Submerged Floating Tunnel
________________________________________________________________________
1
A
SEMINAR REPORT
On
” SUBMERGED FLOATING
TUNNEL”
SUBMITTED BY
Mr. SHANTANU SANJAY PATIL
DEPARTMENT OF CIVIL ENGINEERING
S.S.V.P.S.’s B.S.DEORE COLLEGE OF ENGINEERING,
DHULE- 424 005
2015-2016
Submerged Floating Tunnel
________________________________________________________________________
2
INDEX
Sr.No. Contents Page No.
1. INTRODUCTION 3
2. STRUCTURAL COMPONENTS OF SFT 5
3. COMPETITIVE FEATURES OF SFT 8
4. CASE STUDY ON A SFT : TRANSATLANTIC
TUNNEL
10
5. CONCLUSION 16
6. REFERENCES 17
Submerged Floating Tunnel
________________________________________________________________________
3
INTRODUCTION
Tunnels in water are by no means new in civil engineering. Since about 1900,
more then 100 immersed tunnels have been constructed. Bridges are the most
common structures used for crossing water bodies. In some cases immersed
tunnels also used which run beneath the sea or river bed. But when the bed is
too rocky ,too deep or too undulating submerged floating tunnels are used .
The Submerged Floating Tunnel concept was first conceived at the beginning
of the century, but no actual project was undertaken until recently. As the needs
of society for regional growth and the protection of the environment have
assumed increased importance, in this wider context the submerged floating
tunnel offers new opportunities. The submerged floating tunnel is an innovative
concept for crossing waterways, utilizing the law of buoyancy to support the
structure at a moderate and convenient depth .The Submerged floating Tunnel is
a tube like structure made of Steel and Concrete utilizing the law of buoyancy .It
supported on columns or held in place by tethers attached to the sea floor or by
pontoons floating on the surface. The Submerged floating tunnel utilizes lakes
and waterways to carry traffic under water and on to the other side, where it can
be conveniently linked to the rural network or to the underground infrastructure of
modern cities.
1.1 REASON FOR CHOOSING FLOATING TUNNEL
Floating tunnel is the totally new concept and never used before even for very
small length. It can be observed that the depth of bed varies from place to place
on a great extent. The maximum depth is up to 8 km. also at certain sections.
The average depth is 3.3 km. The two alternatives are available for constructions
are bridge above water level or tunnel below ground level. Since the depth is up
to 8 km it is impossible to construct concrete columns of such height for a bridge.
And also the pressure below 8km from sea surface is nearly about 500 times
than atmospheric pressure so one can not survive in such a high pressure zone.
So the immersed tunnels also cannot be used. Therefore, floating tunnel is
finalised which is at a depth 30m from the sea level, where there is no problem of
high pressure. This is sufficient for any big ship to pass over it without any
obstruction.
Submerged Floating Tunnel
________________________________________________________________________
4
1.2.BASIC PRINCIPLE OF SFT
SFT is a buoyant structure which moves in water. The relation between
buoyancy and self weight is very important, since it controls the static behaviour f
the tunnel and to some extend, also the response to dynamic forces. Minimum
internal dimension often result in a near optimum design. There are two ways in
which SFT can be floated. That is positive and negative buoyancy.
Positive buoyancy : In this the SFT is fixed in position by anchoring either by
means of tension legs to the bottom or by means of pontoons on the surface.
Here SFT is mainly 30 metres below the water surface.
Negative buoyancy: Here the foundations would be piers or columns to the sea
or lake. This method is limited to 100 meters water depth
SFT is subjected to all environmental actions typical in the water environment:
wave ,current , vibration of water level, earthquake, corrosion, ice and marine
growth. It should be designed to with stand all actions, operational and
accidental loads, with enough strength and stiffness. Transverse stiffness is
provided by bottom anchoring.
1.3 OPTIMAL SHAPE OF SFT
The shape of the SFT in Fig. 1 has been chosen for the following reasons:
When the vertical curvature is concentrated in the middle of the SFT, it is easier
to shorten the concrete tube during installation, variations in the buoyancy in the
middle of the tunnel introduce little bending in the tunnel. Similarly an unusual
amount of water in the middle of the tunnel gives little bending and axial force.
Fig 1. Optimal shape of an SFT
Submerged Floating Tunnel
________________________________________________________________________
5
STRUCTURAL COMPONENTS OF SFT
Submerged floating tunnel consists of many structural components. These
components should provide strength and stiffness against the various forces
acting under the water surface. The three basic structural components are:
 Tube
 Anchoring
 Shore connections
2.1 Tube : It should accommodate the traffic lanes and the equipments. External
shape can be circular , elliptical or polygonal. It may be constructed of steel or
concrete. Corrosion protection is the main issue. Tube is composed of elements
of length varying from one hundred meters to half a kilometre.
2.2 Anchoring:
There are basically fours types of anchoring:
 SFT with pontoons
 SFT supported on columns
 SFT with tethers to the bottom
 SFT unanchored
2.2.1 SFT with pontoons: It is independent of water depth, the system is
sensitive to wind, waves, currents and possible ships collision. Design should be
such that if one pontoon is lost ,then also the structure will survive.
2.2.2 SFT supported on columns: It is an “underwater bridge” with foundations
on the bottom, in principle the columns are in compression but they may also be
a tension type alternative. Water depth will play an important role in this case and
a few hundred meters depth is considered a limit at the present time. However,
much deeper foundations are at present under investigation.
Submerged Floating Tunnel
________________________________________________________________________
6
