Kirksey       Office Buildings & Parking Structures
                   Market conditions in the construction economy are constantly changing. As a service to
     ANNUAL        our clients, we periodically poll leading general contractors to give an update on current
                   conditions. Figures apply to core and shell only and do not include tenant improvements.
                   Using several generic building types, we have compiled our findings below.
cost update 2010   One-Story Flex Office Buildings — $60 to $65/sf ($60 to $70/sf in 2009)
                   One-story shell buildings designed to accommodate uses ranging from traditional offices to light
                   assembly, high-technology lab applications. Typical projects are cold, dark shell steel structures
                   with tilt-up concrete skins and punched openings. Cost includes $7 to $10/sf for sitework and
                   surface parking lot, depending on parking density and detention requirements.

                   Low-Rise Office Buildings — $75 to $83/sf ($77 to $90/sf in 2009)
                   Two- to three-story, larger footprint shell buildings designed with speculative building features.
                   Typical projects are composite steel structures, bar joist roof structures with tilt-up concrete skins
                   and punched openings. Cost includes $7 to $9/sf for sitework and surface parking lot, depending
                   on parking density and detention requirements.

                   Mid-Rise Office Buildings — $85 to $95/sf ($90 to $100/sf in 2009)
                   Four- to six-story, 25,000-sf footprint shell buildings designed with speculative building features.
                   Typical projects are composite steel structures with pre-cast concrete and glass skins. Cost
                   includes $4 to $5/sf for sitework and minimal (visitor) surface parking. Typical projects have
                   majority of parking housed in adjacent parking garage. See garage costs on next page.

                   High-Rise Office Buildings — $90 to $122/sf ($100 to $125/sf in 2009)
                   7 stories — $90 to $100/sf ($100 to $105/sf in 2009)
                   14 stories — $100 to $110/sf ($105 to $115/sf in 2009)
                   20 stories — $105 to $115/sf ($110 to $120/sf in 2009)
                   25 stories — $115 to $122/sf ($120 to $125/sf in 2009)

                   Seven- to 25-story, 25,000-sf footprint shell buildings. Typical projects are cast-in-place concrete
                   structures with articulated pre-cast and curtainwall glass skins. Costs include less than $3/sf for
                   sitework and minimal (visitor) surface parking. Majority of parking is in adjacent garages. See
                   garage costs on next page.

                   Commercial Tenant Improvements — $35 to $42/sf ($35 to $45/sf in 2009)
                   Costs typical of a 25,000-sf full floor office tenant buildout. Reception lobby and executive areas
                   have upgraded finishes. The remainder of the space is about 50% enclosed offices and 50% open
                   plan areas with tenant standard finishes.
 construction




                   Medical Office Buildings — $95 to $125/sf ($100 to $130/sf in 2009)
                   Low-rise, 2 to 3 stories — $95 to $105/sf ($100 to $110/sf in 2009)
                   Mid-rise, 4 to 6 stories — $105 to $115/sf ($110 to $120/sf in 2009)
                   High-rise, 7 to 25 stories — $115 to $125/sf ($120 to $130/sf in 2009)

                   In general, Medical Office shell buildings have similar features to corporate office buildings
                   described above. Unique MOB features include larger parking requirements, larger floor-to-floor
                   heights, increased base MEP systems with redundancies, emergency power, covered walkways and
                   drop-offs, and increased elevator requirements.

                                                                                                                 cont’d >



                   Cost information reflects market conditions in and around the Houston area.           © Kirksey 2010
Kirksey       Office Buildings & Parking Structures, cont’d
     ANNUAL        Parking Structures — $20 to $33/sf ($23 to $36/sf in 2009)
                   Cast-in-place concrete — $28 to $33/sf, without basement ($31 to $36/sf in 2009)
                   Pre-cast concrete — $23 to $27/sf, without basement ($25 to $29/sf in 2009)
cost update 2010   Steel — $20 to $25/sf, without basement ($23 to $28/sf in 2009)

                   Most office projects continue to build pre-cast or cast-in-place garages. The lower cost range
                   examples would typically be for more efficient suburban sites. Small urban downtown and
                   medical center sites with limitations may have higher costs than our ranges show. Many low-rise
                   projects continue to provide inexpensive canopies to meet market demands for covered parking.



