CANADA’S NEXT
INTERMEDIATE
GOLD PRODUCER




    Corporate Presentation
    January 16, 2013
1
Forward Looking Information
    This presentation contains certain forward-looking information as defined in applicable securities laws (referred to herein as
    “forward-looking statements”). Specifically, this presentation contains forward-looking statements regarding the reserve and
    resource estimates, ore grade, expected mine life, anticipated gold production, gold recovery, cash operating costs and other
    costs, capital costs, sensitivity to metal prices and other sensitivities, financial analysis of the project, commencement of
    operations, potential expansion opportunities, and plans for organic growth. Forward-looking statements involve known and
    unknown risks, uncertainties and other factors which are beyond Detour Gold’s ability to predict or control and may cause
    Detour Gold’s actual results, performance or achievements to be materially different from any of its future results, performance
    or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but
    are not limited to, gold price volatility, changes in debt and equity markets, the uncertainties involved in interpreting geological
    data, increases in costs, environmental compliance and changes in environmental legislation and regulation, interest rate and
    exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development
    industry, as well as those risk factors discussed in the section entitled “Description of Business - Risk Factors” in Detour Gold’s
    2011 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com.
    Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but
    not limited to, assumptions about the following: the supply and demand for gold, and the level and volatility of the price of gold;
    the availability of financing for exploration and development activities; the estimated timeline for the development of the Detour
    Lake gold project; the expected mine life; anticipated gold production; gold recovery; the development schedule; cash
    operating costs and other costs; the financial analysis for the project; capital costs; sensitivity to metal prices and other
    sensitivities; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource
    estimates are based; the receipt of necessary permits; market competition; ongoing relations with employees and impacted
    communities; and general business and economic conditions. Accordingly, readers should not place undue reliance on
    forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other
    date or dates specified in such statements. Detour Gold undertakes no obligation to update publicly or otherwise revise any
    forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as
    may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn
    that it will make additional updates with respect to those or other forward-looking statements.




2
NI-43 101 Disclosure
    Information Containing Estimates of Mineral Reserves and Resources
    The mineral reserve and resource estimates reported in this presentation were prepared in accordance with Canadian
    National Instrument 43-101Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities
    regulatory authorities. For United States reporting purposes, the United States Securities and Exchange Commission (“SEC”)
    applies different standards in order to classify mineralization as a reserve. In particular, while the terms “measured,” “indicated”
    and “inferred” mineral resources are required pursuant to NI 43-101, the SEC does not recognize such terms. Canadian
    standards differ significantly from the requirements of the SEC. Investors are cautioned not to assume that any part or all of
    the mineral deposits in these categories constitute or will ever be converted into reserves. In addition, “inferred” mineral
    resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal
    feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category.
    Under Canadian securities laws, issuers must not make any disclosure of results of an economic analysis that includes
    inferred mineral resources, except in rare cases.

    On September 4, 2012, Detour Gold announced an updated mine production plan for the Detour Lake project. The NI 43-101
    compliant Technical Report for this update was filed on SEDAR on October 18, 2012. The following QPs participated in this
    update: BBA Inc., under the direction of André Allaire, Eng., Vice-President, Markets – Mining and Metals and Patrice Live,
    Eng., Mining Manager; SGS Canada Inc., under the direction of Michel Dagbert, Eng., Senior Geostatistician and Maxime
    Dupéré, P.Geo., Senior Geologist; and AMEC Environment & Infrastructure, a Division of AMEC Americas Limited, David G.
    Ritchie M.Eng., P.Eng, Senior Associate Geotechnical Engineer.




