How To Get The Most Out Of Your Existing DCS
emphasizing a flexible approach to migration that leverages your
existing assets and minimizes your risk of downtime or disruption.

Presented by:

Nasir Mundh, Global Modernization Director

Michael Rhodes, Global Migration Practice Director

1

Invensys proprietary & confidential

© Invensys 12 November, 2013
Agenda
1. Housekeeping
2. Introductions
3. Why Migrate?
4. What Should You Consider?
5. Selecting A Migration Approach
6. Solutions
7. Why Invensys
8. Wrap Up/Questions
Why Migrate?

Invensys proprietary & confidential

© Invensys 12 November 2013
Why change what you are doing
today?
According to ARC:
•

$65 billion worth of obsolete technology is still in use
today

•

Although these systems are still performing well beyond
original life expectancy, this introduces appreciable risk
for manufacturing organizations

4
Justifiers to Migrate
Two primary reasons to migrate:

Financial opportunities
•

Improved efficiencies

•

Reduced downtime

The unknown
•

Fear of previously reliable equipment
failing

•

Risk of downtime and safety
Justifiers to Migrate
Fears and risks:
Can’t get support from OEM when you need it
•

Limited technical or service support

•

Parts not available

•

Training not available

Aging workforce
•

How do you train new operators on older equipment?

•

How do you train technicians/engineers?

Compliance and cyber concerns
•

System doesn’t support cyber program

•

System not compliant with governmental requirements
Justifiers to Migrate
Financial opportunities:
System downtime
•

Higher rate of failure

•

Materials not readily available

•

Inefficient troubleshooting

Improved operator interaction
•

Alarm scheming not operator friendly

•

Graphics overwhelming

•

System navigation inefficient

•

Situational training
Justifiers to Migrate
Financial opportunities:
Improved control
•

Improved DCS control schemes

•

Multivariable control

•

Business decision making

Maintenance management
•

Improved diagnostics

•

Workflow

•

Mobile solutions

•

Downtime tracking

•

Reporting and analysis
Justifiers to Migrate
Financial opportunities:
High maintenance costs
•

Materials cost more

•

Services cost escalated

•

Need third party consultant

•

Have to go to “gray” market for
parts of questionable reliability
What Should You
Consider?

Invensys proprietary & confidential

© Invensys 12 November 2013
What To Consider

•

Technology

•

Experience

•

Total automation vision

•

Value add features

•

Justifying return on investment
Evaluating Technology
• Fault tolerant hardware
• Control network interfaces
• Intelligent marshaling
• Virtualization and thin client
• Engineer anywhere
• Open standards
• Application integration
• Lifecycle approach
• Contextualized graphics
Experience
Engineering Expertise:

Migration Experience:

• Training

• Consultant approach

• Experience

• Audit processes

• Global resources

• Delivery processes

• Service

• Total projects
• Cutover experience
• What industries
• What equipment
• Minimum downtime
Total Vision
Control

Operations

Maintenance

• DCS

• Alarm management

• Training

• APC

• High performance graphics

• Business management
Service Support
• Technical support
• Remote monitoring
• Field service support

• Report analysis
• Situational training
Compliance and security
• Consulting services
• Product architecture
• Knowledge of practices
• Knowledge of current & future
regulations

• Equipment Diagnostics
Life Cycle Support
• Philosophy
• Track record
Corporate
• Business visibility
• Business planning
Value Additions
Advanced
Applications

Workflow

Analytics, KPIs
& Dashboards

Process
Flowsheet
Design

Mass & Energy
Balance

Data
Reconciliation &
Material Balance

Advanced
Process Control

Real-Time
Optimization

Real-Time
Process
Performance
Modeling

Operator
Training
Simulator

Dynamic
Simulation &
Studies

Enterprise Asset
Management
System

Instrument Asset
Management
System

Condition
Monitoring

Predictive
Measurement &
Analysis

Manufacturing
Execution
System

Alarm Analysis

Alarm
Rationalization

Alarm Shelving

Advanced
Alarming

Many Others
Return On Investment

Lifecycle approach to ROI:
•
•
•
•
•

Reduced workload & risk
Reduced unplanned downtime
Improved response & productivity
Safe, available, secure
Lowest total cost of ownership
Example: Potential Business
Benefits
Benefit

Impact
Min

Max

0.30%

0.50%

1

Improve heat rate by reducing excess air and
distributing oxygen and CO uniformly

2

Reduce maintenance and operations cost by: providing
predictive and diagnostic asset management systems;
improving data collection and analysis; and replacing
obsolete systems (paper based notes).

1.0%

2.0%

3

Reduce duration of planned shutdowns by eliminating
need for overspeed testing

1.5%

2.5%

4

Reduce auxiliary power requirement through advanced
controls and simulation

70%

80%

Millions of dollars in benefits identified by implementing solutions.
Improve heat rate
by reducing
1 excess air and
distributing O2 and
CO uniformly
Reduce
2 maintenance and
operations cost

20% 20% 25% 15%

5%

5% 10%
10
%

70%

5%

10%

80% 15%
23

6

11

20

7

3

OTS

Mobile
Solutions

Enterprise
Manufacturing
Intelligence

Workflow

Smart Firing

80% 15%

Reduce duration of
3 planned
10%
shutdowns
Reduce auxiliary
4 power
requirement
Payback (months)

Combustion
Optimization

Turbine
Overspeed Trip

Asset Mgmt Diagnostics &
Alerts (CM)

Asset Mgmt Diagnostics &
Alerts (FDM)

Benefits

DCS Upgrade

Example: Solutions To Address Issues

5%
9

7

5

7
Selecting A
Migration Approach

Invensys proprietary & confidential

© Invensys 12 November 2013
Migration Strategies

Bulldoze

HMI/Gateway

Cable Solution

I/O Replacement
Bulldoze Solutions
Bulldoze is a total system replacement
• Rip out & replace all hardware
• Most comprehensive way to migrate to a new system
• New controls with modern strategies
• Highest cost
• High risk
• Most disruptive solution
• Most process downtime
• Requires the most planning
• Typically the most difficult to justify

