𝟏𝟎 𝐥𝐞𝐬𝐬𝐨𝐧𝐬 𝐥𝐞𝐚𝐫𝐧𝐞𝐝 𝐟𝐫𝐨𝐦 𝐭𝐡𝐞 𝐛𝐨𝐨𝐤
"𝐁𝐞𝐥𝐢𝐞𝐯𝐞 𝐈𝐭 𝐭𝐨 𝐀𝐜𝐡𝐢𝐞𝐯𝐞 𝐈𝐭" by Brian Tracy and Christina Stein is a motivational book that focuses on the power of mindset and belief in achieving goals. Some key lessons from the book include:
1.The Power of Belief:
_______
The book emphasizes that your beliefs shape your actions and outcomes. Having a strong belief in your abilities and your goals can drive you towards success.
2.Positive Self-Talk:
_____
The authors stress the importance of using positive affirmations and self-talk to overcome self-doubt and build self-confidence.
3. Visualization:
____
The book encourages readers to visualize their goals and desired outcomes. Visualizing success can help in creating a clear mental image of what you want to achieve.
4. Setting Clear Goals:
___
Setting specific, measurable, achievable, relevant, and time-bound (SMART) goals is essential for focused progress and achievement.
5. Perseverance:
______
The book highlights the need to stay persistent in the face of challenges and setbacks. Believing in your goals and maintaining determination can help you push through difficulties.
6. Taking Action:
_____
Belief alone isn't enough; taking consistent action towards your goals is crucial. The book emphasizes the importance of continuous effort.
7. Surrounding Yourself with Positivity:
_____
Surrounding yourself with supportive and positive influences can help reinforce your beliefs and motivate you to achieve your goals.
8. Mindset Shift:
__
The book advocates for shifting from a fixed mindset to a growth mindset, where you believe that your abilities and intelligence can be developed through dedication and hard work.
9. Overcoming Fear:
______
The authors discuss strategies for overcoming fear and doubt, which often hinder progress. Cultivating courage and facing challenges head-on is essential.
10. Learning and Adaptation:
____
Embracing a mindset of learning from failures and adapting your approach can lead to continuous improvement and eventual success.
Thanks for reading.
@tongsa guy
Book:- https://amzn.to/3rbSM2F.M𝟏𝟎 𝐥𝐞𝐬𝐬𝐨𝐧𝐬 𝐥𝐞𝐚𝐫𝐧𝐞𝐝 𝐟𝐫𝐨𝐦 𝐭𝐡𝐞 𝐛𝐨𝐨𝐤
"𝐁𝐞𝐥𝐢𝐞𝐯𝐞 𝐈𝐭 𝐭𝐨 𝐀𝐜𝐡𝐢𝐞𝐯𝐞 𝐈𝐭" by Brian Tracy and Christina Stein is a motivational book that focuses on the power of mindset and belief in achieving goals. Some key lessons from the book include:
1.The Power of Belief:
_______
The book emphasizes that your beliefs shape your actions and outcomes. Having a strong belief in your abilities and your goals can drive you towards success.
2.Positive Self-Talk:
_____
The authors stress the importance of using positive affirmations and self-talk to overcome self-doubt and build self-confidence.
3. Visualization:
____
The book encourages readers to visualize their goals and desired outcomes. Visualizing success can help in creating a clear mental image of what you want to achieve.
4. Setting Cle
4. GROUP MEMBERS
NAME ID
Rejvi Ahmed 13307132
Md. Mahadi Hassan 12307016
Md. Mehedi Hasan 15107001
Md. Kudrat-E-Khuda 13207109
Md. Zahidul Islam 12307061
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
4
5. CONTENTS
WHAT IS FEASIBILITY STUDY?
WHY DO FEASIBILITY STUDIES?
DIMENSIONS OF FEASIBILITY STUDY
MARKETING ANALYSIS
TECHNICAL ANALYSIS
FINANCIAL ANALYSIS
ECONOMIC ANALYSIS
ECOLOGICAL ANALYSIS
LEGAL AND ADMINISTRATIVE
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
5
6. FEASIBILITY STUDY
Feasibility study-
• is an analysis of the viability of an idea.
• is an analysis of all possible solutions to a problem and a recommendation
on the best solution to use.
• is a formal study to decide what type of system can be developed, which
best the needs of the organization.
