SlideShare a Scribd company logo
1 of 20
PRODUCTION AND
OPERATIONS
MANAGEMENT
Chapter 12
AGGREGATE PLANNING AND
MASTER PRODUCTION
SCHEDULING
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
• Aggregate planning involves planning the best quality to
produce in the intermediate-range horizon (3 months to
one year)
• Aggregate production planning is the process of
determining output levels of product groups over the next
6 to 18 months period.
• Objectives of Aggregate Planning
i. The overall objective is to balance conflicting
objectives involving customer service, work force
stability, cost and profit.
ii. To establish company-wide strategic plan for
allocating resources.
iii.To develop an economic strategy to meet customer
demand.
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Inputs to and Outputs from Aggregate Production
Planning
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Importance of Aggregate Plans
 The various inputs to aggregate plans that affect
the performance of production and operations
managers are:
i. Engineering
ii. Materials
iii.Operations
iv. Marketing and distribution
v. Accounting and finance
vi. Human resources
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Aggregate Planning or Aggregate
Capacity Planning
 Need for Aggregate Capacity Planning
1. It facilitates fully loaded facilities and minimizes
overloading and underloading and keeps production
costs low.
2. Adequate production capacity is provided to meet
expected aggregate demand.
3. Orderly and systematic transition of production
capacity to meet the peaks and valleys of expected
customer demand is facilitated.
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
 Steps in Aggregate Capacity Planning
i. Determine the demand (i.e., sales forecast) for each product for
each time period (i.e., weeks or months or quarters) over the
planning horizon (6 to 12 months).
ii. Determine the aggregate demand by summing up the demand for
individual products.
iii. Transform the aggregate demand for each time period into workers,
materials, machines required to satisfy aggregate demand.
iv. Identify company policies that are pertinent (e.g., policy regarding
safety stock maintenance, maintaining stable workforce etc.).
v. Determine unit costs for regular time, overtime, subcontracting,
holding inventories, back orders, layoffs etc.
vi. Develop alternative resource plans for providing necessary
production capacity to support the cumulative aggregate demand
and compute the cost of each alternative plan.
vii.Select the resource plan from among the alternatives considered that
satisfies aggregate demand and best meets the objectives of the
firm.
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Approaches to Aggregate Planning
1. Top down approach
2. A bottom-up approach or subplan consolidation
approach
 Rough-cut Capacity Planning
This is done in conjunction with the tentative
master production schedule to test its feasibility
in terms of capacity before the master
production schedule (MPS) is finalised.
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
STRATEGIES OF APS
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Flow Chart for Rough-cut Capacity Planning
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Capacity Planning and
Capacity Requirement Planning
(CRP)
 Production capacity is defined as the maximum production
rate of a facility or a plant.
• Types of Capacity
1. Fixed capacity
2. Adjustable capacity
3. Design capacity
4. System capacity
5. Potential capacity
6. Immediate capacity
7. Effective capacity
8. Normal capacity or rated capacity
9. Actual or utilised capacity
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Actual Output
• System efficiency is the ratio of the actual measured
output of goods/services to the system capacity
• System efficiency=
System capacity
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
• Capacity Decisions
• Major considerations in capacity decisions are
a. What size of plant? How much capacity to install?
b. When capacity is needed? When to phase-in capacity
or phase-out capacity?
c. At what cost? How to budget for the cost?
• Factors Affecting Determination of Plant Capacity
1. Market demand for a product/service.
2. The amount of capital that can be invested.
3. Degree of automation desired.
4. Level of integration (i.e., vertical integration).
5. Type of technology selected.
6. Flexibility for capacity additions.
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Capacity Planning
 Capacity planning involves activities such as:
a. Assessing existing capacity
b. Forecasting future capacity needs
c. Identifying alternative ways to modify capacity
d. Evaluating financial, economical and technological
capacity alternatives
e. Selecting a capacity alternative most suited to achieve
the strategic mission of the firm. Capacity planning
involves capacity decisions that must merge consumer
demands with human, material and financial resources
of the organization.
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
4 Types of Capacity Planning are:
• Long term Capacity Planning
• Short-term Capacity Planing
• Finite Capacity Planning
• Infinite Capacity Planning.
• Two catagories of factors affecting capacity planning
are:
• Controllable Factors
• Less Controllable Factors.
• Capacity Requirement Planning (CRP): A technique to
determine the labour and equipment capacities needed to
meet the objectives.
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Capacity Requirement Planning (CRP)
Process
Capacity Requirement Planning Process (Flow Chart)
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Master Production Scheduling
• Objectives of Master Production Scheduling
1. To schedule end items to be completed promptly
and when promised to customers.
2. To avoid overloading or underloading the
production facility so that production capacity is
efficiently utilized and low production costs result.
Functions of MPS:
• Translating aggregate plans
• Evaluating alternative master schedules
• Generating material and capacity requirements
• Facilitating information processing
• Maintaining priorities
• Utilizing the capacity effectively.
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Master Production Schedule - Flow Chart
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
Guidelines for Master Scheduling
1. Work from an aggregate production plan
2. Schedule common modules when possible
3. Load facilities realistically
4. Release orders on a timely basis
5. Monitor inventory levels closely
6. Reschedule as required
Himalaya Publishing House
Production and Operations Management
By K. Aswathappa & K. Shridhara Bhat
Chapter 12
Aggregate Planning and
Master Production Scheduling
MPS in Produce-to-stock and
Produce-to-order Firms
 The elements of the MPS that are affected by
the type of production system are:
a. Demand management
b. Lot-sizing
c. Number of products to be scheduled (product-mix).