                   Recent Trends
                   Despite the hesitation nationwide to undertake new building projects, now may be the best
                   time to build. Interest rates are low and construction costs are down, so owners and developers
                   are able to get more for their dollar. In addition to decreased material costs, these lower costs are
                   due in part to subcontractors’ reductions in fees, so while it is a great time to take advantage of
                   lower costs, it is important to work closely with general contractors to qualify subcontractors and
                   avoid potential defaults.

                   While office building and parking garage costs continue their fall from the highs of early 2008,
                   new starts in buildings taller than three or four stories are few and far between. There is some
                   activity in the small build-to-suit office building markets with owners taking advantage of the low
                   construction costs, but commercial activity is slow to recover.

                   LEED® Certification and green buildings have become standard considerations for most office
                   building projects. Intelligent design practices, required energy codes, and construction team
                   experience have reduced green building premiums. Hard cost premiums, documentation fees,
                   and commissioning services range from 0.5% to 2% of construction costs for a Silver Certified
                   LEED office building, with the higher percentage range affecting smaller projects. Because of
                   increasing competition, existing buildings are rapidly adopting the LEED for Existing Buildings
                   program to “green” their operations and maintenance. For the Gold LEED EB rating, properties
                   are paying $0.06/sf to $0.26/sf, with the higher number affecting smaller properties.



                   Statistics Provided By:
                   Anslow + Bryant Construction            Gilbane, Inc.                         Pepper-Lawson Construction
 construction




                   Arch-Con Corporation                    Harvey Builders                       Rosenberger Construction
                   Austin Commercial                       Hoar Construction, LLC                Satterfield & Pontikes Construction
                   Brookstone Corporation                  JE Dunn Construction Company          Tellepsen Corporation
                   Burton Construction                     Metzger Construction Company          Tribble & Stephens
                   EE Reed Construction                    O’Donnell/Snider Construction         Turner Construction Company



                   For more information, please contact Scott Wilkinson, AIA, Commercial Team Leader,
                   713 426 7434, scottw@kirksey.com.



                                                         6909 Portwest Drive Houston Texas 77024
                                                         713 850 9600 www.kirksey.com


                   Cost information reflects market conditions in and around the Houston area.                     © Kirksey 2010

More Related Content

Similar to Kirksey - Houston Office Building Construction Costs

Re roofing how much does a new roof cost
Re roofing how much does a new roof costRe roofing how much does a new roof cost
Re roofing how much does a new roof costdiversifiedroofing11
 
HIGH RISE BUILDINGS.pptx
HIGH RISE BUILDINGS.pptxHIGH RISE BUILDINGS.pptx
HIGH RISE BUILDINGS.pptxPrarthnaMetaphor
 
Pre Engineered Building (PEB) Concept | Peb 360 Solutions
Pre Engineered Building (PEB) Concept | Peb 360 SolutionsPre Engineered Building (PEB) Concept | Peb 360 Solutions
Pre Engineered Building (PEB) Concept | Peb 360 SolutionsPeb 360 Solutions
 
Imt slideshare3.2
Imt slideshare3.2Imt slideshare3.2
Imt slideshare3.2Peter Faggioni
 
Could Modular Construction Influence Housing Affordability?
Could Modular Construction Influence Housing Affordability?Could Modular Construction Influence Housing Affordability?
Could Modular Construction Influence Housing Affordability?Scott Robinson
 
Could modular construction influence housing affordability 7.27.16
Could modular construction influence housing affordability 7.27.16Could modular construction influence housing affordability 7.27.16
Could modular construction influence housing affordability 7.27.16Denham Apperley
 
Roger Wallace Resume Jan2012
Roger Wallace Resume Jan2012Roger Wallace Resume Jan2012
Roger Wallace Resume Jan2012rogerwallace
 
Concrete Polishing Training Seminar
Concrete Polishing Training SeminarConcrete Polishing Training Seminar
Concrete Polishing Training SeminarHeather Cavalier
 
Atluri Ascend | Commercial Real Estate | Investor presentation
Atluri Ascend | Commercial Real Estate | Investor presentationAtluri Ascend | Commercial Real Estate | Investor presentation
Atluri Ascend | Commercial Real Estate | Investor presentationPriyankaSharma1401
 
Bgi work product re cap rates jan.5.16
Bgi work product re cap rates   jan.5.16Bgi work product re cap rates   jan.5.16
Bgi work product re cap rates jan.5.16Ian Jones MRICS
 
Roger wallace resume 01 18-16
Roger wallace resume 01 18-16Roger wallace resume 01 18-16
Roger wallace resume 01 18-16rogerwallace
 
