Project & Project Management
 A temporary endeavor undertaken to create a unique product or
service . Defined as scientifically evolved work plan devised to
achieve a specific objective with the specified period of time.
 The application of knowledge, skills, tools, and techniques to
project objectives to meet stakeholder needs and expectations.
Characteristics and Features
 Investment pattern.
 Benefits of gains.
 Location.
 Objectives.
Characteristic features
 Life span.
 Team work.
 Interrelated.
 Uniqueness.
 Change.
 Successive principles.
 Made to order or customer specific.
 Unity in diversity.
 High levels of sub-contracting.
 Risk and uncertainty.
Knowledge Areas
 Scope Management
 Time Management
 Cost Management
 Quality Management
 Human Resources Management
 Communications Management
 Risk Management
 Procurement Management
 Integration Management
Project Classification
1. Quantifiable and Non-Quantifiable projects
2. Sector projects
3. Techno-economic projects
4. Financial institutions classification
5. Services projects
Project Classification
 Quantifiable and Non-Quantifiable projects
 Quantifiable projects are those in which a reasonable quantitative assessment of benefits can be made
 Non-quantifiable projects are those where such an assessment not possible
 Sector Projects
 Agriculture Industry and mining
 Transport
 Social services
 Techno-economic projects
 Causation-oriented classification (RM based)
 Factor intensity oriented classification (LLCO)
 Magnitude oriented classification (Large /Small)
 Financial Institutions classification
 New projects
 Expansion projects
 Diversification projects
 Services Projects
 Welfare services
 Service projects
 Educational projects
Project Life Style Stages
 Conception Stage or Project Identification
 Idea germination
 Project identification
 Definition stage or project formulation :
 In this stage the project will develop the idea generated during the conception stage. The areas examined in
this stage are ( Eg ..cement plant) Raw materials, Plant size, Location, Technology, Project layout, Plant
layout, Electrical works, Civil works, Utilities – fuel, power, Manpower Financial Implementation schedule
 Planning and Organizing stage or project design :
 Prepare project execution. Take necessary action for realization of project like, Project Infrastructure System
design, Licensing, Identification of project manager
 Implementation:
 85% of the work done in this stage
 Project Clean-up stage:
 Drawing, documents, files, operation and maintenance manuals are catalogued and handed over to the
customer Handing over
Project Management and Other
Disciplines
 Finance
 HRM
 Operations
 Purchase and logistics
 R & D
 Marketing
Project Formulation
 Defined as “ taking a first look carefully and critically at a
project idea by an entrepreneur to build up an all round
beneficial to project after carefully weighing its various
components”
Phases of Project Formulation
1. Conception of an idea
2. Analysis of related aspects
3. Formulation of a project
4. Design of a project
Sequential Stages in Project
Formulation
 Feasibility study
 Techno-economic analysis
 Project Design and Network analysis
 Input Analysis
 Financial analysis
 Social cost benefit analysis
 Pre-investment analysis
Project Planning
 Project Plan “Is a formal, approved document used to manage and control project execution”
 Project Plan Development – Output of Planning processes in other knowledge areas:
 Historic Information
 Stakeholder skills and knowledge
 Organizational Policies
 Limitations and Assumptions
 Project Planning Methodology
 Project Plan
 Project Scope
 To whom the project is prepared
 The target audience
 The usefulness for the stakeholders
 Project Planning Objectives
 To satisfy the stakeholder
 To show one’s expertise
 To get the approval
Feasibility Study
 A feasibility study is an analysis of the viability of an idea through
a disciplined and documented process of thinking through the idea
from its logical beginning to its logical end. A feasibility study
provides an Investigating function that helps answer “Should we
proceed with the proposed project idea? Is it a viable business
venture?” A feasibility study should be conducted to determine the
viability of an idea BEFORE proceeding with the development of a
business.
Distinction between pre-feasibility
study and Feasibility study
Pre-Feasibility Study
 No thoughts on the
viability of the project
from economic, social,
technical, managerial,
market and financial
point of view
Feasibility Study
 Deeper knowledge on
various feasibility, such
as economic, social,
technical, managerial,
market and financial
Various Feasibility Studies
1. Socio-Economic Feasibility
2. Technical Feasibility
3. Managerial Feasibility
4. Market Feasibility
5. Financial Feasibility
Michael Porter: Aligning Strategy &
Project Management
 https://www.youtube.com/watch?v=CKcSzH1SvCk&list=WL
&index=1
Feasibility Reports Presentation
 A feasibility report provides primary economic
information, financial data and technical details
which serves as the basis for carrying out the
project successfully. The feasibility report should
cover the following important aspects all the
feasibilities studies such as market, financial,
economic, social etc…
Project Feasibility Report
Checklist
 Socio-Economic Feasibility
 Technical Feasibility
 Managerial Feasibility
 Market Feasibility
 Financial Feasibility
 HR feasibility
 Operational Feasibility
Sources of Finance
 Short Term
 Medium Term
 Long Term
 Bank credit
 Trade credit
 Installment credit
 Customer advances
 Issue of shares
 Issue of debentures
 Loans form banks and other financial institutions
 Public deposits (For existing concerns)
 Ploughing back of profits
Break Even Analysis
 Break Even Analysis
 Refers to determining the level of activity where total cost is equal to the total sale
 Break even is a point of zero profit and zero loss