3
Invest in Detour Gold
    Our Vision




     Focus on a world-class asset – Detour Lake
        Canada’s largest pure gold play with 15.6 M oz in reserves
        Gold processing initiated in January 2013
     One of the best cash flow/share opportunities
     Average annual gold production of 657,000 oz
     Excellent organic growth potential (5 year plan)
     Potential expansion of mill throughput




4
Share Capital
                                                           OPTIONS & FN SHARE
                                                             COMMITMENTS
     ISSUED AND                                                       8.9 M
    OUTSTANDING
                                FULLY DILUTED                     CONVERTIBLE
      117.6M                        139.5 M                         NOTES
                                                                      13.0 M



     Market cap: C$2.8 billion
     Cash position: C$236 million
     Major shareholders:
              Paulson & Co.       15%
              Carmignac Gestion 5%
              Detour Gold Mgmt <2%
              Institutions total >90%
    Note: Cash position and share data at December 31, 2012. An additional 0.3 M
    shares were issued in January 2013 following partial exercise of the over-
    allotment option.
5
Share Capital
                                1000%
                                                   Share Issuance vs. Performance
                                        900%


                                        800%                     580% total                                                                             DGC     DGC
                                                                                                                                                        08/11   01/12 DGC
                                                              return since IPO
    Jan. 2007 to Present Total Return




                                        700%                                                                                                                          11/12
                                                                                                                         DGC
                                        600%                                                                             07/10

                                        500%
                                                             DGC
                                                             04/08
                                        400%
                                                               Randgold
                                                                                                    DGC
                                        300%                                                        11/09

                                                                   DGC
                                        200%
                                                                   07/09
                                                                        AGI                                            Eldorado                                         Osisko
                                                    Buenaventura
                                        100%                                                                                                                            (239%)
                                                   Aurizon                                                            Yamana             Newcrest
                                                                   IMG
                                                   NEM       G
                                        IPO                  ABX     AEM
                                          0%                                  Anglo Gold Ashanti                                     Hecla                 AuRico
                                                   CG      Goldfields                                       Kinross                                                 Great Basin
                                                        GSC                              Gabriel                               Eco Oro                                  (209%)
                                                                                                                                         Andina
                                    -100%
                                               0                                  50                           100                                150                        200
                                                                                Jan. 2007 to Present % Change in Shares Outstanding
                                                                                                   Source: BMO, Nov. 2012
                                        Note: Date of DGC equity financings
6
Successful Focused Approach
       Record Timing from “Discovery” to Projected Production
                  Detour Lake in 6 years
     2007            2009            2010       2011-12        2013


                                                                   PRODUCTION
                                                                   2013




    ACQUISITION   PRE-FEASIBILITY FEASIBILITY   DEVELOPMENT PRODUCTION
    /DISCOVERY    STUDY           STUDY &
                                  PERMITTING




7
2013 Objectives
    H1 2013
     First gold pour
     Commissioning of second production line
     Securing $90 million credit facility
     20,000 m drilling program targeting high-grade gold mineralization

    H2 2013
     Declaring commercial production
     Gold production target of +350,000 ounces for the year
     Completing pre-feasibility study on Block A
     Advancing evaluation of mine expansion scenarios
     Revising block model for Detour Lake


8
Detour Lake Profile
                                                                                                          September 2012
                                                                        Detour Lake                         Mine Plan(1)

             Open pit                                                   Production Start                    Q1 2013
             @ 0.5 g/t cut-off                20,600E                   OP Reserves (M oz)                    15.6

                                                                        Mill throughput (tpd)                55,000

                                                                        Strip Ratio (waste:ore)                3.7
                                                                        Gold recoveries                       91%
   16,500E
                                                                        Average grade (g/t)                   1.03
                                                                        Estimated mine life (yrs)             21.5
700 m                                          1.0 g/t Au               Avg. Production (oz/yr)              657,000
                                               0.5 - 1.0 g/t Au         Cash operating costs (C$/oz)          $710
                                               <0.5 g/t Au
                                                                        Total cash costs (C$/oz)              $749
                                                                        Initial Capex (C$ B)(2)               1.45


      (1) Gold price assumptions: US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015.
      (2) Revised to approx. C$1.5 B in news release dated November 8, 2012.