© Invensys 00/00/00

Bulldoze
Cable Solutions
• Comprehensive way to migrate to a new system
• Replace all electronics and power supplies
• New controls with modern strategies
• Leaves minimal equipment
•

Field wiring stays in place

•

TA’s/TU’s remain

• Less downtime than bulldoze
• Disruptive to control cabinets
•

Removal of power supplies

•

Removal of existing card racks

•

Install new card racks and power supplies

Invensys proprietary & confidential

© Invensys 00/00/00

Cable Solutions
I/O Plug-In Solutions
I/O modules are designed to plug-in to existing legacy system racks
• Reuse existing cabinets, racks, termination assemblies & field wiring
• Automated conversion tools & processes
• New controls with modern strategies
• New workstations, controllers & I/O modules
• No I/O mapping issues - exact match
• Automated database & I/O porting tools
• Least amount of process downtime
• Least amount of risk
• Reversible

© Invensys 00/00/00

I/O Replacement
HMI/Gateway Solutions
HMI is designed to interface with legacy DCS, PLC, and other
automation systems
• Reuse existing controls and strategies
• Minimal or no process downtime with side-by-side installation &
checkout
• Automated conversion tools and processes
• Incremental or phased migration approach
• Should be a gateway enabling older technology
to be interfaced to applications with higher
return on investment

Invensys proprietary & confidential

© Invensys 00/00/00

HMI/Gateway
Which Migration Approach Is Best?
No one approach will fit every facility
• Only you know the business drivers
• Most system architectures are unique
• Total automation installed base is unique
• Most corporate policies and how they are
deployed at each plant is unique
Which Vendor Approach Is Best?
Flexibility in approach:
• Multiple migration approaches
• Phased approach to fit your business drivers, not modifying your business
to fit migration options
Extensive experience:
• Demonstrated past projects with each approach
• Procedures, utilities, and process specifically pertaining to migration
• Ability to adjust to evolving requirements
Return on investment:
• Company focused on delivering value, not products
• Holistic approach to modernization
• Migration as a gateway to other value added applications
Solutions

Invensys proprietary & confidential

© Invensys 12 November 2013
Best Practices - Plan
• Carefully consider objectives and timeframe
• Use existing company standards or define new
• Include representatives from operations early
– Include your company standards and policies
– Include operational, maintenance, engineering, and
management requirements
Best Practices - Prepare
•

Timeframe for project
• Project window is shorter than outage period
• Consider warm up/cool down and testing

•

Prepare infrastructure
• Network switches, data highway, controllers, etc
• Ship controllers in simulation mode
• Everything in place and ready for shutdown

•

Training
• Simulation to train operators
Best Practices - Document
• Document status of equipment in field
• Accurate list of all devices whether or not in service
• Third party devices – emulate if necessary
• Record all alarm points and values
• Note critical loops prior to cut-over
Best Practices - Optimize
• Control logic
• Functional replacement not a copy
• Apply current industry application knowledge

• Graphics
• Look to high performance graphics
• Improve navigational strategy

• Take advantage newest technology
• Alarms
• Reducing alarm density
• Removing ‘toothpick’ mentality
Project Execution Approaches
Cold Cutover
•
Requires process downtime
•
Allows for marshaling alternatives
•
Forgiving of errors or poorly
documented installations
•
Most cost effective cutover
Hot Cutover
•
No process downtime required
•
Must identify critical loops and
equipment that can shutdown
process or cause safety hazard
•
Does not easily allow for
marshaling alternatives
•
Highest cutover cost

Hot and Cold Combination
•
Minimal process downtime
•
Identify critical loops and
equipment cut them hot
•
More easily allows for
marshaling alternatives
•
Higher cost than cold cutover
•
Safer than hot cutover
•
Allows for phased approach
Foxboro Configuration Tools
•Simple change
management of sequence
code/block connections
•Advanced troubleshooting
techniques
•SQL views, high
performance querying and
reporting of all control
configurations
•Superior predictive
maintenance and asset
management
•Bulk engineering
•Automated install
procedure
Legacy DCS vs. Foxboro Evo Comparison

Slide 34
Automated Database Conversion Process
Legacy Control
Database

Existing
Database

• Honeywell
• Emerson
• Westinghouse
• Bailey
• Moore
• Spectrum
• other

FoxMacro

Foxboro
Taglist (prelim)

LoopView
Editor

Foxboro
Taglist(final)

Automatically transforms data to
Foxboro format
Preserves:
• tag names
• tuning parameters
• alarm parameters
• descriptions, etc
All usable info captured

Assign loops, templates, hardware

Ready for Foxboro Configuration
Tools import
Top to Bottom Fault Tolerance
• Every bus
• Every I/O module
• Every control processor
• Every network connection
• No bad outputs
• No undetected failures
• Bumpless switchover to shadow
module
• Highest Availability
I/O plug-in Migration Solution
I/O modules are manufactured to plug-in to existing legacy
system racks.
• Reuse existing cabinets, racks, termination
assemblies & field wiring
• No I/O mapping issues - exact match
• Minimum process downtime
• New workstations, controllers and I/O modules
•Automated database porting tools

Invensys proprietary & confidential

© Invensys 00/00/00
Unique Plug-In Solution
Workstations

Step 1:
Step 2:
Step 3:
Step 4:
Step 5:
Step 6:

Install new workstations
& controllers
Shut down the process
Replace I/O modules &
attach network connectors
Loop check
Start up process
Making product & saving
money - day 1!
And It’s Reversible !!!

