SEPARATION WALL
SMOKE CURTAIN
2 HOUR FIRE RATED
SEPARATION WALL
SMOKE CURTAIN
2 HOUR FIRE RATED
SEPARATION WALL
SMOKE CURTAIN
2 HOUR FIRE RATED
SEPARATION WALL
SMOKE CURTAIN
2 HOUR FIRE RATED
SEPARATION WALL
SMOKE CURTAIN
2 HOUR FIRE RATED
SEPARATION WALL
SMOKE CURTAIN
2 HOUR FIRE RATED
SEPARATION WALL
SMOKE CURTAIN
2 HOUR FIRE RATED
SEPARATION WALL
SMOKE CURTAIN
F
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
F
ABC
CO2
F
F
Ø200 FF Pipe @ Basement Ceiling Level
Ø200 FF Pipe @ Basement Ceiling Level
Ø200 FF Pipe @ Basement Ceiling Level
F.H.C
F.H.C
F.H.C
F.H.C
F.H.C
AIM
AIM
AIM
AIM
AIM
AIM
AIM
AIM
AIM
AIM
AIM
All Stair must be positive air
pressurized.
F
13.Fire
pump room
41'-10''X19'-2''
EXIT
FIRE LIFT
SAFETY
LOBBY
FIRE LIFT
2.95X5.38m
FIRE LIFT
FIRE LIFT
5.28X2.90m
4'
FIRE LIFT
2.90X5.28m
BASEMENT
SLOPE : 1: 8
92'-0"x8'-0"
Ø100mm Standpipe
Riser -1
Ø150 Sprinkler &
Standpipe Riser
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
ABC
CO2
ABC
CO2
5.6,68°
U
F
F
F
ABC
CO2
ABC
CO2
F.H.C
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
F.H.C
Ø100 Sprinkler &
Standpipe Riser-5
Ø150 Sprinkler &
Standpipe Riser -01
Ø50 Drain Riser
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø150 Sprinkler &
Standpipe Riser -04
Ø50 Drain Riser
ABC
CO2
F
F
F
F
F
F
F
F
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
Basement
to
semi
basement
LIFT
2.44X4.78m
Ø200 FF Pipe @ Basement Ceiling Level
Ø200 FF Pipe @ Basement Ceiling Level
BASEMENT PLAN- CAR PARKING AREA
Ex:S-5.6
68°
LIFT
2.95X5.38m
Basement
to
Ground
floor
Basement
to
Ground
floor
Basement to
Ground floor
308'-6"
298'-9"
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 08
CANTEEN-01
20.18mX12.98m
COOKING PLATFROM
LAUNDRY
12.34mX8.20m
MATRIAL RECIEVING AREA
8.16mX4.67m
DIETARY OFFICER
3.77mX2.98m
CHANGE
2.82mX2.49m
CART AREA
4.52mX11.73m
MANAGER
2.82mX2.94m
DRY STORE
2.82mX2.81m
GENERAL STORE
3.00mX5.98m
FREEZER
3.00mX5.51m
BAKERY
2.59mX4.77m
DISH WASH/
MACHINE
2.53mX3.78m
FISH PREPARATION
VEG.PREPARATION
FOOD
PREPARATION
3.75mX4.16m
MEAT PREPARATION
FRUIT PRE.
COLD KITCHEN
3.75mX10.04m
LIQUID PREPARATION
DIRTY INSTRUMENT &
LINEN RECEIVE AREA
4.45mX7.34m
PACKING &
PREPARATION AREA
9.98mX10.01m
AUTOCLAVE
OFFICE
5.36mX4.32m
CHEMICAL
STORE
2.49mX3.05m
LINEN RECEIVING
& SORTING AREA
2.49mX5.17m
MANAGER
3.23mX3.05m
SPOT WASH
AREA
3.33mX2.12m
DISTRIBUTION
COUNTER
DIRTY UTILITY
STAFF
3.77mX4.29m
CROCKERY
STORE
3.69mX4.47m
Counter
MEDICAL RECORD STORE
11.96mX8.05m
TRANSCRIPTIONIST
6.20mX3.10m
MORTUARY
3.56mX3.94m
VACCINE CENTER
5.88mX10.06m
CORPSE
WASHING AREA
3.69mX3.70m
ONCOLOGY
7.21mX10.69m
GENERAL STORE
17.38mX10.19m
TAYLOR
6.96mX9.27m
DN
AHU
3.76mX7.42m
BLOOD BANK
25.75mX9.80m
IPD PHARMACY
7.37mX11.99m
PHARMACY STORE
7.37mX9.78m
SUPPLY CHAIN DEPARTMENT,ACCOUNTS & FINANCE
26.19mX7.42m
ENGINEERING DEPT.
7.54mX20.21m
BIO MEDICAL
7.77mX9.27m
STERILIZE STORE
4.83mX1.38m
STORE
2.80mX2.62m
LINEN STORE
2.80mX2.58m
AHU
3.65mX4.07m
KITCHEN
Area:4750sft
12.GAS MANIFOLD ROOM
8.51mX7.49m
LOADING & UNLOADING AREA
DRIVE WAY
FEMALE TOILET
3.12mX7.42m
MALE TOILET
3.56mX5.97m
Sore
8.44mX19.28m
AHU
AHU
3.84mX5.11m
AHU
5.24mX5.49m
MALE(TOILET)
3.88mX4.29m
FEMALE(TOILET)
3.88mX2.98m
CHANGE
1.90mX3.03m
CLEAN
5.41mX3.46m
CLEAN STORE
3.51mX4.32m
11.AIR COMPRESSOR
8.51mX5.62m
CLINICAL SERVICE
11.40mX7.34m
NURSING DEPARTMENT
12.09mX8.38m
Admin & Operation
12.12mX11.89m
CUSTOMER CARE DEPARTMENT
15.52mX5.66m
IT
SERVER
3.76mX7.72m
PBX/ PHONE/FIRE
3.92mX7.72m
IT DEPARTMENT
3.90mX7.72m
TOILET
3.96X2.87m
CHEMO MIXTURE
7.62mX1.80m
TUTORIAL ROOM
7.77mX4.37m
NURSE ROOM
3.18mX3.91m
DOCTOR'S ROOM
3.18mX3.65m
STORE ROOM
3.18mX1.45m
WAITING(chemotherapy)
7.77mX4.11m
CHEMOTHERAPY
18.61mX6.48m
COUNTER
N.S
DRIVER'S
WAITING
2.98mX4.86m
Level -1.98m
FOOD
PREPARATION
CANTEEN-02
16.54mX12.37m
Counter
DN
UP
UP
DN
DRIVE WAY UP
UP
DN
UP
DRIVE
WAY
DRIVE WAY
-2.54m
Floor Level
-1.98m
Floor Level
-2.13m
Floor Level
-2.54m
Floor Level
-1.98m
Floor Level
+3'-0"
Floor Level
+.61m
Floor Level
DN UP
-1.98m
Floor Level
-1.98m
Floor Level
UP
UP
TOILET
2.98mX1.78m
DRIVE
WAY
VOID
DUMB
WAITER
1.22mX1.52m
CONSULTANT
3.66mX3.53m
CONSULTANT
3.81mX3.53m
CONSULTANT
2.77mX3.66m
CONSULTANT
2.79mX3.66m
UP
DN
UP TO GROUND FLOOR
(Slope - 1: 8)
DN TO ROAD
(Slope - 1: 8)
17'-8" [5.39]
SCALE - 1:100
LIFT
7.62X2.41m
LIFT
2.44X4.78m
LIFT
2.95X5.38m
LIFT
2.95X5.38m
-1.98m
Floor Level
-1.98m
Floor Level
-1.98m
Floor Level
-2.54m
Floor Level
LIFT
2.90X5.28m
LIFT
5.28X2.90m
LOBBY
8.92mX14.38m
4.70m
4.70m
-2.54m
Floor Level
5.49m
5.33m
3.20m
29.39m
24.21m
2.44m
DUMB
WAITER
1.22mX1.52m
TOILET
1.90X1.17
2.12m WIDE PASSAGE
2.44m
WIDE
PASSAGE
COMMON
11.96mX4.06m
2.74m WIDE PASSAGE
2.44m
WIDE
PASSAGE
LIFT LOBBY AREA
DOWN
TO
BASEMENT
(Slope
:
1:
8)
79'-9"x18'-0"
DN
TO
SEMI
BASEMENT
(Slope
-
1:
9.13)
91'-6"x16'-0"
UP
TO
GROUND
FLOOR
(Slope
-
1:
12)
36'-0"x16'-0"
(Slope
-
1:
9.05)
16'-2"x14'-7"
DOWN
TO
SEMI
BASEM
ENT
(Slope
-
1:
9.10)
93'-9"x
16'-0"
DOWN
TO
SEMI
BASEMENT
(Slope
:
1:
9.33)
86'-0"x16'-0"
chemical
Store
Lift
&
Stair
lobby
F.H.C
F.H.C
F.H.C
FIRE STAIR-1
23'-2"X14'-2"
EXIT
FIRE STAIR -2
23'-8"X14'-2"
FIRE
STAIR
23'-2"X14'-2"
SAFETY LOBBY
SAFETY
LOBBY
SAFETY LOBBY
EXIT
EXIT
BASEMENT
SLOPE : 1: 8
BASEMENT
SLOPE : 1: 8
100'-8"x17'-11"
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex
:S
-5
.6
68
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
A
P
FM-200
Control Panel
100 LITTER CYLINDER
FM-200 SYSTEM
FM-200
Control Panel
FM-200 SYSTEM
A
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
F
F
F
F
F
F
F
EXIT
F
F
F
F
F
F
F
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
FIRST AID BOX
FIRST
AID
BOX
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
F
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
Fire Elevator-01
7.62X2.41m
Fire Elevator-03
7.62X2.41m
FIRE LIFT
2.95X5.38m
FIRE LIFT
2.95X5.38m
FIRE LIFT
5.28X2.90m
FIRE LIFT
2.90X5.28m
FIRE LIFT
2.44X4.78m
BASEMENT
SLOPE : 1: 8
100'-8"x17'-11"
(Slope
-
1:
9.05)
16'-2"x14'-7"
5.6,68°
U
5.6,68°
U
EXIT
EXIT
EXIT
EXIT
ABC
ABC
ABC
ABC
ABC
F
F
F F
F
F
F
F
F
F
F
F
F
F ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
F
F ABC
CO2
ABC
CO2
F
ABC
CO2
F
F.H.C
Ø100 Sprinkler &
Standpipe Riser-5
Ø150 Sprinkler &
Standpipe Riser -01
Ø50 Drain Riser
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø150 Sprinkler &
Standpipe Riser -04
Ø50 Drain Riser
Ø150 Sprinkler &
Standpipe Riser -02
Ø50 Drain Riser
F.H.C
Ø100 Standpipe
Riser-1
Ø150 Sprinkler &
Standpipe Riser -04
Ø50 Drain Riser
F.H.C
F
ABC
CO2
ABC
CO2
F
F F
F
ABC
CO2
ABC
CO2
ABC
CO2 ABC
CO2
ABC
CO2
F
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
semi
basement
to
Basement
semi
basement
to
Ground
floor
Ground floor to
semi-basement
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,79°
U
5.6,68°
U
All Stair must be positive air
pressurized.
F
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
SAFETY
LOBBY
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
SAFETY
LOBBY
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
F
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
2 HOUR FIRE RATED
SEPARATION WALL
SMOKE CURTAIN
Symbol Description
Legend:
Q.T
Smoke Detector
Heat Detector
Addressable Output Module
ABC
CO2
Extinguisher (ABC & CO2)
03
05
07
28
K-5.6, SR, 68°, Upright Sprinkler
Horn With Light 42
02
50
K-5.6, EC, 68°,Sidewall Sprinkler
100 LITTER FM 200 GAS CYLINDER
FM-200 Control Panel
Abort Switch
FM 200 FOAM NOZZLE 360°(FOR ROOM SPACE)
01
40
02
05
54
02
DOUBLE Fire Door 2 Rated
K-5.6, SR, 68°, Pendent Sprinkler
SINGLE Fire Door 2 Rated
Ø150mm Sprinkler & Standpipe Riser
FIRST AID BOX
Actuator
200 LITTER FM 200 FOAM CYLINDER
05
55
03
02
01
09
06
Ex:S-5.6
68°
AS PER
DRAWING
P
5.6,68°
EXIT
A
F
364
Emergency Light
Manual call points
4 -Hour Fire Rated Wall
5.6,68°
U
5.6,68°
P K-5.6, SR, 68°, Pendent Sprinkler
FM 200 GAS NOZZLE 360°(FOR ROOM SPACE)
236
14
5.6,79°
U
Upright Sprinkler, K-5.6, 79 deg, SR 53
02
Sprinkler K- 11.2
P 02
PRESSURE SWITCH
F.H.C Class II Hose Connection 08
Floor Area:88865sft
Extinguisher (ABC )
ABC
05
Landing Valve (Ø65)
6W
Speaker
PA SPEAKER 04
F.H.C
F.H.C
All Stair must be positive air
pressurized.
F
All Stair must be positive air
pressurized.
F
SEMI BASEMENT FLOOR PLAN-CHEMOTHERAPY,CAR PARKING FOR COLLEGE STAFF ,
CAR PARKING FOR HOSPITAL STAFF
S
N
W
E
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 09
±0"
Road Level
Generator
Registration &
Records
Trauma/Treatment
Treatment Area
Duty Doctor
Triage Room
N.S
CT Scan
WAITING
Report Delivery
MRI
Store
Janitor
Female
Toilet
PHARMACY
Observation
Observation
CASH
E M E R G E N C Y
Nurse Rest
Room
N.S
Linen/paster
Clean utility
Scrub
Staff
Change
(male)
Staff Change
(Female)
Patient toilet
Wating lobby
Minor O.T
AHU
Flofluoroscopy
Console
Sample
Change
(F)
Change
(M)
Report preparation
X-ray X-ray
Console
Console
Mammography
Ultra sonogram
Ultra sonogram
±0"
Road Level
Male Toilet
VISITOR CAFE
Shop
Shop
Treatment
room
Treatment
room
Treatment
room
Hospital Main Entry/Exit
RMU
AHU
Male toilet
Female toilet
LT & PFI PANEL
For 2 Nos Generator
is OK
AVR ROOM
Female Toilet
AHU
3.47mX2.92m
AHU
AHU
AHU
Console
Change
(M)
Console
Change
(F)
Radiologist
Sample
TOILET
Clean
store
Reception
Treatment room
Treatment
room
Treatment room
Treatment room
IN-Patient
CT Scan
Technical room
+1.52m
Floor Level
+5'-0"
Floor Level
-2.13m
Floor Level
+1.68m
Floor Level
+0.91m
Floor Level
+1.52m
Floor Level
+1.12m
Floor Level
-1.98m
Floor Level
DN
E
N
T
R
Y
UP
-1.98m
Floor Level
DN
+0.61m
Floor Level
EXIT
U
P
T
O
G
R
O
U
N
D
F
L
O
O
R
(
S
l
op
e
-
1
:
9
.
5
2
)
DN TO ROAD
(Slope - 1: 8)
LIFT
7.62X2.41m
LIFT
2.44X4.78
Male
Toilet
Female
Toilet
Male
Toilet
UP
FIRE
DOOR
UP
UP
LOBBY
3.66mX18.26m
LIFT
2.95X5.38m
LIFT
2.95X5.38m
LIFT
2.90X5.28m
LIFT
5.28mX2.90m
GROUND FLOOR PLAN
S
N
W
E
SCALE - 1:100
18 .29 m W i d e R o a d
12.
19
m
W
i
d
e
R
o
a
d
Green Space
Green Space
Green Space
Green Space
GENERAL OPD
GENERAL OPD
SURGICAL
OPD
GENERAL
OPD
ENT & OPHTHALMOLOGY
MOTHERS & CHIELD
SURGICAL OPD
WAITING & LOBBY
AREA
EMERGENCY
ENTRY
Medica
l
College
Main
Entry/E
xit
4.88m
4.88m
4.57m
8.34m
+1.68m
Floor Level
+1.68m
Floor Level
+1.68m
Floor Level
+1.52m
Floor Level
4
.6
1
m
4
.6
0
m
4.57m
4.57m
4.57m
4.57m
4.57m
4.57m
24.20m
6.09m
6.15m
6.10m
7.62m
100.33m
113.03m
104.02m
110.8
3m
SW Septic Tank
SW
Septic
Tank
RADIOLOGY & IMAGING
TOILET
TOILET
2.74m WIDE PASSAGE
3.05m
WIDE
PASSAGE
3.05m
WIDE
PASSAGE
3.66m WIDE PASSAGE
INTERNAL ROAD
4.88m
+0.46m
Level
FIRE
DOOR
Professor
Professor
Professor
Professor
Professor
Professor
Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor Assistant Professor Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Assistant Professor
Associate Professor
Associate Professor
Associate Professor
Associate Professor
Associate Professor Associate Professor
Associate Professor
Associate Professor
Associate Professor
Associate Professor
Associate Professor
Associate Professor
Associate Professor Associate Professor Associate Professor
Associate Professor
Associate Professor
Associate Professor
Associate Professor Associate Professor Associate Professor
Associate Professor
Associate Professor
Associate Professor
Associate Professor
Associate Professor
Associate Professor
Associate Professor
Generator
x-former
x-former
HT.
Panel
DOWN
TO
SEMI
BASEM
ENT
(Slope
-
1:
9.10)
93'-9"x1
6'-0"
DN
TO
SEMI
BASEMENT
(Slope
-
1:
9.13)
91'-6"x16'-0"
UP
TO
GROUND
FLOOR
(Slope
-
1:
12)
36'-0"x16'-0"
Fire Elevator-01
7.62X2.41m
Fire Elevator-03
7.62X2.41m
FIRE IP-OP
5.28mX2.90m
FIRE LIFT
2.95X5.38m
FIRE LIFT
2.95X5.38m
DOWN
TO
SEMI
BASEM
ENT
(Slope
:
1:
8.51)
86'-0"x1
6'-0"
LIFT
&
STAIR
LOBBY
F.H.C
Ø150 Sprinkler &
Standpipe Riser -03
Ø50 Drain Riser
Ø150 Sprinkler &
Standpipe Riser -02
Ø50 Drain Riser
F.H.C
F.H.C
F.H.C
F.H.C
Ø100 Standpipe
Riser-1
F.H.C
F.H.C
FIRE STAIR-1
23'-8"X6'-10"
SAFETY LOBBY
All Stair must be positive air
pressurized.
F
FIRE
STAIR-2
24'-2"X14'-4"
SAFETY
LOBBY
SAFETY LOBBY
FIRE STAIR-3
23'-6"X14'-2"
SAFETY LOBBY
SAFETY
LOBBY
SAFETY LOBBY
FIRE STAIR
23'-4"X6'-6"
SAFETY LOBBY
FIRE STAIR-4
23'-8"X14'-8"
SAFETY LOBBY
FIRE
STAIR-5
23'-2"X6'-6"
SAFETY
LOBBY
7'-1"
All
Stair
must
be
positive
air
pressurized.
F
All Stair must be positive air
pressurized.
F
All Stair must be positive air
pressurized.
F
All Stair must be positive air
pressurized.
F
FIRE STAIR
17'-8"X14'-11"
SAFETY LOBBY
EXIT
EXIT
EXIT
EXIT
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
200x2 LITTER CYLINDER
FM-200 SYSTEM
FM-200
Control Panel
5.6,68°
U
5.6,68°
U
A P
5.6,68°
U
5.6,68°
U
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
U
F
F
F
F
F
F
F
F
F
F
F
F
F
ABC
CO2 ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
F
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
EXIT
EXIT
FIRST AID BOX
FIRST AID BOX
HT. Meter
Room
5000kva Sub station
A P
ABC
CO2
A
P
A
P A
P
ABC
CO2
ABC
CO2
100 LITTER CYLINDER
FM-200 SYSTEM
100 LITTER CYLINDER
FM-200 SYSTEM
50 LITTER CYLINDER
FM-200 SYSTEM
50 LITTER CYLINDER
FM-200 SYSTEM
FM-200
Control Panel
FM-200
Control
Panel
FM-200
Control Panel
DV
5.6,68°
U
SAFETY
LOBBY
FIRE
STAIR-5
23'-2"X6'-6"
FIRE STAIR
23'-4"X6'-6"
5.6,68°
U
SAFETY LOBBY
SAFETY LOBBY
5.6,68°
U
FIRE STAIR-1
23'-8"X6'-10"
5.6,68°
P 5.6,68°
P
5.6,68°
P 5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
All Stair must be positive air
pressurized.
F
FIRE LIFT
2.90X5.28m
FIRE LIFT
2.44X4.78
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5
.6
68°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
E
x
:
S
-
5
.
6
6
8
°
Ex
:S-
5.6
68°
FIRE ALARM
CONTROL ROOM
5.6,68°
U
Ø65 HOSE
VALVE
F
Ø100 Sprinkler &
Standpipe Riser-5
Ø150 Sprinkler &
Standpipe Riser -01
Ø50 Drain Riser
Ø150
Sprinkler
&
Standpipe
Riser
-04
Ø50 Drain Riser
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
ABC
CO2
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
Control
panel
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
Ground
floor
to
semi-basement
F ABC
CO2
6W
Speaker
Ground floor to
semi-basement
Patient Stretcher Entry
AMBULANCE
AMBULANCE
AMBULANCE
AMBULANCE
AREA
Ground
to
Basement
floor
Ground
to
Roof
floor
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
toilet
toilet
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
Ground to
Basement floor
Ground to
Roof floor
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
Associate Professor
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
ABC
CO2
F
toilet toilet
toilet
toilet
All
Stair
must
be
positive
air
pressurized.
F
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
Ground
to
Basement
floor
Ground
to
Roof
floor
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
6W
Speaker
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
6W
Speaker
5.6,68°
P
5.6,68°
P
5.6,68°
U
Entry/Exit
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Symbol Description
Legend:
Q.T
Smoke Detector
Heat Detector
Addressable Output Module
ABC
CO2
Extinguisher (ABC & CO2)
08
07
09
21
K-5.6, SR, 68°, Upright Sprinkler
Horn With Light 21
05
32
K-5.6, EC, 68°,Sidewall Sprinkler
100 LITTER FM 200 GAS CYLINDER
FM-200 Control Panel
Abort Switch
FM 200 FOAM NOZZLE 360°(FOR ROOM SPACE)
04
17
07
07
126
05
Double Fire Door 2 Rated
K-5.6, SR, 68°, Pendent Sprinkler
Single Fire Door 2 Rated
Ø150mm Sprinkler & Standpipe Riser
FIRST AID BOX
Actuator
200 LITTER FM 200 FOAM CYLINDER
05
126
02
05
02
20
08
Ex:S-5.6
68°
AS PER
DRAWING
P
5.6,68°
EXIT
A
F
284
Emergency Light
Manual call points
4 -Hour Fire Rated Wall
5.6,68°
U
5.6,68°
P K-5.6, SR, 68°, Pendent Sprinkler
FM 200 GAS NOZZLE 360°(FOR ROOM SPACE)
11
Ø100mm Standpipe Riser
P PRESSURE SWITCH
F.H.C Class II Hose Connection
01
05
07
Floor Area:57715sft
Open Nozzle (K-22)
Deluge Valve Assembly
DV
01
04
Landing Valve (Ø65) 06
Control panel 01
6W
Speaker