Industrial Epoxy Floors Detroit.pptx
Industrial Epoxy Floors Detroit.pptxIndustrial Epoxy Floors Detroit.pptx
Industrial Epoxy Floors Detroit.pptxelishaalysa
 
Giotan construction estimate sheets march 2013
Giotan construction estimate sheets march 2013Giotan construction estimate sheets march 2013
Giotan construction estimate sheets march 2013Chris Fyvie
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_studentsChhay Teng
 
Leed Certification & Leed Exam Overview by Everblue Training Institute
Leed Certification & Leed Exam Overview by Everblue Training InstituteLeed Certification & Leed Exam Overview by Everblue Training Institute
Leed Certification & Leed Exam Overview by Everblue Training InstituteJon Boggiano
 
Company brochure
Company brochureCompany brochure
Company brochurevikrantmunde2
 

Similar to Kirksey - Houston Office Building Construction Costs (20)

Re roofing how much does a new roof cost
Re roofing how much does a new roof costRe roofing how much does a new roof cost
Re roofing how much does a new roof cost
 
HIGH RISE BUILDINGS.pptx
HIGH RISE BUILDINGS.pptxHIGH RISE BUILDINGS.pptx
HIGH RISE BUILDINGS.pptx
 
IMT SlideShare
IMT SlideShareIMT SlideShare
IMT SlideShare
 
Pre Engineered Building (PEB) Concept | Peb 360 Solutions
Pre Engineered Building (PEB) Concept | Peb 360 SolutionsPre Engineered Building (PEB) Concept | Peb 360 Solutions
Pre Engineered Building (PEB) Concept | Peb 360 Solutions
 
Imt slideshare3.2
Imt slideshare3.2Imt slideshare3.2
Imt slideshare3.2
 
Could Modular Construction Influence Housing Affordability?
Could Modular Construction Influence Housing Affordability?Could Modular Construction Influence Housing Affordability?
Could Modular Construction Influence Housing Affordability?
 
Could modular construction influence housing affordability 7.27.16
Could modular construction influence housing affordability 7.27.16Could modular construction influence housing affordability 7.27.16
Could modular construction influence housing affordability 7.27.16
 
Roger Wallace Resume Jan2012
Roger Wallace Resume Jan2012Roger Wallace Resume Jan2012
Roger Wallace Resume Jan2012
 
Concrete Polishing Training Seminar
Concrete Polishing Training SeminarConcrete Polishing Training Seminar
Concrete Polishing Training Seminar
 
Atluri Ascend | Commercial Real Estate | Investor presentation
Atluri Ascend | Commercial Real Estate | Investor presentationAtluri Ascend | Commercial Real Estate | Investor presentation
Atluri Ascend | Commercial Real Estate | Investor presentation
 
Bgi work product re cap rates jan.5.16
Bgi work product re cap rates   jan.5.16Bgi work product re cap rates   jan.5.16
Bgi work product re cap rates jan.5.16
 
Roger wallace resume 01 18-16
Roger wallace resume 01 18-16Roger wallace resume 01 18-16
Roger wallace resume 01 18-16
 
Industrial Epoxy Floors Detroit.pptx
Industrial Epoxy Floors Detroit.pptxIndustrial Epoxy Floors Detroit.pptx
Industrial Epoxy Floors Detroit.pptx
 
What BIPV does to YOU R1
What BIPV does to YOU R1What BIPV does to YOU R1
What BIPV does to YOU R1
 
What BIPV does to YOU R1
What BIPV does to YOU R1What BIPV does to YOU R1
What BIPV does to YOU R1
 
Giotan construction estimate sheets march 2013
Giotan construction estimate sheets march 2013Giotan construction estimate sheets march 2013
Giotan construction estimate sheets march 2013
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_students
 
Leed Certification & Leed Exam Overview by Everblue Training Institute
Leed Certification & Leed Exam Overview by Everblue Training InstituteLeed Certification & Leed Exam Overview by Everblue Training Institute
Leed Certification & Leed Exam Overview by Everblue Training Institute
 
Company brochure
Company brochureCompany brochure
Company brochure
 
IMT SlideShare
IMT SlideShareIMT SlideShare
IMT SlideShare
 

More from Bob Lowery

PWC Emerging Trends in Real Estate 2012
PWC Emerging Trends in Real Estate 2012PWC Emerging Trends in Real Estate 2012
PWC Emerging Trends in Real Estate 2012Bob Lowery
 
