Agenda
• Maximo HSE Overview
• Maximo Use Cases
qControl of Work
q Risk Assessment
q Permit to Work
q Work Management
• Client in Vietnam
2
High Risk Industry
• Subject to major hazard risk – operations with
significant risk to people, process and the
environment
• Operating in a sectors defined by regulatory
authorities as subject to major hazards - COMAH,
OSHA, EPA
• Enterprises requiring a high level of assurance that
systems and procedures continue to operate as
intended
Operational
Risk
Dynamic
Risk
Environmental
Risk
Business
Risk
Regulatory
Risk
Compliance
Risk
3
People Process Environment
Unqualified to operate a piece
of equipment/ Expired Operator
Certifications
SOPs that aren’t followed / No
defined SOPs
Inability to prove Regulatory
Compliance
HFACS contributing to failure No Change Process in place Inability stay current with
regulatory changes
Not following established
Operating Procedures
Control of work not in place Equipment break down
PSSRs not in place, tracked or
performed
Equipment certifications not up
to date
Big Iron – Big Machines
Hazardous Nature of the Work
– Height, Heat, Confined,
Trench…
PPE not used properly, tracked
properly or certified on a
regular basis
No Intra-Shift Operational
Communications
Customer Pain Points
4
Maximo HSE Manager 7.6.1 business processes
Operations
Management
Asset & Work
Management
Control of
Work
HSE Management Management
of Change
Quality
Management
Manage operator
logs
Shift handover
Production loss
reporting
Define operating
policies and
procedures
Bypass
Management
Asset
management
Defect
Management
Risk
Management
Permit to Work
Incident
Management
Investigation
Management
Continuous
Improvement
Management
of
Change
Regulatory
Compliance
Competency
Management
Managing
non-conformance
Major Business Processes
Detailed
Business
Processes
Safety
Quality
Compliance
Isolation
Management
Audit
Management
Work
Management
Turnaround
management
Hazard
Management
Managing
Operational
Actions
Failure
management
Managing
Corrective Action
Knowledge
Management
Capturing
Knowledge
Identifying
Solutions
Managing
regulatory permits
and environmental
Consents
Managing Supply
Chain Quality
Construction and
Commissioning
Management
Mobile Incident
Reporting
New processes
5
What is Maximo Health, Safety and Environment Manager?
Incident
Management
Operating
Procedures
Audit and Survey
Failure
Reporting
Investigations
Operating
Policy
Personnel
Certification
Tracking
Solutions
Change
Management
Risk
Assessment
Operators
Log
Defect
Elimination
Non-Conformance
Management
Risk
Matrix
Action
Tracking
Bypass
Management
Regulatory
Compliance
Location
Profile
Benefits &
Losses
Certifications
Preparation
Activities
Improvements
Lock Out
and
Tag Out Plan
Permit to Work 5
BE
PREPARED!
An Add-on solution to Maximo
with a comprehensive
capabilities to support HSE
objectives across industries
Incident Investigation
MOC
Risk Assessment
Permit to Work
Audit and Survey
6
Risk Assessment Permit to Work
Work Management
MOC
Audit & Survey
Risk Matrix By-Pass Management
Work Request
10,000 Foot View of Control of Work
Click the links to go to BlueworkLive
for a detailed process flow
7
Why take an integrated approach?
“The Space Shuttle program has a wealth of data
tucked away in multiple databases without a
convenient way to integrate and use the data
for management, engineering or safety
decisions”
Columbia Accident Investigation Board as quoted in
Organization Learning at Nasa: The Challenger and
Columbia Accidents by J Mahler & M Casamayou
Mike Mullane
8
Risk Assessment / Permit To Work / Work Management
Use Case
9
10
Risk Assessment
11
12
13
14
Permit to Work
15
16
17
18
19
20
Work Order Tracking
21
22
23
Maximo HSE Manager Capabilities
24
HSE Manager Capability (1 of 6)
Capability Benefit
Incidents Addresses the continuous need for customers to improve operational performance by
creating, reviewing, and analyzing incidents. Includes Self Service Create and Review
Incidents. A mobile Incident Reporter application is also included
Investigations Allows customers to identify the root cause of problems arising from incidents on their plants
that may be safety, environmental, or production related.
Management
of Change
Allows customers to support change requirements in a more robust way with multiple levels
of reviews/approvals, authorization of change, pre and post start actions
Defects,
Non-Conformance
Provides non-conformance management capabilities designed to automate, manage, and
streamline for identifying, evaluating, reviewing, and handling on non-conforming
engineering specifications, materials, components, parts and processes.
Regulatory
Compliance
Identifies regulatory compliance against assets and locations and associates job plans and
work orders to these regulations to ensure compliance – significantly reducing the costs