2.2.3 SFT with tethers to the bottom : It is based on tethers being in tension in
all future situations, no slack in these tethers may be accepted in any future load
cases. The present practical depths for this type of crossing may be several
hundred meters, whether the tethers are vertical or a combination of vertical and
inclined.
2.2.4 SFT unanchored: It is interesting as it has no anchoring at all except at
landfalls and is then independent of depth. There is obviously a limit to the length
but only further development will answer this. Perhaps an alternative for light
traffic should be designed, possibly a 100 or 200 meter long .
The four types of anchoring are given in FIG 2.(a), 2.(b),2.(c), 2(d)
Fig. 2(a). SFT with pontoons
Fig. 2(b). SFT supported on columns
Submerged Floating Tunnel
________________________________________________________________________
7
Fig. 2(c). SFT with tethers to the bottom
Fig. 2(d). SFT unanchored
2.3 Connections:
The connections of the tube to the shore require appropriate interface elements
to couple the flexible water tube with the much more rigid tunnel bored in the
ground. This joint should be able to restrain tube movements, without any
unsustainable increase in stresses. On the other hand , the joints must be water
tight to be able to prevent entry of water. Additional care in shore connections is
required, especially in seismic areas , due to the risk of submarine landslides.
Submerged Floating Tunnel
________________________________________________________________________
8
COMPETITIVE FEATURES OF SFT
3.1 Invisible
Crossing waterways, whether being from main land to islands in the sea or
maybe more important crossing an inland lake, perhaps the one we are at now
will in many cases meet protests both from tourist interests and also from the
public in general. Lakes of special beauty or perhaps historical value should be
preserved for the future, the crossing of such areas and lakes with SFT may
make this possible. An illustration of this may be seen in Fig. 3.1
3.2. Length only from shore to shore
The actual SFT structure is only as long as the distance between the shores.
If desired the SFT may be connected directly to tunnels and then be completely
out of sight for any desired distance.
Fig. 3.1.SFT crossing of lakes
3.3. Very low gradient
Crossings with undersea tunnels or bridges will frequently mean longer
structures with consequently higher costs and this may offset the higher cost per
meter for an alternative SFT. An SFT crossing may have a very gentle gradient
or being nearly horizontal giving considerable savings in energy used by traffic.
3.4. Access to underground service-parking space at ends
As the SFT may continue in tunnels having crossed the waterway, it is
possible to arrange parking places or service areas under ground and provide
Submerged Floating Tunnel
________________________________________________________________________
9
access to the surface by lifts directly into cities or recreational areas as shown in
Fig. 3.2. These possibilities may be one of big advantages in future, in fact for all
types of tunnels.
Fig.3.2. Parking and service areas
3.5. May surface just above shoreline
As an SFT may be positioned at any depth below the surface arrangements
may be made that the SFT surfaces at or very near the shoreline. This may be
an advantage for connections to new or existing road systems and gives the
planners freedom to locate connections in a very flexible way.
3.6. Constructed away from densely populated areas
Construction of infrastructure is a major everyday problem in many cities,
traffic is piling up, new one way streets daily and generally great frustrations by
millions of people. One very interesting feature with SFT is that the actual
construction may be done away from the densely or highly populated areas, a
feature also for immersed tunnel construction. After the sections of the tunnel are
finished they may be towed to the actual site and there joined together and
installed at the desired depth. In some instances the whole length of the SFT
may be assembled at the construction site and the complete structure towed to
the actual site and installed. This would ensure minimum disturbances to the
local area and perhaps the whole operation may only take months instead of
years.
Submerged Floating Tunnel
________________________________________________________________________
10
3.7. Easy removal at end of life
All structures will have to be removed or replaced sooner or later and as the
amount of structures increase it is important to prepare for these operations
already at the planning and design stage. Removal, recycling or reuse of
materials or parts of the structures will become increasingly necessary in the
future, for both economic and environmental reasons. SFT is in most cases a
floating structure as a whole and may therefore be towed away to some place
where parts of the SFT may be reused. One may imagine such an operation by
for instance placing bulkheads in the original elements and then separating the
SFT in suitable lengths to be perhaps towed to different locations for reuse or
destruction.
3.8. Some possibilities of reuse or recycling SFT
Sections of a tunnel may be used for many purposes, depending on its size
and condition. One obvious possibility is for various types of storage facilities,
whether in the sea or on dry land, a section of tunnel ,say 12 meters in diameter
cut to a length of 10 to 15 meters would not present any difficulty to get up on dry
land if that was desired. To cut a concrete tunnel into sections would not present
big difficulties either; it’s more a question of overall economy than technology.
Submerged Floating Tunnel
________________________________________________________________________
11
CASE STUDY ON A SFT : TRANSATLANTIC TUNNEL
A Transatlantic tunnel is a theoretical submerged floating tunnel which would
span the Atlantic Ocean between North America and Europe. The transatlantic
tunnel would be built of 54000 prefabricated sections connected by watertight
