CONSTRAINTS
GENERAL SANTOS SUBSTATION
Constraints
 General Substation lacks Transformer N-1 contingency if
SOCOTECO II’s embedded Sarangani Energy
Corporation (SEC) is not in operation. The peak load of
the substation is already 160MW but the capacity is only 2
x 100MVA
 If one of the transformers trips during this situation, the
other one will be overloaded
GEN. SANTOS
SUBSTATION
(NGCP)
100 MVA T5
100 MVA T4
GLAN (Sari and Glan SS)
LLEDO (Veranza and Main SS)
POBLACION TUPI (Polomolok, Tupi and DOLE SS)
KAMANGA
SUBSTATION
(SOCOTECO II)
TINOTO L1
TINOTO L2
Llido
SS
Lanoy SS
DOLE COBOX SS
Fishport SS
SEC
Cargill SS
Damalerio SS Airport SS
Maasim and
Kiamba SS
G
Scenario: SEC is Out, SIPS Not Activated
80MW
80MW
G
New Society SS
Peak Power
ADGI
G
GENERAL SANTOS SUBSTATION
Business Continuity Plan
 If only one transformer is available at Gen. Santos
Substation, SOCOTECO II will be requested to limit their
total load to only 85MW.
 SOCOTECO II may also maximize their nomination with
Peakpower and ADGI so they can load an additional
50MW.
 In this situation, 20MW of SOCOTECO II’s load will not be
supplied with power.
GENERAL SANTOS SUBSTATION
Long-Term Action Plan
 A 100MVA will be installed in place of the previously
decommissioned T1. Estimated completion May 2019
 A 100MVA Mobile Transformer is also scheduled to be
installed at Gen. Santos Substation. Estimated arrival
January 2019
GENERAL SANTOS SUBSTATION
Constraints
 Reduce reliable capacity of 100MVA Power Transformer
5. It is registering high primary and secondary winding
temperature at 80% loading only.
 Highest recorded is 119˚C, another 3˚C more will reach
the trip setting of the thermal protection.
 If T5 is truly overheating, loss of life of transformer is also
accelerating. Eventually will result to failure of paper
insulation and tripping of transformer.
GENERAL SANTOS SUBSTATION
Mitigations
 (Completed) MTD-B temporarily removed the trip signal of
the winding thermal protection with coordination from
manufacturer since the thermal sensor was suspected to
be defective.
 (Proposed) reconfiguration of 69KV Bus to operate T4 &
T5 independently taking loads 95% and 65% of capacity
respectively (see next slide).
 Conduct PMS of T5 on Sept. 22 for diagnostic testing and
correct any defect.
GENERAL SANTOS SUBSTATION
Business Continuity Plan
 If Transformer no. 5 fail, SOCOTECO II will be requested
to limit their total load to only 85MW. 85MW will curtailed
however.
 SOCOTECO II may maximize their nomination with
Peakpower and ADGI so they can load an additional
50MW thus reducing curtailment to 20MW.
GENERAL SANTOS SUBSTATION
Long-Term Action Plan
 A 100MVA will be installed in place of the previously
decommissioned T1. Request P&E to fast-tract the project
to be competed much earlier than May 2019
 A 100MVA Mobile Transformer is also scheduled to be
installed at Gen. Santos Substation. Estimated arrival
January 2019
GENERAL SANTOS SUBSTATION
Proposed reconfiguration of 69KV Bus
GENERAL SANTOS SUBSTATION
Possible Scenarios in Critical Loads
 Failure of aging Oil CB Z-CB04(5LI1GSA-TIN)GSA
Business Continuity Plan: Transfer power supply of
5LI1GSA-TIN to Z-CB04(5LI1GSA-SX1)GSA
 Failure of aging Oil CB Z-CB04(5LI1GSA-LLE)GSA
Business Continuity Plan: Transfer power supply of
5LI1GSA-TIN to Z-CB04(5LI1GSA-SX3)GSA which is
already on use
GENERAL SANTOS SUBSTATION
Possible Scenarios in Critical Loads
 Failure of aging Oil CB Z-CB04(5LI2GSA-TIN)GSA which
already happened
Business Continuity Plan: Immediately replaced by
transferring the spare GCB 5Z-CB04(7XF02GSA)
GENERAL SANTOS SUBSTATION
Possible Scenario in Matanao-Gensan 138KV Line 1
 Failure of 7Z-02CB08GSA which currently 7Z-
02CB24GSA and 7Z-02CB04GSA are open due to defect
in contact resistance of the later PCB.
Business Continuity Plan: Bypass 7Z-02CB04GSA by
connecting former transformer 2 overhead bus directly to
7BS01GSA.
TACURONG SUBSTATION
Constraints
 A 100MVA Power Transformer T4 will be installed at
Tacurong Substation but cannot be utilized since 69kV
Bay High Voltage Equipment were not included in the
contract. T4 was supposed to be a replacement for T2 but
T2 is still currently fit for operation