Legacy rack

Controllers

Form fit
replacement
modules
I/O plug-in Migration Solution
•Bailey Net90
Controllers

Workstations

•Bailey Infi90
•Fisher Provox
•Honeywell TDC2000
Legacy Racks
Form fit 
modules

•Honeywell TDC3000
•Moore APACS
•Westinghouse WDPF
HMI Solution
HMI is designed to interface with legacy DCS, PLC, and other
automation systems
• Based on industry leading HMI
• Reuse existing controls
• Minimum process downtime with side-by-side installation & checkout
• Automated conversion tools and processes
• Enables operational improvement applications
• Situational awareness library included
Integrated HMI Solutions
Integrated HMI Solutions
•

Bi-directional data link

•

Automatic database configuration

•

Integrated faceplate

•

Integrated system status displays and
alerts

•

Alarm and events integrated with blocks

•

Tested side-by-side operation

•

Tested and verified time synchronization

•

Tested peer-to-peer communication

•

Benchmark

Invensys proprietary & confidential

© Invensys 11/12/2013

OPC Solutions
•

Bi-directional data link
HMI Migration Solution
Workstations

Integrated Solutions
•

Bailey Infi90

•

Honeywell TDC2000

•

Honeywell TDC3000

•

Moore APACS

•
Legacy Controls

Bailey Net90

•

Legacy HMI

AB PLC

•

Siemens PLC

OPC Solutions
•

Fisher Provox

•

DeltaV

•

Westinghouse WDPF

•

and more
HMI Migration Solution
Trend
• Plants are larger, more complex
• Increased levels of
instrumentation
• Increased levels of automation
• Centralized operations

1970’s

1980’s

Operator Impact
• Increased monitoring load
• Lack of understanding
• More data to manage
• Lost in the details
• Operators become disengaged
• Role is reduced to dealing with upsets
• Loss of direct awareness

1990’s

Present

Situational Awareness Graphic

43

Invensys proprietary & confidential

© Invensys 11/12/2013
HMI Migration Solution
Management

Maintenance

Company LAN

Server

www
Internet

PLC
DCS

Any location

Plant

44

Invensys proprietary & confidential

© Invensys 11/12/2013
HMI Migration Solution
Information & Intelligence

• Intelligence Applications & Content
• Workflow and Collaboration
• Process Modeling 
• Reporting & Analysis
Operations & Execution

• Quality Management 
• Mobility
• System Connectivity
• Advanced Simulation, Optimization
Control & Supervisory

• Performance, Scalability
• Technology Modernization
• Security and Simplification
• Enable Common Control and Safety platform
Why Invensys

Invensys proprietary & confidential

© Invensys 12 November 2013
Why Invensys?
Flexible solutions to fit your needs, options to fit your plant
•

Top down with HMI/Gateway solutions

•

Bottom up with I/O replacement solutions

•

Complete replacement solutions

Holistic approach with proven expertise
•

Migration engineering processes (conversion, commissioning & optimization)

•

Global migration consultants, engineering, delivery & service teams

•

Best practices planning, from design to support

More than a migration
•

Extends existing investments to add ‘intelligence’

•

Improvements to process efficiency & business performance

Experience
•

Bulldoze migration

•

I/O solution migration

•

HMI migration
Thousands Of Projects:
MOORE APACS

HONEYWELL TDC 2000 / 3000

FOXBORO 
SPEC200 & SPECTRUM

Freeport 
(Phelps
Dodge) 
Linn Western 
Operating Inc
IOGEN

WESTINGHOUSE (WDPF)
Duke (M landing)
Kentucky Util
NRG
Erco
Proctor Gamble
American ref. Corp
Nfld Hydro
Indeck (Corrinth)
Chanute 
Sanyo (Batch)
Keadby (UK)
Boralex Stratton
Hercules (US)
Indeck (orleans)
Brazos (Turbine

100’s of sites

FISHER SERIES 10&20
Series 10
Aracruz)
BCIT 
Teck 
Yara Norway 
BP Kitiwake
Series 20
Hawaii Sugar 
ExxonMobil
PPG
Sterling Chem.
Potash Co Boralex 
Total

Mod300 SC series
Bowater (GE 
TRIO)
LT Automation

BAILEY NET/INFI90
Borden
IOC
UPM
BC Hydro
First Energy
Ambit
Crompton
Great Lakes
Karachanganak Petr
Ohio Edison
Loma Linda
Tesoro Refinery HI
ERG Sircusa Italia
Cleveland Thermal

TDC2K
Agrium
Alcan
Dofasco
Lanxess(Bayer)
Teck 
Mexicana de Cananea
Dakota Gas
Total (Elf Atochem)
Huntsman
Nipsco
TXU
Union Carbide
San Miguel
Kraton Polymers
Corporation Nacional  
del Cobre
TDC3K
BASF AK
Kaucuk
Koch Refining
Shell UK
CMPC
Dakota Gas
BASF Antwerp
Valero
SRP Coronado
Invensys Minimizes Process Downtime
Questions?
Michael Rhodes, Global Migration Practice Director
michael.rhodes@invensys.com +1 949 421 8068

Nasir Mundh, Global Modernization Director
nasir.mundh@invensys.com

+1 519 381 0411

For more valuable DCS migration resources:
www.real-time-answers.com/migration
50

Invensys proprietary & confidential

© Invensys 11/12/2013

More Related Content

What's hot

Field Data Gathering Services — A Cloud-Based Approach
Field Data Gathering Services — A Cloud-Based ApproachField Data Gathering Services — A Cloud-Based Approach
Field Data Gathering Services — A Cloud-Based ApproachSchneider Electric
 
The Building Blocks of the Industrial Network
The Building Blocks of the Industrial NetworkThe Building Blocks of the Industrial Network
The Building Blocks of the Industrial NetworkPanduit
 
Getting Started with Advanced Network Operations
Getting Started with Advanced Network OperationsGetting Started with Advanced Network Operations
Getting Started with Advanced Network OperationsSchneider Electric
 
Maximize your business and machine performance
Maximize your business and machine performanceMaximize your business and machine performance
Maximize your business and machine performanceSchneider Electric
 
Cybersecurity for Industrial Plants: Threats and Defense Approach - Dave Hreha
Cybersecurity for Industrial Plants: Threats and Defense Approach - Dave Hreha Cybersecurity for Industrial Plants: Threats and Defense Approach - Dave Hreha
Cybersecurity for Industrial Plants: Threats and Defense Approach - Dave Hreha Schneider Electric
 
Solving the maintain vs. modernization equation
Solving the maintain vs. modernization equationSolving the maintain vs. modernization equation
Solving the maintain vs. modernization equationSchneider Electric
 
Essential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility OperationsEssential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility OperationsSchneider Electric
 