HealthCare Appraisers - 2011 Report
HealthCare Appraisers - 2011 ReportHealthCare Appraisers - 2011 Report
HealthCare Appraisers - 2011 ReportBob Lowery
 
Houston Association of Realtors - Housing Update
Houston Association of Realtors - Housing UpdateHouston Association of Realtors - Housing Update
Houston Association of Realtors - Housing UpdateBob Lowery
 
Houston Economy at a Glance - Augst 2011
Houston Economy at a Glance - Augst 2011Houston Economy at a Glance - Augst 2011
Houston Economy at a Glance - Augst 2011Bob Lowery
 
The Outlook for Health Care - Gary Schilling
The Outlook for Health Care - Gary SchillingThe Outlook for Health Care - Gary Schilling
The Outlook for Health Care - Gary SchillingBob Lowery
 
PWC/ULI - 2011 Emerging Trends in Real Estate
PWC/ULI - 2011 Emerging Trends in Real Estate PWC/ULI - 2011 Emerging Trends in Real Estate
PWC/ULI - 2011 Emerging Trends in Real Estate Bob Lowery
 
Costar Advisory Report: Houston Office - 3Q 2010
Costar Advisory Report:  Houston Office - 3Q 2010Costar Advisory Report:  Houston Office - 3Q 2010
Costar Advisory Report: Houston Office - 3Q 2010Bob Lowery
 
GHP: The Economy at a Glance - October 2010
GHP: The Economy at a Glance - October 2010GHP: The Economy at a Glance - October 2010
GHP: The Economy at a Glance - October 2010Bob Lowery
 
GHP Houston: The Economy at a Glance
GHP Houston: The Economy at a GlanceGHP Houston: The Economy at a Glance
GHP Houston: The Economy at a GlanceBob Lowery
 
Oilwatch Monthly - August 2010
Oilwatch Monthly - August 2010Oilwatch Monthly - August 2010
Oilwatch Monthly - August 2010Bob Lowery
 
Coldwell Banker Commercial - Office
Coldwell Banker Commercial - OfficeColdwell Banker Commercial - Office
Coldwell Banker Commercial - OfficeBob Lowery
 
NFIB: Small Business
NFIB: Small BusinessNFIB: Small Business
NFIB: Small BusinessBob Lowery
 
GHP: The Economy At A Glance (August 2010)
GHP: The Economy At A Glance (August 2010)GHP: The Economy At A Glance (August 2010)
GHP: The Economy At A Glance (August 2010)Bob Lowery
 
Policom: (Cities) Economic Strength Rankings
Policom: (Cities) Economic Strength RankingsPolicom: (Cities) Economic Strength Rankings
Policom: (Cities) Economic Strength RankingsBob Lowery
 
Houston Office Market Report: Mid-Year 2010
Houston Office Market Report: Mid-Year 2010Houston Office Market Report: Mid-Year 2010
Houston Office Market Report: Mid-Year 2010Bob Lowery
 
Pimco Commercial Real Estate - June 2010
Pimco Commercial Real Estate - June 2010Pimco Commercial Real Estate - June 2010
Pimco Commercial Real Estate - June 2010Bob Lowery
 
Office Tenant Retention Tips
Office Tenant Retention TipsOffice Tenant Retention Tips
Office Tenant Retention TipsBob Lowery
 
Texas Landlords and Tenants Guide - 2010
Texas Landlords and Tenants Guide - 2010Texas Landlords and Tenants Guide - 2010
Texas Landlords and Tenants Guide - 2010Bob Lowery
 
SSRN Paper: Expected Returns and the Expected Growth in Rents of Commercial R...
SSRN Paper: Expected Returns and the Expected Growth in Rents of Commercial R...SSRN Paper: Expected Returns and the Expected Growth in Rents of Commercial R...
SSRN Paper: Expected Returns and the Expected Growth in Rents of Commercial R...Bob Lowery
 
Grant Thornton: TxDOT Managament and Organizational Review
Grant Thornton: TxDOT Managament and Organizational ReviewGrant Thornton: TxDOT Managament and Organizational Review
Grant Thornton: TxDOT Managament and Organizational ReviewBob Lowery
 

More from Bob Lowery (20)

PWC Emerging Trends in Real Estate 2012
PWC Emerging Trends in Real Estate 2012PWC Emerging Trends in Real Estate 2012
PWC Emerging Trends in Real Estate 2012
 