PA SPEAKER 08
Control
panel
GROUND FLOOR PLAN-CONSULTANT ROOM ,AMBULANCE PARKING ,ATM BOOTH ,MAMMOGRAPHY ,
ULTRA SONOGRAM ,X-RAY ,FLUOROSCOPY ,MRI ,CT SCAN AREA
FIRE STAIR
21'-6"X14'-8"
SAFETY LOBBY
All
Stair
must
be
positive
air
pressurized.
F
stretcher
lift
4'-11'x
3'-11'
stretcher
lift
4'-11'x
3'-11'
DN TO ROAD
(Slope : 1: 12)
95'-0"x15'-0"
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
AMBULANCE
AREA
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 10
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 11
LT & PFI PANEL
x-former
x-former
HT.
Panel
FIRST AID BOX
HT. Meter
Room
5000kva Sub station
A P
ABC
CO2
A
P
A
P A
P
ABC
CO2
ABC
CO2 100 LITTER CYLINDER
FM-200 SYSTEM
100 LITTER CYLINDER
FM-200 SYSTEM
50 LITTER CYLINDER
FM-200 SYSTEM
50 LITTER CYLINDER
FM-200 SYSTEM
FM-200
Control Panel
FM-200
Control
Panel
FM-200
Control Panel
5.6,68°
U
5.6,68°
U
Generator
For 6 Nos 6000KVA
Generator
Generator
EXIT
200x2 LITTER CYLINDER
FM-200 SYSTEM
FM-200
Control Panel
A P
ABC
CO2
FIRST AID BOX
Symbol Description
Legend:
Q.T
Smoke Detector
Heat Detector
Addressable Output Module
ABC
CO2
Extinguisher (ABC & CO2)
05
05
04
04
Horn With Light 04
03
100 LITTER FM 200 GAS CYLINDER
FM-200 Control Panel
Abort Switch
04
08
05
Double Fire Door 2 Rated
Actuator 05
02
AS PER
DRAWING
EXIT
A
Emergency Light
4 -Hour Fire Rated Wall
FM 200 GAS NOZZLE 360°(FOR ROOM SPACE)
02
P PRESSURE SWITCH 05
GROUND FLOOR - PROPOSED 6250 KVA + 4000 KVA ELECTRICAL SUB-STATION
Floor Area:2140sft
N
Single Fire Door 2 Rated 02
FM 200 FIRE SUPPRESSION SYSTEM
FM 200 FOAM NOZZLE 360°(FOR ROOM SPACE)
200 LITTER FM 200 FOAM CYLINDER 02
07
FIRST AID BOX 02
NOZZLE HEAD
DETECTOR
CONTROL PANEL
FM-200 AGENTS
Generator & Emergency Power:
1.Electric Backup For Fire Lift.
2.Electric Backup For Stair Case Positive Air Pressure
3.Electric Backup Ventilation System With Cross Fresh Air
4.Electric Backup Fire Pump/Jockey Pump
5.All Singes Including Backup Emergency Exit Sing
Generator Room
1.Separation Rating
2.Wall 4 Hour, Door, 2 Hour Fire Rating
3.Suppression, Clean Agent
4.Capacity 00KVA
5.Location Ground Floor
Generator & Emergency Power:
1.Separation Rating
2.Wall 4 Hour, Door, 2 Hour Fire Rating
3.Suppression, Clean Agent
4.Capacity 00KVA
5.Location Ground Floor
NOTE:
Schematic Drawing For Automatic Clean Agent
Distribution System For Sub-Station
Room Siza Approximately 220sft
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 12
Endoscopy
Endoscopy
Recovery
Echocardiography
Treadmill Treadmill
Change
male
Change
Female
ECG ECG
Uroflowmetry Fibro scan Holter & BP
monitor
BMD
PFT/LFT
TOI.
Wating room
Ultra sonogram
Shop-04
Shop-05
Shop-08
Shop-09
Shop-05
Treatment
Room
Cardiac investigation
Ultra sonogram
Pathological Laboratory Facilities
Biochemistry
Lab
Female
Toilet
Doctor's
room
Executive
screening
ENTRY FROM
GROUND FLOOR
C o r r i d
o r
C o r r i d o r
Open
Courtyarrd
UP
Area:3390sft
G.OPD
Treatment
room
Treatment
room
Treatment
room
Janitor's Room
AHU
Store
Treatment
room
Treatment
room
Histopathology Lab
In-charge
Crossing Autoclave
hematology Lab
In-charge
In-charge
urine/stool
Cell
counter
Micro biology
Lab
Media pre
store
Dirty
In-charge In-charge
Sterile
autoclave
Molecular Lab
AHU
Store Reception/inpatient
report delivery
Office
Simple
T T
Cardiac OPD
Area:3920sft
Information
Admin Office
Assistant Professor Assistant Professor
C o r r i d o r
Student
Selection Room
Admin Office
8'-0" W i d e C o r r i d o r
Toilet
Toilet
Toilet
Stuff Male
Stuff
Female
Professor
Associate Professor
Associate Professor
Associate Professor
Meeting
Room
Student Common room(Boy's) Student Common room(Girl's)
Department Office
Assistant Professor
Assistant Professor
Professor
Associate Professor
Assistant Professor
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Professor
Professor
Associate Professor
Associate Professor
Associate
Professor
Assistant Professor
Assistant
Professor
Assistant Professor
Assistant
Professor
Assistant
Professor
Department
Office
Department Office
Department Office
lecturer Room
Student Female
Toilet
Student Male
Toilet
Janitors
Accessible
Toilet
Toilet
Department Office
Store
Toilet
Toilet
Toilet
Dirty
Utility
Tutorial
Room
Dirty
Utility
Treatment
room
Toilet Toilet Toilet
Toilet Toilet Toilet Accessible
Toilet
2.96mx2.54m
Lift
2.96mx2.54m
2.64x2.90m
Lift
2.64x2.90m
2.64x2.90m
Lift
Lift
2.96mx2.54m
Balcony
Balcony
Balcony
Elevator-02
2.27mx2.41m 2.27mx2.41m 2.27mx2.41m
Lobby
2.27mx2.41m
Lift
2.27mx2.41m
Terrace
Tutorial
Room
S
N
W
E
SCALE - 1:100
Open TO Sky
1.83m
WIDE
PASSAGE
WAITING AREA
WAITING AREA
WAITING AREA
WAITING AREA
Professor Professor
Professor Professor
Assistant Professor
Assistant Professor Assistant Professor
Assistant Professor
Assistant Professor Assistant Professor
Assistant Professor Assistant Professor
Associate Professor Associate Professor
Associate Professor Associate Professor
ENTRY FROM
GROUND FLOOR
ENTRY FROM
GROUND FLOOR
AHU
FIRE LIFT FIRE Lift
2.64x2.90m
FIRE LIFT
FAIR LIFT
2.96mx2.54m
Fire Elevator-01 Fire Elevator-03
FIRE LIFT-04
Lift
lobby
UP
UP
F.H.C
Ø150 Sprinkler &
Standpipe Riser -03
Ø50 Drain Riser
Ø150 Sprinkler &
Standpipe Riser -02
F.H.C
F.H.C
F.H.C
F.H.C
Ø100 Standpipe
Riser-1
F.H.C
F.H.C
FIRE STAIR-1
23'-8"X14'-2"
FIRE
STAIR-2
24'-2"X14'-4"
SAFETY
LOBBY
All Stair must be positive air
pressurized.
F
FIRE STAIR-3
23'-6"X14'-2"
SAFETY LOBBY
SAFETY
LOBBY
FIRE STAIR
23'-4"X14'-2"
SAFETY LOBBY
FIRE STAIR-4
23'-8"X14'-8"
SAFETY LOBBY
FIRE
STAIR-5
23'-2"X14'-2"
SAFETY
LOBBY
All Stair must be positive air
pressurized.
F
All
Stair
must
be
positive
air
pressurized.
F
SAFETY LOBBY
FIRE STAIR
17'-8"X14'-11"
FIRE STAIR
24'-0"X14'-8"
SAFETY LOBBY
All Stair must be positive air
pressurized.
F
All Stair must be positive air
pressurized.
F
All Stair must be positive air
pressurized.
F
SAFETY
LOBBY
Lift Lobby-01
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
E
X
I
T
EXIT
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
6'-10"
7'-1"
6'-10"
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P 5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P 5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P 5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P 5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
F F
F
F
F
5.6,68°
U
5.6,68°
U
F
F
ABC
CO2
ABC
CO2
ABC
CO2
F.H.C
39'-5"
EXIT
All Stair must be positive air
pressurized.
F
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
All Stair must be positive air
pressurized.
F
Ø50 Drain Riser
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
F
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
F
F
F
ABC
CO2
Ø100 Sprinkler &
Standpipe Riser-5
Ø150 Sprinkler &
Standpipe Riser -01
Ø50 Drain Riser
Ø150 Sprinkler &
Standpipe Riser -04
Ø50 Drain Riser
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
5.6,68°
U
5.6,68°
U
1st floor to 2nd floor
5.6,68°
U
SAFETY
LOBBY
SAFETY LOBBY
SAFETY LOBBY
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
F
F
ABC
CO2
ABC
CO2
F
F
F F
ABC
CO2 ABC
CO2
1ST FLOOR PLAN-OPD 1 - Consulant room,Endoscopy ,Ultrasonogram,Food court ,Admin office,Department office,Professor Room,Associate Professor
Room,Assistant Professor Room,Lecturer Room ,Meeting Room,Students Common (Boy's),Students Common (Girl's
Symbol Description
Legend:
Q.T
Smoke Detector
Addressable Output Module
ABC
CO2
Extinguisher (ABC & CO2)
90
08
25
K-5.6, SR, 68°, Upright Sprinkler
Horn With Light
17
72
Double Fire Door 2 Rated
K-5.6, SR, 68°, Pendent Sprinkler
Single Fire Door 2 Rated
05
10
13
AS PER
DRAWING
P
5.6,68°
EXIT
F
155
Emergency Light
Manual call points
4 -Hour Fire Rated Wall
5.6,68°
U
12
F.H.C
08
R/F
Floor Area:58,241sft
MULTI DETECTOR
Ø100mm Standpipe Riser
Ø150mm Sprinkler & Standpipe Riser
01
00
Landing Valve (Ø65) 06
Class II Hose Connection
17
6W
Speaker
PA SPEAKER 04
stretcher
lift
4'-11'x
3'-11'
stretcher
lift
4'-11'x
3'-11'
DOWN TO GROUND FLOOR
(Slope : 1: 12)
95'-0"x15'-0" Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 13
O.T-02
Scrub
Scrub
O.T-01
Dirty Corridor
O.T-03
Gas
Scrub
AHU
Waiting
Female
toilet
Janitor
Consoling room
Nurse
Doctor
Toilet Toilet
Nurse
Dirty
linen
Equipment
Wash
Fluid store
&
disposal
AHU
R.O
Pantry
Patient
Report
Doctor
dirty
utility
Cath lab-01
Technical
room
Technical
room
Wash
Wash
Console
TRANSFER
Holding
Holding
Student
Collab
Transfer
Consultant
Recovery
Doctor
lounge
Nurse
rest room
Male
Change
Clean Store
Duty doctor
Dirty
Sterile Store
Clean Store
Female
Change
Toilet
Dirty
utility utility
8'-9''
wide
corridor
9'-0''
wide
corridor
Waiting
N.S.
Toi
Waste
Equ.
wash
Female Change
Male Change
Anesthetist
Nurse
room
N.S.
N.S.
Male
toilet
SURGICAL SUIT(CARDIAC)
Toilet
Toilet
Toilet
CCU
CARDIAC HDU
N.S.
N.S.
Hemodialysis
Duty
Doctor
Female
Change
Male
Change
TRANSFER
Toilet
Equ.wash
waste
TRANSFER
Toilet
Dirty
utility
Nurse room
Clean utility
CICU
Cath lab
Step down
AHU
AHU
AHU
Clean
135sft
Toi
Toi
Dead Body Preservation
Dissection Hall
Anatomy Museum
Histology Lab
Medical Education Unit
Anatomy lecturer Room
12'-0" W i d e C o r r i d o r
8'-0" W i d e C o r r i d o r
9'-0"
W
i
d
e
C
o
r
r
i
d
o
r
Tutorial Room
Tutorial Room
Tutorial Room
Tutorial Room
Professor
Office
Toilet
Toilet
Toilet
Stuff male
Stuff
Female
Associate Professor Associate Professor
Down to
1st floor
Assistant Professor Assistant Professor Assistant Professor Assistant Professor
9'-0"
W
i
d
e
C
o
r
r
i
d
o
r
9'-0" W i d e C o r r i d o r
Student Female
Toilet
Student
Male Toilet
Janitors
Accessible
Toilet
Toilet
Toilet
Toilet
Toilet
Balcony
Balcony
Elevator-02
2.27mx2.41m 2.27mx2.41m 2.27mx2.41m
2.27mx2.41m
Lift
2.27mx2.41m
2.96mx2.54m
Lift
2.96mx2.54m
2.64x2.90m
Lift
2.64x2.90m
2.64x2.90m
2.64x2.90m
Lift
2.96mx2.54m
Lift
2.96mx2.54m
Balcony
Balcony
Tutorial
Room
Lobby
S
N
W
E
SCALE - 1:100
lecture gallery
FIRE
DOOR
Lift & Stair lobby
FIRE Lift
FIRE LIFT
FIRE Staff/ IP
Patient Lift
FIRE Elevator-04
FIRE Elevator-01 FIRE Elevator-03
F.H.C
Ø150 Sprinkler &
Standpipe Riser -03
Ø50 Drain Riser
Ø150 Sprinkler &
Standpipe Riser -02
F.H.C
F.H.C
F.H.C
F.H.C
Ø100 Standpipe
Riser-1
F.H.C
F.H.C
SAFETY
LOBBY
FIRE STAIR-1
23'-8"X14'-2"
FIRE
STAIR-2
24'-2"X14'-4"
SAFETY
LOBBY
All
Stair
must
be
positive
air
pressurized.
F
FIRE STAIR-3
23'-6"X14'-2"
SAFETY LOBBY
SAFETY
LOBBY
FIRE STAIR
23'-4"X14'-2"
SAFETY LOBBY
FIRE STAIR-4
23'-8"X14'-8"
SAFETY LOBBY
FIRE
STAIR-5
23'-2"X14'-2"
SAFETY
LOBBY
All Stair must be positive air
pressurized.
F
All
Stair
must
be
positive
air
pressurized.
F
FIRE STAIR
17'-8"X14'-11"
FIRE STAIR
21'-6"X14'-8"
SAFETY LOBBY
All
Stair
must
be
positive
air
pressurized.
F
All
Stair
must
be
positive
air
pressurized.
F
SAFETY LOBBY
All Stair must be positive air
pressurized.
F
SAFETY
LOBBY
SAFETY Lift Lobby-01
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
E
X
I
T
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
EXIT
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
F
F
F
F
F
F
F
F F
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
F.H.C
All Stair must be positive air
pressurized.
F
27'-7"
DV
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
All Stair must be positive air
pressurized.
F
ABC
CO2
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
P
5.6,68°
P
F
F
F
F
F
ABC
CO2
Ø100 Sprinkler &
Standpipe Riser-5
Ø150 Sprinkler &
Standpipe Riser -04
Ø50 Drain Riser
Ø50
Drain
Riser
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
F
F
F
ABC
CO2
ABC
CO2
ABC
CO2
F
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
ABC
CO2
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
Control
panel
DV
Control
panel
DV
Control
panel
Down to 1st floor
SAFETY LOBBY
FIRE Lift
F
I
R
E
D
O
O
R
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
ABC
CO2
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
DV
Control
panel
DV
Control
panel
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
Symbol Description
Legend:
Q.T
Smoke Detector
Addressable Output Module
ABC
CO2
Extinguisher (ABC & CO2)
110
13
22
K-5.6, SR, 68°, Upright Sprinkler
Horn With Light 17
18
81
Double Fire Door 2 Rated
K-5.6, SR, 68°, Pendent Sprinkler
SINGLE Fire Door 2 Rated
05
16
19
AS PER
DRAWING
P
5.6,68°
EXIT
F
130
Emergency Light
Manual call points
4 -Hour Fire Rated Wall
5.6,68°
U
15
F.H.C
01
08
08
Floor Area:58,562sft
Ø100mm Standpipe Riser
Ø150mm Sprinkler & Standpipe Riser
Open Nozzle (K-22)
Deluge Valve Assembly
DV
26
05
Landing Valve (Ø65) 06
Class II Hose Connection
05
Control panel
6W
Speaker
PA SPEAKER
Control
panel
04
2ND FLOOR PLAN(CARDIAC)-O.T,O.T RECOVERY ,O.T. Holding,Cath Lab,Cath Recovery,Cath ,Holding,CICU ,CCU,Cardiac HDU,Hemodialysis ,Department office,Professor
Room,Associate Professor Room,Assistant Professor Room,Dissection Hall ,Dead body preservation ,Anatomy museum ,Anatomy lecturer room ,Medical education unit ,Histology
Lab, Tutorial Room Area
Ø150 Sprinkler &
Standpipe Riser -01
Heat Detector
5.6,68°
U
stretcher
lift
4'-11'x
3'-11'
stretcher
lift
4'-11'x
3'-11'
DOWN TO 1ST FLOOR
(Slope : 1: 12)
95'-0"x15'-0" Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 14
Clean Store
O.T-02
Scrub
Scrub
O.T-01
Dirty Corridor
Staff change
ANESTHETIST
Gass
Scrub
AHU
O.T-03
Scrub
O.T-04(free)
HOLDING
Nurse
change
N.S
Physical Therapy
Exercise area
Toilet
Exercise
area(Cardiac)
Treatment
Cubicle
Intern/Doctor/Student
lounge
Toilet
GENERAL WARD
Treatment
Cubicle
AHU
Store
Toilet
Toilet
Toilet
Treatment
Cubicle
Physiotherapist
Physiotherapist
Physiotherapist
Toilet
Toilet
Toilet
Male change
Female change
Toilet
Patient
Counseling
Room
Duty Doctor
Nurse
Toilet
Transfer
Equipment
wash
Clean store
Dirty
utility
ICU
WAITING
Change
Change
Male
Female
TRANSFER
Staff Change
Scrub
Nurse rest
Dirty
utility
Clean
utility
Doctor rest room
TOI.
Counseling
waste
TRANSFER
Visitor
change
Surgical suit(General)
STERILE
STORE
Store
TOI.
Equ.wash Waiting
Female
Toilet
Janitor
Student Collab
HOLDING
Recovery
Duty Doctor
Head Nurse
TOI.
HDU (GENERAL)
TOI.
Store
ICU
Area:3040sft
8'-0'' wide corridor
Male
Toilet
TOI.
AHU
AHU
AHU
CONNECTING CORRIDOR
BETWEEN
HOSPITAL & COLLEGE
CONNECTING
CORRIDOR
BETWEEN
HOSPITAL
&
COLLEGE
Nurse rest room
N.S
Professor
Office
Physiology
Lecturer Room
Physiology
Lab
Biochemistry
Lab
OSCE
Biochemistry
Lecturer Room
Community
Medicine
LecturerRoom
Student
FemaleToilet
Student
Male Toilet
Janitors
Accessible
Toilet
Tutorial
Room
Tutorial
Room
Tutorial
Room
Tutorial
Room
Toilet
Toilet
Toilet
Stuff
male
Stuff
Female
Community Medicine Museum
Assistant Professor Assistant Professor
Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor
Associate Professor
Associate Professor
9'-0"
W
i
d
e
C
o
r
r
i
d
o
r
10'-5"
W
i
d
e
C
o
r
r
i
d
o
r
9'-0" W i d e C o r r i d o r
Elevator-02
2.27mx2.41m 2.27mx2.41m 2.27mx2.41m
2.27mx2.41m
Lift
2.27mx2.41m
Balcony
Balcony
Balcony
Balcony
2.96mx2.54m
Lift
2.96mx2.54m
2.64x2.90m
Lift
2.64x2.90m
2.64x2.90m
2.64x2.90m
Lift
2.96mx2.54m
Lift
2.96mx2.54m
GENERAL WARD
S
N
W
E
SCALE - 1:100
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P 5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
DV
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
5.6,68°
P
5.6,68°
P
5.6,68°
P
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
F
5.6,68°
U
F
F
F
F
Ø150 Sprinkler &
Standpipe Riser -01
Ø50 Drain Riser
F
F F F
ABC
CO2 ABC
CO2
ABC
CO2
ABC
CO2
F
6W
Speaker
6W
Speaker
6W
Speaker
Control
panel
DV
Control
panel
DV
Control
panel
DV
Control
panel
DV
Control
panel
Balcony
Lift & Stair lobby
FIRE LIFT
FIRE LIFT
FIRE Elevator-04
FIRE Elevator-01 FIRE Elevator-03
F.H.C
Ø150 Sprinkler &
Standpipe Riser -03
Ø50 Drain Riser
Ø150 Sprinkler &
Standpipe Riser -02
F.H.C
F.H.C
F.H.C
F.H.C
Ø100 Standpipe
Riser-1
F.H.C
F.H.C
SAFETY
LOBBY
FIRE STAIR-1
23'-8"X14'-2"
FIRE
STAIR-2