Five key emerging trends impacting Data Centers in 2016
Five key emerging trends impacting Data Centers in 2016 Five key emerging trends impacting Data Centers in 2016
Five key emerging trends impacting Data Centers in 2016 Greg Stover
 
Datacenter best practices design and implementation
Datacenter best practices design and implementationDatacenter best practices design and implementation
Datacenter best practices design and implementationAnton An
 
Distributech 2015 - Mobile Work management
Distributech 2015 - Mobile Work managementDistributech 2015 - Mobile Work management
Distributech 2015 - Mobile Work managementSchneider Electric
 
NERC Critical Infrastructure Protection (CIP) and Security for Field Devices
NERC Critical Infrastructure Protection (CIP) and Security for Field DevicesNERC Critical Infrastructure Protection (CIP) and Security for Field Devices
NERC Critical Infrastructure Protection (CIP) and Security for Field DevicesSchneider Electric
 
IntraVUE: Providing advanced analytics for Industrial Ethernet Applications
IntraVUE: Providing advanced analytics for Industrial Ethernet ApplicationsIntraVUE: Providing advanced analytics for Industrial Ethernet Applications
IntraVUE: Providing advanced analytics for Industrial Ethernet ApplicationsPanduit
 
How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...
How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...
How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...Schneider Electric
 
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...Panduit
 

What's hot (20)

Field Data Gathering Services — A Cloud-Based Approach
Field Data Gathering Services — A Cloud-Based ApproachField Data Gathering Services — A Cloud-Based Approach
Field Data Gathering Services — A Cloud-Based Approach
 
SCADA of the Future
SCADA of the FutureSCADA of the Future
SCADA of the Future
 
The Building Blocks of the Industrial Network
The Building Blocks of the Industrial NetworkThe Building Blocks of the Industrial Network
The Building Blocks of the Industrial Network
 
Getting Started with Advanced Network Operations
Getting Started with Advanced Network OperationsGetting Started with Advanced Network Operations
Getting Started with Advanced Network Operations
 
Dc
DcDc
Dc
 
Maximize your business and machine performance
Maximize your business and machine performanceMaximize your business and machine performance
Maximize your business and machine performance
 
Cybersecurity for Industrial Plants: Threats and Defense Approach - Dave Hreha
Cybersecurity for Industrial Plants: Threats and Defense Approach - Dave Hreha Cybersecurity for Industrial Plants: Threats and Defense Approach - Dave Hreha
Cybersecurity for Industrial Plants: Threats and Defense Approach - Dave Hreha
 
Solving the maintain vs. modernization equation
Solving the maintain vs. modernization equationSolving the maintain vs. modernization equation
Solving the maintain vs. modernization equation
 
Holistic Efficiency
Holistic EfficiencyHolistic Efficiency
Holistic Efficiency
 
Essential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility OperationsEssential Elements of Data Center Facility Operations
Essential Elements of Data Center Facility Operations
 
Five key emerging trends impacting Data Centers in 2016
Five key emerging trends impacting Data Centers in 2016 Five key emerging trends impacting Data Centers in 2016
Five key emerging trends impacting Data Centers in 2016
 
Datacenter best practices design and implementation
Datacenter best practices design and implementationDatacenter best practices design and implementation
Datacenter best practices design and implementation
 
DTN ProphetX® - At a Glance
DTN ProphetX® - At a GlanceDTN ProphetX® - At a Glance
DTN ProphetX® - At a Glance
 
Embedded
EmbeddedEmbedded
Embedded
 
Distributech 2015 - Mobile Work management
Distributech 2015 - Mobile Work managementDistributech 2015 - Mobile Work management
Distributech 2015 - Mobile Work management
 
NERC Critical Infrastructure Protection (CIP) and Security for Field Devices
NERC Critical Infrastructure Protection (CIP) and Security for Field DevicesNERC Critical Infrastructure Protection (CIP) and Security for Field Devices
NERC Critical Infrastructure Protection (CIP) and Security for Field Devices
 
IntraVUE: Providing advanced analytics for Industrial Ethernet Applications
IntraVUE: Providing advanced analytics for Industrial Ethernet ApplicationsIntraVUE: Providing advanced analytics for Industrial Ethernet Applications
IntraVUE: Providing advanced analytics for Industrial Ethernet Applications
 
Data Centre Design Guideline and Standards
Data Centre Design Guideline and StandardsData Centre Design Guideline and Standards
Data Centre Design Guideline and Standards
 
How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...
How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...
How Test Labs Reduce Cyber Security Threats to Industrial Control Systemse cy...
 
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
Managing the Impact and Cost of the IOT Data Explosion - Data Centre Converge...
 

Viewers also liked

DCS PRESENTATION
DCS PRESENTATIONDCS PRESENTATION
DCS PRESENTATIONbvent2005
 
Distributed Control System Basics
Distributed Control System BasicsDistributed Control System Basics
Distributed Control System BasicsPratap Chandra
 
Asset Management - what are some of your top priorties?
Asset Management - what are some of your top priorties?Asset Management - what are some of your top priorties?
Asset Management - what are some of your top priorties?Schneider Electric
 
INTEREL GRMS -Catalogue
INTEREL GRMS -CatalogueINTEREL GRMS -Catalogue
INTEREL GRMS -Cataloguehasina shimul
 
Schneider electric strategy presentation
Schneider electric strategy presentationSchneider electric strategy presentation
Schneider electric strategy presentationbkaur11
 

Viewers also liked (7)

DCS PRESENTATION
DCS PRESENTATIONDCS PRESENTATION
DCS PRESENTATION
 
Distributed Control System Basics
Distributed Control System BasicsDistributed Control System Basics
Distributed Control System Basics
 
Asset Management - what are some of your top priorties?
Asset Management - what are some of your top priorties?Asset Management - what are some of your top priorties?
Asset Management - what are some of your top priorties?
 