 Utility of BE Analysis
 It serves as the most useful and important managerial tool to study cost-output-relationship at varying
levels of output
 It is useful in reviewing pricing policies
 It aids in planning capitalization of the enterprise
 It provides the entrepreneur to decide whether to acquire or not assets involving additional fixed costs
Project Design
 In project design, the entrepreneur is expected to
design prototype & test them. Design is the new
weapon and the key driver is innovation to fight out the
competition. For design to become culturally
embedded in an organization three forces have to be
considered:
 A deeper user understanding
 Multiple prototyping
 Strategic business design
Network Design
 Network Design is a system which plans both large and
small projects by analyzing the project activities. Projects are
broken down into simple activities, which are then arranged
in a logical sequence using network tools like PERT, CPM.
History of CPM/PERT
 History of Critical Path Method (CPM)
 E I Du Pont de Nemours & Co. (1957) for construction of new chemical plant and maintenance shut-down
 Deterministic task times
 Activity-on-node network construction
 Repetitive nature of jobs
 Project Evaluation and Review Technique (PERT)
 U S Navy (1958) for the POLARIS missile program
 Multiple task time estimates (probabilistic nature)
 Activity-on-arrow network construction
 Non-repetitive jobs (R & D work)
Project Network
 Network analysis is the general name given to certain
specific techniques which can be used for the planning,
management and control of projects
 Use of nodes and arrows
 Arrows lead from tail to head directionally
 Indicate ACTIVITY, a time consuming effort that is required to
perform a part of the work.
 A node is represented by a circle
 Indicate EVENT, a point in time where one or more activities start
and/or finish.
Activity & Event
 Activity
 A task or a certain amount of work required in the project
 Requires time to complete
 Represented by an arrow
 Indicates only precedence relationships.
 Event
 Signals the beginning or ending of an activity
 Designates a point in time
 Represented by a circle (node)
 Network Shows the sequential relationships among activities using nodes and arrows
 Activity-on-node (AON) nodes represent activities, and arrows show precedence relationships
 Activity-on-arrow (AOA) arrows represent activities and nodes are events for points in time
PERT Analysis
 https://www.youtube.com/watch?v=V5FmgNCD5Rw
PERT
 PERT is based on the assumption that an activity’s duration
follows a probability distribution instead of being a single
value
 Three time estimates are required to compute the
parameters of an activity’s duration distribution:
 pessimistic time (t p ) - the time the activity would take if things
did not go well
 most likely time (t m ) - the consensus best estimate of the
activity’s duration
 optimistic time (t o ) - the time the activity would take if things
did go well
Steps in PERT
 Development of project network
 Time estimation
 Determination of critical path, event slacks and activity floats
 Development of project schedule
 Calculation of variability duration and the probability of
completion in a given time
Network Diagram
 Concepts
• Activity
• Precedence relationship
• Successor
• Event
Guidelines for network
diagram
1. Before an activity can begin, its preceding activities must be
completed.
2. Arrows indicate logical precedence.
3. Flow of the diagram is from left to right.
4. Arrows should not intersect.
5. Dangling should be avoided.
A Simple Project
Activity Immediate
Predecessor
Expected
Time
A - 5
B - 6
C A 4
D A, B 2
Precedence Diagram
STEPS IN DETERMINING
CRITICAL PATH
• Specify the individual activities.
• Determine the sequence of the activities.
• Draw the network diagram.
• Estimate the activity completion time.
• Identify the critical path.
• Update the CPM diagram.
Activit
y
Preceden
ce
Normal time
(week)
Normal
Cost (Rs)
A - 3 300
B A 3 30
C A 7 420
D A 9 720
E D 5 250
F B,C,E 6 320
G F 4 400
H F 13 780
I G 10 1000
Total 4220
1
8
7
6
3
5
4
2
Overhead cost as per the given data- Rs.50
Paths in the network diagram :
A-D-F-G-I = 32
A-D-F-H = 31
A-C-F-H = 29
A-C-F-G-I = 30
A-B-E-F-H = 30
A-B-E-F-G-I = 31
Difference between
CPM & PERT
CPM PERT
• CPM works with fixed
deterministic time
• PERT works with probabilistic
time
•CPM is useful for repetitive and
non complex projects with a
certain degree of time estimates.
•PERT is useful for non repetitive
and complex projects with
uncertain time estimates.
• CPM includes time-cost trade off. •PERT is restricted to time
variable.
• CPM- for construction projects. • PERT- used for R&D programs.
Location of an Enterprise
 Location considerations for the establishment of
manufacturing plants is critical to the operation of the setup
in an uninterrupted and least resistant manner.
 An ideal site is certainly contributes to the smooth and
efficient functioning of an enterprise.
Steps in selection of Enterprise
Location
I. Selection of region
II. Selection of the locality or Community
III. Selection of the exact site; and
IV. Selection of the optimum site
Factors to be consider in studying
the location for an Enterprise
 Location. . .
 Deciding a suitable area/place, etc. where the plant/factory
will start functioning.
 It involves 2 major activities:
1. To select a proper Geographic region
2. Selecting the specific site within the region.
1. Nearness to raw materials
2. Transport Facilities
3. Nearness to Market
4. Availability of labour
5. Availability of Fuel and Power
6. Availability of Water
7. Climatic Conditions
8. Financial and other Aids
9. Land topography
10. Community attitude
11. Presence of related industries
12. Existence of Hospitals, Schools, Banks, Clubs, Post offices
etc.
13. Local bye-laws, taxes, etc
14. Housing Facilities
15. Security
16. Facilities for Expansion
Thank you…