and vacuum-tight gaskets. Each section of tunnel is to be attached to tethers
which are to be affixed to an anchor at the see floor, which is, in some places
almost 8 km deep. The tunnel would hover at about 45 meter below the see
surface, ideal to avoid ships and still minimize pressure and also to sway a bit
under pressure. A high-speed train could theoretically run from New York to
London in 54 minutes. But the train would have to go at a speed of 8000 km/h
through a 5000 km long tunnel, that is itself floating in the Atlantic Ocean. To
reach this speed, almost a perfect vacuum would have to be maintained in the
tunnel and the train would have to be magnetically levitated. There will be 3 rails.
Two are bidirectional and one reserve, to be used during accidents and repairs.
Fig.4.1. Location of Transatlantic tunnel
4.1 COMPONENTSOF TRANSATLANTICTUNNEL
Transatlantic tunnel consists of many components. The main components of this
Tunnel are listed below.
 Gasket/shell
 Sea anchors
 Utility conduits and service port
 Vacuum pumps
 Maglev train
 Guide ways
Submerged Floating Tunnel
________________________________________________________________________
12
4.1GASKET/SHELL
As the tunnel is situated at a depth of 30m, it should be perfectly water tight
and secondly it should resist the salty sea water and thirdly it should be withstand
against hydrostatic forces coming on it.
It is made of 4 layers. Outermost layer is constructed of aluminium to resist the
salty sea water. Second and third layer is made of the foam to float the tunnel
easily in water. Fourth layer is of concrete which gives strength to the tunnel.
As the length of tunnel is very large, it is not possible to construct the tunnel at
situ. Therefore it is made up of 54000 precast units. These units are casted on
shore and transported to place where they have to fix the units with two large
floating platforms .A diagram of shell is given in Fig. 4.1.1
Fig. 4.1.1. Shell
4.2 SEA ANCHORS
As the tunnel is in the Atlantic Ocean, it should have to face high current
velocity in Atlantic Ocean. The tunnel should not deflect much with water current.
Therefore it anchored to the sea bed with the help of steel anchors.
The procedure is as follows :
First, ropes are attached to a block and this block is inserted in sea bed
water come out from top and forms a hydro-statics seal which holds the
block firmly in sea bed. A diagram of sea anchor is given in Fig. 4.2
Submerged Floating Tunnel
________________________________________________________________________
13
Fig. 4.2.1 Sea Anchor
4.3 VACUUM PUMP
The train is running with such a thrilling speed of 5000 mph in the tunnel. The
air resistance is too high on such a high speed. Therefore to reduce it and
increase the speed of train, vacuum is created in tunnel. But creating vacuum in
such a long tunnel is very difficult task. With available equipments, 100 propellers
of most powerful boing jet are require to evacuate the air continuously for 15
days. The vacuum pumps are installed throughout the length of tunnel to
maintain the vacuum in it.
4.4 SERVICE PORT
The tunnel is powered by electrically which should be available for entire
length of tunnel. These electrical wires are carried out through utility
conduits. The two service ports are provided in tunnel, one above and other
below the track conduit. These are provided for communication and access for
repair works. Figure showing the service port is shown in Fig.4.4.1
Fig.4.4.1 Service Port
Submerged Floating Tunnel
________________________________________________________________________
14
4.5 MAGLEV TRAIN
These are magnetically elevated trains. These trains do not run over the track
but floats slightly above the track. Thus we can achieve practically zero tractive
resistance between train and track. Further this train will pass though vacuum,
which increase the speed of train. The sensation of flying at 400mph with no
engine noise or vibration will make the journey through the tunnel a unique
experience. Special rotating and pivoting seats are provided to further reduce the
effect of gravitational force. A diagram of train is given in Fig. 4.5.1.
Fig. 4.5.1 Meglev Train
Figure showing the various components of transatlantic tunnel is given in Fig
4.5.2
Fig 4.5.2 Components Of Transatlantic Tunnel
Submerged Floating Tunnel
________________________________________________________________________
15
4.2 CHALLENGES TO BE FACED
1. Cost: - Due to lots of material and machinery involved in project, estimated cost is
nearly 1.2 Thousand crore dollars.
2. Fire: - It is difficult to rescue people if fire will break out in train and also to face
the problems due to the smoke of fire.
3. Collision: - If in case of collision of two trains took place, it is very difficult to
rescue the people.
4. No Stoppage: - It is very difficult to stop the train travelling on such a high speed.
Submerged Floating Tunnel
________________________________________________________________________
16
CONCLUSION
The submerged floating tunnel will set up new trends in transportation
engineering and which shows with the advances in technology that will reduce
the time required for travelling. And make the transportation more effective by
hiding the traffic under water by which the beauty of landscape is maintained
and valuable land is available for other purposes. Benefits can be obtained with
respect to less energy consumption, air pollution and reduced noise
emission. For wide and deep crossings the submerged floating tunnel may be the
only feasible fix link, replacing present days ferries and providing local
communities with new opportunities for improved communication and regional
development.
Submerged Floating Tunnel
________________________________________________________________________
17
REFERENCES
1. Forum Of European National Highway Research Laboratories (1996),
Analysis of the submerged floating tunnel concept, Transport Research
Laboratory Crowthrone,Berkshire,RG45 6AU.
2. Havard Ostlid (2010), When is SFT competitive, Procedia Engineering, 4, 3–
11
3.http://dsc.discovery.com/convergence/engineering/transatlantictunnel/interactiv
e/interactive.html