associated with compliance
25
Capability Benefit
Operating
Procedures
Capabilities for documented, step-by-step operating procedures
Operating
Policy
Governance application for structuring your operating policy
Risk
Assessment
Iterative document that links all associated Health, Safety and Environment activities and
organizational data. Allows customers to analyze the risks associated with work carried out
through the Maximo products, identifying hazards and defining the impact ranking
Risk
Matrix
An application that models both probability and consequences of events supporting risk
management processes
Improvements Manages continuous improvement programs like Six Sigma or similar methodologies
Maximo HSE Manager Capability (2 of 6)
26
Capability Benefit
People
(Competency
Extensions)
Improves competency assurance through capabilities for adding, modifying, and updating
competencies of the workforce
Operators
Log
Electronic log used by shift operators for recording and qualifying events which occur
during an individuals shift watch
People
(Certification)
Tracking
Complete history of all personnel job roles, certifications, training and current
qualifications
Action
Tracking
Allows customers to track statutory implications to ensure certain types of work and
actions are completed by the agreed dates
Benefits &
Losses
Captures benefits/losses associated with improvements or costs associated with
incidents, failures, survey/audit findings
Maximo HSE Manager Capability (3 of 6)
27
Capability Benefit
Failure
Reporting
Reporting mechanism for capturing metrics to support consistent Failure Reporting and
Corrective Action process (FRACAS)
Solutions Searchable learning repository associated with lessons learned, or with proven solutions
having a safety, operational, maintenance or engineering context
Defects Integrated approach to manage or eliminate defects
Bypass
Management
Use to manage bypass operations, also known as inhibits, or overrides, for safety related
systems such as Emergency Shutdown, Fire and Gas Systems, Alarm Panels and soft
alarms on DCS systems.
It can also be used to manage bypasses of mechanical systems such as sprinklers.
A further use case is management of security system bypasses.
Maximo HSE Manager Capability (4 of 6)
28
Capability Benefit
Certifications A certification record contains the details that are used to verify that standards for assets
or locations are met. They can also be used to make sure that personnel are qualified for
specialized tasks.
Location
Profile
Location profiles contain information on production data. You can use location profiles to
reduce the production losses that can result from planned or unplanned maintenance
shutdowns.
Preparation
Activities
An application to manage the preparation activities that are associated with different
phases of scheduled work packages. Preparation activities are tasks that are usually
carried out either before assets are put into operation or in preparation for a plant
turnaround.
Lock Out/
Tag Out Plan
Lock out and tag out operations specify a plan of isolation for assets or locations to ensure
the safety of the plant. The plans describe how to remove work assets from service and
place them back into service
Permit to Work A permit to work provides for the effective management of hazards in the work place. The
permit to work is frequently used with one or more work orders. You can also generate a
permit to work based on an existing work order or task.
Audit and Survey Audits are used to evaluate compliance with industry-related regulations or with internal
regulations. You can use either audits or surveys to evaluate locations and assets for
regulatory compliance.
BE
PREPARED!
Maximo HSE Manager Capability (5 of 6)
29
Capability Benefit
Operational
Actions
Consolidates standard actions across multiple different applications. Supports the sign-off
of completion of actions in a single place. Allows standard actions to be added to a Start
Center
Log Book Provides a way to bring together individual operator logs into a Log Book. Supports the
shift handover process.
Isolation
Management
Supports the scenario where customers want to manage isolation separately from a
permit. Fully integrated with permit to work if required.
Incident Reporter A Maximo Anywhere based mobile application to report an incident, hazard or safety
observation. Supports disconnected operation. Also provides the ability to view your
reported incidents from the mobile device
Certifications
(Environmental
Consents)
Extension of Certification application to support the management of environmental
consents and regulatory permits.
Assets & Locations
(FMECA
Criticality)
Extensions to Assets and Locations to provide failure mode analysis and criticality
analysis.
Maximo HSE Manager Capability (6 of 6)
30
Client in Vietnam
31
Thank You!