More Related Content

Similar to Establishing An Enterprise and Project Management.pptx

Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Managementchaitanyakrsk
 
Amit Yadav k18203 BBA 5th Semester Project Management PPT.pptx
Amit Yadav k18203 BBA 5th Semester Project Management PPT.pptxAmit Yadav k18203 BBA 5th Semester Project Management PPT.pptx
Amit Yadav k18203 BBA 5th Semester Project Management PPT.pptxmcdopex6
 
M&E Module 4.docx
M&E Module 4.docxM&E Module 4.docx
M&E Module 4.docxswamy62
 
Primavera6.0
Primavera6.0Primavera6.0
Primavera6.0niict
 
UNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementUNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementsdbhosale860
 
ChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementDerbewBirhanu2
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentSiwawong Wuttipongprasert
 
10 me667 chap5 coordination and control
10 me667 chap5 coordination and control10 me667 chap5 coordination and control
10 me667 chap5 coordination and controlPavan Kumar
 
Project initiation
Project initiationProject initiation
Project initiationukrulz4u
 
Project mangement part 1
Project mangement part 1Project mangement part 1
Project mangement part 1ghulam MUSTAFA
 
Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...eSAT Publishing House
 

Similar to Establishing An Enterprise and Project Management.pptx (20)

Togaf project
Togaf projectTogaf project
Togaf project
 
Chapter 5
Chapter 5Chapter 5
Chapter 5
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Management
 
Project Management Fundamentals Course
Project Management Fundamentals CourseProject Management Fundamentals Course
Project Management Fundamentals Course
 
Amit Yadav k18203 BBA 5th Semester Project Management PPT.pptx
Amit Yadav k18203 BBA 5th Semester Project Management PPT.pptxAmit Yadav k18203 BBA 5th Semester Project Management PPT.pptx
Amit Yadav k18203 BBA 5th Semester Project Management PPT.pptx
 
PM ppt unit 1.ppt
PM ppt unit 1.pptPM ppt unit 1.ppt
PM ppt unit 1.ppt
 
M&E Module 4.docx
M&E Module 4.docxM&E Module 4.docx
M&E Module 4.docx
 
Primavera6.0
Primavera6.0Primavera6.0
Primavera6.0
 
UNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementUNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project management
 
Software Project Management by Dr. B. J. Mohite
Software Project Management by Dr. B. J. MohiteSoftware Project Management by Dr. B. J. Mohite
Software Project Management by Dr. B. J. Mohite
 
ChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project managementChapterPM_1.pptx for the course project management
ChapterPM_1.pptx for the course project management
 
PMP integration review
PMP integration reviewPMP integration review
PMP integration review
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
10 me667 chap5 coordination and control
10 me667 chap5 coordination and control10 me667 chap5 coordination and control
10 me667 chap5 coordination and control
 
Spm unit 1
Spm unit 1Spm unit 1
Spm unit 1
 
Project initiation
Project initiationProject initiation
Project initiation
 
Project mangement part 1
Project mangement part 1Project mangement part 1
Project mangement part 1
 
Pm chapter 2...
Pm chapter 2...Pm chapter 2...
Pm chapter 2...
 
Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...
 
Project management
Project managementProject management
Project management
 

More from shrinivas kulkarni

Institutions Supporting Small Business Enterprises.pptx
Institutions Supporting Small Business Enterprises.pptxInstitutions Supporting Small Business Enterprises.pptx
Institutions Supporting Small Business Enterprises.pptxshrinivas kulkarni
 
social enterpreneurship - Entrpreneurship.ppt
social enterpreneurship - Entrpreneurship.pptsocial enterpreneurship - Entrpreneurship.ppt
social enterpreneurship - Entrpreneurship.pptshrinivas kulkarni
 
Information technology in marketing
Information technology in marketingInformation technology in marketing
Information technology in marketingshrinivas kulkarni
 
Promotion, marketing and society
Promotion, marketing and societyPromotion, marketing and society
Promotion, marketing and societyshrinivas kulkarni
 
Marketing process, Mktg mix, NPD,PLC, STP, Distribution
Marketing process, Mktg mix, NPD,PLC, STP, DistributionMarketing process, Mktg mix, NPD,PLC, STP, Distribution
Marketing process, Mktg mix, NPD,PLC, STP, Distributionshrinivas kulkarni
 
Introduction to Marketing Management
Introduction to Marketing ManagementIntroduction to Marketing Management
Introduction to Marketing Managementshrinivas kulkarni
 
Corporate Social Responsibility
Corporate Social ResponsibilityCorporate Social Responsibility
Corporate Social Responsibilityshrinivas kulkarni
 
Sustainability Reporting- Business Ethics
Sustainability Reporting- Business EthicsSustainability Reporting- Business Ethics
Sustainability Reporting- Business Ethicsshrinivas kulkarni
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Managementshrinivas kulkarni
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Controlshrinivas kulkarni
 
Emerging and contemporary themes in global organizational behavior
Emerging and contemporary  themes in global organizational  behaviorEmerging and contemporary  themes in global organizational  behavior
Emerging and contemporary themes in global organizational behaviorshrinivas kulkarni
 

More from shrinivas kulkarni (20)

Institutions Supporting Small Business Enterprises.pptx
Institutions Supporting Small Business Enterprises.pptxInstitutions Supporting Small Business Enterprises.pptx
Institutions Supporting Small Business Enterprises.pptx
 
social enterpreneurship - Entrpreneurship.ppt
social enterpreneurship - Entrpreneurship.pptsocial enterpreneurship - Entrpreneurship.ppt
social enterpreneurship - Entrpreneurship.ppt
 
Sales Management
Sales ManagementSales Management
Sales Management
 
Sustainability reporting
Sustainability reporting Sustainability reporting
Sustainability reporting
 
Ethics in finance
Ethics in financeEthics in finance
Ethics in finance
 
Bes lmr notes (1)
Bes lmr notes (1)Bes lmr notes (1)
Bes lmr notes (1)
 
International Finance
International FinanceInternational Finance
International Finance
 
Social venture creation
Social venture creationSocial venture creation
Social venture creation
 
Family business in india
Family business in indiaFamily business in india
Family business in india
 
Information technology in marketing
Information technology in marketingInformation technology in marketing
Information technology in marketing
 
Promotion, marketing and society
Promotion, marketing and societyPromotion, marketing and society
Promotion, marketing and society
 
Marketing process, Mktg mix, NPD,PLC, STP, Distribution
Marketing process, Mktg mix, NPD,PLC, STP, DistributionMarketing process, Mktg mix, NPD,PLC, STP, Distribution
Marketing process, Mktg mix, NPD,PLC, STP, Distribution
 
Introduction to Marketing Management
Introduction to Marketing ManagementIntroduction to Marketing Management
Introduction to Marketing Management
 
Corporate Social Responsibility
Corporate Social ResponsibilityCorporate Social Responsibility
Corporate Social Responsibility
 
Sustainability Reporting- Business Ethics
Sustainability Reporting- Business EthicsSustainability Reporting- Business Ethics
Sustainability Reporting- Business Ethics
 
Waste management-Production
Waste management-ProductionWaste management-Production
Waste management-Production
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
PhD Viva PPT
PhD Viva PPTPhD Viva PPT
PhD Viva PPT
 