• A feasibility study is essentially a process for determining the viability of a
proposed initiative or service and providing a framework and direction for
its development and delivery
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
6
7. WHY DO FEASIBILITY STUDIES?
• To find a solution that is cost effective from a business perspective.
• To Find a solution that is well recognized
• To find out the probable market for the products
• To find out the opportunities and threats as presented by
environment
• To determine the probable income of operating the project
• To show the contributions the project can offer to the society, among
others
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
7
8. BENEFITS OF CONDUCTING A FEASIBILITY STUDY
• Narrows the business alternatives.
• Gives project teams more focus and provides an alternative outline.
• Identifies a valid reason to undertake the project.
• Enhances the success rate by evaluating multiple parameters.
• Aids decision-making on the project
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
8
9. STAGES OF FEASIBILITY STUDIES
A PREFEASIBILITY STUDY
A FEASIBILITY STUDY
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
9
10. DIMENSIONS OF FEASIBILITY STUDY
MARKET ANALYSIS
TECHNICAL ANALYSIS
FINANCIAL ANALYSIS
ECONOMIC ANALYSIS
ECOLOGICAL ANALYSIS
LEGAL AND ADMINISTRATIVE
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
10
12. MARKET ANALYSIS
Market research is the systematic gathering, recording and analysing
of data about problems relating to the marketing of goods and
services.
Market research is the means by which those who provide goods and
services keep themselves in touch with the needs and wants of those
who buy these goods and services.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
12
13. MARKETING QUESTIONS
What is the market?
Who are the competitors?
Who is the target audience?
What do customers want?
What do competitors offer?
What is your USP?
What do customers think you offer them?
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
13
14. METHODS OF MARKET RESEARCH
Field research
Desk Research
FIELD RESEARCH
• Personal interview
• Telephone interview
• Postal surveys
• Purchase survey
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
14
15. DESK RESEARCH
• Internal Sources
o sales figures
o accounting records
o customers’ comments and complaints
o sales representatives’ reports
• Online Research
o Search Engines
o Newspapers
o University has many useful databases online
• Printed Research
o Business Directories
o Business Statistics
o Industrial Market Research Reports
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
15
17. FINANCIAL ANALYSIS
Financial analysis seeks to ascertain whether the proposed project will be
financially viable in the sense of being able to meet the burden of servicing debt
and whether the proposed project will satisfy the return expectations of those who
provide the capital. The aspects which have to be looked into while conducting
financial appraisal are:
Investment outlay & cost of project.
Means of financing
Project profitability
Break-even-point
Cash flows of the project
Investment worthwhileness judged in terms of various criteria of merit
Projected financial position
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
17
18. "Investment outlay" refers to the financial resources committed to an investment.
The “cost of project” represents the total of all items of outlay associated with a project which are
supported by long-term funds. The major cost elements of a project are the following:
Land and site development
Buildings and civil works
Plant and machinery
Technical know-how and engineering fees
Fixed assets
Preliminary and capital issue expenses
Margin money for working capital
Initial cash losses
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
18
INVESTMENT OUTLAY & COST OF PROJECT
19. MEANS OF FINANCING
Means by which a budget deficit is financed or a surplus is used. Means of financing are not included in the budget
totals. The primary means of financing is borrowing from the public. In general, the cumulative amount borrowed
from the public (debt held by the public) will increase if there is a deficit and decrease if there is a surplus, although
other factors can affect the amount that the government must borrow. Those factors, known as other means of
financing, include reductions (or increases) in the government's cash balances, changes in outstanding checks,
changes in accrued interest costs included in the budget but not yet paid, and cash flows reflected in credit
financing accounts.
To meet the cost of project the following means of finance are available:
Share capital
Term loans
Debenture capital
Deferred credit
Incentive sources
Miscellaneous sources REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
19
20. PROJECT PROFITABILITY
The Project Profitability report is used to monitor the planned and
real cost related to a project.
• Project Profitability is the state or condition of a project to describe the
yielding of a financial profit or gain from that project. It is a measure of
project operational efficiency in terms of financial benefits. As a rule, it
is calculated by the cost-income ratio.
• Estimation is the major activity that ensures project profitability. Through
estimating project parameters (such as cost, performance and time) it is
possible to determine how the project is changed and to explore current
status of project benefits.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
20
21. BREAK EVEN POINT
• Definition At this point the income of the business exactly equals its expenditure. If
production is enhanced beyond this level, profit shall accrue to the business and if it
is decreased from this level, loss shall be suffered by the business.