More Related Content

Similar to Aggregrate_production_plan_operations.ppt

Similar to Aggregrate_production_plan_operations.ppt (20)

Master planning
Master planningMaster planning
Master planning
 
AGGREGATE PLANNING.pptx
AGGREGATE PLANNING.pptxAGGREGATE PLANNING.pptx
AGGREGATE PLANNING.pptx
 
Plan operations. final
Plan operations. finalPlan operations. final
Plan operations. final
 
Models of aggregate planning
Models of aggregate planningModels of aggregate planning
Models of aggregate planning
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
CU Operations Management module 5
CU Operations Management module 5CU Operations Management module 5
CU Operations Management module 5
 
Role of production planning and control in operation management
Role of production planning and control in operation managementRole of production planning and control in operation management
Role of production planning and control in operation management
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017Uop ops 571 final exam guide new 2017
Uop ops 571 final exam guide new 2017
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
How to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideHow to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step Guide
 
Uop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newUop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--new
 

Recently uploaded

Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
daisycvs
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
CaitlinCummins3
 

Recently uploaded (20)

Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORI
 
10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts10 Easiest Ways To Buy Verified TransferWise Accounts
10 Easiest Ways To Buy Verified TransferWise Accounts
 
Beyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic AccountingBeyond Numbers A Holistic Approach to Forensic Accounting
Beyond Numbers A Holistic Approach to Forensic Accounting
 
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deckPitch Deck Teardown: Goodcarbon's $5.5m Seed deck
Pitch Deck Teardown: Goodcarbon's $5.5m Seed deck
 
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors DataSpace Tech Expo Exhibitor List 2024 - Exhibitors Data
Space Tech Expo Exhibitor List 2024 - Exhibitors Data
 
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
Abortion pills in Muscut<Oman(+27737758557) Cytotec available.inn Kuwait City.
 
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdfProgress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
Progress Report - UKG Analyst Summit 2024 - A lot to do - Good Progress1-1.pdf
 
How to refresh to be fit for the future world
How to refresh to be fit for the future worldHow to refresh to be fit for the future world
How to refresh to be fit for the future world
 
WAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdfWAM Corporate Presentation May 2024_w.pdf
WAM Corporate Presentation May 2024_w.pdf
 
Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024Home Furnishings Ecommerce Platform Short Pitch 2024
Home Furnishings Ecommerce Platform Short Pitch 2024
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
 
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
Understanding Financial Accounting 3rd Canadian Edition by Christopher D. Bur...
 
What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...What are the differences between an international company, a global company, ...
What are the differences between an international company, a global company, ...
 
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
How Bookkeeping helps you in Cost Saving, Tax Saving and Smooth Business Runn...
 
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjwSCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
SCI9-Q4-MOD8.1.pdfjttstwjwetw55k5wwtwrjw
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
Powerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metricsPowerpoint showing results from tik tok metrics
Powerpoint showing results from tik tok metrics
 
Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497Sex service available my WhatsApp number 7374088497
Sex service available my WhatsApp number 7374088497
 