Emerging and contemporary themes in global organizational behavior
Emerging and contemporary  themes in global organizational  behaviorEmerging and contemporary  themes in global organizational  behavior
Emerging and contemporary themes in global organizational behavior
 

Recently uploaded

Report about the AHIABGA-UnityNet UNDRIPDay / Earth-Day 2024 Gathering in Mar...
Report about the AHIABGA-UnityNet UNDRIPDay / Earth-Day 2024 Gathering in Mar...Report about the AHIABGA-UnityNet UNDRIPDay / Earth-Day 2024 Gathering in Mar...
Report about the AHIABGA-UnityNet UNDRIPDay / Earth-Day 2024 Gathering in Mar...LHelferty
 
Model Call Girl in Bawana Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Bawana Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Bawana Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Bawana Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(8264348440) 🔝 Call Girls In Babarpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Babarpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Babarpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Babarpur 🔝 Delhi NCRsoniya singh
 
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...Authentic No 1 Amil Baba In Pakistan
 
Gurgaon Rajiv Chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...
Gurgaon Rajiv Chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...Gurgaon Rajiv Chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...
Gurgaon Rajiv Chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...soniya singh
 
CATALOGO MF 650 COMPLETO COM PEÇAS DE TRANSMISSAO
CATALOGO MF 650 COMPLETO COM PEÇAS DE TRANSMISSAOCATALOGO MF 650 COMPLETO COM PEÇAS DE TRANSMISSAO
CATALOGO MF 650 COMPLETO COM PEÇAS DE TRANSMISSAOTMTerraplanagem
 
(8264348440) 🔝 Call Girls In Khanpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Khanpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Khanpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Khanpur 🔝 Delhi NCRsoniya singh
 
Viet Nam Inclusive Business Accreditation System
Viet Nam Inclusive Business Accreditation SystemViet Nam Inclusive Business Accreditation System
Viet Nam Inclusive Business Accreditation SystemTri Dung, Tran
 
TDC Health Limited Nigeria Business Plan Opportunity Presentation 2024
TDC Health Limited Nigeria Business Plan Opportunity Presentation 2024TDC Health Limited Nigeria Business Plan Opportunity Presentation 2024
TDC Health Limited Nigeria Business Plan Opportunity Presentation 2024Fikrie Omar
 
About Entrepreneur ELON MUSK .pptx...
About  Entrepreneur  ELON  MUSK .pptx...About  Entrepreneur  ELON  MUSK .pptx...
About Entrepreneur ELON MUSK .pptx...lahiruherath654
 
Call Girls in Tilak Nagar (DELHI-) 8377877756 Call Girls Service
Call Girls in Tilak Nagar (DELHI-) 8377877756 Call Girls ServiceCall Girls in Tilak Nagar (DELHI-) 8377877756 Call Girls Service
Call Girls in Tilak Nagar (DELHI-) 8377877756 Call Girls Servicedollysharma2066
 
(8264348440) 🔝 Call Girls In Green Park 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Green Park 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Green Park 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Green Park 🔝 Delhi NCRsoniya singh
 
办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证
办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证
办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证0622mpom
 
Smart Traffic Management System presentation
Smart Traffic Management System presentationSmart Traffic Management System presentation
Smart Traffic Management System presentationFareeyaFaisal
 

Recently uploaded (20)

Report about the AHIABGA-UnityNet UNDRIPDay / Earth-Day 2024 Gathering in Mar...
Report about the AHIABGA-UnityNet UNDRIPDay / Earth-Day 2024 Gathering in Mar...Report about the AHIABGA-UnityNet UNDRIPDay / Earth-Day 2024 Gathering in Mar...
Report about the AHIABGA-UnityNet UNDRIPDay / Earth-Day 2024 Gathering in Mar...
 
Model Call Girl in Bawana Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Bawana Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Bawana Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Bawana Delhi reach out to us at 🔝8264348440🔝
 
(8264348440) 🔝 Call Girls In Babarpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Babarpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Babarpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Babarpur 🔝 Delhi NCR
 
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
 
Gurgaon Rajiv Chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...
Gurgaon Rajiv Chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...Gurgaon Rajiv Chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...
Gurgaon Rajiv Chowk 🔝 Call Girls Service 🔝 ( 8264348440 ) unlimited hard sex ...
 