  9
Updated LOM Gold Production
Gold Production (‘000 oz)                        Grade (g/t Au)

800                                                       1.6
                            Avg. 657,000 oz/yr
700                                                       1.4

600                                                       1.2

500                                                       1.0

400                                                       0.8

300                                                       0.6

200                                                       0.4

100                                                       0.2

     0                                                      0




10
Updated LOM Operating Costs
                                                             Breakdown of 2013-14 TCC
     Operating Costs (LOM) C$/t milled C$/t mined   C$/oz

     Mining costs             11.65      2.49       388
                                                                    LABOUR
     Processing cost           7.83       --        260              18%       POWER

     G&A                       1.86       --         62
                                                                               12%
                                                                                  DIESEL
     Cash operating costs     21.34       --        710     MAINTENANCE            8%
     Royalty (2%) and other    1.26       --         42       22%               G&A
     Refining                  0.12       --          4
                                                                                       5%
     Silver credit            (0.20)      --         (7)         CONSUMABLES       ROYALTY+
                                                                                      OTHER
     Total cash costs (TCC)   22.52       --        749               29%           (2% NSR)
                                                                                       6%
     A 10% change in:
     Diesel or power costs = $9/oz change in TCC
     Cdn$ FX rate = $63/oz in TCC



11
Financial Analysis
     Base Case Assumptions
      Gold - US$1,200/oz (1)                             Power Cdn $0.065/kwh
      F/X - $Cdn/$US = 1.00                              Diesel US$100/barrel (WTI)

                                                     Base Case (1)
      US$ Billions                      Undiscounted (0%)                 5.0%
      Pre-tax cash flow                            4.3                     1.7
      Net cash flow after tax                      3.0                     1.1
      Pre-tax IRR                                         14.4%

      1. Gold price US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015.


                                                    @ US$1,600/oz                           12-12-23
      US$ Billions                      Undiscounted (0%)                 5.0%
      Pre-tax cash flow                            9.4                     4.4
      Net cash flow after tax                      6.6                     3.0
      Pre-tax IRR                                           24.6%


12
                                                                                                       49
DETOUR LAKE MINE
START UP
13
2013 Forecast
     Guidance
      350,000 oz to 400,000 oz of gold
      Total cash costs between C$800/oz and C$900/oz (on
       commercial production of 200,000 oz to 250,000 oz sold)
      Estimated LOM sustaining capital of C$1.2 B:
         2013 = C$180 M (<$80 M in H1)
         2014 = C$140 M




14
Mining Production
                                   Status
     2012 Pre-Stripping
                               (Year-end 2012)
     Overburden/Till               15.1 Mt
     Waste                          7.7 Mt
     Low Grade (0.3-0.5 g/t)        1.1 Mt
     Ore                            2.2 Mt
     Total                         26.1 Mt




      2.2 Mt ore inventory on ROMs and short-term stockpiles (reconciled
       average grade of approx. 0.7 g/t) (till dilution on first bench)
      Average mining rates of +115,000 tpd in December 2012
      Mining operation on 24 hrs/day, 365 days/yr



15
Mining Production


                                  NORTH WASTE
       MINERALIZED                   DUMP                           PLANT SITE
          ZONE




                                                                     CAMPBELL
                                                                        PIT



              CURRENT
              PIT SHAPE                         APPROX. PIT SHELL
                                                 AT END OF LOM



      Satellite image dated July 2012

16
Detour Lake Open Pit Mine




                 12-10-22

17
DETOUR LAKE
18
             SITE
Overview Detour Lake Facilities
                 SECONDARY
                 CRUSHERS


                             STOCKPILE
                             RECLAIM

      GEODESIC
      DOME




                             PRIMARY
                             CRUSHER




     12-10-22


19
Primary Crusher (100,000 tpd capacity)




     12-10-02                            Gyro is
                                         9 m high

                     35 m
                 to surface




20
Stockpile Reclaim (2 days capacity)




     12-12-02




                           12-12-23




     12-12-23
21
Processing Plant
        Conventional gravity and CIP plant
        55,000 tpd (=92% availability of 60,000 tpd capacity)
        2 parallel lines (each with 1 secondary cone crusher + 1 SAG & 1 ball mill)
        Estimated gravity recovery: 30-40%
        Estimated overall gold recovery: 91.0%
        Leach time 29 hours; leach feed size 80% passing 95 μm