Aggregrate_production_plan_operations.ppt

  • 1. PRODUCTION AND OPERATIONS MANAGEMENT Chapter 12 AGGREGATE PLANNING AND MASTER PRODUCTION SCHEDULING
  • 2. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling • Aggregate planning involves planning the best quality to produce in the intermediate-range horizon (3 months to one year) • Aggregate production planning is the process of determining output levels of product groups over the next 6 to 18 months period. • Objectives of Aggregate Planning i. The overall objective is to balance conflicting objectives involving customer service, work force stability, cost and profit. ii. To establish company-wide strategic plan for allocating resources. iii.To develop an economic strategy to meet customer demand.
  • 3. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling Inputs to and Outputs from Aggregate Production Planning
  • 4. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling Importance of Aggregate Plans  The various inputs to aggregate plans that affect the performance of production and operations managers are: i. Engineering ii. Materials iii.Operations iv. Marketing and distribution v. Accounting and finance vi. Human resources
  • 5. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling Aggregate Planning or Aggregate Capacity Planning  Need for Aggregate Capacity Planning 1. It facilitates fully loaded facilities and minimizes overloading and underloading and keeps production costs low. 2. Adequate production capacity is provided to meet expected aggregate demand. 3. Orderly and systematic transition of production capacity to meet the peaks and valleys of expected customer demand is facilitated.
  • 6. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling  Steps in Aggregate Capacity Planning i. Determine the demand (i.e., sales forecast) for each product for each time period (i.e., weeks or months or quarters) over the planning horizon (6 to 12 months). ii. Determine the aggregate demand by summing up the demand for individual products. iii. Transform the aggregate demand for each time period into workers, materials, machines required to satisfy aggregate demand. iv. Identify company policies that are pertinent (e.g., policy regarding safety stock maintenance, maintaining stable workforce etc.). v. Determine unit costs for regular time, overtime, subcontracting, holding inventories, back orders, layoffs etc. vi. Develop alternative resource plans for providing necessary production capacity to support the cumulative aggregate demand and compute the cost of each alternative plan. vii.Select the resource plan from among the alternatives considered that satisfies aggregate demand and best meets the objectives of the firm.
  • 7. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling
  • 8. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling Approaches to Aggregate Planning 1. Top down approach 2. A bottom-up approach or subplan consolidation approach  Rough-cut Capacity Planning This is done in conjunction with the tentative master production schedule to test its feasibility in terms of capacity before the master production schedule (MPS) is finalised.
  • 9. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling STRATEGIES OF APS
  • 10. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling Flow Chart for Rough-cut Capacity Planning
  • 11. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling Capacity Planning and Capacity Requirement Planning (CRP)  Production capacity is defined as the maximum production rate of a facility or a plant. • Types of Capacity 1. Fixed capacity 2. Adjustable capacity 3. Design capacity 4. System capacity 5. Potential capacity 6. Immediate capacity 7. Effective capacity 8. Normal capacity or rated capacity 9. Actual or utilised capacity
  • 12. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling Actual Output • System efficiency is the ratio of the actual measured output of goods/services to the system capacity • System efficiency= System capacity
  • 13. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling • Capacity Decisions • Major considerations in capacity decisions are a. What size of plant? How much capacity to install? b. When capacity is needed? When to phase-in capacity or phase-out capacity? c. At what cost? How to budget for the cost? • Factors Affecting Determination of Plant Capacity 1. Market demand for a product/service. 2. The amount of capital that can be invested. 3. Degree of automation desired. 4. Level of integration (i.e., vertical integration). 5. Type of technology selected. 6. Flexibility for capacity additions.
  • 14. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling Capacity Planning  Capacity planning involves activities such as: a. Assessing existing capacity b. Forecasting future capacity needs c. Identifying alternative ways to modify capacity d. Evaluating financial, economical and technological capacity alternatives e. Selecting a capacity alternative most suited to achieve the strategic mission of the firm. Capacity planning involves capacity decisions that must merge consumer demands with human, material and financial resources of the organization.
  • 15. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling 4 Types of Capacity Planning are: • Long term Capacity Planning • Short-term Capacity Planing • Finite Capacity Planning • Infinite Capacity Planning. • Two catagories of factors affecting capacity planning are: • Controllable Factors • Less Controllable Factors. • Capacity Requirement Planning (CRP): A technique to determine the labour and equipment capacities needed to meet the objectives.
  • 16. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling Capacity Requirement Planning (CRP) Process Capacity Requirement Planning Process (Flow Chart)
  • 17. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling Master Production Scheduling • Objectives of Master Production Scheduling 1. To schedule end items to be completed promptly and when promised to customers. 2. To avoid overloading or underloading the production facility so that production capacity is efficiently utilized and low production costs result. Functions of MPS: • Translating aggregate plans • Evaluating alternative master schedules • Generating material and capacity requirements • Facilitating information processing • Maintaining priorities • Utilizing the capacity effectively.
  • 18. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling Master Production Schedule - Flow Chart
  • 19. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling Guidelines for Master Scheduling 1. Work from an aggregate production plan 2. Schedule common modules when possible 3. Load facilities realistically 4. Release orders on a timely basis 5. Monitor inventory levels closely 6. Reschedule as required
  • 20. Himalaya Publishing House Production and Operations Management By K. Aswathappa & K. Shridhara Bhat Chapter 12 Aggregate Planning and Master Production Scheduling MPS in Produce-to-stock and Produce-to-order Firms  The elements of the MPS that are affected by the type of production system are: a. Demand management b. Lot-sizing c. Number of products to be scheduled (product-mix).