CATALOGO MF 650 COMPLETO COM PEÇAS DE TRANSMISSAO
CATALOGO MF 650 COMPLETO COM PEÇAS DE TRANSMISSAOCATALOGO MF 650 COMPLETO COM PEÇAS DE TRANSMISSAO
CATALOGO MF 650 COMPLETO COM PEÇAS DE TRANSMISSAO
 
Why Powderless DTF Printer is T-shirt Printing Game Changer.pptx
Why Powderless DTF Printer is T-shirt Printing Game Changer.pptxWhy Powderless DTF Printer is T-shirt Printing Game Changer.pptx
Why Powderless DTF Printer is T-shirt Printing Game Changer.pptx
 
Cheap Rate ➥8448380779 ▻Call Girls In Sector 56 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 56 GurgaonCheap Rate ➥8448380779 ▻Call Girls In Sector 56 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 56 Gurgaon
 
(8264348440) 🔝 Call Girls In Khanpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Khanpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Khanpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Khanpur 🔝 Delhi NCR
 
Cheap Rate ➥8448380779 ▻Call Girls In Sector 54 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 54 GurgaonCheap Rate ➥8448380779 ▻Call Girls In Sector 54 Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Sector 54 Gurgaon
 
Presentation on Paytm mobile application
Presentation on Paytm mobile applicationPresentation on Paytm mobile application
Presentation on Paytm mobile application
 
Viet Nam Inclusive Business Accreditation System
Viet Nam Inclusive Business Accreditation SystemViet Nam Inclusive Business Accreditation System
Viet Nam Inclusive Business Accreditation System
 
TDC Health Limited Nigeria Business Plan Opportunity Presentation 2024
TDC Health Limited Nigeria Business Plan Opportunity Presentation 2024TDC Health Limited Nigeria Business Plan Opportunity Presentation 2024
TDC Health Limited Nigeria Business Plan Opportunity Presentation 2024
 
About Entrepreneur ELON MUSK .pptx...
About  Entrepreneur  ELON  MUSK .pptx...About  Entrepreneur  ELON  MUSK .pptx...
About Entrepreneur ELON MUSK .pptx...
 
Call Girls in Tilak Nagar (DELHI-) 8377877756 Call Girls Service
Call Girls in Tilak Nagar (DELHI-) 8377877756 Call Girls ServiceCall Girls in Tilak Nagar (DELHI-) 8377877756 Call Girls Service
Call Girls in Tilak Nagar (DELHI-) 8377877756 Call Girls Service
 
(8264348440) 🔝 Call Girls In Green Park 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Green Park 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Green Park 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Green Park 🔝 Delhi NCR
 
办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证
办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证
办昆士兰大学UQ毕业证书/成绩单GPA修改 - 留学买假毕业证
 
Hot Sexy call girls in Rajouri Garden🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in  Rajouri Garden🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in  Rajouri Garden🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Rajouri Garden🔝 9953056974 🔝 Delhi escort Service
 
young call girls in kailash Nagar, 🔝 9953056974 🔝 escort Service
young call girls in kailash Nagar, 🔝 9953056974 🔝 escort Serviceyoung call girls in kailash Nagar, 🔝 9953056974 🔝 escort Service
young call girls in kailash Nagar, 🔝 9953056974 🔝 escort Service
 
Smart Traffic Management System presentation
Smart Traffic Management System presentationSmart Traffic Management System presentation
Smart Traffic Management System presentation
 