More Related Content

What's hot

THE INTRODUCTION OF SUBMERGED FLOATING TUNNELS
THE INTRODUCTION OF SUBMERGED FLOATING TUNNELSTHE INTRODUCTION OF SUBMERGED FLOATING TUNNELS
THE INTRODUCTION OF SUBMERGED FLOATING TUNNELSYash Jethwa
 
Submerged tunnel technical seminar
Submerged tunnel technical seminarSubmerged tunnel technical seminar
Submerged tunnel technical seminarPrashant Ojha
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelAglaia Connect
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge EngineeringKHUSHBU SHAH
 
Advantages and disadvantages of Prestressed concrete
Advantages and disadvantages of Prestressed concreteAdvantages and disadvantages of Prestressed concrete
Advantages and disadvantages of Prestressed concreteBaruti Balinda Jonathan
 
Pavement failures and maintenance
Pavement failures and maintenancePavement failures and maintenance
Pavement failures and maintenanceSatyapal Singh
 
Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaAbhay Ocean India ltd.
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater TunnelsIshan Parekh
 
Traffic engineering IVHS
Traffic engineering IVHSTraffic engineering IVHS
Traffic engineering IVHSJbrk Vinnu
 
Canal falls and its classification
Canal falls and its classificationCanal falls and its classification
Canal falls and its classificationGNANA PRAKASH
 
presentation : cross drainage work
presentation : cross drainage workpresentation : cross drainage work
presentation : cross drainage workEddy Ankit Gangani
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls Manvinder Kingra
 
Admixtures for water proofing in concrete
Admixtures for water proofing in concreteAdmixtures for water proofing in concrete
Admixtures for water proofing in concreteSanjipta Behera
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentationPawan Kumar
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume StudiesMd Tanvir Alam
 

What's hot (20)

THE INTRODUCTION OF SUBMERGED FLOATING TUNNELS
THE INTRODUCTION OF SUBMERGED FLOATING TUNNELSTHE INTRODUCTION OF SUBMERGED FLOATING TUNNELS
THE INTRODUCTION OF SUBMERGED FLOATING TUNNELS
 
Submerged tunnel ppt
Submerged tunnel pptSubmerged tunnel ppt
Submerged tunnel ppt
 
Submerged tunnel technical seminar
Submerged tunnel technical seminarSubmerged tunnel technical seminar
Submerged tunnel technical seminar
 
Transatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnelTransatlantic tunnel-floating-tunnel
Transatlantic tunnel-floating-tunnel
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge Engineering
 
Advantages and disadvantages of Prestressed concrete
Advantages and disadvantages of Prestressed concreteAdvantages and disadvantages of Prestressed concrete
Advantages and disadvantages of Prestressed concrete
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 
Pavement failures and maintenance
Pavement failures and maintenancePavement failures and maintenance
Pavement failures and maintenance
 
Left hand turnout
Left hand turnoutLeft hand turnout
Left hand turnout
 
Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, India
 
Underwater Tunnels
Underwater TunnelsUnderwater Tunnels
Underwater Tunnels
 
Traffic engineering IVHS
Traffic engineering IVHSTraffic engineering IVHS
Traffic engineering IVHS
 
Canal falls and its classification
Canal falls and its classificationCanal falls and its classification
Canal falls and its classification
 
Dewatering
DewateringDewatering
Dewatering
 
Earthen Dam
Earthen DamEarthen Dam
Earthen Dam
 
presentation : cross drainage work
presentation : cross drainage workpresentation : cross drainage work
presentation : cross drainage work
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls
 
Admixtures for water proofing in concrete
Admixtures for water proofing in concreteAdmixtures for water proofing in concrete
Admixtures for water proofing in concrete
 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentation
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume Studies
 

Viewers also liked

Design of An Immersed Tube Tunnel
Design of An Immersed Tube TunnelDesign of An Immersed Tube Tunnel
Design of An Immersed Tube Tunnelneilirish
 
Construction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly AreasConstruction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly AreasShantanu Patil
 
Bridges in Hilly areas seminar
Bridges in Hilly areas seminarBridges in Hilly areas seminar
Bridges in Hilly areas seminarAbhinav Pateriya
 
underwater construction
underwater constructionunderwater construction
underwater constructionYasir Hashmi
 
Use of Waste Plastic for Road Construction by Shantanu Patil
Use of Waste Plastic for Road Construction by Shantanu PatilUse of Waste Plastic for Road Construction by Shantanu Patil
Use of Waste Plastic for Road Construction by Shantanu PatilShantanu Patil
 
UNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTIONUNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTIONHamsui Harold
 
Underground construction Techniques civil final year seminar
Underground construction Techniques civil final year seminarUnderground construction Techniques civil final year seminar
Underground construction Techniques civil final year seminarPavan Kumar N
 
Underwater construction
Underwater construction Underwater construction
Underwater construction Pranay Kumar
 
Constructio underwater
Constructio underwaterConstructio underwater
Constructio underwaterAJITA PANDEY
 
Immersed Tunnels Recent developments
Immersed Tunnels Recent developmentsImmersed Tunnels Recent developments
Immersed Tunnels Recent developmentsStatybos Akademija
 
Land Use Planning Approaches to Climate Change
Land Use Planning Approaches to Climate ChangeLand Use Planning Approaches to Climate Change
Land Use Planning Approaches to Climate ChangeKevin Haroff
 
A seminar report on control of corrosion on underwater piles
A seminar report on control of corrosion on underwater pilesA seminar report on control of corrosion on underwater piles
A seminar report on control of corrosion on underwater pilesRam Sayan Yadav
 
Global Warming Its Causes and effects.
Global Warming Its Causes and effects.Global Warming Its Causes and effects.
Global Warming Its Causes and effects.khuzaimaaaa
 
WATER THROUGH THE TIME
WATER THROUGH THE TIMEWATER THROUGH THE TIME
WATER THROUGH THE TIMErdn100
 
Presentatie blue21 climate pre party november 2015
Presentatie blue21 climate pre party november 2015Presentatie blue21 climate pre party november 2015
Presentatie blue21 climate pre party november 2015Rutger De Graaf-van Dinther
 

Viewers also liked (20)