HealthCare Appraisers - 2011 Report
HealthCare Appraisers - 2011 ReportHealthCare Appraisers - 2011 Report
HealthCare Appraisers - 2011 Report
 
Houston Association of Realtors - Housing Update
Houston Association of Realtors - Housing UpdateHouston Association of Realtors - Housing Update
Houston Association of Realtors - Housing Update
 
Houston Economy at a Glance - Augst 2011
Houston Economy at a Glance - Augst 2011Houston Economy at a Glance - Augst 2011
Houston Economy at a Glance - Augst 2011
 
The Outlook for Health Care - Gary Schilling
The Outlook for Health Care - Gary SchillingThe Outlook for Health Care - Gary Schilling
The Outlook for Health Care - Gary Schilling
 
PWC/ULI - 2011 Emerging Trends in Real Estate
PWC/ULI - 2011 Emerging Trends in Real Estate PWC/ULI - 2011 Emerging Trends in Real Estate
PWC/ULI - 2011 Emerging Trends in Real Estate
 
Costar Advisory Report: Houston Office - 3Q 2010
Costar Advisory Report:  Houston Office - 3Q 2010Costar Advisory Report:  Houston Office - 3Q 2010
Costar Advisory Report: Houston Office - 3Q 2010
 
GHP: The Economy at a Glance - October 2010
GHP: The Economy at a Glance - October 2010GHP: The Economy at a Glance - October 2010
GHP: The Economy at a Glance - October 2010
 
GHP Houston: The Economy at a Glance
GHP Houston: The Economy at a GlanceGHP Houston: The Economy at a Glance
GHP Houston: The Economy at a Glance
 
Oilwatch Monthly - August 2010
Oilwatch Monthly - August 2010Oilwatch Monthly - August 2010
Oilwatch Monthly - August 2010
 
Coldwell Banker Commercial - Office
Coldwell Banker Commercial - OfficeColdwell Banker Commercial - Office
Coldwell Banker Commercial - Office
 
NFIB: Small Business
NFIB: Small BusinessNFIB: Small Business
NFIB: Small Business
 
GHP: The Economy At A Glance (August 2010)
GHP: The Economy At A Glance (August 2010)GHP: The Economy At A Glance (August 2010)
GHP: The Economy At A Glance (August 2010)
 
Policom: (Cities) Economic Strength Rankings
Policom: (Cities) Economic Strength RankingsPolicom: (Cities) Economic Strength Rankings
Policom: (Cities) Economic Strength Rankings
 
Houston Office Market Report: Mid-Year 2010
Houston Office Market Report: Mid-Year 2010Houston Office Market Report: Mid-Year 2010
Houston Office Market Report: Mid-Year 2010
 
Pimco Commercial Real Estate - June 2010
Pimco Commercial Real Estate - June 2010Pimco Commercial Real Estate - June 2010
Pimco Commercial Real Estate - June 2010
 
Office Tenant Retention Tips
Office Tenant Retention TipsOffice Tenant Retention Tips
Office Tenant Retention Tips
 
Texas Landlords and Tenants Guide - 2010
Texas Landlords and Tenants Guide - 2010Texas Landlords and Tenants Guide - 2010
Texas Landlords and Tenants Guide - 2010
 
SSRN Paper: Expected Returns and the Expected Growth in Rents of Commercial R...
SSRN Paper: Expected Returns and the Expected Growth in Rents of Commercial R...SSRN Paper: Expected Returns and the Expected Growth in Rents of Commercial R...
SSRN Paper: Expected Returns and the Expected Growth in Rents of Commercial R...
 
Grant Thornton: TxDOT Managament and Organizational Review
Grant Thornton: TxDOT Managament and Organizational ReviewGrant Thornton: TxDOT Managament and Organizational Review
Grant Thornton: TxDOT Managament and Organizational Review
 

Recently uploaded

Managed Farmland Brochures to get more in
Managed Farmland Brochures to get more inManaged Farmland Brochures to get more in
Managed Farmland Brochures to get more inknoxdigital1
 
The Role of Mortgage Brokers in Retirement Housing: Key Considerations
The Role of Mortgage Brokers in Retirement Housing: Key ConsiderationsThe Role of Mortgage Brokers in Retirement Housing: Key Considerations
The Role of Mortgage Brokers in Retirement Housing: Key Considerationssunlite Mortgage
 