 Defective mechanical linkage of 5Z-DS03(7Z-XF03TAC)
TACURONG SUBSTATION
Short-Term Action Plan
 Temporarily Utilize the 69kV HVEs of 50MVA T1
 T1 shall be temporarily decommissioned
 A proposal for reconfiguration has already been prepared by Mr.
Benjamin B. Miranda.
 Follow-up P & E for the repair of 5Z-DS03(7Z-XF03TAC)
TACURONG SUBSTATION
Long-Term Action Plan
 Procure 69kV HVEs for T4 c/o OMMD-MOM.
KIDAPAWAN SUBSTATION
Constraints
 The Transformer Load at Kidapawan Substation is
already at 85.1%
 Lack of N-1 contingency for Transformer T2 since T1 was
decommissioned due to a defective bushing based on
MTD-B’s test results.
 Two 69kV Bushings of T2 needs to be replaced.
KIDAPAWAN SUBSTATION
Business Continuity Plan
 If the remaining T2 of Kidapawan Substation will be
isolated, the load of Kidapawan Substation can be
temporarily shifted to Tacurong Substation.
 However, during this situation, Kidapawan Substation
Customers will experience low system voltage.
TACURONG
SUBSTATION
50 MVA T1
50 MVA T2
SURALLAH
KALANDAGAN
DATU SAUDI AMPATUAN
KIDAPAWAN
SUBSTATION
BAGONTAPAY
Line Limit = 40 MW
M2GPP
SUKELCO M3
G
Shifting of Load from KID to TAC SS
34MW
100 MVA T3
M1GPP
G
MAT L2
MAT L1
50 MVA T1
50 MVA T2
SUKELCO M4
COTELCO M5
34MW
47MW
COTELCO M2
COTELCO M5
COTELCO M4
COTELCO M8
COTELCO M1
SURALLAH (SPARE)
KIDAPAWAN SUBSTATION
Business Continuity Plan
 To maintain reliability of Tacurong-Bagontapay 69kV Line,
40MW load must be maintained. Therefore, with an
existing load of Tacurong Substation which is 9MW,
Kidapawan Substation can only transfer 31MW out of
their 43.4MW load.
 COTELCO (Main) has to implement load curtailment to
prevent overloading of the line and to improve system
voltage.
KIDAPAWAN SUBSTATION
Short-Term Action Plan
 Replace the defective bushings of 50MVA T2
 1 replacement bushing is already available at Baloi S/S
 Scout for 1 more bushing
KIDAPAWAN SUBSTATION
Long-Term Action Plan
 Installation of 50MVA Transformer from Culaman S/S to
restore N-1 Contingency (c/o P & E)
 Expedite the construction of Kabacan Substation (c/o P &
E) to reduce some of the load of Kidapawan Substation
(already currently at 86.8% of capacity)
SULTAN KUDARAT SUBSTATION
Constraints
 Lack of N-1 contingency for 75 MVA T1 since 30MVA T1
and T2 were decommissioned due to defective bushings
 Lack of N-1 contingency for 138kV Transmission Line
SULTAN KUDARAT SUBSTATION
Business Continuity Plan
 If the remaining T1 of Sultan Kudarat Substation will be
isolated or if Kibawe-Sultan Kudarat 138kV Line is not
available, the load of Sultan Kudarat Substation can be
temporarily shifted to Tacurong Substation
 However, during this situation, Sultan Kudarat Substation
Customers will experience low system voltage
TACURONG
SUBSTATION
50 MVA T1
50 MVA T2
SURALLAH
KALANDAGAN
DATU SAUDI
AMPATUAN
Line Limit = 40 MW
SULTAN KUDARAT
SUBSTATION
BAGONTAPAY
SUKELCO M6
Shifting of Load from SKU to TAC SS
29MW
100 MVA T3
KIBAWE
30 MVA T2
75 MVA T3
SUKELCO M2
29MW
47MW
MAGELCO M5
LPC
G
SIMUAY MIDSAYAP
SURALLAH (SPARE)
30 MVA T1
MAGELCO M2
MAGELCO M4
CLPC
Salimbao
CLPC
Sinsuat
CLPC
Malagapas
G
SULTAN KUDARAT SUBSTATION
Business Continuity Plan
 To maintain reliability of Tacurong-Datu Saudi Ampatuan
69kV Line, 40MW load must be maintained. Therefore,
with an existing load of Tacurong Substation which is
18.4MW, Sultan Kudarat Substation can only transfer
21.6MW out of their 57.3MW load.
 Lamsan Power Corporation can supply 15MW while
CLPC’s Diesel Plant can generate 12MW.
SULTAN KUDARAT SUBSTATION
Business Continuity Plan
 MAGELCO and COTELCO-PPALMA will need to
proportionally curtail 8.7MW of load.
SULTAN KUDARAT SUBSTATION
Short-Term Action Plans
 Re-evaluate the possibility of energizing T1
 Scout for replacement of defective bushings of T2
 Split the 69kV Bus of Sultan Kudarat Substation
 Expedite the commissioning of Capacitor Bank Nos. 3
and 4 to address low system voltage
SULTAN KUDARAT SUBSTATION
Long-Term Action Plans
 Installation of 75MVA Transformer from Sta. Barbara
Substation
 Expedite the Construction of Tacurong-Sultan Kudarat
138kV Line to address lack of N-1 contingency
Business Continuity Plans.pptx