Design of An Immersed Tube Tunnel
Design of An Immersed Tube TunnelDesign of An Immersed Tube Tunnel
Design of An Immersed Tube Tunnel
 
Construction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly AreasConstruction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly Areas
 
Tunneling
TunnelingTunneling
Tunneling
 
Bridges in Hilly areas seminar
Bridges in Hilly areas seminarBridges in Hilly areas seminar
Bridges in Hilly areas seminar
 
underwater construction
underwater constructionunderwater construction
underwater construction
 
Use of Waste Plastic for Road Construction by Shantanu Patil
Use of Waste Plastic for Road Construction by Shantanu PatilUse of Waste Plastic for Road Construction by Shantanu Patil
Use of Waste Plastic for Road Construction by Shantanu Patil
 
UNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTIONUNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTION
 
Buoyancy and floatation
Buoyancy and floatationBuoyancy and floatation
Buoyancy and floatation
 
Underground construction Techniques civil final year seminar
Underground construction Techniques civil final year seminarUnderground construction Techniques civil final year seminar
Underground construction Techniques civil final year seminar
 
Underwater construction
Underwater construction Underwater construction
Underwater construction
 
Underwater concrete
Underwater concreteUnderwater concrete
Underwater concrete
 
Constructio underwater
Constructio underwaterConstructio underwater
Constructio underwater
 
Pont oresund
Pont oresundPont oresund
Pont oresund
 
Immersed Tunnels Recent developments
Immersed Tunnels Recent developmentsImmersed Tunnels Recent developments
Immersed Tunnels Recent developments
 
Land Use Planning Approaches to Climate Change
Land Use Planning Approaches to Climate ChangeLand Use Planning Approaches to Climate Change
Land Use Planning Approaches to Climate Change
 
A seminar report on control of corrosion on underwater piles
A seminar report on control of corrosion on underwater pilesA seminar report on control of corrosion on underwater piles
A seminar report on control of corrosion on underwater piles
 
Global Warming Its Causes and effects.
Global Warming Its Causes and effects.Global Warming Its Causes and effects.
Global Warming Its Causes and effects.
 
WATER THROUGH THE TIME
WATER THROUGH THE TIMEWATER THROUGH THE TIME
WATER THROUGH THE TIME
 
Presentatie blue21 climate pre party november 2015
Presentatie blue21 climate pre party november 2015Presentatie blue21 climate pre party november 2015
Presentatie blue21 climate pre party november 2015
 
Pamphlet
PamphletPamphlet
Pamphlet
 

Similar to Submerged Floating Tunnel by Shantanu Patil

409967709-Submerged-Floating-tunnel.pptx
409967709-Submerged-Floating-tunnel.pptx409967709-Submerged-Floating-tunnel.pptx
409967709-Submerged-Floating-tunnel.pptxGokulS229289
 
SUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationSUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationunofficialdevil48
 
Machine Routing And Channel Design Assignment
Machine Routing And Channel Design AssignmentMachine Routing And Channel Design Assignment
Machine Routing And Channel Design AssignmentBHAGCHAND MEENA
 
Submerged floating tunnel
Submerged floating tunnel Submerged floating tunnel
Submerged floating tunnel Aditya Parida
 
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptxTRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptxSoulLoad
 
Soil Water Conservation structure
Soil Water Conservation structureSoil Water Conservation structure
Soil Water Conservation structureMoudud Hasan
 
CH6 Water Passages.pptx
CH6 Water Passages.pptxCH6 Water Passages.pptx
CH6 Water Passages.pptxDawit Girma
 
Flow diversion and storage
Flow diversion and storageFlow diversion and storage
Flow diversion and storageshaymaa17
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling explorationjamali husain
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERINGVATSAL PATEL
 
Irrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil EngineeringIrrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil EngineeringLatif Hyder Wadho
 
Hydraulic structures pdf
Hydraulic structures pdfHydraulic structures pdf
Hydraulic structures pdfSaqib Imran
 
Critical review of stilling basin models for pipe outlet works
Critical review of stilling basin models for pipe outlet worksCritical review of stilling basin models for pipe outlet works
Critical review of stilling basin models for pipe outlet workseSAT Publishing House
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15John Grover
 

Similar to Submerged Floating Tunnel by Shantanu Patil (20)

409967709-Submerged-Floating-tunnel.pptx
409967709-Submerged-Floating-tunnel.pptx409967709-Submerged-Floating-tunnel.pptx
409967709-Submerged-Floating-tunnel.pptx
 
SUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationSUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentation
 
Machine Routing And Channel Design Assignment
Machine Routing And Channel Design AssignmentMachine Routing And Channel Design Assignment
Machine Routing And Channel Design Assignment
 
Submerged floating tunnel
Submerged floating tunnel Submerged floating tunnel
Submerged floating tunnel
 
1115
11151115
1115
 
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptxTRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
TRANSATLANTIC-TUNNEL-Floating-Tunnel.pptx
 
Soil Water Conservation structure
Soil Water Conservation structureSoil Water Conservation structure
Soil Water Conservation structure
 
Ilovepdf merged
Ilovepdf mergedIlovepdf merged
Ilovepdf merged
 
CH6 Water Passages.pptx
CH6 Water Passages.pptxCH6 Water Passages.pptx
CH6 Water Passages.pptx
 
Canals
CanalsCanals
Canals
 
Flow diversion and storage
Flow diversion and storageFlow diversion and storage
Flow diversion and storage
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 
06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf06. Diversion Headworks-2.pdf
06. Diversion Headworks-2.pdf
 