Brigade Neopolis Kokapet, Hyderabad E- Brochure
Brigade Neopolis Kokapet, Hyderabad E- BrochureBrigade Neopolis Kokapet, Hyderabad E- Brochure
Brigade Neopolis Kokapet, Hyderabad E- Brochurefaheemali990101
 
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your SpaceShapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Spaceaidasheikh47
 
Prestige Sector 94 at Noida E Brochure.pdf
Prestige Sector 94 at Noida E Brochure.pdfPrestige Sector 94 at Noida E Brochure.pdf
Prestige Sector 94 at Noida E Brochure.pdfsarak0han45400
 
SVN Live 4.22.24 Weekly Property Broadcast
SVN Live 4.22.24 Weekly Property BroadcastSVN Live 4.22.24 Weekly Property Broadcast
SVN Live 4.22.24 Weekly Property BroadcastSVN International Corp.
 
Call Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCR
Call Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCRCall Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCR
Call Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCRasmaqueen5
 
Affordable and Quality Construction SVTN's Signature Blend of Cost-Efficiency...
Affordable and Quality Construction SVTN's Signature Blend of Cost-Efficiency...Affordable and Quality Construction SVTN's Signature Blend of Cost-Efficiency...
Affordable and Quality Construction SVTN's Signature Blend of Cost-Efficiency...AditiAlishetty
 
Listing Turkey - Viva Perla Maltepe Catalog
Listing Turkey - Viva Perla Maltepe CatalogListing Turkey - Viva Perla Maltepe Catalog
Listing Turkey - Viva Perla Maltepe CatalogListing Turkey
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|AkshayJoshi575980
 
Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...
Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...
Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...Clemson Engineering Consultant
 
Pride Wonderland Dhanori Pune Brochure.pdf
Pride Wonderland Dhanori Pune Brochure.pdfPride Wonderland Dhanori Pune Brochure.pdf
Pride Wonderland Dhanori Pune Brochure.pdfabbu831446
 
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdfProvident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdffaheemali990101
 
Shapoorji Spectra Sensorium Hinjewadi Pune | E-Brochure
Shapoorji Spectra Sensorium Hinjewadi Pune | E-BrochureShapoorji Spectra Sensorium Hinjewadi Pune | E-Brochure
Shapoorji Spectra Sensorium Hinjewadi Pune | E-BrochureOmanaConsulting
 
A Brief History of Intangibles in Ad Valorem Taxation.pdf
A Brief History of Intangibles in Ad Valorem Taxation.pdfA Brief History of Intangibles in Ad Valorem Taxation.pdf
A Brief History of Intangibles in Ad Valorem Taxation.pdfTim Wilmath
 
How to Navigate the Eviction Process in Pennsylvania: A Landlord's Guide
How to Navigate the Eviction Process in Pennsylvania: A Landlord's GuideHow to Navigate the Eviction Process in Pennsylvania: A Landlord's Guide
How to Navigate the Eviction Process in Pennsylvania: A Landlord's GuideezLandlordForms
 
Anandtara Iris Residences Mundhwa Pune Brochure.pdf
Anandtara Iris Residences Mundhwa Pune Brochure.pdfAnandtara Iris Residences Mundhwa Pune Brochure.pdf
Anandtara Iris Residences Mundhwa Pune Brochure.pdfabbu831446
 
Mahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdfMahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdfPrachiRudram
 

Recently uploaded (20)

Managed Farmland Brochures to get more in
Managed Farmland Brochures to get more inManaged Farmland Brochures to get more in
Managed Farmland Brochures to get more in
 
young call girls in Lajpat Nagar,🔝 9953056974 🔝 escort Service
young call girls in Lajpat Nagar,🔝 9953056974 🔝 escort Serviceyoung call girls in Lajpat Nagar,🔝 9953056974 🔝 escort Service
young call girls in Lajpat Nagar,🔝 9953056974 🔝 escort Service
 
The Role of Mortgage Brokers in Retirement Housing: Key Considerations
The Role of Mortgage Brokers in Retirement Housing: Key ConsiderationsThe Role of Mortgage Brokers in Retirement Housing: Key Considerations
The Role of Mortgage Brokers in Retirement Housing: Key Considerations
 
Brigade Neopolis Kokapet, Hyderabad E- Brochure
Brigade Neopolis Kokapet, Hyderabad E- BrochureBrigade Neopolis Kokapet, Hyderabad E- Brochure
Brigade Neopolis Kokapet, Hyderabad E- Brochure
 