INTEREL GRMS -Catalogue
INTEREL GRMS -CatalogueINTEREL GRMS -Catalogue
INTEREL GRMS -Catalogue
 
Control Room of the Future
Control Room of the FutureControl Room of the Future
Control Room of the Future
 
Schneider electric strategy presentation
Schneider electric strategy presentationSchneider electric strategy presentation
Schneider electric strategy presentation
 
Distributed Control System
Distributed Control SystemDistributed Control System
Distributed Control System
 

Similar to How to get the most out of your existing DCS

Field Services overview for Data Centers
Field Services overview for Data CentersField Services overview for Data Centers
Field Services overview for Data CentersAnton Svinenkov
 
Vendor innovation – New Technologies in practice
Vendor innovation – New Technologies in practiceVendor innovation – New Technologies in practice
Vendor innovation – New Technologies in practiceNNE
 
Fostering innovation through agile Government ICT
Fostering innovation through agile Government ICTFostering innovation through agile Government ICT
Fostering innovation through agile Government ICTsyeats
 
VMworld 2013: Separating Cloud Hype from Reality in Healthcare – a Real-Life ...
VMworld 2013: Separating Cloud Hype from Reality in Healthcare – a Real-Life ...VMworld 2013: Separating Cloud Hype from Reality in Healthcare – a Real-Life ...
VMworld 2013: Separating Cloud Hype from Reality in Healthcare – a Real-Life ...VMworld
 
Continuous Deployment - Case Study at WIX
Continuous Deployment - Case Study at WIXContinuous Deployment - Case Study at WIX
Continuous Deployment - Case Study at WIXAgileSparks
 
PeopleSoft FSCM 9.2 Webinar Presentation
PeopleSoft FSCM 9.2 Webinar PresentationPeopleSoft FSCM 9.2 Webinar Presentation
PeopleSoft FSCM 9.2 Webinar PresentationEmtec Inc.
 
Siebel Clinical for Small and Medium-Sized Organizations
Siebel Clinical for Small and Medium-Sized OrganizationsSiebel Clinical for Small and Medium-Sized Organizations
Siebel Clinical for Small and Medium-Sized OrganizationsPerficient
 
Make A Stress Free Move To The Cloud: Application Modernization and Managemen...
Make A Stress Free Move To The Cloud: Application Modernization and Managemen...Make A Stress Free Move To The Cloud: Application Modernization and Managemen...
Make A Stress Free Move To The Cloud: Application Modernization and Managemen...Dell World
 
Beating the product credit crunch
Beating the product credit crunchBeating the product credit crunch
Beating the product credit crunchStephen Williams
 
General presentation wl 20131015
General presentation wl 20131015General presentation wl 20131015
General presentation wl 20131015Han64
 
Powering Virtualization, Applications, and Data Center Transformation with Co...
Powering Virtualization, Applications, and Data Center Transformation with Co...Powering Virtualization, Applications, and Data Center Transformation with Co...
Powering Virtualization, Applications, and Data Center Transformation with Co...Dell World
 
Continuous Delivery at Wix, Yaniv Even Haim
Continuous Delivery at Wix, Yaniv Even HaimContinuous Delivery at Wix, Yaniv Even Haim
Continuous Delivery at Wix, Yaniv Even HaimDevOpsDays Tel Aviv
 
Miliken Performance system.pdf
Miliken Performance system.pdfMiliken Performance system.pdf
Miliken Performance system.pdfEkoSarwono5
 
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...AVEVA Group plc
 
Chapter 6-Process Selection and Facility Layout.pptx
Chapter 6-Process Selection and Facility Layout.pptxChapter 6-Process Selection and Facility Layout.pptx
Chapter 6-Process Selection and Facility Layout.pptxKristaella Requiz
 
Altus Alliance 2016 - Transitioning From On-Premise to the Cloud
Altus Alliance 2016 - Transitioning From On-Premise to the CloudAltus Alliance 2016 - Transitioning From On-Premise to the Cloud
Altus Alliance 2016 - Transitioning From On-Premise to the CloudSparkrock
 
Benefits of cloud hosting solutions over traditional IT
Benefits of cloud hosting solutions over traditional ITBenefits of cloud hosting solutions over traditional IT
Benefits of cloud hosting solutions over traditional ITINFOCHOLA SOLUTIONS PTE LTD
 

Similar to How to get the most out of your existing DCS (20)

Field Services overview for Data Centers
Field Services overview for Data CentersField Services overview for Data Centers
Field Services overview for Data Centers
 
Vendor innovation – New Technologies in practice
Vendor innovation – New Technologies in practiceVendor innovation – New Technologies in practice
Vendor innovation – New Technologies in practice
 
Fostering innovation through agile Government ICT
Fostering innovation through agile Government ICTFostering innovation through agile Government ICT
Fostering innovation through agile Government ICT
 
VMworld 2013: Separating Cloud Hype from Reality in Healthcare – a Real-Life ...
VMworld 2013: Separating Cloud Hype from Reality in Healthcare – a Real-Life ...VMworld 2013: Separating Cloud Hype from Reality in Healthcare – a Real-Life ...
VMworld 2013: Separating Cloud Hype from Reality in Healthcare – a Real-Life ...
 
Continuous Deployment - Case Study at WIX
Continuous Deployment - Case Study at WIXContinuous Deployment - Case Study at WIX
Continuous Deployment - Case Study at WIX
 
PeopleSoft FSCM 9.2 Webinar Presentation
PeopleSoft FSCM 9.2 Webinar PresentationPeopleSoft FSCM 9.2 Webinar Presentation
PeopleSoft FSCM 9.2 Webinar Presentation
 
Siebel Clinical for Small and Medium-Sized Organizations
Siebel Clinical for Small and Medium-Sized OrganizationsSiebel Clinical for Small and Medium-Sized Organizations
Siebel Clinical for Small and Medium-Sized Organizations
 
Make A Stress Free Move To The Cloud: Application Modernization and Managemen...
Make A Stress Free Move To The Cloud: Application Modernization and Managemen...Make A Stress Free Move To The Cloud: Application Modernization and Managemen...
Make A Stress Free Move To The Cloud: Application Modernization and Managemen...
 