7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING7. TUNNEL ENGINEERING
7. TUNNEL ENGINEERING
 
Hydrolic Power Plant
Hydrolic Power PlantHydrolic Power Plant
Hydrolic Power Plant
 
Irrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil EngineeringIrrigation Engineering Terms In Civil Engineering
Irrigation Engineering Terms In Civil Engineering
 
Chapter 4 embankment dams
Chapter 4 embankment damsChapter 4 embankment dams
Chapter 4 embankment dams
 
Hydraulic structures pdf
Hydraulic structures pdfHydraulic structures pdf
Hydraulic structures pdf
 
Critical review of stilling basin models for pipe outlet works
Critical review of stilling basin models for pipe outlet worksCritical review of stilling basin models for pipe outlet works
Critical review of stilling basin models for pipe outlet works
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
 

Recently uploaded

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 

Recently uploaded (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 

Submerged Floating Tunnel by Shantanu Patil

  • 1. Submerged Floating Tunnel ________________________________________________________________________ 1 A SEMINAR REPORT On ” SUBMERGED FLOATING TUNNEL” SUBMITTED BY Mr. SHANTANU SANJAY PATIL DEPARTMENT OF CIVIL ENGINEERING S.S.V.P.S.’s B.S.DEORE COLLEGE OF ENGINEERING, DHULE- 424 005 2015-2016
  • 2. Submerged Floating Tunnel ________________________________________________________________________ 2 INDEX Sr.No. Contents Page No. 1. INTRODUCTION 3 2. STRUCTURAL COMPONENTS OF SFT 5 3. COMPETITIVE FEATURES OF SFT 8 4. CASE STUDY ON A SFT : TRANSATLANTIC TUNNEL 10 5. CONCLUSION 16 6. REFERENCES 17
  • 3. Submerged Floating Tunnel ________________________________________________________________________ 3 INTRODUCTION Tunnels in water are by no means new in civil engineering. Since about 1900, more then 100 immersed tunnels have been constructed. Bridges are the most common structures used for crossing water bodies. In some cases immersed tunnels also used which run beneath the sea or river bed. But when the bed is too rocky ,too deep or too undulating submerged floating tunnels are used . The Submerged Floating Tunnel concept was first conceived at the beginning of the century, but no actual project was undertaken until recently. As the needs of society for regional growth and the protection of the environment have assumed increased importance, in this wider context the submerged floating tunnel offers new opportunities. The submerged floating tunnel is an innovative concept for crossing waterways, utilizing the law of buoyancy to support the structure at a moderate and convenient depth .The Submerged floating Tunnel is a tube like structure made of Steel and Concrete utilizing the law of buoyancy .It supported on columns or held in place by tethers attached to the sea floor or by pontoons floating on the surface. The Submerged floating tunnel utilizes lakes and waterways to carry traffic under water and on to the other side, where it can be conveniently linked to the rural network or to the underground infrastructure of modern cities. 1.1 REASON FOR CHOOSING FLOATING TUNNEL Floating tunnel is the totally new concept and never used before even for very small length. It can be observed that the depth of bed varies from place to place on a great extent. The maximum depth is up to 8 km. also at certain sections. The average depth is 3.3 km. The two alternatives are available for constructions are bridge above water level or tunnel below ground level. Since the depth is up to 8 km it is impossible to construct concrete columns of such height for a bridge. And also the pressure below 8km from sea surface is nearly about 500 times than atmospheric pressure so one can not survive in such a high pressure zone. So the immersed tunnels also cannot be used. Therefore, floating tunnel is finalised which is at a depth 30m from the sea level, where there is no problem of high pressure. This is sufficient for any big ship to pass over it without any obstruction.
  • 4. Submerged Floating Tunnel ________________________________________________________________________ 4 1.2.BASIC PRINCIPLE OF SFT SFT is a buoyant structure which moves in water. The relation between buoyancy and self weight is very important, since it controls the static behaviour f the tunnel and to some extend, also the response to dynamic forces. Minimum internal dimension often result in a near optimum design. There are two ways in which SFT can be floated. That is positive and negative buoyancy. Positive buoyancy : In this the SFT is fixed in position by anchoring either by means of tension legs to the bottom or by means of pontoons on the surface. Here SFT is mainly 30 metres below the water surface. Negative buoyancy: Here the foundations would be piers or columns to the sea or lake. This method is limited to 100 meters water depth SFT is subjected to all environmental actions typical in the water environment: wave ,current , vibration of water level, earthquake, corrosion, ice and marine growth. It should be designed to with stand all actions, operational and accidental loads, with enough strength and stiffness. Transverse stiffness is provided by bottom anchoring. 1.3 OPTIMAL SHAPE OF SFT The shape of the SFT in Fig. 1 has been chosen for the following reasons: When the vertical curvature is concentrated in the middle of the SFT, it is easier to shorten the concrete tube during installation, variations in the buoyancy in the middle of the tunnel introduce little bending in the tunnel. Similarly an unusual amount of water in the middle of the tunnel gives little bending and axial force. Fig 1. Optimal shape of an SFT
  • 5. Submerged Floating Tunnel ________________________________________________________________________ 5 STRUCTURAL COMPONENTS OF SFT Submerged floating tunnel consists of many structural components. These components should provide strength and stiffness against the various forces acting under the water surface. The three basic structural components are:  Tube  Anchoring  Shore connections 2.1 Tube : It should accommodate the traffic lanes and the equipments. External shape can be circular , elliptical or polygonal. It may be constructed of steel or concrete. Corrosion protection is the main issue. Tube is composed of elements of length varying from one hundred meters to half a kilometre. 2.2 Anchoring: There are basically fours types of anchoring:  SFT with pontoons  SFT supported on columns  SFT with tethers to the bottom  SFT unanchored 2.2.1 SFT with pontoons: It is independent of water depth, the system is sensitive to wind, waves, currents and possible ships collision. Design should be such that if one pontoon is lost ,then also the structure will survive. 2.2.2 SFT supported on columns: It is an “underwater bridge” with foundations on the bottom, in principle the columns are in compression but they may also be a tension type alternative. Water depth will play an important role in this case and a few hundred meters depth is considered a limit at the present time. However, much deeper foundations are at present under investigation.
