10. possibly the world’s most experienced NX Industrial-Design team
18 highly trained 3D industrial-designers – in NX since 1996
many many hundred ID / engineering handovers
many circumstances:
internal
with local clients
with global clients
with client side engineers
with 3rd party engineers / manufacturers
11. ID / Mech-E : old 3D tools / old way = lots of known problems
strategy ‘classic ID’ engineering
product architecture ID options ID development shape re-creation internals
lack of customer input meaningless innovation Surface / Solids duplication of effort
gate 1 gate 2 gate 3 Gate 4 Sign off
factory led over-caution accidental risk taking time consuming loss of customer influence
unnecessary constraints interdisciplinary conflict unreliable, 1 way, damaging compromises
key: = ID team = Mech E team
13. ID / Mech-E: new tools / old way = much better (but still not optimal)
strategy ‘classic ID’ engineering
product architecture ID options ID development shape re-creation internals
saving
gate 1 gate 2 gate Solids / Solids Inherited history hard to Sign off
3 Gate 4 re-use
faster Faster assembly rebuild…
more reliable still a risk of interpretation errors
still 1- time 1-way
key: = ID team = Mech E team
16. Surface quality loss
In house rapid prototyping
3D printing
Green = alloy data
Red = mech e data
Even in NX..
17. NX + the alloy process: new tools / new way
ID solid Shells built around smart internal assumptions
shells are tapered, agreed wall thickness etc..
ID retains control over visible exterior changes
mech-e re-uses ID data in the assembly
mech-e add internals / flanges etc..
mech-e free to make small adjustments
18. new tools + new way = lean innovation breakthrough
strategy ‘classic ID’ engineering
product architecture ID options ID development internals
quality gain
saving BIG SAVING
gate 1 gate 2 gate 3 Gate 4 Sign off
key: = ID team = Mech E team
19. new tools + new way: proven across a broad range of applications
21. origins: BT Plc Design Led innovation / challenging supply chain
ID sign-off: visual = ad shot, data = tooling pattern
repeated hundreds of times in NX over 12 years
42. enterprise benefits of ID in NX:
BIG time & money savings from fast & flexible concurrent working
43. ID / Mech-E: new tools + new way = true concurrent working
strategy ‘classic ID’ engineering
product architecture ID options ID externals + ME internals
Time saving from concurrent work Time saving from re-use
gate 1 gate 2 gate 3 Gate 4 Sign off
key: = ID team = Mech E team
47. ID / Mech-E: new tools + new way = faster cheaper via IP re-use
strategy ‘classic ID’ engineering
product architecture ID options ID development internals
saving saving
saving saving
gate 1 gate 2 gate 3 Gate 4 Sign off
key: = ID team = Mech E team
61. barriers:
entrenched attitudes in both Industrial-Design and Mechanical-Engineering
the fix: ID training - pilot projects - & the growing weight of case studies!
62. alloy: designers trained to be different
to be leaders, empowered by NX
customer led:
in depth user research
role play
trends
commercially smart
business objectives
brand strategy
supply chain capability
technology aware
impact awareness
competitor benchmarking
technology trends
64. more customer focus / lower risk innovation / faster TTM / less cost
lean innovation
to get the most from the best (NX), keep an open mind on ID process