More Related Content

Similar to Business Continuity Plans.pptx

internship report final.DOC
internship report final.DOCinternship report final.DOC
internship report final.DOCqazi faisal
 
Project details
Project detailsProject details
Project detailsSunil Das
 
Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...Niels Inderbiethen
 
Abnormality Report_Final.pdf
Abnormality Report_Final.pdfAbnormality Report_Final.pdf
Abnormality Report_Final.pdfankit shukla
 
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
Presentation Fatehpur Substation  TL Final 22.09.2021.pptxPresentation Fatehpur Substation  TL Final 22.09.2021.pptx
Presentation Fatehpur Substation TL Final 22.09.2021.pptxabhishek357916
 
MWAPE KAMPILIMBA FINAL REPORT
MWAPE KAMPILIMBA FINAL REPORTMWAPE KAMPILIMBA FINAL REPORT
MWAPE KAMPILIMBA FINAL REPORTKampilimba Mwape
 
Lot 04 - AL SAAD Brackish water and reverse osmosis plant
Lot 04 - AL SAAD Brackish water and reverse osmosis plantLot 04 - AL SAAD Brackish water and reverse osmosis plant
Lot 04 - AL SAAD Brackish water and reverse osmosis plantMohammed Abdelkawy
 
ABB Price List -2019..pdf
ABB Price List -2019..pdfABB Price List -2019..pdf
ABB Price List -2019..pdfssuser3f62a8
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapHimmelstern
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapHimmelstern
 
Ajay binay institute of technology,/ondvc
Ajay binay institute                                  of technology,/ondvcAjay binay institute                                  of technology,/ondvc
Ajay binay institute of technology,/ondvcMukesh Kumar
 
Modeling and Analysis of a 3-Phase 132kv GasInsulated Substation
Modeling and Analysis of a 3-Phase 132kv GasInsulated SubstationModeling and Analysis of a 3-Phase 132kv GasInsulated Substation
Modeling and Analysis of a 3-Phase 132kv GasInsulated SubstationIRJET Journal
 
Condition based monitoring
Condition based monitoringCondition based monitoring
Condition based monitoringNiraj Agrawal
 
Engineering Practice Report
Engineering Practice ReportEngineering Practice Report
Engineering Practice ReportPaul Soko
 
HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014Kanai Banerjee
 

Similar to Business Continuity Plans.pptx (20)

internship report final.DOC
internship report final.DOCinternship report final.DOC
internship report final.DOC
 
Project details
Project detailsProject details
Project details
 
Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...
 