  • 6. Submerged Floating Tunnel ________________________________________________________________________ 6 2.2.3 SFT with tethers to the bottom : It is based on tethers being in tension in all future situations, no slack in these tethers may be accepted in any future load cases. The present practical depths for this type of crossing may be several hundred meters, whether the tethers are vertical or a combination of vertical and inclined. 2.2.4 SFT unanchored: It is interesting as it has no anchoring at all except at landfalls and is then independent of depth. There is obviously a limit to the length but only further development will answer this. Perhaps an alternative for light traffic should be designed, possibly a 100 or 200 meter long . The four types of anchoring are given in FIG 2.(a), 2.(b),2.(c), 2(d) Fig. 2(a). SFT with pontoons Fig. 2(b). SFT supported on columns
  • 7. Submerged Floating Tunnel ________________________________________________________________________ 7 Fig. 2(c). SFT with tethers to the bottom Fig. 2(d). SFT unanchored 2.3 Connections: The connections of the tube to the shore require appropriate interface elements to couple the flexible water tube with the much more rigid tunnel bored in the ground. This joint should be able to restrain tube movements, without any unsustainable increase in stresses. On the other hand , the joints must be water tight to be able to prevent entry of water. Additional care in shore connections is required, especially in seismic areas , due to the risk of submarine landslides.
  • 8. Submerged Floating Tunnel ________________________________________________________________________ 8 COMPETITIVE FEATURES OF SFT 3.1 Invisible Crossing waterways, whether being from main land to islands in the sea or maybe more important crossing an inland lake, perhaps the one we are at now will in many cases meet protests both from tourist interests and also from the public in general. Lakes of special beauty or perhaps historical value should be preserved for the future, the crossing of such areas and lakes with SFT may make this possible. An illustration of this may be seen in Fig. 3.1 3.2. Length only from shore to shore The actual SFT structure is only as long as the distance between the shores. If desired the SFT may be connected directly to tunnels and then be completely out of sight for any desired distance. Fig. 3.1.SFT crossing of lakes 3.3. Very low gradient Crossings with undersea tunnels or bridges will frequently mean longer structures with consequently higher costs and this may offset the higher cost per meter for an alternative SFT. An SFT crossing may have a very gentle gradient or being nearly horizontal giving considerable savings in energy used by traffic. 3.4. Access to underground service-parking space at ends As the SFT may continue in tunnels having crossed the waterway, it is possible to arrange parking places or service areas under ground and provide
  • 9. Submerged Floating Tunnel ________________________________________________________________________ 9 access to the surface by lifts directly into cities or recreational areas as shown in Fig. 3.2. These possibilities may be one of big advantages in future, in fact for all types of tunnels. Fig.3.2. Parking and service areas 3.5. May surface just above shoreline As an SFT may be positioned at any depth below the surface arrangements may be made that the SFT surfaces at or very near the shoreline. This may be an advantage for connections to new or existing road systems and gives the planners freedom to locate connections in a very flexible way. 3.6. Constructed away from densely populated areas Construction of infrastructure is a major everyday problem in many cities, traffic is piling up, new one way streets daily and generally great frustrations by millions of people. One very interesting feature with SFT is that the actual construction may be done away from the densely or highly populated areas, a feature also for immersed tunnel construction. After the sections of the tunnel are finished they may be towed to the actual site and there joined together and installed at the desired depth. In some instances the whole length of the SFT may be assembled at the construction site and the complete structure towed to the actual site and installed. This would ensure minimum disturbances to the local area and perhaps the whole operation may only take months instead of years.
  • 10. Submerged Floating Tunnel ________________________________________________________________________ 10 3.7. Easy removal at end of life All structures will have to be removed or replaced sooner or later and as the amount of structures increase it is important to prepare for these operations already at the planning and design stage. Removal, recycling or reuse of materials or parts of the structures will become increasingly necessary in the future, for both economic and environmental reasons. SFT is in most cases a floating structure as a whole and may therefore be towed away to some place where parts of the SFT may be reused. One may imagine such an operation by for instance placing bulkheads in the original elements and then separating the SFT in suitable lengths to be perhaps towed to different locations for reuse or destruction. 3.8. Some possibilities of reuse or recycling SFT Sections of a tunnel may be used for many purposes, depending on its size and condition. One obvious possibility is for various types of storage facilities, whether in the sea or on dry land, a section of tunnel ,say 12 meters in diameter cut to a length of 10 to 15 meters would not present any difficulty to get up on dry land if that was desired. To cut a concrete tunnel into sections would not present big difficulties either; it’s more a question of overall economy than technology.