Beating the product credit crunch
Beating the product credit crunchBeating the product credit crunch
Beating the product credit crunch
 
General presentation wl 20131015
General presentation wl 20131015General presentation wl 20131015
General presentation wl 20131015
 
Powering Virtualization, Applications, and Data Center Transformation with Co...
Powering Virtualization, Applications, and Data Center Transformation with Co...Powering Virtualization, Applications, and Data Center Transformation with Co...
Powering Virtualization, Applications, and Data Center Transformation with Co...
 
Continuous Delivery at Wix, Yaniv Even Haim
Continuous Delivery at Wix, Yaniv Even HaimContinuous Delivery at Wix, Yaniv Even Haim
Continuous Delivery at Wix, Yaniv Even Haim
 
Miliken Performance system.pdf
Miliken Performance system.pdfMiliken Performance system.pdf
Miliken Performance system.pdf
 
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
Think Differently when Executing Capital Projects by Sandy Vasser, formerly ...
 
Chapter 6-Process Selection and Facility Layout.pptx
Chapter 6-Process Selection and Facility Layout.pptxChapter 6-Process Selection and Facility Layout.pptx
Chapter 6-Process Selection and Facility Layout.pptx
 
Altus Alliance 2016 - Transitioning From On-Premise to the Cloud
Altus Alliance 2016 - Transitioning From On-Premise to the CloudAltus Alliance 2016 - Transitioning From On-Premise to the Cloud
Altus Alliance 2016 - Transitioning From On-Premise to the Cloud
 
Benefits of cloud hosting solutions over traditional IT
Benefits of cloud hosting solutions over traditional ITBenefits of cloud hosting solutions over traditional IT
Benefits of cloud hosting solutions over traditional IT
 
OM.pdf
OM.pdfOM.pdf
OM.pdf
 
SmartERP and HMS Webinar
SmartERP and HMS WebinarSmartERP and HMS Webinar
SmartERP and HMS Webinar
 
Proposal for PSEB
Proposal for PSEBProposal for PSEB
Proposal for PSEB
 

Recently uploaded

Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesDavid Newbury
 
Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Brian Pichman
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Will Schroeder
 
AI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarAI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarPrecisely
 
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...DianaGray10
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-pyJamie (Taka) Wang
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfDianaGray10
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?IES VE
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopBachir Benyammi
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UbiTrack UK
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureEric D. Schabell
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfinfogdgmi
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Commit University
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Adtran
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostMatt Ray
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsSafe Software
 

Recently uploaded (20)

Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond Ontologies
 
Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
 
AI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarAI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity Webinar
 
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
 
201610817 - edge part1
201610817 - edge part1201610817 - edge part1
201610817 - edge part1
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-py
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 Workshop
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability Adventure
 
20150722 - AGV
20150722 - AGV20150722 - AGV
20150722 - AGV
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdf
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
 