         12-12-23
22
Simple Process Plant @ 92% Availability

                       Stockpile
Gyratory               12 h live capacity
crusher:
60” x 113”
90,000 tpd

                    Secondary crushers:
                    2 X XL-1100                                           Ball mills:
                                                   SAG mills:             2 X 26’ x 40’6’’, 15MW
                    67,000 tpd
                                                   2 X 36’ x 20’, 15MW    55,000 tpd
                                Pebble crushers:
                                                   55,000 tpd
                                2 X XL-1100
                                                                                          To
                                73,000 tpd                                                leaching
                                                                                          circuit
                                                                                          To
                                                                                          gravity
                                                                                          circuit

                                                             Circ. load
                                                                             Circ. load   From
                                                             28 %
  Leach circuit:                                                             250 %        gravity
                                                                                          circuit

  55,000 tpd + 15% contingency in piping capacity

  23
Tailings Management Area (TMA)




       12-10-22

24
DGC Employees: Hiring Local First
     On track with ramp up schedule: 423 employees at December 31, 2012*

            DIVISION OF LABOUR                     WORKFORCE ORIGIN


                                                    COCHRANE
                 FRONT LINE                           AREA        COCHRANE
                   81%                                26%             25%
                                                                                     REST OF
                       PROFESSIONAL                                                  ONTARIO
                                                       NORTHERN
                          19%                           ONTARIO                       3%
                                                         43%                         OTHER
                                                                                     2%

      Professional are: MGMT, Eng., Geo., Supt.
      Front Line are: Operators, Admin, Support
      Continuing focus on hiring local/regional      * Excludes Corporate office.
  25% of employees are Aboriginal
25
PLANNING FOR
26
     ORGANIC GROWTH
          Under-Explored Greenstone Belt
Planning for Organic Growth
     5 Year Plan for Successful Organic Growth

     Large prospective land position of approx. 566 km2
     • Two main gold structures with total strike length of >80km
     • Continue focus on Detour Lake deposit extension (northern
       structure i.e. Block A)
     • Test targets on structure south of Detour Lake

     Future objectives
      Grow reserve base to +20 M oz (@ US$850/oz)
      Increase mill throughput to above 75,000 tpd for gold production
       output of +800,000 oz/yr
      Find high-grade ore near-surface within trucking distance to
       supplement mill

27
Successful Growth of Resources
     Resource Growth Exceeding 750% Since IPO

      Date     Accumulative   Resources/Reserves (M oz)
               DGC Drilling                                     Inferred   M&I   2P
                                               10M                 20M           30M
     2005-05                     Estimated by Pelangio

     2006-09                       DGC due diligence
     2007-12     50,000m

     2008-06    123,000m

     2009-09    249,000m                 8.8
     2010-06    334,000m      $850/oz        11.4
     2011-01    430,000m      $850/oz                14.9
     2012-01    523,000m      $850/oz                    15.6



28
Priority #1 – Block A Target



      Block A
      Pre-feasibility




      Block A pre-feasibility study by year-end 2013
      Evaluate potential expansion options

     *Not updated with TWD Dec. 30th PR. On Dec. 1, 2011, Detour Gold announced the acquisition of TWD.


29
Priority #1 – Block A Target

Block A near-surface resource




    2012 DH
    2012 extension DH                            Detour Lake
   DH included in 2011 year-end       2011 year-end reserves = 15.6 M oz
   reserves
   DH not included in 2011 year-end
   reserves
    Historical DH




  30
Priority #2 – South Structure




                                           15.6 M oz in Reserves




                                                            20,000 m
                                                            in 2013
                                 MMI Survey Coverage
                                 MMI Au Anomaly

                              Existing DDH
                              Gold occurrence (OGS)
                              DDH intersection >1g/2m
                              DDH intersection >1g/10m

     *Note: Excludes drilling around Detour Lake and M zone (Block A).
31
Invest in Detour Gold
     Our Vision




      Focus on a world-class asset – Detour Lake
         Canada’s largest pure gold play with 15.6 M oz in reserves
         Gold processing initiated in January 2013
      One of the best cash flow/share opportunities
      Average annual gold production of 657,000 oz
      Excellent organic growth potential (5 year plan)
      Potential expansion of mill throughput