The break even point is :-
The point where the gains equal the losses.
The point defines when an investment will generate a positive return.
The point where sales or revenues equal expenses.
The point where total costs equal total revenues.
There is no profit made or loss incurred at the break even point.
It is the lower limit of profit when prices are set and margins are determined.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
21
22. • Formula
Break even point
= (Fixed cost) / (Contribution per unit)
Where,
Contribution = Selling cost – Variable cost
Fixed Cost = Contribution - profit
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
22
23. CASH FLOWS OF THE PROJECT
When beginning capital-budgeting analysis, it is important to determine a
project's cash flows. These cash flows can be segmented as follows:
1. Initial Investment Outlay
These are the costs that are needed to start the project, such as new
equipment, installation, etc.
2. Operating Cash Flow over a Project's Life
This is the additional cash flow a new project generates.
3. Terminal-Year Cash Flow
This is the final cash flow, both the inflows and outflows, at the end of the
project's life; For example, potential salvage value at the end of a
machine's life.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
23
24. PROJECTED FINANCIAL POSITION
• Projected Financial Statements is summary of various
component projections of revenues and expenses for the
budget period. They indicate the expected net income for
the period.
• Projected Financial Statements are an important tool in
determining the overall performance of a company. They
include the balance sheet, income statement and cash
flow statements to indicate the company performance.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
24
26. TECHNICAL ANALYSIS
The technical analysis of a project idea can be scrutinized in
detail to evaluate its technical feasibility. Technical analysis
distinct from commercial, financial, economic and
managerial feasibility .Technical feasibility is one of the first
studies that must be conducted after a project has been
identified. In large engineering projects consulting agencies
that have large staffs of engineers and technicians conduct
technical studies dealing with the projects.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
26
27. PURPOSE
• To ensure that the project is technically feasible in the sense that all the
inputs required to set up the project are available.
• To facilitate the most optimal formulation of the project in terms of
technology, size, location and so on.
• Choose best alternative
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
27
28. TECHNICALANALYSIS FACTORS
Location and site
Plant size
Layout
Machinery & Equipment
Environment impact assessment
Inputs
Infrastructural facilities
Manpower
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
28
29. LOCATION AND SITE
A thorough & comparative analysis for each potential location
should be made to determine the most ideal side.
It has to consider to following factors:
The accessibility to, & availability of, raw material sources.
The availability of cheap or moderately priced utilities such as
power, water or fuel.
The combine cost of transporting raw materials & fuel to the site.
The proximity to distributing outlets.
The availability of skilled & unskilled labor.
Maps & charts of the proposed site must be included.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
29
30. PLANT SIZE
Determination of an optimum plant size is critical to the success
of a project.
A plant represents sunk costs and any under utilisation of its
capacity means either reduced profits or, for levels below the
Break-Even Point, losses.
It is therefore normally better to build a plant having a capacity
that is likely to be fully utilized quickly, rather than to go in for a
large capacity in the fond hope of a growing share of the market.
The best possible size of plant is recommended after analysing
the availability, economics, and practicability of different size
options REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
30
31. TECHNOLOGY
Technology is a critical aspect of technical analysis of
any project. So it must be analyze effectively.
For example, a technology which has proven itself in
cold climates may fail in tropical climate.
Technology’s Cost of acquisition, installation, repairs
and maintenance should be analysed properly.
A technology is considered appropriate only if it is
assessed to be satisfactory and relevant
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
31
32. LAYOUT
The layout should be clearly depicted through diagrams &
descriptions.
A good layout is characterized by:
Minimum material handling.
Effective space utilization.
Smooth work flow.
Safe & conductive working area for the workers.
Safety and sanitation facilities &
Flexibility of arrangements.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
32
33. MACHINERY & EQUIPMENT
What type of equipment and technology will the business need to
produce its product/service?
What costs are involved to purchase and set up the equipment?
What are the costs involved in the ongoing running of the
equipment?
EQUIPMENT SUPPLIERS:
Who are the potential suppliers of the equipment?
Where are they located?
What sort of service and warranties do they provide?
How long will it take to acquire the equipment and begin
operations?
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
33
34. ENVIRONMENTAL IMPACT ASSESSMENT
This study - identifies the environment in which a project is to be
implemented, assesses the short and long-term impacts.
surface water quality
air quality
seismology/geology
erosion
land quality
fisheries
forests
terrestrial wildlife
noise
archaeological/historical significance
public health REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
34
35. INPUTS
These relate to the operation phase of the project, but need to
be identified at this stage of the technical study to examine the
technical feasibility of the proposed system.