KYN28 12kV Medium voltage metal clad switchgear
KYN28 12kV Medium voltage metal clad switchgearKYN28 12kV Medium voltage metal clad switchgear
KYN28 12kV Medium voltage metal clad switchgear
 
Abnormality Report_Final.pdf
Abnormality Report_Final.pdfAbnormality Report_Final.pdf
Abnormality Report_Final.pdf
 
Poster
PosterPoster
Poster
 
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
Presentation Fatehpur Substation  TL Final 22.09.2021.pptxPresentation Fatehpur Substation  TL Final 22.09.2021.pptx
Presentation Fatehpur Substation TL Final 22.09.2021.pptx
 
MWAPE KAMPILIMBA FINAL REPORT
MWAPE KAMPILIMBA FINAL REPORTMWAPE KAMPILIMBA FINAL REPORT
MWAPE KAMPILIMBA FINAL REPORT
 
Lot 04 - AL SAAD Brackish water and reverse osmosis plant
Lot 04 - AL SAAD Brackish water and reverse osmosis plantLot 04 - AL SAAD Brackish water and reverse osmosis plant
Lot 04 - AL SAAD Brackish water and reverse osmosis plant
 
Daman resume
Daman resumeDaman resume
Daman resume
 
ABB Price List -2019..pdf
ABB Price List -2019..pdfABB Price List -2019..pdf
ABB Price List -2019..pdf
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etap
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etap
 
Ajay binay institute of technology,/ondvc
Ajay binay institute                                  of technology,/ondvcAjay binay institute                                  of technology,/ondvc
Ajay binay institute of technology,/ondvc
 
Modeling and Analysis of a 3-Phase 132kv GasInsulated Substation
Modeling and Analysis of a 3-Phase 132kv GasInsulated SubstationModeling and Analysis of a 3-Phase 132kv GasInsulated Substation
Modeling and Analysis of a 3-Phase 132kv GasInsulated Substation
 
GIS 400kv substation
GIS  400kv substationGIS  400kv substation
GIS 400kv substation
 
RamCV1
RamCV1RamCV1
RamCV1
 
Condition based monitoring
Condition based monitoringCondition based monitoring
Condition based monitoring
 
Engineering Practice Report
Engineering Practice ReportEngineering Practice Report
Engineering Practice Report
 
HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014
 

Recently uploaded

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

Business Continuity Plans.pptx

  • 1.
  • 4. GENERAL SANTOS SUBSTATION Constraints  General Substation lacks Transformer N-1 contingency if SOCOTECO II’s embedded Sarangani Energy Corporation (SEC) is not in operation. The peak load of the substation is already 160MW but the capacity is only 2 x 100MVA  If one of the transformers trips during this situation, the other one will be overloaded
  • 5. GEN. SANTOS SUBSTATION (NGCP) 100 MVA T5 100 MVA T4 GLAN (Sari and Glan SS) LLEDO (Veranza and Main SS) POBLACION TUPI (Polomolok, Tupi and DOLE SS) KAMANGA SUBSTATION (SOCOTECO II) TINOTO L1 TINOTO L2 Llido SS Lanoy SS DOLE COBOX SS Fishport SS SEC Cargill SS Damalerio SS Airport SS Maasim and Kiamba SS G Scenario: SEC is Out, SIPS Not Activated 80MW 80MW G New Society SS Peak Power ADGI G
  • 6. GENERAL SANTOS SUBSTATION Business Continuity Plan  If only one transformer is available at Gen. Santos Substation, SOCOTECO II will be requested to limit their total load to only 85MW.  SOCOTECO II may also maximize their nomination with Peakpower and ADGI so they can load an additional 50MW.  In this situation, 20MW of SOCOTECO II’s load will not be supplied with power.
  • 7. GENERAL SANTOS SUBSTATION Long-Term Action Plan  A 100MVA will be installed in place of the previously decommissioned T1. Estimated completion May 2019  A 100MVA Mobile Transformer is also scheduled to be installed at Gen. Santos Substation. Estimated arrival January 2019
  • 8. GENERAL SANTOS SUBSTATION Constraints  Reduce reliable capacity of 100MVA Power Transformer 5. It is registering high primary and secondary winding temperature at 80% loading only.  Highest recorded is 119˚C, another 3˚C more will reach the trip setting of the thermal protection.  If T5 is truly overheating, loss of life of transformer is also accelerating. Eventually will result to failure of paper insulation and tripping of transformer.
  • 9. GENERAL SANTOS SUBSTATION Mitigations  (Completed) MTD-B temporarily removed the trip signal of the winding thermal protection with coordination from manufacturer since the thermal sensor was suspected to be defective.  (Proposed) reconfiguration of 69KV Bus to operate T4 & T5 independently taking loads 95% and 65% of capacity respectively (see next slide).  Conduct PMS of T5 on Sept. 22 for diagnostic testing and correct any defect.
  • 10. GENERAL SANTOS SUBSTATION Business Continuity Plan  If Transformer no. 5 fail, SOCOTECO II will be requested to limit their total load to only 85MW. 85MW will curtailed however.  SOCOTECO II may maximize their nomination with Peakpower and ADGI so they can load an additional 50MW thus reducing curtailment to 20MW.
  • 11. GENERAL SANTOS SUBSTATION Long-Term Action Plan  A 100MVA will be installed in place of the previously decommissioned T1. Request P&E to fast-tract the project to be competed much earlier than May 2019  A 100MVA Mobile Transformer is also scheduled to be installed at Gen. Santos Substation. Estimated arrival January 2019
  • 12. GENERAL SANTOS SUBSTATION Proposed reconfiguration of 69KV Bus
  • 13. GENERAL SANTOS SUBSTATION Possible Scenarios in Critical Loads  Failure of aging Oil CB Z-CB04(5LI1GSA-TIN)GSA Business Continuity Plan: Transfer power supply of 5LI1GSA-TIN to Z-CB04(5LI1GSA-SX1)GSA  Failure of aging Oil CB Z-CB04(5LI1GSA-LLE)GSA Business Continuity Plan: Transfer power supply of 5LI1GSA-TIN to Z-CB04(5LI1GSA-SX3)GSA which is already on use
  • 14. GENERAL SANTOS SUBSTATION Possible Scenarios in Critical Loads  Failure of aging Oil CB Z-CB04(5LI2GSA-TIN)GSA which already happened Business Continuity Plan: Immediately replaced by transferring the spare GCB 5Z-CB04(7XF02GSA)
  • 15. GENERAL SANTOS SUBSTATION Possible Scenario in Matanao-Gensan 138KV Line 1  Failure of 7Z-02CB08GSA which currently 7Z- 02CB24GSA and 7Z-02CB04GSA are open due to defect in contact resistance of the later PCB. Business Continuity Plan: Bypass 7Z-02CB04GSA by connecting former transformer 2 overhead bus directly to 7BS01GSA.
  • 16. TACURONG SUBSTATION Constraints  A 100MVA Power Transformer T4 will be installed at Tacurong Substation but cannot be utilized since 69kV Bay High Voltage Equipment were not included in the contract. T4 was supposed to be a replacement for T2 but T2 is still currently fit for operation  Defective mechanical linkage of 5Z-DS03(7Z-XF03TAC)
  • 17. TACURONG SUBSTATION Short-Term Action Plan  Temporarily Utilize the 69kV HVEs of 50MVA T1  T1 shall be temporarily decommissioned  A proposal for reconfiguration has already been prepared by Mr. Benjamin B. Miranda.  Follow-up P & E for the repair of 5Z-DS03(7Z-XF03TAC)
  • 18. TACURONG SUBSTATION Long-Term Action Plan  Procure 69kV HVEs for T4 c/o OMMD-MOM.
  • 19. KIDAPAWAN SUBSTATION Constraints  The Transformer Load at Kidapawan Substation is already at 85.1%  Lack of N-1 contingency for Transformer T2 since T1 was decommissioned due to a defective bushing based on MTD-B’s test results.  Two 69kV Bushings of T2 needs to be replaced.