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your SpaceShapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
 
Prestige Sector 94 at Noida E Brochure.pdf
Prestige Sector 94 at Noida E Brochure.pdfPrestige Sector 94 at Noida E Brochure.pdf
Prestige Sector 94 at Noida E Brochure.pdf
 
SVN Live 4.22.24 Weekly Property Broadcast
SVN Live 4.22.24 Weekly Property BroadcastSVN Live 4.22.24 Weekly Property Broadcast
SVN Live 4.22.24 Weekly Property Broadcast
 
Call Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCR
Call Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCRCall Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCR
Call Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCR
 
Affordable and Quality Construction SVTN's Signature Blend of Cost-Efficiency...
Affordable and Quality Construction SVTN's Signature Blend of Cost-Efficiency...Affordable and Quality Construction SVTN's Signature Blend of Cost-Efficiency...
Affordable and Quality Construction SVTN's Signature Blend of Cost-Efficiency...
 
9953056974 Low Rate Call Girls In Saket, Delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR9953056974 Low Rate Call Girls In Saket, Delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Listing Turkey - Viva Perla Maltepe Catalog
Listing Turkey - Viva Perla Maltepe CatalogListing Turkey - Viva Perla Maltepe Catalog
Listing Turkey - Viva Perla Maltepe Catalog
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
 
Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...
Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...
Clemson Engineering Consultant Dubai For Innovative and Sustainable Engineeri...
 
Pride Wonderland Dhanori Pune Brochure.pdf
Pride Wonderland Dhanori Pune Brochure.pdfPride Wonderland Dhanori Pune Brochure.pdf
Pride Wonderland Dhanori Pune Brochure.pdf
 
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdfProvident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
 
Shapoorji Spectra Sensorium Hinjewadi Pune | E-Brochure
Shapoorji Spectra Sensorium Hinjewadi Pune | E-BrochureShapoorji Spectra Sensorium Hinjewadi Pune | E-Brochure
Shapoorji Spectra Sensorium Hinjewadi Pune | E-Brochure
 
A Brief History of Intangibles in Ad Valorem Taxation.pdf
A Brief History of Intangibles in Ad Valorem Taxation.pdfA Brief History of Intangibles in Ad Valorem Taxation.pdf
A Brief History of Intangibles in Ad Valorem Taxation.pdf
 
How to Navigate the Eviction Process in Pennsylvania: A Landlord's Guide
How to Navigate the Eviction Process in Pennsylvania: A Landlord's GuideHow to Navigate the Eviction Process in Pennsylvania: A Landlord's Guide
How to Navigate the Eviction Process in Pennsylvania: A Landlord's Guide
 
Anandtara Iris Residences Mundhwa Pune Brochure.pdf
Anandtara Iris Residences Mundhwa Pune Brochure.pdfAnandtara Iris Residences Mundhwa Pune Brochure.pdf
Anandtara Iris Residences Mundhwa Pune Brochure.pdf
 
Mahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdfMahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdf
 