More Related Content

Similar to IBM Maximo HSE Solution Presentation.pdf

A real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 ElementsA real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 Elements360factors
 
CaseStudy_MOC_PX_2015_LI
CaseStudy_MOC_PX_2015_LICaseStudy_MOC_PX_2015_LI
CaseStudy_MOC_PX_2015_LISean Cull
 
Test Management Montioring Control
Test Management Montioring ControlTest Management Montioring Control
Test Management Montioring Controldrishtipuro1234
 
Test Management Montioring Control
Test Management Montioring ControlTest Management Montioring Control
Test Management Montioring Controlsethnainaa
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxSamuel Gher
 
POM: maintenance and system reliability
POM:  maintenance and system reliabilityPOM:  maintenance and system reliability
POM: maintenance and system reliabilityKishor Tayade
 
Plm co e_sap_ec_v1.0
Plm co e_sap_ec_v1.0Plm co e_sap_ec_v1.0
Plm co e_sap_ec_v1.0najuor
 
01 facility management definition and scope opt
01   facility management definition and scope opt01   facility management definition and scope opt
01 facility management definition and scope optArya Wirabhuana
 
Alert Plus PIOGA Presentation - oct'15
Alert Plus PIOGA Presentation - oct'15Alert Plus PIOGA Presentation - oct'15
Alert Plus PIOGA Presentation - oct'15Matt Murdock
 
NSGI Equipment Reliability Short Overview
NSGI Equipment Reliability Short OverviewNSGI Equipment Reliability Short Overview
NSGI Equipment Reliability Short OverviewWHC57
 
Hpe program rating #1 con ops
Hpe program rating #1 con opsHpe program rating #1 con ops
Hpe program rating #1 con opsPMHaas
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptThushan9
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow controlhqdan
 

Similar to IBM Maximo HSE Solution Presentation.pdf (20)

A real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 ElementsA real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 Elements
 
CaseStudy_MOC_PX_2015_LI
CaseStudy_MOC_PX_2015_LICaseStudy_MOC_PX_2015_LI
CaseStudy_MOC_PX_2015_LI
 
Process safety managment
Process safety managmentProcess safety managment
Process safety managment
 
Test Management Montioring Control
Test Management Montioring ControlTest Management Montioring Control
Test Management Montioring Control
 
Test Management Montioring Control
Test Management Montioring ControlTest Management Montioring Control
Test Management Montioring Control
 
Conduct Of Operations
Conduct Of OperationsConduct Of Operations
Conduct Of Operations
 
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptxReliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
Reliability-centered maintenance (RCM) & Total Productive Maintenance (TPM).pptx
 
POM: maintenance and system reliability
POM:  maintenance and system reliabilityPOM:  maintenance and system reliability
POM: maintenance and system reliability
 
Plm co e_sap_ec_v1.0
Plm co e_sap_ec_v1.0Plm co e_sap_ec_v1.0
Plm co e_sap_ec_v1.0
 
01 facility management definition and scope opt
01   facility management definition and scope opt01   facility management definition and scope opt
01 facility management definition and scope opt
 
Alert Plus PIOGA Presentation - oct'15
Alert Plus PIOGA Presentation - oct'15Alert Plus PIOGA Presentation - oct'15
Alert Plus PIOGA Presentation - oct'15
 
Facility management
Facility managementFacility management
Facility management
 
NSGI Equipment Reliability Short Overview
NSGI Equipment Reliability Short OverviewNSGI Equipment Reliability Short Overview
NSGI Equipment Reliability Short Overview
 
Maintenance
MaintenanceMaintenance
Maintenance
 
Hpe program rating #1 con ops
Hpe program rating #1 con opsHpe program rating #1 con ops
Hpe program rating #1 con ops
 
14 Tips for Process Safety Management
14 Tips for Process Safety Management14 Tips for Process Safety Management
14 Tips for Process Safety Management
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow control
 