24'-2"X14'-4"
SAFETY
LOBBY
All Stair must be positive air
pressurized.
F
FIRE STAIR-3
23'-6"X14'-2"
SAFETY LOBBY
SAFETY
LOBBY
FIRE STAIR
23'-4"X14'-2"
SAFETY LOBBY
FIRE STAIR-4
23'-8"X14'-8"
SAFETY LOBBY
FIRE
STAIR-5
23'-2"X14'-2"
SAFETY
LOBBY
All Stair must be positive air
pressurized.
F
All
Stair
must
be
positive
air
pressurized.
F
FIRE STAIR
17'-8"X14'-11"
SAFETY LOBBY
FIRE STAIR
21'-6"X14'-8"
SAFETY LOBBY
All Stair must be positive air
pressurized.
F
All Stair must be positive air
pressurized.
F
SAFETY LOBBY
All Stair must be positive air
pressurized.
F
SAFETY
LOBBY
SAFETY Lift Lobby-01
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
EXIT
F
F
F
F
F F
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
F.H.C
All Stair must be positive air
pressurized.
F
5.6,68°
U
5.6,68°
U
ABC
CO2
Ø100 Sprinkler &
Standpipe Riser-5
Ø150 Sprinkler &
Standpipe Riser -04
Ø50 Drain Riser
F
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
ABC
CO2
SAFETY LOBBY
FIRE Lift
F
5.6,68°
U
5.6,68°
U
5.6,68°
U
F
FIRE
DOOR
5.6,68°
U
ABC
CO2
ABC
CO2
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
Toilet
Toilet
Toilet
5.6,68°
U
5.6,68°
P
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
TOI.
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
3RD FLOOR PLAN(GENERAL)-O.T.,O.T HOLDING,RECOVERY,ICU,HDU,GENERAL WARD,DAY CARE,DEPARTMENT OFFICE,PROFESSOR,ASSOCIATE PROFESSOR ,ASSISTANCE
PROFESSOR,COMMUNITY MEDICINE MUSEUM,BIOCHEMISTRY LAB,PHYSIOLOGY LAB,OSCE ,TUTORIAL ROOM AREA
Symbol Description
Legend:
Q.T
Smoke Detector
Addressable Output Module
ABC
CO2
Extinguisher (ABC & CO2)
101
10
13
K-5.6, SR, 68°, Upright Sprinkler
Horn With Light 19
19
59
Double Fire Door 2 Rated
K-5.6, SR, 68°, Pendent Sprinkler
SINGLE Fire Door 2 Rated 19
13
AS PER
DRAWING
P
5.6,68°
EXIT
F
154
Emergency Light
Manual call points
4 -Hour Fire Rated Wall
5.6,68°
U
13
F.H.C
08
07
Floor Area:56,184sft
Ø100mm Standpipe Riser
Ø150mm Sprinkler & Standpipe Riser 05
01
Open Nozzle (K-22)
Deluge Valve Assembly
DV
40
05
Landing Valve (Ø65)
Class II Hose Connection
06
05
Control panel
6W
Speaker
PA SPEAKER
Control
panel
04
FIRE Lift
5.6,68°
U
Toilet
5.6,68°
U
EXIT
EXIT
EXIT
Heat Detector
stretcher
lift
4'-11'x
3'-11'
stretcher
lift
4'-11'x
3'-11'
DOWN TO 2ND FLOOR
(Slope : 1: 12)
95'-0"x15'-0" Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 15
Treatment/Doctor
Room
Nurse lounge
Linen/Clean
Sister
Medicine
store
N.S.
STERILE STORE
Birth suite
Birth suite
Nurse/doctor rest
Clean
Store
labour room
Delivery room
Delivery room
Baby resuscitation
Sister
Toilet
Baby Hold
Recovey
Toilet
Toilet
Toilet
Toilet
N.S.
Doctor Sister Milk Bath
O.T-02
Scrub
Scrub
O.T-01
Dirty Corridor
Medicine
Nurse
Doctor change
Anesthetist
O.T-03
Gass
Scrub
AHU
Scrub
O.T-04(free)
Holding
Sister
Staff Change
Toilet
Dirty
Change
NURSERY
Sister
Bath
Milk
Nurse
change
N.S
N.S
waiting
Recovery
PICU
NICU
Toilet
Toilet
CONNECTING CORRIDOR
BETWEEN
HOSPITAL & COLLEGE
Feed
Feed
CONNECTING
CORRIDOR
BETWEEN
HOSPITAL
&
COLLEGE
Area:1200sft
Surgical suite
Delivery Unit
Nurse/doctor rest
AHU
AHU
Counseling
Counseling
135sft
Dirty
utility
Elevator-02
2.27mx2.41m 2.27mx2.41m 2.27mx2.41m
2.27mx2.41m
Lift
2.27mx2.41m
2.96mx2.54m
Lift
2.96mx2.54m
2.96mx2.54m
Lift
2.96mx2.54m
2.64x2.90m
Lift
2.64x2.90m
Balcony
Balcony
2.64x2.90m
2.64x2.90m
Lift
6.86mx6.15m
Lobby
Balcony
Balcony
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet
Singel Bed
Cabin-6
Singel Bed
Cabin-5
Singel Bed
Cabin-4
Singel Bed
Cabin-3
Singel Bed
Cabin-2
Singel Bed
Cabin-1
Double Bed
Cabin-1
Double Bed
Cabin-2
Double Bed
Cabin-3
Double Bed
Cabin-4
Double Bed
Cabin-5
Double Bed
Cabin-6
Double Bed
Cabin-7
Tutorial Room
Tutorial Room
Tutorial Room
Tutorial Room
Microbiology
Lab
Pathology
Lab
Pathology
Lecturer
Room
Pathology
Lecturer Room
Microbiology Lecturer
Room
Assistant
Professor
Professor Professor Office
Toilet
Toilet
Toilet
Stuff male
Stuff Female
8'-0" W i d e C o r r i d o r
8'-0" W i d e C o r r i d o r
9'-0"
W
i
d
e
C
o
r
r
i
d
o
r
9'-0"
W
i
d
e
C
o
r
r
i
d
o
r
Office
10'-5"
W
i
d
e
C
o
r
r
i
d
o
r
9'-0" W i d e C o r r i d o r
9'-0" W i d e C o r r i d o r
Assistant
Professor
Assistant
Professor
Assistant
Professor
Assistant
Professor
Assistant
Professor
Assistant
Professor
Assistant
Professor
Assistant
Professor
Assistant
Professor
Assistant
Professor
Student Female
Toilet
Student Male Toilet
Janitors
Accessible Toilet
GENERAL WARD
Tutorial
Room
S
N
W
E
SCALE - 1:100
lecture gallery
Lift & Stair lobby
FIRE Lift
FIRE LIFT
FIRE LIFT
FIRE Elevator-04
FIRE Elevator-01 FIRE Elevator-03
F.H.C
Ø150 Sprinkler &
Standpipe Riser -03
Ø50 Drain Riser
Ø150 Sprinkler &
Standpipe Riser -02
F.H.C
F.H.C
F.H.C
F.H.C
Ø100 Standpipe
Riser-1
F.H.C
F.H.C
SAFETY
LOBBY
FIRE STAIR-1
23'-8"X14'-2"
FIRE
STAIR-2
24'-2"X14'-4"
SAFETY
LOBBY
FIRE STAIR-3
23'-6"X14'-2"
SAFETY LOBBY
SAFETY
LOBBY
FIRE STAIR
23'-4"X14'-2"
SAFETY LOBBY
FIRE STAIR-4
23'-8"X14'-8"
SAFETY LOBBY
FIRE
STAIR-5
23'-2"X14'-2"
SAFETY
LOBBY
All Stair must be positive air
pressurized.
F
All
Stair
must
be
positive
air
pressurized.
F
FIRE STAIR
17'-8"X14'-11"
LOBBY
FIRE STAIR
21'-6"X14'-8"
SAFETY LOBBY
SAFETY LOBBY
All Stair must be positive air
pressurized.
F
SAFETY
LOBBY
SAFETY Lift Lobby-01
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
EXIT
F
F
F
F
F
F F
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
F.H.C
All Stair must be positive air
pressurized.
F
5.6,68°
U
5.6,68°
U
ABC
CO2
Ø100 Sprinkler &
Standpipe Riser-5
Ø150 Sprinkler &
Standpipe Riser -04
Ø50 Drain Riser
F
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
ABC
CO2
SAFETY LOBBY
FIRE Lift
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
DV
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
5.6,68°
P
5.6,68°
P
5.6,68°
P
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
F
Control
panel
DV
Control
panel
DV
Control
panel
DV
Control
panel
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P 5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P 5.6,68°
P 5.6,68°
P 5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
EXIT
ABC
CO2
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
F
F F F
ABC
CO2 ABC
CO2
ABC
CO2
5.6,68°
P
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
DV
Control
panel
DV
Control
panel
Toilet Toilet Toilet Toilet Toilet Toilet
F
ABC
CO2
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
According to NFPA-99
For sensitive area Manually operated deluge
system should provide.
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U 5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
F
F
F
Floor Area:55,022sft
Symbol Description
Legend:
Q.T
Smoke Detector
Addressable Output Module
ABC
CO2
Extinguisher (ABC & CO2)
110
10
12
K-5.6, SR, 68°, Upright Sprinkler
Horn With Light 17
17
73
Double Fire Door 2 Rated
K-5.6, SR, 68°, Pendent Sprinkler
SINGLE Fire Door 2 Rated 13
13
AS PER
DRAWING
P
5.6,68°
EXIT
F
108
Emergency Light
Manual call points
4 -Hour Fire Rated Wall
5.6,68°
U
15
F.H.C
08
07
Ø100mm Standpipe Riser
Ø150mm Sprinkler & Standpipe Riser 05
01
13
K-5.6, EC, 68°,Sidewall Sprinkler
Ex:S-5.6
68°
Open Nozzle (K-22)
Deluge Valve Assembly
DV
32
06
06
Landing Valve (Ø65)
Class II Hose Connection
06
12
Control panel
Control
panel
6W
Speaker
PA SPEAKER 04
4TH FLOOR PLAN(MATERNITY)-DEPARTMENT OFFICE,PROFESSOR,ASSOCIATE PROFESSOR,PATHOLOGY LAB,MICROBIOLOGY,TUTORIAL
,O.T,NICU,PICU,LABOUR,PRE OP,NURSERY,RECOVERY,BABY RESUSCITATION,DOUBLE,SINGLE BED AREA
Ø150 Sprinkler &
Standpipe Riser -01
Ø50 Drain Riser
Heat Detector
EXIT
EXIT
All Stair must be positive air
pressurized.
F All Stair must be positive air
pressurized.
F
All Stair must be positive air
pressurized.
F
stretcher
lift
4'-11'x
3'-11'
stretcher
lift
4'-11'x
3'-11'
DOWN TO 3RD FLOOR
(Slope : 1: 12)
95'-0"x15'-0"
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 16
Janitor
Nurse
Change
CONNECTING
CORRIDOR
BETWEEN
HOSPITAL
&
COLLEGE
AHU
Duty doctor
Medicine store
&Clean utility
2.44m wide corridor
2.44m wide corridor
2.44m wide corridor
2.44m wide corridor
Elevator-02
2.27mx2.41m 2.27mx2.41m 2.27mx2.41m
2.27mx2.41m
Lift
2.27mx2.41m
2.96mx2.54m
Lift
2.96mx2.54m
2.96mx2.54m
Lift
2.96mx2.54m
Balcony
2.64x2.90m
Lift
2.64x2.90m
Balcony
Balcony
2.64x2.90m
2.64x2.90m
Lift
Terrace
Terrace
Terrace
AHU
Tutorial
Room
Housekeeping
WARD
GENERAL WARD
WARD
WARD
WARD
6.86mx6.15m
Lobby
Teachers
Lounge
Library
Fornsic Lecturer
Room
Forensisc
Lab
Tutorial
Room
Tutorial
Room
Tutorial
Room
Tutorial
Room
Tutorial
Room
Tutorial
Room
Tutorial
Room
Tutorial
Room
Toilet
Toilet
Toilet
Stuff male
Stuff Female
2.44m wide corridor
2.44m
wide
corridor
Balcony
GENERAL WARD
S
N
W
ESCALE - 1:100
Tutorial Room
Student Female
Toilet
Student Male Toilet
Janitors
Accessible Toilet Toilet
Tutorial
Room
WAITING AREA
Lift & Stair lobby
FIRE Lift
FIRE LIFT
FIRE LIFT
FIRE Elevator-04
FIRE Elevator-01 FIRE Elevator-03
F.H.C
Ø150 Sprinkler &
Standpipe Riser -03
Ø50 Drain Riser
Ø150 Sprinkler &
Standpipe Riser -02
F.H.C
F.H.C
F.H.C
F.H.C
Ø100 Standpipe
Riser-1
F.H.C
F.H.C
SAFETY
LOBBY
FIRE STAIR-1
23'-8"X14'-2"
FIRE
STAIR-2
24'-2"X14'-4"
SAFETY
LOBBY
FIRE STAIR-3
23'-6"X14'-2"
SAFETY LOBBY
SAFETY
LOBBY
FIRE STAIR
23'-4"X14'-2"
SAFETY LOBBY
FIRE STAIR-4
23'-8"X14'-8"
SAFETY LOBBY
FIRE
STAIR-5
23'-2"X14'-2"
SAFETY
LOBBY
All Stair must be positive air
pressurized.
F
All Stair must be positive air
pressurized.
F
FIRE STAIR
17'-8"X14'-11"
LOBBY
FIRE STAIR
21'-6"X14'-8"
SAFETY LOBBY
SAFETY LOBBY
All Stair must be positive air
pressurized.
F
SAFETY
LOBBY
SAFETY Lift Lobby-01
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
EXIT
F
F
F
F
F
F F
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
F.H.C
All Stair must be positive air
pressurized.
F
5.6,68°
U
5.6,68°
U
ABC
CO2
Ø100 Sprinkler &
Standpipe Riser-5
Ø150 Sprinkler &
Standpipe Riser -04
Ø50 Drain Riser
F
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
ABC
CO2
SAFETY LOBBY
FIRE Lift
EXIT
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
F
F
F
F ABC
CO2
ABC
CO2
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
F
F
F
F
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
5.6,68°
U
5.6,68°
U
ABC
CO2
5.6,68°
U
5.6,68°
U
5.6,68°
U
Symbol Description
Legend:
Q.T
Smoke Detector
Addressable Output Module
ABC
CO2
Extinguisher (ABC & CO2)
108
10
14
K-5.6, SR, 68°, Upright Sprinkler
Horn With Light 16
16
34
Double Fire Door 2 Rated
K-5.6, SR, 68°, Pendent Sprinkler
Single Fire Door 2 Rated
05
13
13
AS PER
DRAWING
P
5.6,68°
EXIT
F
127
Emergency Light
Manual call points
4 -Hour Fire Rated Wall
5.6,68°
U
07
F.H.C
01
08
00
Ø100mm Standpipe Riser
Ø150mm Sprinkler & Standpipe Riser
Floor Area:48,805sft
Class II Hose Connection
Landing Valve (Ø65) 06
6W
Speaker
PA SPEAKER 04
5TH FLOOR PLAN-FORENSIC LAB,FORENSIC LECTURE,COMPUTER,TEACHER LOUNGE,LIBRARY,TUTORIAL,WARD BED AREA
Ø150 Sprinkler &
Standpipe Riser -01
Ø50 Drain Riser
EXIT
Heat Detector
All Stair must be positive air
pressurized.
F
All Stair must be positive air
pressurized.
F
All Stair must be positive air
pressurized.
F
5.6,68°
U
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 17
Stuff Male
130sft
Elevator-02
Stuff Female
W/C
W/C
W/C
W/C
W/C
Exam
Hall/Conferenc
Room
College
Admin
Area
CONNECTING CORRIDOR
BETWEEN
HOSPITAL & COLLEGE
Nurse Station
Toilet Toilet Toilet Toilet Toilet Toilet
2.27mx2.41m 2.27mx2.41m 2.27mx2.41m
2.27mx2.41m
Lift
2.27mx2.41m
2.75m W i d e C o r r i d o r
2.75m W i d e C o r r i d o r
2.96mx2.54m
Lift
2.96mx2.54m
2.96mx2.54m
Lift
2.96mx2.54m
Balcony
Balcony
2.64x2.90m
Lift
2.64x2.90m
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet
Toilet Toilet
Toilet Toilet
Toilet
Toilet
Toilet Toilet
Toilet Toilet
Toilet Toilet
Toilet
Toilet
Toilet Toilet
Toilet Toilet
Toilet Toilet
Toilet
Balcony
Balcony
Balcony
Balcony
2.64x2.90m
2.64x2.90m
Lift
Double Bed
Single Bed
Cabin
VIP CABIN Patient
Attendant
2.44m wide corridor
2.44m wide corridor
2.44m wide corridor
WARD
WARD
WARD
WARD
S
N
W
E SCALE - 1:100
Tutorial Room
WARD
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Double Bed Double Bed Double Bed Double Bed Double Bed Double Bed Double Bed
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Single Bed
Cabin
Lift & Stair lobby
FIRE Lift
FIRE LIFT
FIRE LIFT
FIRE Elevator-04
FIRE Elevator-01 FIRE Elevator-03
F.H.C
Ø150 Sprinkler &
Standpipe Riser -03
Ø50 Drain Riser
Ø150 Sprinkler &
Standpipe Riser -02
F.H.C
F.H.C
F.H.C
F.H.C
Ø100 Standpipe
Riser-1
F.H.C
F.H.C
SAFETY
LOBBY
FIRE STAIR-1
23'-8"X14'-2"
FIRE
STAIR-2
24'-2"X14'-4"
SAFETY
LOBBY
FIRE STAIR-3
23'-6"X14'-2"
SAFETY LOBBY
SAFETY
LOBBY
FIRE STAIR
23'-4"X14'-2"
SAFETY LOBBY
FIRE STAIR-4
23'-8"X14'-8"
SAFETY LOBBY FIRE
STAIR-5
23'-2"X14'-2"
SAFETY
LOBBY
All Stair must be positive air
pressurized.
F
All Stair must be positive air
pressurized.
F
FIRE STAIR
17'-8"X14'-11"
LOBBY
FIRE STAIR
21'-6"X14'-8"
SAFETY LOBBY
SAFETY LOBBY
All Stair must be positive air
pressurized.
F
SAFETY
LOBBY
SAFETY Lift Lobby-01
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
EXIT
F
F
F
F
F
F F
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
ABC
CO2
F.H.C
All Stair must be positive air
pressurized.
F
5.6,68°
U
5.6,68°
U
ABC
CO2
Ø100 Sprinkler &
Standpipe Riser-5
Ø150 Sprinkler &
Standpipe Riser -04
Ø50 Drain Riser
F
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
Ø65 HOSE
VALVE
ABC
CO2
SAFETY LOBBY
FIRE Lift
Ø150 Sprinkler &
Standpipe Riser -01
Ø50 Drain Riser
EXIT
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
P
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
Ex:S-5.6
68°
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
5.6,68°
U
6TH FLOOR PLAN-VIP,DELUXE,DOUBLE BED,SINGLE CABIN ,EXAM HALL ,CHAIRMAN,MANAGING,OPSE,BOARD ,ADMIN ,OFFICE AREA
F
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
5.6,68°
P
F
ABC
CO2
F
F
F
ABC
CO2
ABC
CO2
ABC
CO2
6W
Speaker
6W
Speaker
6W
Speaker
6W
Speaker
5.6,68°
U
5.6,68°
P
5.6,68°
U
5.6,68°
U
5.6,68°
U
F
F
F
ABC
CO2
F
Symbol Description
Legend:
Q.T
Smoke Detector
Addressable Output Module
ABC
CO2
Extinguisher (ABC & CO2)
112
10
12
K-5.6, SR, 68°, Upright Sprinkler
Horn With Light 17
37
K-5.6, EC, 68°,Sidewall Sprinkler
17
33
Double Fire Door 2 Rated
K-5.6, SR, 68°, Pendent Sprinkler
Single Fire Door 2 Rated
05
10
13
Ex:S-5.6
68°
AS PER
DRAWING
P
5.6,68°
EXIT
F
41
Emergency Light
Manual call points
4 -Hour Fire Rated Wall
5.6,68°
U
06
F.H.C
01
08
Floor Area:48,486sft
Ø100mm Standpipe Riser
Ø150mm Sprinkler & Standpipe Riser
Class II Hose Connection
Landing Valve (Ø65) 06
6W
Speaker
PA SPEAKER 04
Ex:S-5.6
68°
EXIT
EXIT
All Stair must be positive air
pressurized.
F All Stair must be positive air
pressurized.
F
All Stair must be positive air
pressurized.
F
PROJECT NAME & ADDRESS:
OWNER'S NAME / REPRESENTATIVE
PREPARED BY
ENGINEER
FIRE PROFESSIONAL
APPROVED BY
DEPARTMENT OF FIRE SERVICE
& CIVIL DEFENSE.
Head Office: 38-46, Road:
KaziAlauddin Road, Siddique Bazar, Dhaka.
SCALE
PAGE SIZE:
1:100
23-02-2022
A-3
DATE
CONSULTANT:
MART ENGINEERING
& CONSULTANCY
Address: House -10,Road-03,(1st FL)
Middle Badda, Gulshan Badda Link
Road, Dhaka-1212.
Mobile : +88017 - 17432054
DESIGNER
MD. Mahmudul Hasan Rony
B.SC in EEE
ARCHITECT
PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED
HOSPITAL BUILDING.
AT SATARKUL,DHAKA
UNITED MEDICAL COLLEGE & HOSPITAL
PAGE NO : 18
In such open ceiling areas,fire detection
In such open ceiling areas,fire detection
In such open ceiling areas,fire detection
In such open ceiling areas,fire detection
In such open ceiling areas,fire detection
In such open ceiling areas,fire detection
In such open ceiling areas,fire detection
In such open ceiling areas,fire detection
In such open ceiling areas,fire detection
In such open ceiling areas,fire detection
In such open ceiling areas,fire detection