How to get the most out of your existing DCS

  • 1. Welcome! How To Get The Most Out Of Your Existing DCS emphasizing a flexible approach to migration that leverages your existing assets and minimizes your risk of downtime or disruption. Presented by: Nasir Mundh, Global Modernization Director Michael Rhodes, Global Migration Practice Director 1 Invensys proprietary & confidential © Invensys 12 November, 2013
  • 2. Agenda 1. Housekeeping 2. Introductions 3. Why Migrate? 4. What Should You Consider? 5. Selecting A Migration Approach 6. Solutions 7. Why Invensys 8. Wrap Up/Questions
  • 3. Why Migrate? Invensys proprietary & confidential © Invensys 12 November 2013
  • 4. Why change what you are doing today? According to ARC: • $65 billion worth of obsolete technology is still in use today • Although these systems are still performing well beyond original life expectancy, this introduces appreciable risk for manufacturing organizations 4
  • 5. Justifiers to Migrate Two primary reasons to migrate: Financial opportunities • Improved efficiencies • Reduced downtime The unknown • Fear of previously reliable equipment failing • Risk of downtime and safety
  • 6. Justifiers to Migrate Fears and risks: Can’t get support from OEM when you need it • Limited technical or service support • Parts not available • Training not available Aging workforce • How do you train new operators on older equipment? • How do you train technicians/engineers? Compliance and cyber concerns • System doesn’t support cyber program • System not compliant with governmental requirements
  • 7. Justifiers to Migrate Financial opportunities: System downtime • Higher rate of failure • Materials not readily available • Inefficient troubleshooting Improved operator interaction • Alarm scheming not operator friendly • Graphics overwhelming • System navigation inefficient • Situational training
  • 8. Justifiers to Migrate Financial opportunities: Improved control • Improved DCS control schemes • Multivariable control • Business decision making Maintenance management • Improved diagnostics • Workflow • Mobile solutions • Downtime tracking • Reporting and analysis
  • 9. Justifiers to Migrate Financial opportunities: High maintenance costs • Materials cost more • Services cost escalated • Need third party consultant • Have to go to “gray” market for parts of questionable reliability
  • 10. What Should You Consider? Invensys proprietary & confidential © Invensys 12 November 2013
  • 11. What To Consider • Technology • Experience • Total automation vision • Value add features • Justifying return on investment
  • 12. Evaluating Technology • Fault tolerant hardware • Control network interfaces • Intelligent marshaling • Virtualization and thin client • Engineer anywhere • Open standards • Application integration • Lifecycle approach • Contextualized graphics
  • 13. Experience Engineering Expertise: Migration Experience: • Training • Consultant approach • Experience • Audit processes • Global resources • Delivery processes • Service • Total projects • Cutover experience • What industries • What equipment • Minimum downtime
  • 14. Total Vision Control Operations Maintenance • DCS • Alarm management • Training • APC • High performance graphics • Business management Service Support • Technical support • Remote monitoring • Field service support • Report analysis • Situational training Compliance and security • Consulting services • Product architecture • Knowledge of practices • Knowledge of current & future regulations • Equipment Diagnostics Life Cycle Support • Philosophy • Track record Corporate • Business visibility • Business planning
  • 15. Value Additions Advanced Applications Workflow Analytics, KPIs & Dashboards Process Flowsheet Design Mass & Energy Balance Data Reconciliation & Material Balance Advanced Process Control Real-Time Optimization Real-Time Process Performance Modeling Operator Training Simulator Dynamic Simulation & Studies Enterprise Asset Management System Instrument Asset Management System Condition Monitoring Predictive Measurement & Analysis Manufacturing Execution System Alarm Analysis Alarm Rationalization Alarm Shelving Advanced Alarming Many Others
  • 16. Return On Investment Lifecycle approach to ROI: • • • • • Reduced workload & risk Reduced unplanned downtime Improved response & productivity Safe, available, secure Lowest total cost of ownership
  • 17. Example: Potential Business Benefits Benefit Impact Min Max 0.30% 0.50% 1 Improve heat rate by reducing excess air and distributing oxygen and CO uniformly 2 Reduce maintenance and operations cost by: providing predictive and diagnostic asset management systems; improving data collection and analysis; and replacing obsolete systems (paper based notes). 1.0% 2.0% 3 Reduce duration of planned shutdowns by eliminating need for overspeed testing 1.5% 2.5% 4 Reduce auxiliary power requirement through advanced controls and simulation 70% 80% Millions of dollars in benefits identified by implementing solutions.
  • 18. Improve heat rate by reducing 1 excess air and distributing O2 and CO uniformly Reduce 2 maintenance and operations cost 20% 20% 25% 15% 5% 5% 10% 10 % 70% 5% 10% 80% 15% 23 6 11 20 7 3 OTS Mobile Solutions Enterprise Manufacturing Intelligence Workflow Smart Firing 80% 15% Reduce duration of 3 planned 10% shutdowns Reduce auxiliary 4 power requirement Payback (months) Combustion Optimization Turbine Overspeed Trip Asset Mgmt Diagnostics & Alerts (CM) Asset Mgmt Diagnostics & Alerts (FDM) Benefits DCS Upgrade Example: Solutions To Address Issues 5% 9 7 5 7
  • 19. Selecting A Migration Approach Invensys proprietary & confidential © Invensys 12 November 2013
  • 21. Bulldoze Solutions Bulldoze is a total system replacement • Rip out & replace all hardware • Most comprehensive way to migrate to a new system • New controls with modern strategies • Highest cost • High risk • Most disruptive solution • Most process downtime • Requires the most planning • Typically the most difficult to justify © Invensys 00/00/00 Bulldoze
  • 22. Cable Solutions • Comprehensive way to migrate to a new system • Replace all electronics and power supplies • New controls with modern strategies • Leaves minimal equipment • Field wiring stays in place • TA’s/TU’s remain • Less downtime than bulldoze • Disruptive to control cabinets • Removal of power supplies • Removal of existing card racks • Install new card racks and power supplies Invensys proprietary & confidential © Invensys 00/00/00 Cable Solutions
  • 23. I/O Plug-In Solutions I/O modules are designed to plug-in to existing legacy system racks • Reuse existing cabinets, racks, termination assemblies & field wiring • Automated conversion tools & processes • New controls with modern strategies • New workstations, controllers & I/O modules • No I/O mapping issues - exact match • Automated database & I/O porting tools • Least amount of process downtime • Least amount of risk • Reversible © Invensys 00/00/00 I/O Replacement
  • 24. HMI/Gateway Solutions HMI is designed to interface with legacy DCS, PLC, and other automation systems • Reuse existing controls and strategies • Minimal or no process downtime with side-by-side installation & checkout • Automated conversion tools and processes • Incremental or phased migration approach • Should be a gateway enabling older technology to be interfaced to applications with higher return on investment Invensys proprietary & confidential © Invensys 00/00/00 HMI/Gateway
  • 25. Which Migration Approach Is Best? No one approach will fit every facility • Only you know the business drivers • Most system architectures are unique • Total automation installed base is unique • Most corporate policies and how they are deployed at each plant is unique
  • 26. Which Vendor Approach Is Best? Flexibility in approach: • Multiple migration approaches • Phased approach to fit your business drivers, not modifying your business to fit migration options Extensive experience: • Demonstrated past projects with each approach • Procedures, utilities, and process specifically pertaining to migration • Ability to adjust to evolving requirements Return on investment: • Company focused on delivering value, not products • Holistic approach to modernization • Migration as a gateway to other value added applications