  • 11. Submerged Floating Tunnel ________________________________________________________________________ 11 CASE STUDY ON A SFT : TRANSATLANTIC TUNNEL A Transatlantic tunnel is a theoretical submerged floating tunnel which would span the Atlantic Ocean between North America and Europe. The transatlantic tunnel would be built of 54000 prefabricated sections connected by watertight and vacuum-tight gaskets. Each section of tunnel is to be attached to tethers which are to be affixed to an anchor at the see floor, which is, in some places almost 8 km deep. The tunnel would hover at about 45 meter below the see surface, ideal to avoid ships and still minimize pressure and also to sway a bit under pressure. A high-speed train could theoretically run from New York to London in 54 minutes. But the train would have to go at a speed of 8000 km/h through a 5000 km long tunnel, that is itself floating in the Atlantic Ocean. To reach this speed, almost a perfect vacuum would have to be maintained in the tunnel and the train would have to be magnetically levitated. There will be 3 rails. Two are bidirectional and one reserve, to be used during accidents and repairs. Fig.4.1. Location of Transatlantic tunnel 4.1 COMPONENTSOF TRANSATLANTICTUNNEL Transatlantic tunnel consists of many components. The main components of this Tunnel are listed below.  Gasket/shell  Sea anchors  Utility conduits and service port  Vacuum pumps  Maglev train  Guide ways
  • 12. Submerged Floating Tunnel ________________________________________________________________________ 12 4.1GASKET/SHELL As the tunnel is situated at a depth of 30m, it should be perfectly water tight and secondly it should resist the salty sea water and thirdly it should be withstand against hydrostatic forces coming on it. It is made of 4 layers. Outermost layer is constructed of aluminium to resist the salty sea water. Second and third layer is made of the foam to float the tunnel easily in water. Fourth layer is of concrete which gives strength to the tunnel. As the length of tunnel is very large, it is not possible to construct the tunnel at situ. Therefore it is made up of 54000 precast units. These units are casted on shore and transported to place where they have to fix the units with two large floating platforms .A diagram of shell is given in Fig. 4.1.1 Fig. 4.1.1. Shell 4.2 SEA ANCHORS As the tunnel is in the Atlantic Ocean, it should have to face high current velocity in Atlantic Ocean. The tunnel should not deflect much with water current. Therefore it anchored to the sea bed with the help of steel anchors. The procedure is as follows : First, ropes are attached to a block and this block is inserted in sea bed water come out from top and forms a hydro-statics seal which holds the block firmly in sea bed. A diagram of sea anchor is given in Fig. 4.2
  • 13. Submerged Floating Tunnel ________________________________________________________________________ 13 Fig. 4.2.1 Sea Anchor 4.3 VACUUM PUMP The train is running with such a thrilling speed of 5000 mph in the tunnel. The air resistance is too high on such a high speed. Therefore to reduce it and increase the speed of train, vacuum is created in tunnel. But creating vacuum in such a long tunnel is very difficult task. With available equipments, 100 propellers of most powerful boing jet are require to evacuate the air continuously for 15 days. The vacuum pumps are installed throughout the length of tunnel to maintain the vacuum in it. 4.4 SERVICE PORT The tunnel is powered by electrically which should be available for entire length of tunnel. These electrical wires are carried out through utility conduits. The two service ports are provided in tunnel, one above and other below the track conduit. These are provided for communication and access for repair works. Figure showing the service port is shown in Fig.4.4.1 Fig.4.4.1 Service Port
  • 14. Submerged Floating Tunnel ________________________________________________________________________ 14 4.5 MAGLEV TRAIN These are magnetically elevated trains. These trains do not run over the track but floats slightly above the track. Thus we can achieve practically zero tractive resistance between train and track. Further this train will pass though vacuum, which increase the speed of train. The sensation of flying at 400mph with no engine noise or vibration will make the journey through the tunnel a unique experience. Special rotating and pivoting seats are provided to further reduce the effect of gravitational force. A diagram of train is given in Fig. 4.5.1. Fig. 4.5.1 Meglev Train Figure showing the various components of transatlantic tunnel is given in Fig 4.5.2 Fig 4.5.2 Components Of Transatlantic Tunnel
  • 15. Submerged Floating Tunnel ________________________________________________________________________ 15 4.2 CHALLENGES TO BE FACED 1. Cost: - Due to lots of material and machinery involved in project, estimated cost is nearly 1.2 Thousand crore dollars. 2. Fire: - It is difficult to rescue people if fire will break out in train and also to face the problems due to the smoke of fire. 3. Collision: - If in case of collision of two trains took place, it is very difficult to rescue the people. 4. No Stoppage: - It is very difficult to stop the train travelling on such a high speed.
  • 16. Submerged Floating Tunnel ________________________________________________________________________ 16 CONCLUSION The submerged floating tunnel will set up new trends in transportation engineering and which shows with the advances in technology that will reduce the time required for travelling. And make the transportation more effective by hiding the traffic under water by which the beauty of landscape is maintained and valuable land is available for other purposes. Benefits can be obtained with respect to less energy consumption, air pollution and reduced noise emission. For wide and deep crossings the submerged floating tunnel may be the only feasible fix link, replacing present days ferries and providing local communities with new opportunities for improved communication and regional development.
  • 17. Submerged Floating Tunnel ________________________________________________________________________ 17 REFERENCES 1. Forum Of European National Highway Research Laboratories (1996), Analysis of the submerged floating tunnel concept, Transport Research Laboratory Crowthrone,Berkshire,RG45 6AU. 2. Havard Ostlid (2010), When is SFT competitive, Procedia Engineering, 4, 3– 11 3.http://dsc.discovery.com/convergence/engineering/transatlantictunnel/interactiv e/interactive.html