More Related Content

Similar to In such open ceiling areas,fire detection

(Hospital presentation)
(Hospital presentation)(Hospital presentation)
(Hospital presentation)Bee Key Verma
 
HOSPITAL CASE STUDY
HOSPITAL CASE STUDY HOSPITAL CASE STUDY
HOSPITAL CASE STUDY ArshaqKN
 
PIMS MULTI SPECIALITY HOSPITAL.pptx
PIMS MULTI SPECIALITY HOSPITAL.pptxPIMS MULTI SPECIALITY HOSPITAL.pptx
PIMS MULTI SPECIALITY HOSPITAL.pptxDavisReshma1
 
Handbook to build_an_hospital_crf
Handbook to build_an_hospital_crfHandbook to build_an_hospital_crf
Handbook to build_an_hospital_crfsubh111
 
500 Bed Hospital
500 Bed Hospital500 Bed Hospital
500 Bed HospitalShayne Galo
 
FIRE PREVENTION AND SAFTEY SURVEY REPORT OF HUSSAIN EBRAHIM JAMAL RESEARCH I...
FIRE PREVENTION AND SAFTEY  SURVEY REPORT OF HUSSAIN EBRAHIM JAMAL RESEARCH I...FIRE PREVENTION AND SAFTEY  SURVEY REPORT OF HUSSAIN EBRAHIM JAMAL RESEARCH I...
FIRE PREVENTION AND SAFTEY SURVEY REPORT OF HUSSAIN EBRAHIM JAMAL RESEARCH I...Naeem Ahmed Khan
 
Newmont Ulrasound Training 2.pptx
Newmont Ulrasound Training 2.pptxNewmont Ulrasound Training 2.pptx
Newmont Ulrasound Training 2.pptxselloramatla
 
NATIONAL desktop.pptx
NATIONAL desktop.pptxNATIONAL desktop.pptx
NATIONAL desktop.pptxkeshiboddeda
 
SuperTech Genius Of Tank - Boutros Noun 5
SuperTech Genius Of Tank - Boutros Noun 5SuperTech Genius Of Tank - Boutros Noun 5
SuperTech Genius Of Tank - Boutros Noun 5Pierre Noun
 
DATA COLLECTION for university design.pdf
DATA COLLECTION for university design.pdfDATA COLLECTION for university design.pdf
DATA COLLECTION for university design.pdfSALONIKAAHUJA1
 
PRESENTATION ON FIRE SAFETY MANAGEMENT 1.pptx
PRESENTATION ON FIRE SAFETY MANAGEMENT 1.pptxPRESENTATION ON FIRE SAFETY MANAGEMENT 1.pptx
PRESENTATION ON FIRE SAFETY MANAGEMENT 1.pptxpraveenphalani
 
Terminologies of Community Health Centre
Terminologies of Community Health Centre Terminologies of Community Health Centre
Terminologies of Community Health Centre NIKITA SHARMA
 
FPG High Hazard Tunnel Brochure Web
FPG High Hazard Tunnel Brochure WebFPG High Hazard Tunnel Brochure Web
FPG High Hazard Tunnel Brochure WebKenneth Strachan
 
Testing/Manufacture/Mini Tensile Tester
Testing/Manufacture/Mini Tensile TesterTesting/Manufacture/Mini Tensile Tester
Testing/Manufacture/Mini Tensile Testerfec2020
 
Testing/Manufacture/mini tenstile
Testing/Manufacture/mini tenstileTesting/Manufacture/mini tenstile
Testing/Manufacture/mini tenstilefec2020
 

Similar to In such open ceiling areas,fire detection (20)

(Hospital presentation)
(Hospital presentation)(Hospital presentation)
(Hospital presentation)
 
HOSPITAL CASE STUDY
HOSPITAL CASE STUDY HOSPITAL CASE STUDY
HOSPITAL CASE STUDY
 
PIMS MULTI SPECIALITY HOSPITAL.pptx
PIMS MULTI SPECIALITY HOSPITAL.pptxPIMS MULTI SPECIALITY HOSPITAL.pptx
PIMS MULTI SPECIALITY HOSPITAL.pptx
 
Handbook to build_an_hospital_crf
Handbook to build_an_hospital_crfHandbook to build_an_hospital_crf
Handbook to build_an_hospital_crf
 
FORTIS NOIDA.pptx
FORTIS NOIDA.pptxFORTIS NOIDA.pptx
FORTIS NOIDA.pptx
 
500 Bed Hospital
500 Bed Hospital500 Bed Hospital
500 Bed Hospital
 
FIRE PREVENTION AND SAFTEY SURVEY REPORT OF HUSSAIN EBRAHIM JAMAL RESEARCH I...
FIRE PREVENTION AND SAFTEY  SURVEY REPORT OF HUSSAIN EBRAHIM JAMAL RESEARCH I...FIRE PREVENTION AND SAFTEY  SURVEY REPORT OF HUSSAIN EBRAHIM JAMAL RESEARCH I...
FIRE PREVENTION AND SAFTEY SURVEY REPORT OF HUSSAIN EBRAHIM JAMAL RESEARCH I...
 
Newmont Ulrasound Training 2.pptx
Newmont Ulrasound Training 2.pptxNewmont Ulrasound Training 2.pptx
Newmont Ulrasound Training 2.pptx
 
NATIONAL desktop.pptx
NATIONAL desktop.pptxNATIONAL desktop.pptx
NATIONAL desktop.pptx
 
Supertech | Brochure
Supertech | BrochureSupertech | Brochure
Supertech | Brochure
 
SuperTech Genius Of Tank - Boutros Noun 5
SuperTech Genius Of Tank - Boutros Noun 5SuperTech Genius Of Tank - Boutros Noun 5
SuperTech Genius Of Tank - Boutros Noun 5
 
DATA COLLECTION for university design.pdf
DATA COLLECTION for university design.pdfDATA COLLECTION for university design.pdf
DATA COLLECTION for university design.pdf
 
hospital case study
hospital case studyhospital case study
hospital case study
 
[GLP]Health printer1
[GLP]Health printer1[GLP]Health printer1
[GLP]Health printer1
 
PRESENTATION ON FIRE SAFETY MANAGEMENT 1.pptx
PRESENTATION ON FIRE SAFETY MANAGEMENT 1.pptxPRESENTATION ON FIRE SAFETY MANAGEMENT 1.pptx
PRESENTATION ON FIRE SAFETY MANAGEMENT 1.pptx
 
HYBRID OPERATING THEATER ROOM
HYBRID OPERATING THEATER ROOM HYBRID OPERATING THEATER ROOM
HYBRID OPERATING THEATER ROOM
 
Terminologies of Community Health Centre
Terminologies of Community Health Centre Terminologies of Community Health Centre
Terminologies of Community Health Centre
 
FPG High Hazard Tunnel Brochure Web
FPG High Hazard Tunnel Brochure WebFPG High Hazard Tunnel Brochure Web
FPG High Hazard Tunnel Brochure Web
 
Testing/Manufacture/Mini Tensile Tester
Testing/Manufacture/Mini Tensile TesterTesting/Manufacture/Mini Tensile Tester
Testing/Manufacture/Mini Tensile Tester
 
Testing/Manufacture/mini tenstile
Testing/Manufacture/mini tenstileTesting/Manufacture/mini tenstile
Testing/Manufacture/mini tenstile
 

Recently uploaded

How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 

Recently uploaded (20)

TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 

In such open ceiling areas,fire detection

  • 1. ENGR. M.A. RASHID TIPU,CFPS Certified Fire Protection Specialist Ba-08, South Badda, Gulshan, (Behind of shooting club) Dhaka-1212, Bangladesh. Mobile:-01717-432054, 01670-212478 PROJECT NAME AND ADDRESS OCCUPANCY CLASSIFICATION BUILDING TYPE PREPARED BY APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE 38-46, ROAD-KAZI-ALAUDDIN ROAD, SIDDIQUE BAZAR, DHAKA 1000 WE KILL FIRE BEFORE IT KILLS YOU R.C.C BUILDING MART ENGINEERING & CONSULTANCY HOTLINE:-01717-432054, 01670-212478 PROPOSED FIRE SAFETY PLAN DRAWING OWNER'S NAME D-1 Ref No:MEC:Dhaka:December:2021:18 PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. BUILDING DEVELOPER OWNER AT SATARKUL,DHAKA ABUL KALAM AZAD (6250+4000)KVA ELECTRICAL SUB-STATION UNITED MEDICAL COLLEGE & HOSPITAL
  • 2. PAGE NO INDEX-1 1 DESCRIPTION COVER PAGE INDEX-1 MASTER LAYOUT PLAN ALL FLOOR NAME & AREA-1 GOOGLE MAP GENERAL NOTE SEMI BASEMENT FLOOR PLAN-CHEMOTHERAPY,CAR PARKING FOR COLLEGE STAFF , CAR PARKING FOR HOSPITAL STAFF SECTION OF UNITED MEDICAL COLLEGE & HOSPITAL BASEMENT PLAN- CAR PARKING AREA 7TH FLOOR PLAN-VIP,DELUXE,DOUBLE BED,SINGLE CABIN ,EXAM HALL AREA 8TH FLOOR PLAN-VIP,DELUXE,DOUBLE SINGLE CABIN AREA LIGHTING PROTECTION SYSTEM PROPOSED FIRE ALARM RISER DIAGRAM-2 9TH FLOOR PLAN-VIP CABIN,DELUXE ,DOUBLE BED CABIN ,SINGLE CABIN AREA Roof Floor plan GROUND FLOOR PLAN-CONSULTANT ROOM ,AMBULANCE PARKING ,ATM BOOTH ,MAMMOGRAPHY , ULTRA SONOGRAM ,X-RAY ,FLUOROSCOPY ,MRI ,CT SCAN AREA GROUND FLOOR - PROPOSED 5000KVA ELECTRICAL SUB-STATION 1ST FLOOR PLAN-OPD 1 - Consulant room,Endoscopy ,Ultrasonogram,Food court ,Admin office, Department office,Professor Room,Associate Professor Room,Assistant Professor Room,Lecturer Room , Meeting Room,Students Common (Boy's),Students Common (Girl's 2ND FLOOR PLAN(CARDIAC)-O.T,O.T RECOVERY ,O.T. Holding,Cath Lab,Cath Recovery,Cath ,Holding,CICU , CCU,Cardiac HDU,Hemodialysis ,Department office,Professor Room,Associate Professor Room,Assistant Professor Room,Dissection Hall , Dead body preservation ,Anatomy museum ,Anatomy lecturer room ,Medical education unit ,Histology Lab, Tutorial Room Area 3RD FLOOR PLAN(GENERAL)-O.T.,O.T HOLDING,RECOVERY,ICU,HDU,GENERAL WARD,DAY CARE, DEPARTMENT OFFICE,PROFESSOR,ASSOCIATE PROFESSOR ,ASSISTANCE PROFESSOR, COMMUNITY MEDICINE MUSEUM,BIOCHEMISTRY LAB,PHYSIOLOGY LAB,OSCE ,TUTORIAL ROOM AREA 4TH FLOOR PLAN(MATERNITY)-DEPARTMENT OFFICE,PROFESSOR,ASSOCIATE PROFESSOR,PATHOLOGY LAB,MICROBIOLOGY,TUTORIAL ,O.T,NICU,PICU,LABOUR,PRE OP,NURSERY,RECOVERY,BABY RESUSCITATION,DOUBLE,SINGLE BED AREAPLAN) 5TH FLOOR PLAN-FORENSIC LAB,FORENSIC LECTURE,COMPUTER,TEACHER LOUNGE,LIBRARY,TUTORIAL,WARD BED AREA 6TH FLOOR PLAN-VIP,DELUXE,DOUBLE BED,SINGLE CABIN ,EXAM HALL ,CHAIRMAN,MANAGING,OPSE,BOARD ,ADMIN ,OFFICE AREA PROPOSED POSITIVE SUCTION FIRE PUMP DETAILS PROPOSED POSITIVE SUCTION FIRE HYDRANT SCHEMATIC DIAGRAM PROPOSED FIRE ALARM RISER DIAGRAM-1 PROPOSED SINGLE LINE DIAGRAM(SLD) 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 02
  • 3. SL. NO ALL FLOOR NAME & AREA FLOOR NAME FLOOR AREA TOTAL AREA= OCCUPANCY 01 94450 sft GROUND FLOOR PLAN 617,957 sft TOTAL AREA = 617,957 SFT BASEMENT FLOOR PLAN SEMI-BASEMENT FLOOR PLAN 1ST FLOOR PLAN 2ND FLOOR PLAN 3RD FLOOR PLAN 4TH FLOOR PLAN 5TH FLOOR PLAN 6TH FLOOR PLAN 7TH FLOOR PLAN 8TH FLOOR PLAN 9TH FLOOR PLAN ROOF FLOOR PLAN 02 03 04 05 06 07 08 09 10 11 12 13 88865 sft 57715 sft 58241 sft 58562 sft 56184 sft 55022 sft 48805 sft 48486 sft 47681 sft 47672 sft 47124 sft 3600 sft CAR PARKING AREA CHEMOTHERAPY,CAR PARKING FOR COLLEGE STAFF , CAR PARKING FOR HOSPITAL STAFF CONSULTANT ROOM ,AMBULANCE PARKING ,ATM BOOTH ,MAMMOGRAPHY , ULTRA SONOGRAM ,X-RAY ,FLUOROSCOPY ,MRI ,CT SCAN AREA Consulant room,Endoscopy ,Ultrasonogram,Food court ,Admin office,Department office, Professor Room,Associate Professor Room,Assistant Professor Room,Lecturer Room , Meeting Room,Students Common (Boy's),Students Common (Girl's O.T,O.T RECOVERY ,O.T. Holding,Cath Lab,Cath Recovery,Cath ,Holding,CICU ,CCU,Cardiac HDU, Hemodialysis ,Department office,Professor Room,Associate Professor Room,Assistant Professor Room,Dissection Hall , Dead body preservation ,Anatomy museum ,Anatomy lecturer room ,Medical education unit ,Histology Lab, Tutorial Room Area O.T.,O.T HOLDING,RECOVERY,ICU,HDU,GENERAL WARD,DAY CARE,DEPARTMENT OFFICE,PROFESSOR, ASSOCIATE PROFESSOR ,ASSISTANCE PROFESSOR,COMMUNITY MEDICINE MUSEUM,BIOCHEMISTRY LAB,PHYSIOLOGY LAB,OSCE ,TUTORIAL ROOM AREA DEPARTMENT OFFICE,PROFESSOR,ASSOCIATE PROFESSOR,PATHOLOGY LAB, MICROBIOLOGY,TUTORIAL ,O.T,NICU,PICU,LABOUR,PRE OP,NURSERY,RECOVERY, BABY RESUSCITATION,DOUBLE,SINGLE BED AREAPLAN) FORENSIC LAB,FORENSIC LECTURE,COMPUTER, TEACHER LOUNGE,LIBRARY,TUTORIAL,WARD BED AREA VIP,DELUXE,DOUBLE BED,SINGLE CABIN ,EXAM HALL ,CHAIRMAN,MANAGING,OPSE,BOARD ,ADMIN ,OFFICE AREA VIP,DELUXE,DOUBLE BED,SINGLE CABIN ,EXAM HALL AREA VIP,DELUXE,DOUBLE SINGLE CABIN AREA VIP CABIN,DELUXE ,DOUBLE BED CABIN ,SINGLE CABIN AREA STAIR,LOBBY PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 03
  • 4. MEANS OF EGRESS BASIC REQUIREMENTS FOR MEANS OF EGRESS For any storey with only two exits, the maximum occupant load should not exceed 500 people. For any storey with only three exits, the maximum occupant load should not exceed 1000 people. For rooms with more than 49 occupants, doors must swing in the direction of egress (i.e. the doors must swing out of the room). For areas with more than 49 occupants, doors should be equipped with panic hardware (crash bars). [Ref: STANDARD: ACCORD STANDARD PART 6 SECTION 6.5] PORTABLE FIRE EXTINGUISHERS Ref: Portable f re extinguishers shall be installed throughout all new and existing facilities in accordance with BNBC Part 4 Section 4.10 and NFPA 10. Spacing: Extinguishers shall be placed so that maximum travel distance to the nearest unit shall not exceed 30 m (100 ft). Mounting height: a. Fire extinguishers having a gross weight not exceeding 18.14 kg (40 lb) shall be installed so that the top of the f re extinguisher is not more than 1.53 m (5 ft) above the f oor (NFPA 10 6.1.3.8). b. Fire extinguishers having a gross weight greater than 18.14 kg (40 lb) (except wheeled types) shall be installed so that the top of the f re extinguisher is not more than 1.07 m (3_ ft) above the f oor (NFPA 10 6.1.3.8). 6.13.2: Common Path of Travel. The common path of egress travel shall not exceed 23 m (75 ft). Where the building is provided with a complete automatic sprinkler system, the common path of egress travel shall not exceed 30 m (100 ft). The common path of egress travel for Group H (storage) occupancies with not more than 30 occupants shall not exceed 30 m (100 ft). The common path of egress travel for Group J (high hazard) occupancies shall not exceed 8 m (25 ft). General Note: Travel Distance. References: As per BNBC & NFPA ( Accord, Alliance) 6.131 : General. Travel distance to reach an exit for new and existing shall not exceed the values listed in BNBC Part 4 Section 3.15.1 unless the requirements of 6.13.1.1 or 6.13.1.2 can be met. 6.13.1.1: Travel distance limitations for G2 (RMG factories) shall be increased to 60 m (200 ft) where a complete automatic fire detection system, portable fire extinguishers, and standpipe system are provided in ac 6.13.1.2: Travel distance limitations for G2 (RMG factories) shall be increased to 122 m (400 ft) where a complete automatic sprinkler system, automatic fire alarm system, and portable fire extinguishers are provided in accordance with this Standard.cordance with this Standard. Exit doors must not be equipped with locking hardware that would allow an occupant to be locked inside the room or space. Exit doors should also not be equipped with secondary locking devices, such as a deadbolt or slide bolt, etc. It should be possible to open any designated exit door using a single motion, without the use of a key, tool, or special knowledge. Each occupant must be provided with at least 4mm of egress width for exit doors. For example, if the exit door is 32 inches wide, a maximum of 200 occupants could egress through that door. Stairs require 8mm per person. The rules for minimum number of exits still apply. Occupant load is also limited by the size of the room, and depends on how the room is being used. (See occupant load below.) [REF: STANDARD: ACCORD STANDARD PART 6 SECTION 6.5] Minimum Widths: Structural Element Exit doors (existing) Exit doors (New) Aisles Corridors Stairs (existing) Stairs (New) Stair Landings (existing) Ramps Fire Resistance Rating 0.8m (32in.) 1m (40 in) 0.9m (36in) 1.1m (44in) 0.9m (36in) 1.5m (59in) 0.9m (36in) 1.1m (44in) Ref: BNBC Part 1-5 2.5.1.5 When the basement or ground floor of a building of Occupancy A is used wholly or partly for generator or electrical substation, the walls and floors surrounding such use shall be of at least Type I-B construction. TYPE I-B--Fire Resistive Non-Combustible (Commonly found in mid-rise office & Group R buildings). 2 Hr. Exterior Walls* 2 Hr. Structural Frame 2 Hr. Ceiling/Floor Separation 1 Hr. Ceiling/Roof Assembly General Note PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 04
  • 5. GOOGLE MAP PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 05
  • 6. FIRE LIFT FIRE LIFT FIRE LIFT FIRE STAIR FIRE LIFT FIRE STAIR, PROPOSED 10 STORIED BUILDING Property Line 18 .29 m W i d e R o a d 12. 19 m W i d e R o a d EMERGENCY ENTRANCE PARKING IN/OUT PARKING IN/OUT PROPOSED 10 STORIED BUILDING AUDITORIUM Green Space GROUND FLOOR SOFT PAVE AREA 18.34m 30.06m 34.76m 35.58m Green Space Soft Pave Area Green Space Footpath 3.64m 4.62m 30.05m 6.21m 34.06m 10.06m 6.24m 15.83m 4.56m 10.38m 13.94m O P E N T E R R A C E O P E N T E R R A C E O P E N C O U R T Y A R R D O P E N T E R R A C E O P E N T E R R A C E Green Space Basement Slab (Open To sky) WASA MAIN WATER SUPPLY RUN EXISTING 11KV+ 440V POWER LINE Property Line Ramp Green Space Medical College Entry OPD (Free) 100.33m 113.03m 104.02m 34.04m 7.37m FIRE STAIR FIRE LIFT FIRE STAIR 22.75m +0.30m Guard Room Height 2.50m 34.09m LEVEL +34.59 m LEVEL +34.59 m LEVEL +23.47 m LEVEL +23.47 m LEVEL +23.47 m LEVEL +19.81 m 10 STORIED BUILDING 10 STORIED BUILDING Hospital Main Entry/Exit DOWN TO SEMI BASEMENT (Slope - 1: 9.10) E N T R Y UP TO GROUND FLOOR (Slope - 1: 12) DN TO SEMI BASEMENT (Slope - 1: 9.13) EXIT U P T O G R O U N D F L O O R ( S l o p e - 1 : 9 . 5 2 ) U P T O G R O U N D F L O O R ( S l o p e - 1 : 9 . 52 ) Guard Room Height 2.50m DN DN TO ROAD (Slope - 1: 8) Green Space Green Space Green Space Green Space Green Space GLASS CANOPY 4.37m 7.11m 8.78m LEVEL+1.52m LEVEL +1.67m LEVEL +0.60m LEVEL -1.98m LEVEL -1.98m LEVEL +1.52m LEVEL +1.52m LEVEL ±0" LEVEL +1.52m LEVEL +0.91m LEVEL ±0" LEVEL ±0" Softr Pave Area Green Space Green Space SW Septic Tank SW Septic Tank WASA MAIN SEWERAGE LINE RUN GAS LINE WASA MAIN WATER SUPPLY RUN EXISTING 11KV+ 440V POWER LINE WASA MAIN SEWERAGE LINE RUN GAS LINE 6.22m 6.12m 7.29m 3.99m 7.64m Semi Basment Slab outline ETP/STP Raw Water Tank Fire Water Tank Fire & Plumbing Water Pump Room Raw Water,Soft Water,Row Water Treatment Plant Soft Water Tank 8.02m 6.12m 28.63m Semi Basement Floor Line Basement Floor Line Basement Floor Line Green Space Ramp Down To Semi Basment 4.82 m W i d e I n t e r n a l R o a d GREEN SPACE Balcony Excluded DN TO SEMI BASMENT Sky Light Sky Light Sky Light Guard Room Height 2.50m 18.29 m 12.19m Soft pave Green Space 4.57m 4.57m 4.57m 4 . 6 0 m 4 . 6 1 m Soft Pave Green Space 3.10m 6.11m O P E N C O U R T Y A R R D Balcony Excluded Balcony Excluded Balcony Excluded Balcony Excluded Balcony Excluded 110.8 3m Soft pave Soft pave GROUND FLOOR SOFT PAVE AREA Soft Pave Soft Pave Garbage bin LEVEL +5.33 m Fire Stair Fire Stair Fire Stair Fire Stair 18.68m LEVEL +27.28 m LEVEL +5.33 m LEVEL+5.33m 95.67m Sky Light N MASTER PLAN Fire water tank Basement Floor 47'-5''X41'-11'' =219,095.745 US GALLON Fire pump room Basement Floor 41'-10''X19'-2'' Fire Stair Fire LIFT Generator Generator ROOM FIRE ALARM CONTROL ROOM TRANSFORMER ROOM Switchgear Room Box Hose Box Hose Box Hose Box Hose 4-Ø65x150 FIRE DEPARTMENT CONNECTION PILLAR HYDRANT WITH HOSE BOX PILLAR HYDRANT WITH HOSE BOX PILLAR HYDRANT WITH HOSE BOX PILLAR HYDRANT WITH HOSE BOX 4-Ø65x150 FIRE DEPARTMENT CONNECTION AMBULANCE AREA SCALE - 1:100 Pillar Hydrant & Hose Connection 4 way(65mmX150) Fire Department Connection Q.T SYMBOL SYMBOL NAME 07 02 Box Hose Box Hose Box Hose PILLAR HYDRANT WITH HOSE BOX Box Hose PILLAR HYDRANT WITH HOSE BOX PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 06
  • 7. ±0" Road Level +5'-6" Floor Level -6'-6" Basment -01 Level -17'-0" Basment -02 Level Sky Light ±0" Road Level -18'-4" Basment -02 Level -8'-4" Basment -01 Level -22'-0" Basment -02 Level Soft water tank ETP -22'-0" Basment -02 Level -3'-6" Internal Road Level +5'-6" Floor Level +17'-6" Floor Level +24'-6" Floor Level +36'-6" Floor Level +48'-6" Floor Level +60'-6" Floor Level +72'-6" Floor Level +84'-6" Floor Level +96'-6" Floor Level +108'-6" Floor Level +5'-6" Floor Level -6'-6" Basment -01 Level +5'-6" Floor Level SECTION OF UNITED MEDICAL COLLEGE & HOSPITAL ELLIPS ELLIPS 1.4 (AIR TERMINAL) PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 07