  • 20. KIDAPAWAN SUBSTATION Business Continuity Plan  If the remaining T2 of Kidapawan Substation will be isolated, the load of Kidapawan Substation can be temporarily shifted to Tacurong Substation.  However, during this situation, Kidapawan Substation Customers will experience low system voltage.
  • 21. TACURONG SUBSTATION 50 MVA T1 50 MVA T2 SURALLAH KALANDAGAN DATU SAUDI AMPATUAN KIDAPAWAN SUBSTATION BAGONTAPAY Line Limit = 40 MW M2GPP SUKELCO M3 G Shifting of Load from KID to TAC SS 34MW 100 MVA T3 M1GPP G MAT L2 MAT L1 50 MVA T1 50 MVA T2 SUKELCO M4 COTELCO M5 34MW 47MW COTELCO M2 COTELCO M5 COTELCO M4 COTELCO M8 COTELCO M1 SURALLAH (SPARE)
  • 22. KIDAPAWAN SUBSTATION Business Continuity Plan  To maintain reliability of Tacurong-Bagontapay 69kV Line, 40MW load must be maintained. Therefore, with an existing load of Tacurong Substation which is 9MW, Kidapawan Substation can only transfer 31MW out of their 43.4MW load.  COTELCO (Main) has to implement load curtailment to prevent overloading of the line and to improve system voltage.
  • 23. KIDAPAWAN SUBSTATION Short-Term Action Plan  Replace the defective bushings of 50MVA T2  1 replacement bushing is already available at Baloi S/S  Scout for 1 more bushing
  • 24. KIDAPAWAN SUBSTATION Long-Term Action Plan  Installation of 50MVA Transformer from Culaman S/S to restore N-1 Contingency (c/o P & E)  Expedite the construction of Kabacan Substation (c/o P & E) to reduce some of the load of Kidapawan Substation (already currently at 86.8% of capacity)
  • 25. SULTAN KUDARAT SUBSTATION Constraints  Lack of N-1 contingency for 75 MVA T1 since 30MVA T1 and T2 were decommissioned due to defective bushings  Lack of N-1 contingency for 138kV Transmission Line
  • 26. SULTAN KUDARAT SUBSTATION Business Continuity Plan  If the remaining T1 of Sultan Kudarat Substation will be isolated or if Kibawe-Sultan Kudarat 138kV Line is not available, the load of Sultan Kudarat Substation can be temporarily shifted to Tacurong Substation  However, during this situation, Sultan Kudarat Substation Customers will experience low system voltage
  • 27. TACURONG SUBSTATION 50 MVA T1 50 MVA T2 SURALLAH KALANDAGAN DATU SAUDI AMPATUAN Line Limit = 40 MW SULTAN KUDARAT SUBSTATION BAGONTAPAY SUKELCO M6 Shifting of Load from SKU to TAC SS 29MW 100 MVA T3 KIBAWE 30 MVA T2 75 MVA T3 SUKELCO M2 29MW 47MW MAGELCO M5 LPC G SIMUAY MIDSAYAP SURALLAH (SPARE) 30 MVA T1 MAGELCO M2 MAGELCO M4 CLPC Salimbao CLPC Sinsuat CLPC Malagapas G
  • 28. SULTAN KUDARAT SUBSTATION Business Continuity Plan  To maintain reliability of Tacurong-Datu Saudi Ampatuan 69kV Line, 40MW load must be maintained. Therefore, with an existing load of Tacurong Substation which is 18.4MW, Sultan Kudarat Substation can only transfer 21.6MW out of their 57.3MW load.  Lamsan Power Corporation can supply 15MW while CLPC’s Diesel Plant can generate 12MW.
  • 29. SULTAN KUDARAT SUBSTATION Business Continuity Plan  MAGELCO and COTELCO-PPALMA will need to proportionally curtail 8.7MW of load.
  • 30. SULTAN KUDARAT SUBSTATION Short-Term Action Plans  Re-evaluate the possibility of energizing T1  Scout for replacement of defective bushings of T2  Split the 69kV Bus of Sultan Kudarat Substation  Expedite the commissioning of Capacitor Bank Nos. 3 and 4 to address low system voltage
  • 31. SULTAN KUDARAT SUBSTATION Long-Term Action Plans  Installation of 75MVA Transformer from Sta. Barbara Substation  Expedite the Construction of Tacurong-Sultan Kudarat 138kV Line to address lack of N-1 contingency

Editor's Notes

  1. You have the option to use all caps or caps/lower case.
  2. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  3. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  4. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  5. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  6. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  7. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  8. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  9. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  10. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  11. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  12. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  13. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  14. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  15. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  16. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  17. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  18. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  19. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  20. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  21. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  22. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  23. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  24. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  25. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  26. You have the option to create headlines with two colors. Eg. Green combines with dark grey.
  27. You have the option to create headlines with two colors. Eg. Green combines with dark grey.