Maintenance 2sp
Maintenance 2spMaintenance 2sp
Maintenance 2sp
 

Recently uploaded

Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 

Recently uploaded (20)

Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 

IBM Maximo HSE Solution Presentation.pdf

  • 1. 0 Maximo Health, Safety and Environment Manager (HSE) Overview
  • 2. 1 Agenda • Maximo HSE Overview • Maximo Use Cases qControl of Work q Risk Assessment q Permit to Work q Work Management • Client in Vietnam
  • 3. 2 High Risk Industry • Subject to major hazard risk – operations with significant risk to people, process and the environment • Operating in a sectors defined by regulatory authorities as subject to major hazards - COMAH, OSHA, EPA • Enterprises requiring a high level of assurance that systems and procedures continue to operate as intended Operational Risk Dynamic Risk Environmental Risk Business Risk Regulatory Risk Compliance Risk
  • 4. 3 People Process Environment Unqualified to operate a piece of equipment/ Expired Operator Certifications SOPs that aren’t followed / No defined SOPs Inability to prove Regulatory Compliance HFACS contributing to failure No Change Process in place Inability stay current with regulatory changes Not following established Operating Procedures Control of work not in place Equipment break down PSSRs not in place, tracked or performed Equipment certifications not up to date Big Iron – Big Machines Hazardous Nature of the Work – Height, Heat, Confined, Trench… PPE not used properly, tracked properly or certified on a regular basis No Intra-Shift Operational Communications Customer Pain Points
  • 5. 4 Maximo HSE Manager 7.6.1 business processes Operations Management Asset & Work Management Control of Work HSE Management Management of Change Quality Management Manage operator logs Shift handover Production loss reporting Define operating policies and procedures Bypass Management Asset management Defect Management Risk Management Permit to Work Incident Management Investigation Management Continuous Improvement Management of Change Regulatory Compliance Competency Management Managing non-conformance Major Business Processes Detailed Business Processes Safety Quality Compliance Isolation Management Audit Management Work Management Turnaround management Hazard Management Managing Operational Actions Failure management Managing Corrective Action Knowledge Management Capturing Knowledge Identifying Solutions Managing regulatory permits and environmental Consents Managing Supply Chain Quality Construction and Commissioning Management Mobile Incident Reporting New processes
  • 6. 5 What is Maximo Health, Safety and Environment Manager? Incident Management Operating Procedures Audit and Survey Failure Reporting Investigations Operating Policy Personnel Certification Tracking Solutions Change Management Risk Assessment Operators Log Defect Elimination Non-Conformance Management Risk Matrix Action Tracking Bypass Management Regulatory Compliance Location Profile Benefits & Losses Certifications Preparation Activities Improvements Lock Out and Tag Out Plan Permit to Work 5 BE PREPARED! An Add-on solution to Maximo with a comprehensive capabilities to support HSE objectives across industries Incident Investigation MOC Risk Assessment Permit to Work Audit and Survey
  • 7. 6 Risk Assessment Permit to Work Work Management MOC Audit & Survey Risk Matrix By-Pass Management Work Request 10,000 Foot View of Control of Work Click the links to go to BlueworkLive for a detailed process flow
  • 8. 7 Why take an integrated approach? “The Space Shuttle program has a wealth of data tucked away in multiple databases without a convenient way to integrate and use the data for management, engineering or safety decisions” Columbia Accident Investigation Board as quoted in Organization Learning at Nasa: The Challenger and Columbia Accidents by J Mahler & M Casamayou Mike Mullane
  • 9. 8 Risk Assessment / Permit To Work / Work Management Use Case
  • 10. 9
  • 12. 11
  • 13. 12
  • 14. 13
  • 16. 15
  • 17. 16
  • 18. 17
  • 19. 18
  • 20. 19
  • 22. 21
  • 23. 22
  • 24. 23 Maximo HSE Manager Capabilities
  • 25. 24 HSE Manager Capability (1 of 6) Capability Benefit Incidents Addresses the continuous need for customers to improve operational performance by creating, reviewing, and analyzing incidents. Includes Self Service Create and Review Incidents. A mobile Incident Reporter application is also included Investigations Allows customers to identify the root cause of problems arising from incidents on their plants that may be safety, environmental, or production related. Management of Change Allows customers to support change requirements in a more robust way with multiple levels of reviews/approvals, authorization of change, pre and post start actions Defects, Non-Conformance Provides non-conformance management capabilities designed to automate, manage, and streamline for identifying, evaluating, reviewing, and handling on non-conforming engineering specifications, materials, components, parts and processes. Regulatory Compliance Identifies regulatory compliance against assets and locations and associates job plans and work orders to these regulations to ensure compliance – significantly reducing the costs associated with compliance