  • 8. PRAYER SPACE (FEMALE) 8.74mX11.51m PRAYER SPACE (MALE) 22.58mX11.94m DRIVER'S WAITING JANITOR 3.01mX2.03m UP DRIVER'S TOILET 7.43mX7.34m 08 .STP DRIVER'S WAITING 21.87mX3.96m 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 30-___-HI 3 0 - _ _ _ - H I 3 0 - _ _ _ - H I 3 0 - _ _ _ - H I 3 0 - _ _ _ - H I 3 0 - _ _ _ - H I 3 0 - _ _ _ - H I 3 0 - _ _ _ - H I 3 0 - _ _ _ - H I 3 0 - _ _ _ - H I 3 0 - _ _ _ - H I DN DN ABULATION & TOILET (MALE) 6.82mX3.30m DRIVER'S TOILET 4.78mX3.83m METAL WORKSHOP 8.86mX12.40m MEDICAL RECORD STORE 6.93mX12.52m UP UP UP UP TO SEMIBASEMENT (Slope : 1: 8) UP UP TO SEMIBASEMENT (Slope : 1:8.03) UP 04.SOFT WATER TANK 06.RAW WATER,SOFT WATER,RO WATER TREATMENT PLANT 13.FIRE & PLUMBING WATER PUMP ROOM 1.RAW WATER TANK 02.FIRE WATER TANK Level - 6.71m D R I V E W A Y D R I V E W A Y D R I V E W A Y D R I V E W A Y D R I V E W A Y D R I V E W A Y D R I V E W A Y D R I V E W A Y D R I V E W A Y D R I V E W A Y D R I V E W A Y D R I V E W A Y D R I V E W A Y D R I V E W A Y STORE 4.80mX4.80m ABLUTION & TOILET 5.03mX2.49m - 5.18m Floor Level -5.59m Floor Level - 5.18m Floor Level - 5.18m Floor Level UP Level -17'-0" 4"X2" Gutter work 4"X2" Gutter work 4"X2" Gutter work 18'-0" I B -5.59m Floor Level ETP Level - 6.71m Level - 6.71m Level - 6.71m Level - 6.71m Level - 6.71m Level - 5.18m 2.44X4.78m LIFT 2.95X5.38m 2.95X5.38m LIFT 2.90X5.28m LIFT 5.28X2.90m Level - 5.18m Level - 5.59m - 5.18m Floor Level - 5.18m Floor Level - 5.18m Floor Level - 5.18m Floor Level 4.98m 14.48m 5.44m 9.78m 12.80m 12.80m 12.80m 9.19m 14.85m 5.42m 9.19m S N W E SCALE - 1:100 25.78m ABLUTION 4.16mX1.68m Symbol Description Legend: Q.T Heat Detector Addressable Output Module ABC CO2 Extinguisher (ABC & CO2) 00 02 26 Horn With Light 20 16 K-5.6, EC, 68°,Sidewall Sprinkler 22 05 Double Fire Door 2 Rated Single Fire Door 2 Rated Ø150mm Sprinkler & Standpipe Riser 05 06 09 07 Ex:S-5.6 68° AS PER DRAWING EXIT F Emergency Light Manual call points 4 -Hour Fire Rated Wall Sprinkler K- 11.2 802 48 F.H.C Addressable Input Module AIM 11 Class II Hose Connection Floor Area:94450sft K-5.6, SR, 68°, Upright Sprinkler 5.6,68° U Landing Valve (Ø65) 02 6W Speaker PA SPEAKER 08 Fire water tank 47'-5''X41'-11'' =219,095.745 US GALLON 13.Fire pump room 41'-10''X19'-2'' FIRE STAIR-1 23'-2"X14'-2" EXIT EXIT EXIT FIRE STAIR -2 23'-8"X14'-2" FIRE STAIR 23'-2"X14'-2" SAFETY LOBBY SAFETY LOBBY SAFETY LOBBY SAFETY LOBBY SAFETY LOBBY SAFETY LOBBY EXIT EXIT EXIT EXIT EXIT EXIT EXIT BASEMENT SLOPE : 1: 8 92'-4"x18'-0" BASEMENT SLOPE : 1: 8 16'-5"x16'-0" BASEMENT SLOPE : 1: 8 92'-0"x8'-0" BASEMENT SLOPE : 1: 8 16'-8"x16'-0" Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° F F F F F F F MECHANICAL VENTILATION 2 HOUR FIRE RATED SEPARATION WALL SMOKE CURTAIN 2 HOUR FIRE RATED SEPARATION WALL SMOKE CURTAIN 2 HOUR FIRE RATED SEPARATION WALL SMOKE CURTAIN 2 HOUR FIRE RATED SEPARATION WALL SMOKE CURTAIN 2 HOUR FIRE RATED SEPARATION WALL SMOKE CURTAIN 2 HOUR FIRE RATED SEPARATION WALL SMOKE CURTAIN 2 HOUR FIRE RATED SEPARATION WALL SMOKE CURTAIN 2 HOUR FIRE RATED SEPARATION WALL SMOKE CURTAIN 2 HOUR FIRE RATED SEPARATION WALL SMOKE CURTAIN F ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 F ABC CO2 F F Ø200 FF Pipe @ Basement Ceiling Level Ø200 FF Pipe @ Basement Ceiling Level Ø200 FF Pipe @ Basement Ceiling Level F.H.C F.H.C F.H.C F.H.C F.H.C AIM AIM AIM AIM AIM AIM AIM AIM AIM AIM AIM All Stair must be positive air pressurized. F 13.Fire pump room 41'-10''X19'-2'' EXIT FIRE LIFT SAFETY LOBBY FIRE LIFT 2.95X5.38m FIRE LIFT FIRE LIFT 5.28X2.90m 4' FIRE LIFT 2.90X5.28m BASEMENT SLOPE : 1: 8 92'-0"x8'-0" Ø100mm Standpipe Riser -1 Ø150 Sprinkler & Standpipe Riser 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U ABC CO2 ABC CO2 5.6,68° U F F F ABC CO2 ABC CO2 F.H.C ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 F.H.C Ø100 Sprinkler & Standpipe Riser-5 Ø150 Sprinkler & Standpipe Riser -01 Ø50 Drain Riser Ø65 HOSE VALVE Ø65 HOSE VALVE Ø150 Sprinkler & Standpipe Riser -04 Ø50 Drain Riser ABC CO2 F F F F F F F F 6W Speaker 6W Speaker 6W Speaker 6W Speaker 6W Speaker 6W Speaker 6W Speaker 6W Speaker Basement to semi basement LIFT 2.44X4.78m Ø200 FF Pipe @ Basement Ceiling Level Ø200 FF Pipe @ Basement Ceiling Level BASEMENT PLAN- CAR PARKING AREA Ex:S-5.6 68° LIFT 2.95X5.38m Basement to Ground floor Basement to Ground floor Basement to Ground floor 308'-6" 298'-9" PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 08
  • 9. CANTEEN-01 20.18mX12.98m COOKING PLATFROM LAUNDRY 12.34mX8.20m MATRIAL RECIEVING AREA 8.16mX4.67m DIETARY OFFICER 3.77mX2.98m CHANGE 2.82mX2.49m CART AREA 4.52mX11.73m MANAGER 2.82mX2.94m DRY STORE 2.82mX2.81m GENERAL STORE 3.00mX5.98m FREEZER 3.00mX5.51m BAKERY 2.59mX4.77m DISH WASH/ MACHINE 2.53mX3.78m FISH PREPARATION VEG.PREPARATION FOOD PREPARATION 3.75mX4.16m MEAT PREPARATION FRUIT PRE. COLD KITCHEN 3.75mX10.04m LIQUID PREPARATION DIRTY INSTRUMENT & LINEN RECEIVE AREA 4.45mX7.34m PACKING & PREPARATION AREA 9.98mX10.01m AUTOCLAVE OFFICE 5.36mX4.32m CHEMICAL STORE 2.49mX3.05m LINEN RECEIVING & SORTING AREA 2.49mX5.17m MANAGER 3.23mX3.05m SPOT WASH AREA 3.33mX2.12m DISTRIBUTION COUNTER DIRTY UTILITY STAFF 3.77mX4.29m CROCKERY STORE 3.69mX4.47m Counter MEDICAL RECORD STORE 11.96mX8.05m TRANSCRIPTIONIST 6.20mX3.10m MORTUARY 3.56mX3.94m VACCINE CENTER 5.88mX10.06m CORPSE WASHING AREA 3.69mX3.70m ONCOLOGY 7.21mX10.69m GENERAL STORE 17.38mX10.19m TAYLOR 6.96mX9.27m DN AHU 3.76mX7.42m BLOOD BANK 25.75mX9.80m IPD PHARMACY 7.37mX11.99m PHARMACY STORE 7.37mX9.78m SUPPLY CHAIN DEPARTMENT,ACCOUNTS & FINANCE 26.19mX7.42m ENGINEERING DEPT. 7.54mX20.21m BIO MEDICAL 7.77mX9.27m STERILIZE STORE 4.83mX1.38m STORE 2.80mX2.62m LINEN STORE 2.80mX2.58m AHU 3.65mX4.07m KITCHEN Area:4750sft 12.GAS MANIFOLD ROOM 8.51mX7.49m LOADING & UNLOADING AREA DRIVE WAY FEMALE TOILET 3.12mX7.42m MALE TOILET 3.56mX5.97m Sore 8.44mX19.28m AHU AHU 3.84mX5.11m AHU 5.24mX5.49m MALE(TOILET) 3.88mX4.29m FEMALE(TOILET) 3.88mX2.98m CHANGE 1.90mX3.03m CLEAN 5.41mX3.46m CLEAN STORE 3.51mX4.32m 11.AIR COMPRESSOR 8.51mX5.62m CLINICAL SERVICE 11.40mX7.34m NURSING DEPARTMENT 12.09mX8.38m Admin & Operation 12.12mX11.89m CUSTOMER CARE DEPARTMENT 15.52mX5.66m IT SERVER 3.76mX7.72m PBX/ PHONE/FIRE 3.92mX7.72m IT DEPARTMENT 3.90mX7.72m TOILET 3.96X2.87m CHEMO MIXTURE 7.62mX1.80m TUTORIAL ROOM 7.77mX4.37m NURSE ROOM 3.18mX3.91m DOCTOR'S ROOM 3.18mX3.65m STORE ROOM 3.18mX1.45m WAITING(chemotherapy) 7.77mX4.11m CHEMOTHERAPY 18.61mX6.48m COUNTER N.S DRIVER'S WAITING 2.98mX4.86m Level -1.98m FOOD PREPARATION CANTEEN-02 16.54mX12.37m Counter DN UP UP DN DRIVE WAY UP UP DN UP DRIVE WAY DRIVE WAY -2.54m Floor Level -1.98m Floor Level -2.13m Floor Level -2.54m Floor Level -1.98m Floor Level +3'-0" Floor Level +.61m Floor Level DN UP -1.98m Floor Level -1.98m Floor Level UP UP TOILET 2.98mX1.78m DRIVE WAY VOID DUMB WAITER 1.22mX1.52m CONSULTANT 3.66mX3.53m CONSULTANT 3.81mX3.53m CONSULTANT 2.77mX3.66m CONSULTANT 2.79mX3.66m UP DN UP TO GROUND FLOOR (Slope - 1: 8) DN TO ROAD (Slope - 1: 8) 17'-8" [5.39] SCALE - 1:100 LIFT 7.62X2.41m LIFT 2.44X4.78m LIFT 2.95X5.38m LIFT 2.95X5.38m -1.98m Floor Level -1.98m Floor Level -1.98m Floor Level -2.54m Floor Level LIFT 2.90X5.28m LIFT 5.28X2.90m LOBBY 8.92mX14.38m 4.70m 4.70m -2.54m Floor Level 5.49m 5.33m 3.20m 29.39m 24.21m 2.44m DUMB WAITER 1.22mX1.52m TOILET 1.90X1.17 2.12m WIDE PASSAGE 2.44m WIDE PASSAGE COMMON 11.96mX4.06m 2.74m WIDE PASSAGE 2.44m WIDE PASSAGE LIFT LOBBY AREA DOWN TO BASEMENT (Slope : 1: 8) 79'-9"x18'-0" DN TO SEMI BASEMENT (Slope - 1: 9.13) 91'-6"x16'-0" UP TO GROUND FLOOR (Slope - 1: 12) 36'-0"x16'-0" (Slope - 1: 9.05) 16'-2"x14'-7" DOWN TO SEMI BASEM ENT (Slope - 1: 9.10) 93'-9"x 16'-0" DOWN TO SEMI BASEMENT (Slope : 1: 9.33) 86'-0"x16'-0" chemical Store Lift & Stair lobby F.H.C F.H.C F.H.C FIRE STAIR-1 23'-2"X14'-2" EXIT FIRE STAIR -2 23'-8"X14'-2" FIRE STAIR 23'-2"X14'-2" SAFETY LOBBY SAFETY LOBBY SAFETY LOBBY EXIT EXIT BASEMENT SLOPE : 1: 8 BASEMENT SLOPE : 1: 8 100'-8"x17'-11" Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex :S -5 .6 68 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U A P FM-200 Control Panel 100 LITTER CYLINDER FM-200 SYSTEM FM-200 Control Panel FM-200 SYSTEM A P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U F F F F F F F EXIT F F F F F F F ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 FIRST AID BOX FIRST AID BOX 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U F 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U Fire Elevator-01 7.62X2.41m Fire Elevator-03 7.62X2.41m FIRE LIFT 2.95X5.38m FIRE LIFT 2.95X5.38m FIRE LIFT 5.28X2.90m FIRE LIFT 2.90X5.28m FIRE LIFT 2.44X4.78m BASEMENT SLOPE : 1: 8 100'-8"x17'-11" (Slope - 1: 9.05) 16'-2"x14'-7" 5.6,68° U 5.6,68° U EXIT EXIT EXIT EXIT ABC ABC ABC ABC ABC F F F F F F F F F F F F F F ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 F F ABC CO2 ABC CO2 F ABC CO2 F F.H.C Ø100 Sprinkler & Standpipe Riser-5 Ø150 Sprinkler & Standpipe Riser -01 Ø50 Drain Riser Ø65 HOSE VALVE Ø65 HOSE VALVE Ø150 Sprinkler & Standpipe Riser -04 Ø50 Drain Riser Ø150 Sprinkler & Standpipe Riser -02 Ø50 Drain Riser F.H.C Ø100 Standpipe Riser-1 Ø150 Sprinkler & Standpipe Riser -04 Ø50 Drain Riser F.H.C F ABC CO2 ABC CO2 F F F F ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 F 6W Speaker 6W Speaker 6W Speaker 6W Speaker 6W Speaker 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U semi basement to Basement semi basement to Ground floor Ground floor to semi-basement 5.6,79° U 5.6,79° U 5.6,79° U 5.6,79° U 5.6,68° U All Stair must be positive air pressurized. F 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U SAFETY LOBBY 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U SAFETY LOBBY 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U F 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 2 HOUR FIRE RATED SEPARATION WALL SMOKE CURTAIN Symbol Description Legend: Q.T Smoke Detector Heat Detector Addressable Output Module ABC CO2 Extinguisher (ABC & CO2) 03 05 07 28 K-5.6, SR, 68°, Upright Sprinkler Horn With Light 42 02 50 K-5.6, EC, 68°,Sidewall Sprinkler 100 LITTER FM 200 GAS CYLINDER FM-200 Control Panel Abort Switch FM 200 FOAM NOZZLE 360°(FOR ROOM SPACE) 01 40 02 05 54 02 DOUBLE Fire Door 2 Rated K-5.6, SR, 68°, Pendent Sprinkler SINGLE Fire Door 2 Rated Ø150mm Sprinkler & Standpipe Riser FIRST AID BOX Actuator 200 LITTER FM 200 FOAM CYLINDER 05 55 03 02 01 09 06 Ex:S-5.6 68° AS PER DRAWING P 5.6,68° EXIT A F 364 Emergency Light Manual call points 4 -Hour Fire Rated Wall 5.6,68° U 5.6,68° P K-5.6, SR, 68°, Pendent Sprinkler FM 200 GAS NOZZLE 360°(FOR ROOM SPACE) 236 14 5.6,79° U Upright Sprinkler, K-5.6, 79 deg, SR 53 02 Sprinkler K- 11.2 P 02 PRESSURE SWITCH F.H.C Class II Hose Connection 08 Floor Area:88865sft Extinguisher (ABC ) ABC 05 Landing Valve (Ø65) 6W Speaker PA SPEAKER 04 F.H.C F.H.C All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F SEMI BASEMENT FLOOR PLAN-CHEMOTHERAPY,CAR PARKING FOR COLLEGE STAFF , CAR PARKING FOR HOSPITAL STAFF S N W E PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 09
  • 10. ±0" Road Level Generator Registration & Records Trauma/Treatment Treatment Area Duty Doctor Triage Room N.S CT Scan WAITING Report Delivery MRI Store Janitor Female Toilet PHARMACY Observation Observation CASH E M E R G E N C Y Nurse Rest Room N.S Linen/paster Clean utility Scrub Staff Change (male) Staff Change (Female) Patient toilet Wating lobby Minor O.T AHU Flofluoroscopy Console Sample Change (F) Change (M) Report preparation X-ray X-ray Console Console Mammography Ultra sonogram Ultra sonogram ±0" Road Level Male Toilet VISITOR CAFE Shop Shop Treatment room Treatment room Treatment room Hospital Main Entry/Exit RMU AHU Male toilet Female toilet LT & PFI PANEL For 2 Nos Generator is OK AVR ROOM Female Toilet AHU 3.47mX2.92m AHU AHU AHU Console Change (M) Console Change (F) Radiologist Sample TOILET Clean store Reception Treatment room Treatment room Treatment room Treatment room IN-Patient CT Scan Technical room +1.52m Floor Level +5'-0" Floor Level -2.13m Floor Level +1.68m Floor Level +0.91m Floor Level +1.52m Floor Level +1.12m Floor Level -1.98m Floor Level DN E N T R Y UP -1.98m Floor Level DN +0.61m Floor Level EXIT U P T O G R O U N D F L O O R ( S l op e - 1 : 9 . 5 2 ) DN TO ROAD (Slope - 1: 8) LIFT 7.62X2.41m LIFT 2.44X4.78 Male Toilet Female Toilet Male Toilet UP FIRE DOOR UP UP LOBBY 3.66mX18.26m LIFT 2.95X5.38m LIFT 2.95X5.38m LIFT 2.90X5.28m LIFT 5.28mX2.90m GROUND FLOOR PLAN S N W E SCALE - 1:100 18 .29 m W i d e R o a d 12. 19 m W i d e R o a d Green Space Green Space Green Space Green Space GENERAL OPD GENERAL OPD SURGICAL OPD GENERAL OPD ENT & OPHTHALMOLOGY MOTHERS & CHIELD SURGICAL OPD WAITING & LOBBY AREA EMERGENCY ENTRY Medica l College Main Entry/E xit 4.88m 4.88m 4.57m 8.34m +1.68m Floor Level +1.68m Floor Level +1.68m Floor Level +1.52m Floor Level 4 .6 1 m 4 .6 0 m 4.57m 4.57m 4.57m 4.57m 4.57m 4.57m 24.20m 6.09m 6.15m 6.10m 7.62m 100.33m 113.03m 104.02m 110.8 3m SW Septic Tank SW Septic Tank RADIOLOGY & IMAGING TOILET TOILET 2.74m WIDE PASSAGE 3.05m WIDE PASSAGE 3.05m WIDE PASSAGE 3.66m WIDE PASSAGE INTERNAL ROAD 4.88m +0.46m Level FIRE DOOR Professor Professor Professor Professor Professor Professor Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Associate Professor Generator x-former x-former HT. Panel DOWN TO SEMI BASEM ENT (Slope - 1: 9.10) 93'-9"x1 6'-0" DN TO SEMI BASEMENT (Slope - 1: 9.13) 91'-6"x16'-0" UP TO GROUND FLOOR (Slope - 1: 12) 36'-0"x16'-0" Fire Elevator-01 7.62X2.41m Fire Elevator-03 7.62X2.41m FIRE IP-OP 5.28mX2.90m FIRE LIFT 2.95X5.38m FIRE LIFT 2.95X5.38m DOWN TO SEMI BASEM ENT (Slope : 1: 8.51) 86'-0"x1 6'-0" LIFT & STAIR LOBBY F.H.C Ø150 Sprinkler & Standpipe Riser -03 Ø50 Drain Riser Ø150 Sprinkler & Standpipe Riser -02 Ø50 Drain Riser F.H.C F.H.C F.H.C F.H.C Ø100 Standpipe Riser-1 F.H.C F.H.C FIRE STAIR-1 23'-8"X6'-10" SAFETY LOBBY All Stair must be positive air pressurized. F FIRE STAIR-2 24'-2"X14'-4" SAFETY LOBBY SAFETY LOBBY FIRE STAIR-3 23'-6"X14'-2" SAFETY LOBBY SAFETY LOBBY SAFETY LOBBY FIRE STAIR 23'-4"X6'-6" SAFETY LOBBY FIRE STAIR-4 23'-8"X14'-8" SAFETY LOBBY FIRE STAIR-5 23'-2"X6'-6" SAFETY LOBBY 7'-1" All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F FIRE STAIR 17'-8"X14'-11" SAFETY LOBBY EXIT EXIT EXIT EXIT 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 200x2 LITTER CYLINDER FM-200 SYSTEM FM-200 Control Panel 5.6,68° U 5.6,68° U A P 5.6,68° U 5.6,68° U According to NFPA-99 For sensitive area Manually operated deluge system should provide. 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° U F F F F F F F F F F F F F ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 F ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 EXIT EXIT FIRST AID BOX FIRST AID BOX HT. Meter Room 5000kva Sub station A P ABC CO2 A P A P A P ABC CO2 ABC CO2 100 LITTER CYLINDER FM-200 SYSTEM 100 LITTER CYLINDER FM-200 SYSTEM 50 LITTER CYLINDER FM-200 SYSTEM 50 LITTER CYLINDER FM-200 SYSTEM FM-200 Control Panel FM-200 Control Panel FM-200 Control Panel DV 5.6,68° U SAFETY LOBBY FIRE STAIR-5 23'-2"X6'-6" FIRE STAIR 23'-4"X6'-6" 5.6,68° U SAFETY LOBBY SAFETY LOBBY 5.6,68° U FIRE STAIR-1 23'-8"X6'-10" 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U All Stair must be positive air pressurized. F FIRE LIFT 2.90X5.28m FIRE LIFT 2.44X4.78 E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5 .6 68° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° E x : S - 5 . 6 6 8 ° Ex :S- 5.6 68° FIRE ALARM CONTROL ROOM 5.6,68° U Ø65 HOSE VALVE F Ø100 Sprinkler & Standpipe Riser-5 Ø150 Sprinkler & Standpipe Riser -01 Ø50 Drain Riser Ø150 Sprinkler & Standpipe Riser -04 Ø50 Drain Riser Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE ABC CO2 6W Speaker 6W Speaker 6W Speaker 6W Speaker 6W Speaker Control panel 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U Ground floor to semi-basement F ABC CO2 6W Speaker Ground floor to semi-basement Patient Stretcher Entry AMBULANCE AMBULANCE AMBULANCE AMBULANCE AREA Ground to Basement floor Ground to Roof floor 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P toilet toilet 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U Ground to Basement floor Ground to Roof floor 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U Associate Professor 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U ABC CO2 F toilet toilet toilet toilet All Stair must be positive air pressurized. F 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U Ground to Basement floor Ground to Roof floor 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 6W Speaker 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 6W Speaker 5.6,68° P 5.6,68° P 5.6,68° U Entry/Exit Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Symbol Description Legend: Q.T Smoke Detector Heat Detector Addressable Output Module ABC CO2 Extinguisher (ABC & CO2) 08 07 09 21 K-5.6, SR, 68°, Upright Sprinkler Horn With Light 21 05 32 K-5.6, EC, 68°,Sidewall Sprinkler 100 LITTER FM 200 GAS CYLINDER FM-200 Control Panel Abort Switch FM 200 FOAM NOZZLE 360°(FOR ROOM SPACE) 04 17 07 07 126 05 Double Fire Door 2 Rated K-5.6, SR, 68°, Pendent Sprinkler Single Fire Door 2 Rated Ø150mm Sprinkler & Standpipe Riser FIRST AID BOX Actuator 200 LITTER FM 200 FOAM CYLINDER 05 126 02 05 02 20 08 Ex:S-5.6 68° AS PER DRAWING P 5.6,68° EXIT A F 284 Emergency Light Manual call points 4 -Hour Fire Rated Wall 5.6,68° U 5.6,68° P K-5.6, SR, 68°, Pendent Sprinkler FM 200 GAS NOZZLE 360°(FOR ROOM SPACE) 11 Ø100mm Standpipe Riser P PRESSURE SWITCH F.H.C Class II Hose Connection 01 05 07 Floor Area:57715sft Open Nozzle (K-22) Deluge Valve Assembly DV 01 04 Landing Valve (Ø65) 06 Control panel 01 6W Speaker PA SPEAKER 08 Control panel GROUND FLOOR PLAN-CONSULTANT ROOM ,AMBULANCE PARKING ,ATM BOOTH ,MAMMOGRAPHY , ULTRA SONOGRAM ,X-RAY ,FLUOROSCOPY ,MRI ,CT SCAN AREA FIRE STAIR 21'-6"X14'-8" SAFETY LOBBY All Stair must be positive air pressurized. F stretcher lift 4'-11'x 3'-11' stretcher lift 4'-11'x 3'-11' DN TO ROAD (Slope : 1: 12) 95'-0"x15'-0" Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° AMBULANCE AREA PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 10