Establishing An Enterprise and Project Management.pptx

  • 1. Establishing An Enterprise and Project Management Dr S V K
  • 2. Project & Project Management  A temporary endeavor undertaken to create a unique product or service . Defined as scientifically evolved work plan devised to achieve a specific objective with the specified period of time.  The application of knowledge, skills, tools, and techniques to project objectives to meet stakeholder needs and expectations.
  • 3. Characteristics and Features  Investment pattern.  Benefits of gains.  Location.  Objectives. Characteristic features  Life span.  Team work.  Interrelated.  Uniqueness.  Change.  Successive principles.  Made to order or customer specific.  Unity in diversity.  High levels of sub-contracting.  Risk and uncertainty.
  • 4. Knowledge Areas  Scope Management  Time Management  Cost Management  Quality Management  Human Resources Management  Communications Management  Risk Management  Procurement Management  Integration Management
  • 5. Project Classification 1. Quantifiable and Non-Quantifiable projects 2. Sector projects 3. Techno-economic projects 4. Financial institutions classification 5. Services projects
  • 6. Project Classification  Quantifiable and Non-Quantifiable projects  Quantifiable projects are those in which a reasonable quantitative assessment of benefits can be made  Non-quantifiable projects are those where such an assessment not possible  Sector Projects  Agriculture Industry and mining  Transport  Social services  Techno-economic projects  Causation-oriented classification (RM based)  Factor intensity oriented classification (LLCO)  Magnitude oriented classification (Large /Small)  Financial Institutions classification  New projects  Expansion projects  Diversification projects  Services Projects  Welfare services  Service projects  Educational projects
  • 7. Project Life Style Stages  Conception Stage or Project Identification  Idea germination  Project identification  Definition stage or project formulation :  In this stage the project will develop the idea generated during the conception stage. The areas examined in this stage are ( Eg ..cement plant) Raw materials, Plant size, Location, Technology, Project layout, Plant layout, Electrical works, Civil works, Utilities – fuel, power, Manpower Financial Implementation schedule  Planning and Organizing stage or project design :  Prepare project execution. Take necessary action for realization of project like, Project Infrastructure System design, Licensing, Identification of project manager  Implementation:  85% of the work done in this stage  Project Clean-up stage:  Drawing, documents, files, operation and maintenance manuals are catalogued and handed over to the customer Handing over
  • 8. Project Management and Other Disciplines  Finance  HRM  Operations  Purchase and logistics  R & D  Marketing
  • 9. Project Formulation  Defined as “ taking a first look carefully and critically at a project idea by an entrepreneur to build up an all round beneficial to project after carefully weighing its various components”
  • 10. Phases of Project Formulation 1. Conception of an idea 2. Analysis of related aspects 3. Formulation of a project 4. Design of a project
  • 11. Sequential Stages in Project Formulation  Feasibility study  Techno-economic analysis  Project Design and Network analysis  Input Analysis  Financial analysis  Social cost benefit analysis  Pre-investment analysis
  • 12. Project Planning  Project Plan “Is a formal, approved document used to manage and control project execution”  Project Plan Development – Output of Planning processes in other knowledge areas:  Historic Information  Stakeholder skills and knowledge  Organizational Policies  Limitations and Assumptions  Project Planning Methodology  Project Plan  Project Scope  To whom the project is prepared  The target audience  The usefulness for the stakeholders  Project Planning Objectives  To satisfy the stakeholder  To show one’s expertise  To get the approval
  • 13. Feasibility Study  A feasibility study is an analysis of the viability of an idea through a disciplined and documented process of thinking through the idea from its logical beginning to its logical end. A feasibility study provides an Investigating function that helps answer “Should we proceed with the proposed project idea? Is it a viable business venture?” A feasibility study should be conducted to determine the viability of an idea BEFORE proceeding with the development of a business.
  • 14. Distinction between pre-feasibility study and Feasibility study Pre-Feasibility Study  No thoughts on the viability of the project from economic, social, technical, managerial, market and financial point of view Feasibility Study  Deeper knowledge on various feasibility, such as economic, social, technical, managerial, market and financial
  • 15. Various Feasibility Studies 1. Socio-Economic Feasibility 2. Technical Feasibility 3. Managerial Feasibility 4. Market Feasibility 5. Financial Feasibility
  • 16. Michael Porter: Aligning Strategy & Project Management  https://www.youtube.com/watch?v=CKcSzH1SvCk&list=WL &index=1
  • 17. Feasibility Reports Presentation  A feasibility report provides primary economic information, financial data and technical details which serves as the basis for carrying out the project successfully. The feasibility report should cover the following important aspects all the feasibilities studies such as market, financial, economic, social etc…
  • 18. Project Feasibility Report Checklist  Socio-Economic Feasibility  Technical Feasibility  Managerial Feasibility  Market Feasibility  Financial Feasibility  HR feasibility  Operational Feasibility
  • 19. Sources of Finance  Short Term  Medium Term  Long Term  Bank credit  Trade credit  Installment credit  Customer advances  Issue of shares  Issue of debentures  Loans form banks and other financial institutions  Public deposits (For existing concerns)  Ploughing back of profits