Classification of the inputs :
Raw materials
Processed materials
Water & steam
Gas, fuels and electricity.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
35
36. INFRASTRUCTURAL FACILITIES
Availability and characteristics of roads, bridges, railway facilities
(like station, yards), air transportation, waterways, ports, etc
depending upon their relevance to the assessed requirements of the
project at both implementation and operation stages need to be
studied
A large part of the land area is normally required to be reserved for
service roads, storm water mains, railways, over-ground or
overhead gas, steam, and air pipelines, water reservoirs, and even
harbours for certain large-scale industrial projects.
A detailed study of all such requirements, and of their implications
in terms of time, resources, and approximate costs is necessary to
avoid surprises later on.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
36
37. MANPOWER
The availability in needed numbers, of manpower of
requisite skills where and when required, has to be studied.
manpower covers both the project implementation and the
operation (& maintenance) phases.
In case imparting of training is also involved, timely
availability, and costs, of the training facilities have also to
be assessed.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
37
39. Economic feasibility is
where Analysis of a
project's costs and
revenues in an effort to
determine whether or
not it is logical and
possible to complete.
Economic feasibility
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
39
44. OPERATIONAL FEASIBILITY
• Operational feasibility determines if the human resources are available to
operate the system once it has been installed
• Users that do not want a new system may prevent it from becoming operationally
feasible
• Is a measure of how well a proposed system solves the problems, and takes
advantages of the opportunities identified during scope definition and how it
satisfies the requirements identified in the requirements analysis phase of system
development.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
44
45. THE ESSENTIAL QUESTIONS TO HELP IN TESTING
THE OPERATIONAL FEASIBILITY OF A SYSTEM
• Does management support the project?
• Are the users not happy with current business practices?
• Will it reduce the time (operation) considerably
• Have the users been involved in the planning and development of the
project?
• Will the proposed system really benefit the organization?
• Does the overall response increase?
• Will accessibility of information be lost?
• Will the system effect the customers in considerable way?
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
45
47. ECOLOGICAL ANALYSIS
• ecological - characterized by the interdependence of living organisms
in an environment; "an ecological Anything ecological relates to the
science of ecology, which is the study of how living things and the
environment do their thing.
• issues like preserving rain forests, saving endangered species, and
keeping drinking water safe, you're interested in ecological issues.
Ecological things have to do with how plants and animals relate to
each other, in good and bad ways, in specific environments — from
the impact of floods on river insects to how smog harms humans. Just
about anything people do has an ecological impact — for better or
worse.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
47
48. THE CONCERNS THAT ARE USUALLY ADDRESSED
INCLUDE THE FOLLOWING:
• What is the likely damage caused by the project to the environment?
• What is the cost of restoration measures required to ensure that the
damage to the environment is contained within acceptable limits?
• What are the likely environmental impacts from undertaking project ?
• What is the cost of reducing the negative impact
• Evaluation of the environmental impacts and risks with and without
technical measures are taken to reduce these impacts?
• Are there alternative ways of supplying the good or service of project
without incurring these environmental costs? What are the costs of these
alternatives?
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
48
50. LEGAL FEASIBILITY
• a measure of how well a solution can be implemented within existing
legal/contractual obligations.
• It includes study concerning contracts, liability, violations, and legal other traps
frequently unknown to the technical staff
• Determines whether the proposed system conflicts with legal requirements,
• e.g. a data processing system must comply with the local Data Protection Acts.
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
50
51. STUDY OF LEGAL ISSUES RELATED TO THE PROJECT
• Copyrights or patent laws
• Legal requirements for financial reporting
• Antitrust laws
• Labor relations and regulations
• Safety regulation
• Union contracts
• National data and work laws
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
51
52. ADMINISTRATIVE ANALYSIS
Administrative relating to the management of a company, school, or other
organization. or has held a position with significant secretarial or clerical
duties. Ad Someone who has administrative experience either holds
administrative experience comes in a variety of forms but broadly relates
to skills in communication, organization, research, scheduling and office
support
• What are managerial needs of the project?
• Does organization have the ability to get the managerial skills needed?
• Is timing of project consistent with quantity and quality of management?
REJVI AHMED, Feasibility Study, Pentagon, Dept. of Mechanical
Engineering. IUBAT
52