  • 11. PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 11
  • 12. LT & PFI PANEL x-former x-former HT. Panel FIRST AID BOX HT. Meter Room 5000kva Sub station A P ABC CO2 A P A P A P ABC CO2 ABC CO2 100 LITTER CYLINDER FM-200 SYSTEM 100 LITTER CYLINDER FM-200 SYSTEM 50 LITTER CYLINDER FM-200 SYSTEM 50 LITTER CYLINDER FM-200 SYSTEM FM-200 Control Panel FM-200 Control Panel FM-200 Control Panel 5.6,68° U 5.6,68° U Generator For 6 Nos 6000KVA Generator Generator EXIT 200x2 LITTER CYLINDER FM-200 SYSTEM FM-200 Control Panel A P ABC CO2 FIRST AID BOX Symbol Description Legend: Q.T Smoke Detector Heat Detector Addressable Output Module ABC CO2 Extinguisher (ABC & CO2) 05 05 04 04 Horn With Light 04 03 100 LITTER FM 200 GAS CYLINDER FM-200 Control Panel Abort Switch 04 08 05 Double Fire Door 2 Rated Actuator 05 02 AS PER DRAWING EXIT A Emergency Light 4 -Hour Fire Rated Wall FM 200 GAS NOZZLE 360°(FOR ROOM SPACE) 02 P PRESSURE SWITCH 05 GROUND FLOOR - PROPOSED 6250 KVA + 4000 KVA ELECTRICAL SUB-STATION Floor Area:2140sft N Single Fire Door 2 Rated 02 FM 200 FIRE SUPPRESSION SYSTEM FM 200 FOAM NOZZLE 360°(FOR ROOM SPACE) 200 LITTER FM 200 FOAM CYLINDER 02 07 FIRST AID BOX 02 NOZZLE HEAD DETECTOR CONTROL PANEL FM-200 AGENTS Generator & Emergency Power: 1.Electric Backup For Fire Lift. 2.Electric Backup For Stair Case Positive Air Pressure 3.Electric Backup Ventilation System With Cross Fresh Air 4.Electric Backup Fire Pump/Jockey Pump 5.All Singes Including Backup Emergency Exit Sing Generator Room 1.Separation Rating 2.Wall 4 Hour, Door, 2 Hour Fire Rating 3.Suppression, Clean Agent 4.Capacity 00KVA 5.Location Ground Floor Generator & Emergency Power: 1.Separation Rating 2.Wall 4 Hour, Door, 2 Hour Fire Rating 3.Suppression, Clean Agent 4.Capacity 00KVA 5.Location Ground Floor NOTE: Schematic Drawing For Automatic Clean Agent Distribution System For Sub-Station Room Siza Approximately 220sft PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 12
  • 13. Endoscopy Endoscopy Recovery Echocardiography Treadmill Treadmill Change male Change Female ECG ECG Uroflowmetry Fibro scan Holter & BP monitor BMD PFT/LFT TOI. Wating room Ultra sonogram Shop-04 Shop-05 Shop-08 Shop-09 Shop-05 Treatment Room Cardiac investigation Ultra sonogram Pathological Laboratory Facilities Biochemistry Lab Female Toilet Doctor's room Executive screening ENTRY FROM GROUND FLOOR C o r r i d o r C o r r i d o r Open Courtyarrd UP Area:3390sft G.OPD Treatment room Treatment room Treatment room Janitor's Room AHU Store Treatment room Treatment room Histopathology Lab In-charge Crossing Autoclave hematology Lab In-charge In-charge urine/stool Cell counter Micro biology Lab Media pre store Dirty In-charge In-charge Sterile autoclave Molecular Lab AHU Store Reception/inpatient report delivery Office Simple T T Cardiac OPD Area:3920sft Information Admin Office Assistant Professor Assistant Professor C o r r i d o r Student Selection Room Admin Office 8'-0" W i d e C o r r i d o r Toilet Toilet Toilet Stuff Male Stuff Female Professor Associate Professor Associate Professor Associate Professor Meeting Room Student Common room(Boy's) Student Common room(Girl's) Department Office Assistant Professor Assistant Professor Professor Associate Professor Assistant Professor Toilet Toilet Toilet Toilet Toilet Toilet Toilet Professor Professor Associate Professor Associate Professor Associate Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Department Office Department Office Department Office lecturer Room Student Female Toilet Student Male Toilet Janitors Accessible Toilet Toilet Department Office Store Toilet Toilet Toilet Dirty Utility Tutorial Room Dirty Utility Treatment room Toilet Toilet Toilet Toilet Toilet Toilet Accessible Toilet 2.96mx2.54m Lift 2.96mx2.54m 2.64x2.90m Lift 2.64x2.90m 2.64x2.90m Lift Lift 2.96mx2.54m Balcony Balcony Balcony Elevator-02 2.27mx2.41m 2.27mx2.41m 2.27mx2.41m Lobby 2.27mx2.41m Lift 2.27mx2.41m Terrace Tutorial Room S N W E SCALE - 1:100 Open TO Sky 1.83m WIDE PASSAGE WAITING AREA WAITING AREA WAITING AREA WAITING AREA Professor Professor Professor Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Associate Professor Associate Professor Associate Professor Associate Professor ENTRY FROM GROUND FLOOR ENTRY FROM GROUND FLOOR AHU FIRE LIFT FIRE Lift 2.64x2.90m FIRE LIFT FAIR LIFT 2.96mx2.54m Fire Elevator-01 Fire Elevator-03 FIRE LIFT-04 Lift lobby UP UP F.H.C Ø150 Sprinkler & Standpipe Riser -03 Ø50 Drain Riser Ø150 Sprinkler & Standpipe Riser -02 F.H.C F.H.C F.H.C F.H.C Ø100 Standpipe Riser-1 F.H.C F.H.C FIRE STAIR-1 23'-8"X14'-2" FIRE STAIR-2 24'-2"X14'-4" SAFETY LOBBY All Stair must be positive air pressurized. F FIRE STAIR-3 23'-6"X14'-2" SAFETY LOBBY SAFETY LOBBY FIRE STAIR 23'-4"X14'-2" SAFETY LOBBY FIRE STAIR-4 23'-8"X14'-8" SAFETY LOBBY FIRE STAIR-5 23'-2"X14'-2" SAFETY LOBBY All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F SAFETY LOBBY FIRE STAIR 17'-8"X14'-11" FIRE STAIR 24'-0"X14'-8" SAFETY LOBBY All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F SAFETY LOBBY Lift Lobby-01 EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT E X I T EXIT 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 6'-10" 7'-1" 6'-10" 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P F F F F F 5.6,68° U 5.6,68° U F F ABC CO2 ABC CO2 ABC CO2 F.H.C 39'-5" EXIT All Stair must be positive air pressurized. F 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U All Stair must be positive air pressurized. F Ø50 Drain Riser 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U F ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 F F F ABC CO2 Ø100 Sprinkler & Standpipe Riser-5 Ø150 Sprinkler & Standpipe Riser -01 Ø50 Drain Riser Ø150 Sprinkler & Standpipe Riser -04 Ø50 Drain Riser Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 6W Speaker 6W Speaker 6W Speaker 6W Speaker 5.6,68° U 5.6,68° U 1st floor to 2nd floor 5.6,68° U SAFETY LOBBY SAFETY LOBBY SAFETY LOBBY 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P F F ABC CO2 ABC CO2 F F F F ABC CO2 ABC CO2 1ST FLOOR PLAN-OPD 1 - Consulant room,Endoscopy ,Ultrasonogram,Food court ,Admin office,Department office,Professor Room,Associate Professor Room,Assistant Professor Room,Lecturer Room ,Meeting Room,Students Common (Boy's),Students Common (Girl's Symbol Description Legend: Q.T Smoke Detector Addressable Output Module ABC CO2 Extinguisher (ABC & CO2) 90 08 25 K-5.6, SR, 68°, Upright Sprinkler Horn With Light 17 72 Double Fire Door 2 Rated K-5.6, SR, 68°, Pendent Sprinkler Single Fire Door 2 Rated 05 10 13 AS PER DRAWING P 5.6,68° EXIT F 155 Emergency Light Manual call points 4 -Hour Fire Rated Wall 5.6,68° U 12 F.H.C 08 R/F Floor Area:58,241sft MULTI DETECTOR Ø100mm Standpipe Riser Ø150mm Sprinkler & Standpipe Riser 01 00 Landing Valve (Ø65) 06 Class II Hose Connection 17 6W Speaker PA SPEAKER 04 stretcher lift 4'-11'x 3'-11' stretcher lift 4'-11'x 3'-11' DOWN TO GROUND FLOOR (Slope : 1: 12) 95'-0"x15'-0" Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 13
  • 14. O.T-02 Scrub Scrub O.T-01 Dirty Corridor O.T-03 Gas Scrub AHU Waiting Female toilet Janitor Consoling room Nurse Doctor Toilet Toilet Nurse Dirty linen Equipment Wash Fluid store & disposal AHU R.O Pantry Patient Report Doctor dirty utility Cath lab-01 Technical room Technical room Wash Wash Console TRANSFER Holding Holding Student Collab Transfer Consultant Recovery Doctor lounge Nurse rest room Male Change Clean Store Duty doctor Dirty Sterile Store Clean Store Female Change Toilet Dirty utility utility 8'-9'' wide corridor 9'-0'' wide corridor Waiting N.S. Toi Waste Equ. wash Female Change Male Change Anesthetist Nurse room N.S. N.S. Male toilet SURGICAL SUIT(CARDIAC) Toilet Toilet Toilet CCU CARDIAC HDU N.S. N.S. Hemodialysis Duty Doctor Female Change Male Change TRANSFER Toilet Equ.wash waste TRANSFER Toilet Dirty utility Nurse room Clean utility CICU Cath lab Step down AHU AHU AHU Clean 135sft Toi Toi Dead Body Preservation Dissection Hall Anatomy Museum Histology Lab Medical Education Unit Anatomy lecturer Room 12'-0" W i d e C o r r i d o r 8'-0" W i d e C o r r i d o r 9'-0" W i d e C o r r i d o r Tutorial Room Tutorial Room Tutorial Room Tutorial Room Professor Office Toilet Toilet Toilet Stuff male Stuff Female Associate Professor Associate Professor Down to 1st floor Assistant Professor Assistant Professor Assistant Professor Assistant Professor 9'-0" W i d e C o r r i d o r 9'-0" W i d e C o r r i d o r Student Female Toilet Student Male Toilet Janitors Accessible Toilet Toilet Toilet Toilet Toilet Balcony Balcony Elevator-02 2.27mx2.41m 2.27mx2.41m 2.27mx2.41m 2.27mx2.41m Lift 2.27mx2.41m 2.96mx2.54m Lift 2.96mx2.54m 2.64x2.90m Lift 2.64x2.90m 2.64x2.90m 2.64x2.90m Lift 2.96mx2.54m Lift 2.96mx2.54m Balcony Balcony Tutorial Room Lobby S N W E SCALE - 1:100 lecture gallery FIRE DOOR Lift & Stair lobby FIRE Lift FIRE LIFT FIRE Staff/ IP Patient Lift FIRE Elevator-04 FIRE Elevator-01 FIRE Elevator-03 F.H.C Ø150 Sprinkler & Standpipe Riser -03 Ø50 Drain Riser Ø150 Sprinkler & Standpipe Riser -02 F.H.C F.H.C F.H.C F.H.C Ø100 Standpipe Riser-1 F.H.C F.H.C SAFETY LOBBY FIRE STAIR-1 23'-8"X14'-2" FIRE STAIR-2 24'-2"X14'-4" SAFETY LOBBY All Stair must be positive air pressurized. F FIRE STAIR-3 23'-6"X14'-2" SAFETY LOBBY SAFETY LOBBY FIRE STAIR 23'-4"X14'-2" SAFETY LOBBY FIRE STAIR-4 23'-8"X14'-8" SAFETY LOBBY FIRE STAIR-5 23'-2"X14'-2" SAFETY LOBBY All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F FIRE STAIR 17'-8"X14'-11" FIRE STAIR 21'-6"X14'-8" SAFETY LOBBY All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F SAFETY LOBBY All Stair must be positive air pressurized. F SAFETY LOBBY SAFETY Lift Lobby-01 EXIT EXIT EXIT EXIT EXIT EXIT E X I T EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U EXIT 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U F F F F F F F F F ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 F.H.C All Stair must be positive air pressurized. F 27'-7" DV 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P According to NFPA-99 For sensitive area Manually operated deluge system should provide. According to NFPA-99 For sensitive area Manually operated deluge system should provide. According to NFPA-99 For sensitive area Manually operated deluge system should provide. According to NFPA-99 For sensitive area Manually operated deluge system should provide. 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U All Stair must be positive air pressurized. F ABC CO2 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° P 5.6,68° P F F F F F ABC CO2 Ø100 Sprinkler & Standpipe Riser-5 Ø150 Sprinkler & Standpipe Riser -04 Ø50 Drain Riser Ø50 Drain Riser ABC CO2 ABC CO2 ABC CO2 ABC CO2 F F F ABC CO2 ABC CO2 ABC CO2 F Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE ABC CO2 6W Speaker 6W Speaker 6W Speaker 6W Speaker Control panel DV Control panel DV Control panel Down to 1st floor SAFETY LOBBY FIRE Lift F I R E D O O R 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U ABC CO2 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U DV Control panel DV Control panel According to NFPA-99 For sensitive area Manually operated deluge system should provide. 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P Symbol Description Legend: Q.T Smoke Detector Addressable Output Module ABC CO2 Extinguisher (ABC & CO2) 110 13 22 K-5.6, SR, 68°, Upright Sprinkler Horn With Light 17 18 81 Double Fire Door 2 Rated K-5.6, SR, 68°, Pendent Sprinkler SINGLE Fire Door 2 Rated 05 16 19 AS PER DRAWING P 5.6,68° EXIT F 130 Emergency Light Manual call points 4 -Hour Fire Rated Wall 5.6,68° U 15 F.H.C 01 08 08 Floor Area:58,562sft Ø100mm Standpipe Riser Ø150mm Sprinkler & Standpipe Riser Open Nozzle (K-22) Deluge Valve Assembly DV 26 05 Landing Valve (Ø65) 06 Class II Hose Connection 05 Control panel 6W Speaker PA SPEAKER Control panel 04 2ND FLOOR PLAN(CARDIAC)-O.T,O.T RECOVERY ,O.T. Holding,Cath Lab,Cath Recovery,Cath ,Holding,CICU ,CCU,Cardiac HDU,Hemodialysis ,Department office,Professor Room,Associate Professor Room,Assistant Professor Room,Dissection Hall ,Dead body preservation ,Anatomy museum ,Anatomy lecturer room ,Medical education unit ,Histology Lab, Tutorial Room Area Ø150 Sprinkler & Standpipe Riser -01 Heat Detector 5.6,68° U stretcher lift 4'-11'x 3'-11' stretcher lift 4'-11'x 3'-11' DOWN TO 1ST FLOOR (Slope : 1: 12) 95'-0"x15'-0" Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 14