  • 26. 25 Capability Benefit Operating Procedures Capabilities for documented, step-by-step operating procedures Operating Policy Governance application for structuring your operating policy Risk Assessment Iterative document that links all associated Health, Safety and Environment activities and organizational data. Allows customers to analyze the risks associated with work carried out through the Maximo products, identifying hazards and defining the impact ranking Risk Matrix An application that models both probability and consequences of events supporting risk management processes Improvements Manages continuous improvement programs like Six Sigma or similar methodologies Maximo HSE Manager Capability (2 of 6)
  • 27. 26 Capability Benefit People (Competency Extensions) Improves competency assurance through capabilities for adding, modifying, and updating competencies of the workforce Operators Log Electronic log used by shift operators for recording and qualifying events which occur during an individuals shift watch People (Certification) Tracking Complete history of all personnel job roles, certifications, training and current qualifications Action Tracking Allows customers to track statutory implications to ensure certain types of work and actions are completed by the agreed dates Benefits & Losses Captures benefits/losses associated with improvements or costs associated with incidents, failures, survey/audit findings Maximo HSE Manager Capability (3 of 6)
  • 28. 27 Capability Benefit Failure Reporting Reporting mechanism for capturing metrics to support consistent Failure Reporting and Corrective Action process (FRACAS) Solutions Searchable learning repository associated with lessons learned, or with proven solutions having a safety, operational, maintenance or engineering context Defects Integrated approach to manage or eliminate defects Bypass Management Use to manage bypass operations, also known as inhibits, or overrides, for safety related systems such as Emergency Shutdown, Fire and Gas Systems, Alarm Panels and soft alarms on DCS systems. It can also be used to manage bypasses of mechanical systems such as sprinklers. A further use case is management of security system bypasses. Maximo HSE Manager Capability (4 of 6)
  • 29. 28 Capability Benefit Certifications A certification record contains the details that are used to verify that standards for assets or locations are met. They can also be used to make sure that personnel are qualified for specialized tasks. Location Profile Location profiles contain information on production data. You can use location profiles to reduce the production losses that can result from planned or unplanned maintenance shutdowns. Preparation Activities An application to manage the preparation activities that are associated with different phases of scheduled work packages. Preparation activities are tasks that are usually carried out either before assets are put into operation or in preparation for a plant turnaround. Lock Out/ Tag Out Plan Lock out and tag out operations specify a plan of isolation for assets or locations to ensure the safety of the plant. The plans describe how to remove work assets from service and place them back into service Permit to Work A permit to work provides for the effective management of hazards in the work place. The permit to work is frequently used with one or more work orders. You can also generate a permit to work based on an existing work order or task. Audit and Survey Audits are used to evaluate compliance with industry-related regulations or with internal regulations. You can use either audits or surveys to evaluate locations and assets for regulatory compliance. BE PREPARED! Maximo HSE Manager Capability (5 of 6)
  • 30. 29 Capability Benefit Operational Actions Consolidates standard actions across multiple different applications. Supports the sign-off of completion of actions in a single place. Allows standard actions to be added to a Start Center Log Book Provides a way to bring together individual operator logs into a Log Book. Supports the shift handover process. Isolation Management Supports the scenario where customers want to manage isolation separately from a permit. Fully integrated with permit to work if required. Incident Reporter A Maximo Anywhere based mobile application to report an incident, hazard or safety observation. Supports disconnected operation. Also provides the ability to view your reported incidents from the mobile device Certifications (Environmental Consents) Extension of Certification application to support the management of environmental consents and regulatory permits. Assets & Locations (FMECA Criticality) Extensions to Assets and Locations to provide failure mode analysis and criticality analysis. Maximo HSE Manager Capability (6 of 6)