  • 27. Solutions Invensys proprietary & confidential © Invensys 12 November 2013
  • 28. Best Practices - Plan • Carefully consider objectives and timeframe • Use existing company standards or define new • Include representatives from operations early – Include your company standards and policies – Include operational, maintenance, engineering, and management requirements
  • 29. Best Practices - Prepare • Timeframe for project • Project window is shorter than outage period • Consider warm up/cool down and testing • Prepare infrastructure • Network switches, data highway, controllers, etc • Ship controllers in simulation mode • Everything in place and ready for shutdown • Training • Simulation to train operators
  • 30. Best Practices - Document • Document status of equipment in field • Accurate list of all devices whether or not in service • Third party devices – emulate if necessary • Record all alarm points and values • Note critical loops prior to cut-over
  • 31. Best Practices - Optimize • Control logic • Functional replacement not a copy • Apply current industry application knowledge • Graphics • Look to high performance graphics • Improve navigational strategy • Take advantage newest technology • Alarms • Reducing alarm density • Removing ‘toothpick’ mentality
  • 32. Project Execution Approaches Cold Cutover • Requires process downtime • Allows for marshaling alternatives • Forgiving of errors or poorly documented installations • Most cost effective cutover Hot Cutover • No process downtime required • Must identify critical loops and equipment that can shutdown process or cause safety hazard • Does not easily allow for marshaling alternatives • Highest cutover cost Hot and Cold Combination • Minimal process downtime • Identify critical loops and equipment cut them hot • More easily allows for marshaling alternatives • Higher cost than cold cutover • Safer than hot cutover • Allows for phased approach
  • 33. Foxboro Configuration Tools •Simple change management of sequence code/block connections •Advanced troubleshooting techniques •SQL views, high performance querying and reporting of all control configurations •Superior predictive maintenance and asset management •Bulk engineering •Automated install procedure
  • 34. Legacy DCS vs. Foxboro Evo Comparison Slide 34
  • 35. Automated Database Conversion Process Legacy Control Database Existing Database • Honeywell • Emerson • Westinghouse • Bailey • Moore • Spectrum • other FoxMacro Foxboro Taglist (prelim) LoopView Editor Foxboro Taglist(final) Automatically transforms data to Foxboro format Preserves: • tag names • tuning parameters • alarm parameters • descriptions, etc All usable info captured Assign loops, templates, hardware Ready for Foxboro Configuration Tools import
  • 36. Top to Bottom Fault Tolerance • Every bus • Every I/O module • Every control processor • Every network connection • No bad outputs • No undetected failures • Bumpless switchover to shadow module • Highest Availability
  • 37. I/O plug-in Migration Solution I/O modules are manufactured to plug-in to existing legacy system racks. • Reuse existing cabinets, racks, termination assemblies & field wiring • No I/O mapping issues - exact match • Minimum process downtime • New workstations, controllers and I/O modules •Automated database porting tools Invensys proprietary & confidential © Invensys 00/00/00
  • 38. Unique Plug-In Solution Workstations Step 1: Step 2: Step 3: Step 4: Step 5: Step 6: Install new workstations & controllers Shut down the process Replace I/O modules & attach network connectors Loop check Start up process Making product & saving money - day 1! And It’s Reversible !!! Legacy rack Controllers Form fit replacement modules
  • 39. I/O plug-in Migration Solution •Bailey Net90 Controllers Workstations •Bailey Infi90 •Fisher Provox •Honeywell TDC2000 Legacy Racks Form fit  modules •Honeywell TDC3000 •Moore APACS •Westinghouse WDPF
  • 40. HMI Solution HMI is designed to interface with legacy DCS, PLC, and other automation systems • Based on industry leading HMI • Reuse existing controls • Minimum process downtime with side-by-side installation & checkout • Automated conversion tools and processes • Enables operational improvement applications • Situational awareness library included
  • 41. Integrated HMI Solutions Integrated HMI Solutions • Bi-directional data link • Automatic database configuration • Integrated faceplate • Integrated system status displays and alerts • Alarm and events integrated with blocks • Tested side-by-side operation • Tested and verified time synchronization • Tested peer-to-peer communication • Benchmark Invensys proprietary & confidential © Invensys 11/12/2013 OPC Solutions • Bi-directional data link
  • 42. HMI Migration Solution Workstations Integrated Solutions • Bailey Infi90 • Honeywell TDC2000 • Honeywell TDC3000 • Moore APACS • Legacy Controls Bailey Net90 • Legacy HMI AB PLC • Siemens PLC OPC Solutions • Fisher Provox • DeltaV • Westinghouse WDPF • and more
  • 43. HMI Migration Solution Trend • Plants are larger, more complex • Increased levels of instrumentation • Increased levels of automation • Centralized operations 1970’s 1980’s Operator Impact • Increased monitoring load • Lack of understanding • More data to manage • Lost in the details • Operators become disengaged • Role is reduced to dealing with upsets • Loss of direct awareness 1990’s Present Situational Awareness Graphic 43 Invensys proprietary & confidential © Invensys 11/12/2013
  • 44. HMI Migration Solution Management Maintenance Company LAN Server www Internet PLC DCS Any location Plant 44 Invensys proprietary & confidential © Invensys 11/12/2013
  • 45. HMI Migration Solution Information & Intelligence • Intelligence Applications & Content • Workflow and Collaboration • Process Modeling  • Reporting & Analysis Operations & Execution • Quality Management  • Mobility • System Connectivity • Advanced Simulation, Optimization Control & Supervisory • Performance, Scalability • Technology Modernization • Security and Simplification • Enable Common Control and Safety platform
  • 46. Why Invensys Invensys proprietary & confidential © Invensys 12 November 2013
  • 47. Why Invensys? Flexible solutions to fit your needs, options to fit your plant • Top down with HMI/Gateway solutions • Bottom up with I/O replacement solutions • Complete replacement solutions Holistic approach with proven expertise • Migration engineering processes (conversion, commissioning & optimization) • Global migration consultants, engineering, delivery & service teams • Best practices planning, from design to support More than a migration • Extends existing investments to add ‘intelligence’ • Improvements to process efficiency & business performance Experience • Bulldoze migration • I/O solution migration • HMI migration
  • 48. Thousands Of Projects: MOORE APACS HONEYWELL TDC 2000 / 3000 FOXBORO  SPEC200 & SPECTRUM Freeport  (Phelps Dodge)  Linn Western  Operating Inc IOGEN WESTINGHOUSE (WDPF) Duke (M landing) Kentucky Util NRG Erco Proctor Gamble American ref. Corp Nfld Hydro Indeck (Corrinth) Chanute  Sanyo (Batch) Keadby (UK) Boralex Stratton Hercules (US) Indeck (orleans) Brazos (Turbine 100’s of sites FISHER SERIES 10&20 Series 10 Aracruz) BCIT  Teck  Yara Norway  BP Kitiwake Series 20 Hawaii Sugar  ExxonMobil PPG Sterling Chem. Potash Co Boralex  Total Mod300 SC series Bowater (GE  TRIO) LT Automation BAILEY NET/INFI90 Borden IOC UPM BC Hydro First Energy Ambit Crompton Great Lakes Karachanganak Petr Ohio Edison Loma Linda Tesoro Refinery HI ERG Sircusa Italia Cleveland Thermal TDC2K Agrium Alcan Dofasco Lanxess(Bayer) Teck  Mexicana de Cananea Dakota Gas Total (Elf Atochem) Huntsman Nipsco TXU Union Carbide San Miguel Kraton Polymers Corporation Nacional   del Cobre TDC3K BASF AK Kaucuk Koch Refining Shell UK CMPC Dakota Gas BASF Antwerp Valero SRP Coronado
  • 50. Questions? Michael Rhodes, Global Migration Practice Director michael.rhodes@invensys.com +1 949 421 8068 Nasir Mundh, Global Modernization Director nasir.mundh@invensys.com +1 519 381 0411 For more valuable DCS migration resources: www.real-time-answers.com/migration 50 Invensys proprietary & confidential © Invensys 11/12/2013