  • 15. Clean Store O.T-02 Scrub Scrub O.T-01 Dirty Corridor Staff change ANESTHETIST Gass Scrub AHU O.T-03 Scrub O.T-04(free) HOLDING Nurse change N.S Physical Therapy Exercise area Toilet Exercise area(Cardiac) Treatment Cubicle Intern/Doctor/Student lounge Toilet GENERAL WARD Treatment Cubicle AHU Store Toilet Toilet Toilet Treatment Cubicle Physiotherapist Physiotherapist Physiotherapist Toilet Toilet Toilet Male change Female change Toilet Patient Counseling Room Duty Doctor Nurse Toilet Transfer Equipment wash Clean store Dirty utility ICU WAITING Change Change Male Female TRANSFER Staff Change Scrub Nurse rest Dirty utility Clean utility Doctor rest room TOI. Counseling waste TRANSFER Visitor change Surgical suit(General) STERILE STORE Store TOI. Equ.wash Waiting Female Toilet Janitor Student Collab HOLDING Recovery Duty Doctor Head Nurse TOI. HDU (GENERAL) TOI. Store ICU Area:3040sft 8'-0'' wide corridor Male Toilet TOI. AHU AHU AHU CONNECTING CORRIDOR BETWEEN HOSPITAL & COLLEGE CONNECTING CORRIDOR BETWEEN HOSPITAL & COLLEGE Nurse rest room N.S Professor Office Physiology Lecturer Room Physiology Lab Biochemistry Lab OSCE Biochemistry Lecturer Room Community Medicine LecturerRoom Student FemaleToilet Student Male Toilet Janitors Accessible Toilet Tutorial Room Tutorial Room Tutorial Room Tutorial Room Toilet Toilet Toilet Stuff male Stuff Female Community Medicine Museum Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Associate Professor Associate Professor 9'-0" W i d e C o r r i d o r 10'-5" W i d e C o r r i d o r 9'-0" W i d e C o r r i d o r Elevator-02 2.27mx2.41m 2.27mx2.41m 2.27mx2.41m 2.27mx2.41m Lift 2.27mx2.41m Balcony Balcony Balcony Balcony 2.96mx2.54m Lift 2.96mx2.54m 2.64x2.90m Lift 2.64x2.90m 2.64x2.90m 2.64x2.90m Lift 2.96mx2.54m Lift 2.96mx2.54m GENERAL WARD S N W E SCALE - 1:100 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U DV According to NFPA-99 For sensitive area Manually operated deluge system should provide. According to NFPA-99 For sensitive area Manually operated deluge system should provide. 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P According to NFPA-99 For sensitive area Manually operated deluge system should provide. 5.6,68° P 5.6,68° P 5.6,68° P According to NFPA-99 For sensitive area Manually operated deluge system should provide. 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U F 5.6,68° U F F F F Ø150 Sprinkler & Standpipe Riser -01 Ø50 Drain Riser F F F F ABC CO2 ABC CO2 ABC CO2 ABC CO2 F 6W Speaker 6W Speaker 6W Speaker Control panel DV Control panel DV Control panel DV Control panel DV Control panel Balcony Lift & Stair lobby FIRE LIFT FIRE LIFT FIRE Elevator-04 FIRE Elevator-01 FIRE Elevator-03 F.H.C Ø150 Sprinkler & Standpipe Riser -03 Ø50 Drain Riser Ø150 Sprinkler & Standpipe Riser -02 F.H.C F.H.C F.H.C F.H.C Ø100 Standpipe Riser-1 F.H.C F.H.C SAFETY LOBBY FIRE STAIR-1 23'-8"X14'-2" FIRE STAIR-2 24'-2"X14'-4" SAFETY LOBBY All Stair must be positive air pressurized. F FIRE STAIR-3 23'-6"X14'-2" SAFETY LOBBY SAFETY LOBBY FIRE STAIR 23'-4"X14'-2" SAFETY LOBBY FIRE STAIR-4 23'-8"X14'-8" SAFETY LOBBY FIRE STAIR-5 23'-2"X14'-2" SAFETY LOBBY All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F FIRE STAIR 17'-8"X14'-11" SAFETY LOBBY FIRE STAIR 21'-6"X14'-8" SAFETY LOBBY All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F SAFETY LOBBY All Stair must be positive air pressurized. F SAFETY LOBBY SAFETY Lift Lobby-01 EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U EXIT F F F F F F ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 F.H.C All Stair must be positive air pressurized. F 5.6,68° U 5.6,68° U ABC CO2 Ø100 Sprinkler & Standpipe Riser-5 Ø150 Sprinkler & Standpipe Riser -04 Ø50 Drain Riser F Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE ABC CO2 SAFETY LOBBY FIRE Lift F 5.6,68° U 5.6,68° U 5.6,68° U F FIRE DOOR 5.6,68° U ABC CO2 ABC CO2 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U Toilet Toilet Toilet 5.6,68° U 5.6,68° P 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P According to NFPA-99 For sensitive area Manually operated deluge system should provide. 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U TOI. 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 3RD FLOOR PLAN(GENERAL)-O.T.,O.T HOLDING,RECOVERY,ICU,HDU,GENERAL WARD,DAY CARE,DEPARTMENT OFFICE,PROFESSOR,ASSOCIATE PROFESSOR ,ASSISTANCE PROFESSOR,COMMUNITY MEDICINE MUSEUM,BIOCHEMISTRY LAB,PHYSIOLOGY LAB,OSCE ,TUTORIAL ROOM AREA Symbol Description Legend: Q.T Smoke Detector Addressable Output Module ABC CO2 Extinguisher (ABC & CO2) 101 10 13 K-5.6, SR, 68°, Upright Sprinkler Horn With Light 19 19 59 Double Fire Door 2 Rated K-5.6, SR, 68°, Pendent Sprinkler SINGLE Fire Door 2 Rated 19 13 AS PER DRAWING P 5.6,68° EXIT F 154 Emergency Light Manual call points 4 -Hour Fire Rated Wall 5.6,68° U 13 F.H.C 08 07 Floor Area:56,184sft Ø100mm Standpipe Riser Ø150mm Sprinkler & Standpipe Riser 05 01 Open Nozzle (K-22) Deluge Valve Assembly DV 40 05 Landing Valve (Ø65) Class II Hose Connection 06 05 Control panel 6W Speaker PA SPEAKER Control panel 04 FIRE Lift 5.6,68° U Toilet 5.6,68° U EXIT EXIT EXIT Heat Detector stretcher lift 4'-11'x 3'-11' stretcher lift 4'-11'x 3'-11' DOWN TO 2ND FLOOR (Slope : 1: 12) 95'-0"x15'-0" Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 15
  • 16. Treatment/Doctor Room Nurse lounge Linen/Clean Sister Medicine store N.S. STERILE STORE Birth suite Birth suite Nurse/doctor rest Clean Store labour room Delivery room Delivery room Baby resuscitation Sister Toilet Baby Hold Recovey Toilet Toilet Toilet Toilet N.S. Doctor Sister Milk Bath O.T-02 Scrub Scrub O.T-01 Dirty Corridor Medicine Nurse Doctor change Anesthetist O.T-03 Gass Scrub AHU Scrub O.T-04(free) Holding Sister Staff Change Toilet Dirty Change NURSERY Sister Bath Milk Nurse change N.S N.S waiting Recovery PICU NICU Toilet Toilet CONNECTING CORRIDOR BETWEEN HOSPITAL & COLLEGE Feed Feed CONNECTING CORRIDOR BETWEEN HOSPITAL & COLLEGE Area:1200sft Surgical suite Delivery Unit Nurse/doctor rest AHU AHU Counseling Counseling 135sft Dirty utility Elevator-02 2.27mx2.41m 2.27mx2.41m 2.27mx2.41m 2.27mx2.41m Lift 2.27mx2.41m 2.96mx2.54m Lift 2.96mx2.54m 2.96mx2.54m Lift 2.96mx2.54m 2.64x2.90m Lift 2.64x2.90m Balcony Balcony 2.64x2.90m 2.64x2.90m Lift 6.86mx6.15m Lobby Balcony Balcony Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Singel Bed Cabin-6 Singel Bed Cabin-5 Singel Bed Cabin-4 Singel Bed Cabin-3 Singel Bed Cabin-2 Singel Bed Cabin-1 Double Bed Cabin-1 Double Bed Cabin-2 Double Bed Cabin-3 Double Bed Cabin-4 Double Bed Cabin-5 Double Bed Cabin-6 Double Bed Cabin-7 Tutorial Room Tutorial Room Tutorial Room Tutorial Room Microbiology Lab Pathology Lab Pathology Lecturer Room Pathology Lecturer Room Microbiology Lecturer Room Assistant Professor Professor Professor Office Toilet Toilet Toilet Stuff male Stuff Female 8'-0" W i d e C o r r i d o r 8'-0" W i d e C o r r i d o r 9'-0" W i d e C o r r i d o r 9'-0" W i d e C o r r i d o r Office 10'-5" W i d e C o r r i d o r 9'-0" W i d e C o r r i d o r 9'-0" W i d e C o r r i d o r Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Assistant Professor Student Female Toilet Student Male Toilet Janitors Accessible Toilet GENERAL WARD Tutorial Room S N W E SCALE - 1:100 lecture gallery Lift & Stair lobby FIRE Lift FIRE LIFT FIRE LIFT FIRE Elevator-04 FIRE Elevator-01 FIRE Elevator-03 F.H.C Ø150 Sprinkler & Standpipe Riser -03 Ø50 Drain Riser Ø150 Sprinkler & Standpipe Riser -02 F.H.C F.H.C F.H.C F.H.C Ø100 Standpipe Riser-1 F.H.C F.H.C SAFETY LOBBY FIRE STAIR-1 23'-8"X14'-2" FIRE STAIR-2 24'-2"X14'-4" SAFETY LOBBY FIRE STAIR-3 23'-6"X14'-2" SAFETY LOBBY SAFETY LOBBY FIRE STAIR 23'-4"X14'-2" SAFETY LOBBY FIRE STAIR-4 23'-8"X14'-8" SAFETY LOBBY FIRE STAIR-5 23'-2"X14'-2" SAFETY LOBBY All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F FIRE STAIR 17'-8"X14'-11" LOBBY FIRE STAIR 21'-6"X14'-8" SAFETY LOBBY SAFETY LOBBY All Stair must be positive air pressurized. F SAFETY LOBBY SAFETY Lift Lobby-01 EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U EXIT F F F F F F F ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 F.H.C All Stair must be positive air pressurized. F 5.6,68° U 5.6,68° U ABC CO2 Ø100 Sprinkler & Standpipe Riser-5 Ø150 Sprinkler & Standpipe Riser -04 Ø50 Drain Riser F Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE ABC CO2 SAFETY LOBBY FIRE Lift 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P DV According to NFPA-99 For sensitive area Manually operated deluge system should provide. 5.6,68° P 5.6,68° P 5.6,68° P According to NFPA-99 For sensitive area Manually operated deluge system should provide. 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P F Control panel DV Control panel DV Control panel DV Control panel 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P EXIT ABC CO2 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U According to NFPA-99 For sensitive area Manually operated deluge system should provide. F F F F ABC CO2 ABC CO2 ABC CO2 5.6,68° P 6W Speaker 6W Speaker 6W Speaker 6W Speaker DV Control panel DV Control panel Toilet Toilet Toilet Toilet Toilet Toilet F ABC CO2 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U According to NFPA-99 For sensitive area Manually operated deluge system should provide. 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P F F F Floor Area:55,022sft Symbol Description Legend: Q.T Smoke Detector Addressable Output Module ABC CO2 Extinguisher (ABC & CO2) 110 10 12 K-5.6, SR, 68°, Upright Sprinkler Horn With Light 17 17 73 Double Fire Door 2 Rated K-5.6, SR, 68°, Pendent Sprinkler SINGLE Fire Door 2 Rated 13 13 AS PER DRAWING P 5.6,68° EXIT F 108 Emergency Light Manual call points 4 -Hour Fire Rated Wall 5.6,68° U 15 F.H.C 08 07 Ø100mm Standpipe Riser Ø150mm Sprinkler & Standpipe Riser 05 01 13 K-5.6, EC, 68°,Sidewall Sprinkler Ex:S-5.6 68° Open Nozzle (K-22) Deluge Valve Assembly DV 32 06 06 Landing Valve (Ø65) Class II Hose Connection 06 12 Control panel Control panel 6W Speaker PA SPEAKER 04 4TH FLOOR PLAN(MATERNITY)-DEPARTMENT OFFICE,PROFESSOR,ASSOCIATE PROFESSOR,PATHOLOGY LAB,MICROBIOLOGY,TUTORIAL ,O.T,NICU,PICU,LABOUR,PRE OP,NURSERY,RECOVERY,BABY RESUSCITATION,DOUBLE,SINGLE BED AREA Ø150 Sprinkler & Standpipe Riser -01 Ø50 Drain Riser Heat Detector EXIT EXIT All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F stretcher lift 4'-11'x 3'-11' stretcher lift 4'-11'x 3'-11' DOWN TO 3RD FLOOR (Slope : 1: 12) 95'-0"x15'-0" PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 16
  • 17. Janitor Nurse Change CONNECTING CORRIDOR BETWEEN HOSPITAL & COLLEGE AHU Duty doctor Medicine store &Clean utility 2.44m wide corridor 2.44m wide corridor 2.44m wide corridor 2.44m wide corridor Elevator-02 2.27mx2.41m 2.27mx2.41m 2.27mx2.41m 2.27mx2.41m Lift 2.27mx2.41m 2.96mx2.54m Lift 2.96mx2.54m 2.96mx2.54m Lift 2.96mx2.54m Balcony 2.64x2.90m Lift 2.64x2.90m Balcony Balcony 2.64x2.90m 2.64x2.90m Lift Terrace Terrace Terrace AHU Tutorial Room Housekeeping WARD GENERAL WARD WARD WARD WARD 6.86mx6.15m Lobby Teachers Lounge Library Fornsic Lecturer Room Forensisc Lab Tutorial Room Tutorial Room Tutorial Room Tutorial Room Tutorial Room Tutorial Room Tutorial Room Tutorial Room Toilet Toilet Toilet Stuff male Stuff Female 2.44m wide corridor 2.44m wide corridor Balcony GENERAL WARD S N W ESCALE - 1:100 Tutorial Room Student Female Toilet Student Male Toilet Janitors Accessible Toilet Toilet Tutorial Room WAITING AREA Lift & Stair lobby FIRE Lift FIRE LIFT FIRE LIFT FIRE Elevator-04 FIRE Elevator-01 FIRE Elevator-03 F.H.C Ø150 Sprinkler & Standpipe Riser -03 Ø50 Drain Riser Ø150 Sprinkler & Standpipe Riser -02 F.H.C F.H.C F.H.C F.H.C Ø100 Standpipe Riser-1 F.H.C F.H.C SAFETY LOBBY FIRE STAIR-1 23'-8"X14'-2" FIRE STAIR-2 24'-2"X14'-4" SAFETY LOBBY FIRE STAIR-3 23'-6"X14'-2" SAFETY LOBBY SAFETY LOBBY FIRE STAIR 23'-4"X14'-2" SAFETY LOBBY FIRE STAIR-4 23'-8"X14'-8" SAFETY LOBBY FIRE STAIR-5 23'-2"X14'-2" SAFETY LOBBY All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F FIRE STAIR 17'-8"X14'-11" LOBBY FIRE STAIR 21'-6"X14'-8" SAFETY LOBBY SAFETY LOBBY All Stair must be positive air pressurized. F SAFETY LOBBY SAFETY Lift Lobby-01 EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U EXIT F F F F F F F ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 F.H.C All Stair must be positive air pressurized. F 5.6,68° U 5.6,68° U ABC CO2 Ø100 Sprinkler & Standpipe Riser-5 Ø150 Sprinkler & Standpipe Riser -04 Ø50 Drain Riser F Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE ABC CO2 SAFETY LOBBY FIRE Lift EXIT 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U F F F F ABC CO2 ABC CO2 6W Speaker 6W Speaker 6W Speaker 6W Speaker 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U F F F F ABC CO2 ABC CO2 ABC CO2 ABC CO2 5.6,68° U 5.6,68° U ABC CO2 5.6,68° U 5.6,68° U 5.6,68° U Symbol Description Legend: Q.T Smoke Detector Addressable Output Module ABC CO2 Extinguisher (ABC & CO2) 108 10 14 K-5.6, SR, 68°, Upright Sprinkler Horn With Light 16 16 34 Double Fire Door 2 Rated K-5.6, SR, 68°, Pendent Sprinkler Single Fire Door 2 Rated 05 13 13 AS PER DRAWING P 5.6,68° EXIT F 127 Emergency Light Manual call points 4 -Hour Fire Rated Wall 5.6,68° U 07 F.H.C 01 08 00 Ø100mm Standpipe Riser Ø150mm Sprinkler & Standpipe Riser Floor Area:48,805sft Class II Hose Connection Landing Valve (Ø65) 06 6W Speaker PA SPEAKER 04 5TH FLOOR PLAN-FORENSIC LAB,FORENSIC LECTURE,COMPUTER,TEACHER LOUNGE,LIBRARY,TUTORIAL,WARD BED AREA Ø150 Sprinkler & Standpipe Riser -01 Ø50 Drain Riser EXIT Heat Detector All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F 5.6,68° U PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 17
  • 18. Stuff Male 130sft Elevator-02 Stuff Female W/C W/C W/C W/C W/C Exam Hall/Conferenc Room College Admin Area CONNECTING CORRIDOR BETWEEN HOSPITAL & COLLEGE Nurse Station Toilet Toilet Toilet Toilet Toilet Toilet 2.27mx2.41m 2.27mx2.41m 2.27mx2.41m 2.27mx2.41m Lift 2.27mx2.41m 2.75m W i d e C o r r i d o r 2.75m W i d e C o r r i d o r 2.96mx2.54m Lift 2.96mx2.54m 2.96mx2.54m Lift 2.96mx2.54m Balcony Balcony 2.64x2.90m Lift 2.64x2.90m Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Toilet Balcony Balcony Balcony Balcony 2.64x2.90m 2.64x2.90m Lift Double Bed Single Bed Cabin VIP CABIN Patient Attendant 2.44m wide corridor 2.44m wide corridor 2.44m wide corridor WARD WARD WARD WARD S N W E SCALE - 1:100 Tutorial Room WARD Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Double Bed Double Bed Double Bed Double Bed Double Bed Double Bed Double Bed Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Single Bed Cabin Lift & Stair lobby FIRE Lift FIRE LIFT FIRE LIFT FIRE Elevator-04 FIRE Elevator-01 FIRE Elevator-03 F.H.C Ø150 Sprinkler & Standpipe Riser -03 Ø50 Drain Riser Ø150 Sprinkler & Standpipe Riser -02 F.H.C F.H.C F.H.C F.H.C Ø100 Standpipe Riser-1 F.H.C F.H.C SAFETY LOBBY FIRE STAIR-1 23'-8"X14'-2" FIRE STAIR-2 24'-2"X14'-4" SAFETY LOBBY FIRE STAIR-3 23'-6"X14'-2" SAFETY LOBBY SAFETY LOBBY FIRE STAIR 23'-4"X14'-2" SAFETY LOBBY FIRE STAIR-4 23'-8"X14'-8" SAFETY LOBBY FIRE STAIR-5 23'-2"X14'-2" SAFETY LOBBY All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F FIRE STAIR 17'-8"X14'-11" LOBBY FIRE STAIR 21'-6"X14'-8" SAFETY LOBBY SAFETY LOBBY All Stair must be positive air pressurized. F SAFETY LOBBY SAFETY Lift Lobby-01 EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT EXIT 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U EXIT F F F F F F F ABC CO2 ABC CO2 ABC CO2 ABC CO2 ABC CO2 F.H.C All Stair must be positive air pressurized. F 5.6,68° U 5.6,68° U ABC CO2 Ø100 Sprinkler & Standpipe Riser-5 Ø150 Sprinkler & Standpipe Riser -04 Ø50 Drain Riser F Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE Ø65 HOSE VALVE ABC CO2 SAFETY LOBBY FIRE Lift Ø150 Sprinkler & Standpipe Riser -01 Ø50 Drain Riser EXIT Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° P Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° Ex:S-5.6 68° 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 5.6,68° U 6TH FLOOR PLAN-VIP,DELUXE,DOUBLE BED,SINGLE CABIN ,EXAM HALL ,CHAIRMAN,MANAGING,OPSE,BOARD ,ADMIN ,OFFICE AREA F 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P 5.6,68° P F ABC CO2 F F F ABC CO2 ABC CO2 ABC CO2 6W Speaker 6W Speaker 6W Speaker 6W Speaker 5.6,68° U 5.6,68° P 5.6,68° U 5.6,68° U 5.6,68° U F F F ABC CO2 F Symbol Description Legend: Q.T Smoke Detector Addressable Output Module ABC CO2 Extinguisher (ABC & CO2) 112 10 12 K-5.6, SR, 68°, Upright Sprinkler Horn With Light 17 37 K-5.6, EC, 68°,Sidewall Sprinkler 17 33 Double Fire Door 2 Rated K-5.6, SR, 68°, Pendent Sprinkler Single Fire Door 2 Rated 05 10 13 Ex:S-5.6 68° AS PER DRAWING P 5.6,68° EXIT F 41 Emergency Light Manual call points 4 -Hour Fire Rated Wall 5.6,68° U 06 F.H.C 01 08 Floor Area:48,486sft Ø100mm Standpipe Riser Ø150mm Sprinkler & Standpipe Riser Class II Hose Connection Landing Valve (Ø65) 06 6W Speaker PA SPEAKER 04 Ex:S-5.6 68° EXIT EXIT All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F All Stair must be positive air pressurized. F PROJECT NAME & ADDRESS: OWNER'S NAME / REPRESENTATIVE PREPARED BY ENGINEER FIRE PROFESSIONAL APPROVED BY DEPARTMENT OF FIRE SERVICE & CIVIL DEFENSE. Head Office: 38-46, Road: KaziAlauddin Road, Siddique Bazar, Dhaka. SCALE PAGE SIZE: 1:100 23-02-2022 A-3 DATE CONSULTANT: MART ENGINEERING & CONSULTANCY Address: House -10,Road-03,(1st FL) Middle Badda, Gulshan Badda Link Road, Dhaka-1212. Mobile : +88017 - 17432054 DESIGNER MD. Mahmudul Hasan Rony B.SC in EEE ARCHITECT PROPOSED BASEMENT +SEMI-BASEMENT+10-STORIED HOSPITAL BUILDING. AT SATARKUL,DHAKA UNITED MEDICAL COLLEGE & HOSPITAL PAGE NO : 18