  • 20. Break Even Analysis  Break Even Analysis  Refers to determining the level of activity where total cost is equal to the total sale  Break even is a point of zero profit and zero loss  Utility of BE Analysis  It serves as the most useful and important managerial tool to study cost-output-relationship at varying levels of output  It is useful in reviewing pricing policies  It aids in planning capitalization of the enterprise  It provides the entrepreneur to decide whether to acquire or not assets involving additional fixed costs
  • 21. Project Design  In project design, the entrepreneur is expected to design prototype & test them. Design is the new weapon and the key driver is innovation to fight out the competition. For design to become culturally embedded in an organization three forces have to be considered:  A deeper user understanding  Multiple prototyping  Strategic business design
  • 22. Network Design  Network Design is a system which plans both large and small projects by analyzing the project activities. Projects are broken down into simple activities, which are then arranged in a logical sequence using network tools like PERT, CPM.
  • 23.
  • 24. History of CPM/PERT  History of Critical Path Method (CPM)  E I Du Pont de Nemours & Co. (1957) for construction of new chemical plant and maintenance shut-down  Deterministic task times  Activity-on-node network construction  Repetitive nature of jobs  Project Evaluation and Review Technique (PERT)  U S Navy (1958) for the POLARIS missile program  Multiple task time estimates (probabilistic nature)  Activity-on-arrow network construction  Non-repetitive jobs (R & D work)
  • 25. Project Network  Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects  Use of nodes and arrows  Arrows lead from tail to head directionally  Indicate ACTIVITY, a time consuming effort that is required to perform a part of the work.  A node is represented by a circle  Indicate EVENT, a point in time where one or more activities start and/or finish.
  • 26. Activity & Event  Activity  A task or a certain amount of work required in the project  Requires time to complete  Represented by an arrow  Indicates only precedence relationships.  Event  Signals the beginning or ending of an activity  Designates a point in time  Represented by a circle (node)  Network Shows the sequential relationships among activities using nodes and arrows  Activity-on-node (AON) nodes represent activities, and arrows show precedence relationships  Activity-on-arrow (AOA) arrows represent activities and nodes are events for points in time
  • 28. PERT  PERT is based on the assumption that an activity’s duration follows a probability distribution instead of being a single value  Three time estimates are required to compute the parameters of an activity’s duration distribution:  pessimistic time (t p ) - the time the activity would take if things did not go well  most likely time (t m ) - the consensus best estimate of the activity’s duration  optimistic time (t o ) - the time the activity would take if things did go well
  • 29. Steps in PERT  Development of project network  Time estimation  Determination of critical path, event slacks and activity floats  Development of project schedule  Calculation of variability duration and the probability of completion in a given time
  • 30. Network Diagram  Concepts • Activity • Precedence relationship • Successor • Event
  • 31. Guidelines for network diagram 1. Before an activity can begin, its preceding activities must be completed. 2. Arrows indicate logical precedence. 3. Flow of the diagram is from left to right. 4. Arrows should not intersect. 5. Dangling should be avoided.
  • 32. A Simple Project Activity Immediate Predecessor Expected Time A - 5 B - 6 C A 4 D A, B 2
  • 34. STEPS IN DETERMINING CRITICAL PATH • Specify the individual activities. • Determine the sequence of the activities. • Draw the network diagram. • Estimate the activity completion time. • Identify the critical path. • Update the CPM diagram.
  • 35. Activit y Preceden ce Normal time (week) Normal Cost (Rs) A - 3 300 B A 3 30 C A 7 420 D A 9 720 E D 5 250 F B,C,E 6 320 G F 4 400 H F 13 780 I G 10 1000 Total 4220
  • 37. Overhead cost as per the given data- Rs.50 Paths in the network diagram : A-D-F-G-I = 32 A-D-F-H = 31 A-C-F-H = 29 A-C-F-G-I = 30 A-B-E-F-H = 30 A-B-E-F-G-I = 31
  • 38. Difference between CPM & PERT CPM PERT • CPM works with fixed deterministic time • PERT works with probabilistic time •CPM is useful for repetitive and non complex projects with a certain degree of time estimates. •PERT is useful for non repetitive and complex projects with uncertain time estimates. • CPM includes time-cost trade off. •PERT is restricted to time variable. • CPM- for construction projects. • PERT- used for R&D programs.
  • 39. Location of an Enterprise  Location considerations for the establishment of manufacturing plants is critical to the operation of the setup in an uninterrupted and least resistant manner.  An ideal site is certainly contributes to the smooth and efficient functioning of an enterprise.
  • 40. Steps in selection of Enterprise Location I. Selection of region II. Selection of the locality or Community III. Selection of the exact site; and IV. Selection of the optimum site
  • 41. Factors to be consider in studying the location for an Enterprise  Location. . .  Deciding a suitable area/place, etc. where the plant/factory will start functioning.  It involves 2 major activities: 1. To select a proper Geographic region 2. Selecting the specific site within the region.
  • 42. 1. Nearness to raw materials 2. Transport Facilities 3. Nearness to Market 4. Availability of labour 5. Availability of Fuel and Power 6. Availability of Water 7. Climatic Conditions 8. Financial and other Aids
  • 43. 9. Land topography 10. Community attitude 11. Presence of related industries 12. Existence of Hospitals, Schools, Banks, Clubs, Post offices etc. 13. Local bye-laws, taxes, etc 14. Housing Facilities 15. Security 16. Facilities for Expansion

Editor's Notes

  1. https://www.slideshare.net/DrMahmoudAlNaimi1/aoa-and-aon-networks-69802018