Kirksey - Houston Office Building Construction Costs

  • 1. Kirksey Office Buildings & Parking Structures Market conditions in the construction economy are constantly changing. As a service to ANNUAL our clients, we periodically poll leading general contractors to give an update on current conditions. Figures apply to core and shell only and do not include tenant improvements. Using several generic building types, we have compiled our findings below. cost update 2010 One-Story Flex Office Buildings — $60 to $65/sf ($60 to $70/sf in 2009) One-story shell buildings designed to accommodate uses ranging from traditional offices to light assembly, high-technology lab applications. Typical projects are cold, dark shell steel structures with tilt-up concrete skins and punched openings. Cost includes $7 to $10/sf for sitework and surface parking lot, depending on parking density and detention requirements. Low-Rise Office Buildings — $75 to $83/sf ($77 to $90/sf in 2009) Two- to three-story, larger footprint shell buildings designed with speculative building features. Typical projects are composite steel structures, bar joist roof structures with tilt-up concrete skins and punched openings. Cost includes $7 to $9/sf for sitework and surface parking lot, depending on parking density and detention requirements. Mid-Rise Office Buildings — $85 to $95/sf ($90 to $100/sf in 2009) Four- to six-story, 25,000-sf footprint shell buildings designed with speculative building features. Typical projects are composite steel structures with pre-cast concrete and glass skins. Cost includes $4 to $5/sf for sitework and minimal (visitor) surface parking. Typical projects have majority of parking housed in adjacent parking garage. See garage costs on next page. High-Rise Office Buildings — $90 to $122/sf ($100 to $125/sf in 2009) 7 stories — $90 to $100/sf ($100 to $105/sf in 2009) 14 stories — $100 to $110/sf ($105 to $115/sf in 2009) 20 stories — $105 to $115/sf ($110 to $120/sf in 2009) 25 stories — $115 to $122/sf ($120 to $125/sf in 2009) Seven- to 25-story, 25,000-sf footprint shell buildings. Typical projects are cast-in-place concrete structures with articulated pre-cast and curtainwall glass skins. Costs include less than $3/sf for sitework and minimal (visitor) surface parking. Majority of parking is in adjacent garages. See garage costs on next page. Commercial Tenant Improvements — $35 to $42/sf ($35 to $45/sf in 2009) Costs typical of a 25,000-sf full floor office tenant buildout. Reception lobby and executive areas have upgraded finishes. The remainder of the space is about 50% enclosed offices and 50% open plan areas with tenant standard finishes. construction Medical Office Buildings — $95 to $125/sf ($100 to $130/sf in 2009) Low-rise, 2 to 3 stories — $95 to $105/sf ($100 to $110/sf in 2009) Mid-rise, 4 to 6 stories — $105 to $115/sf ($110 to $120/sf in 2009) High-rise, 7 to 25 stories — $115 to $125/sf ($120 to $130/sf in 2009) In general, Medical Office shell buildings have similar features to corporate office buildings described above. Unique MOB features include larger parking requirements, larger floor-to-floor heights, increased base MEP systems with redundancies, emergency power, covered walkways and drop-offs, and increased elevator requirements. cont’d > Cost information reflects market conditions in and around the Houston area. © Kirksey 2010
  • 2. Kirksey Office Buildings & Parking Structures, cont’d ANNUAL Parking Structures — $20 to $33/sf ($23 to $36/sf in 2009) Cast-in-place concrete — $28 to $33/sf, without basement ($31 to $36/sf in 2009) Pre-cast concrete — $23 to $27/sf, without basement ($25 to $29/sf in 2009) cost update 2010 Steel — $20 to $25/sf, without basement ($23 to $28/sf in 2009) Most office projects continue to build pre-cast or cast-in-place garages. The lower cost range examples would typically be for more efficient suburban sites. Small urban downtown and medical center sites with limitations may have higher costs than our ranges show. Many low-rise projects continue to provide inexpensive canopies to meet market demands for covered parking. Recent Trends Despite the hesitation nationwide to undertake new building projects, now may be the best time to build. Interest rates are low and construction costs are down, so owners and developers are able to get more for their dollar. In addition to decreased material costs, these lower costs are due in part to subcontractors’ reductions in fees, so while it is a great time to take advantage of lower costs, it is important to work closely with general contractors to qualify subcontractors and avoid potential defaults. While office building and parking garage costs continue their fall from the highs of early 2008, new starts in buildings taller than three or four stories are few and far between. There is some activity in the small build-to-suit office building markets with owners taking advantage of the low construction costs, but commercial activity is slow to recover. LEED® Certification and green buildings have become standard considerations for most office building projects. Intelligent design practices, required energy codes, and construction team experience have reduced green building premiums. Hard cost premiums, documentation fees, and commissioning services range from 0.5% to 2% of construction costs for a Silver Certified LEED office building, with the higher percentage range affecting smaller projects. Because of increasing competition, existing buildings are rapidly adopting the LEED for Existing Buildings program to “green” their operations and maintenance. For the Gold LEED EB rating, properties are paying $0.06/sf to $0.26/sf, with the higher number affecting smaller properties. Statistics Provided By: Anslow + Bryant Construction Gilbane, Inc. Pepper-Lawson Construction construction Arch-Con Corporation Harvey Builders Rosenberger Construction Austin Commercial Hoar Construction, LLC Satterfield & Pontikes Construction Brookstone Corporation JE Dunn Construction Company Tellepsen Corporation Burton Construction Metzger Construction Company Tribble & Stephens EE Reed Construction O’Donnell/Snider Construction Turner Construction Company For more information, please contact Scott Wilkinson, AIA, Commercial Team Leader, 713 426 7434, scottw@kirksey.com. 6909 Portwest Drive Houston Texas 77024 713 850 9600 www.kirksey.com Cost information reflects market conditions in and around the Houston area. © Kirksey 2010