32
ADDITIONAL
INFORMATION
 33
Detour Lake Profile
                                                                                   January 2011   September 2012
      Detour Lake
                                                                                     Update (2)     Mine Plan(3)
                            Gold price (US$/oz) (1)                                    850            1,200
                            Foreign exchange rate (US$/Cdn$)                           1.10            1.00
     Assumptions Fuel price (US$/barrel)                                               80              100
                            Income/mining tax rate (%)                                25/10           25/10
                            Net Smelter Royalty (%)                                     2               2
                            Ore milled (Mt)                                           449.6           470.0
                            Waste mined (Mt) (4)                                      1,654           1,734
     Mine                   Strip ratio (waste:ore)                                    3.9             3.7
     Parameters             Average gold grade (g/t)                                   1.03            1.03
                            Total contained gold (M oz)                                14.9            15.6
                            Estimated gold recovery (%)                                91.0            91.0
                            Total recovered gold (M oz)                                13.5            14.1
                            Mine life (years)                                          21              21.5
                            Average annual gold production (oz)                      657,000         657,000
     1.   US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015.
     2.   Press release Jan. 31, 2011 with Technical Report dated Mar. 15, 2011.
     3.   Press release Sept. 4, 2012 with Technical Report dated Oct. 18, 2012.
     4.   Includes low-grade stockpile.
34
Gold Production/Cost Profile
Gold Production (‘000 oz)                                        Total Cash Costs (C$/oz)

800                                              Avg. C$749/oz                     900

700                                                                                850

600                                                                                800

500                                                                                750

400                                                                                700

300                                                                                650

200                                                                                600

100                                                                                550

     0                                                                             500


         Note: Excludes stripping adjustments.


35
Detour Lake Reserves & Resources
     As at December 31, 2011

                                Tonnes            Grade         Contained Gold
     @ US$850/oz
                               (millions)          (g/t)           (‘000 oz)
     Reserves (1)
     Proven                       101.6             1.29                4,222
     Probable                     368.4             0.96               11,351
     P&P                          470.0             1.03               15,573
     Resources (2)
     Measured                     124.5             1.36                5,424
     Indicated                    554.3             1.00               17,836
     M&I                          678.8             1.07               23,261
     Inferred                     208.5             0.86                5,785


     1.   After a 95% mining recovery rate; Mining dilution factor of 15.5%.
     2.   Inclusive of mineral reserves.




36
Block Model – Gold Distribution
                                        Approx. 3 M oz between 0.3-0.5 g/t Au
                  1,600
                                                  Stockpile over LOM                                                     OK (oz Au)
                                                  0.3-0.5 g/t material                                                   ID3 (oz Au)
                  1,400

                  1,200
 Ounces (000’s)




                  1,000

                   800

                   600

                   400

                   200

                     0    0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0

                                                                           Cut-off BINs
37
Grade Control
             DDH     RC G/C
     Bench
     6264m




             DDH     RC G/C
     Bench
     6252m




38
Management & Directors
     Management
      Gerald Panneton               Pat Donovan                  Andrew Croal
         Founder, President & CEO     VP Corporate Development       Director Technical Services
         Director                    James Mavor                  Laurie Gaborit
      Michael Kenyon                  VP Finance                    Director Investor Relations
         Executive Chairman          Rachel Pineault              Jean-Francois Metail
      Paul Martin                     VP HR & Northern Affairs      Director Reserves and Resources
         CFO                         James Robertson              Greg Miazga
      Pierre Beaudoin                VP Environment &               Director Construction & Engineering
         Sr VP Capital Projects       Sustainability
                                                                   Bill Snelling
      Derek Teevan                  Eric Josipovic                 Director Corporate Systems & Controls
         Sr VP External &             Controller
                                                                   Christian Brousseau
         Aboriginal Affairs          Drew Anwyll                    Project Manager
      Julie Galloway                 Director of Operations
         Sr VP General Counsel &                                   Patrik Gillerstedt
         Corporate Secretary                                         Mine Manager

     Directors
        Peter Crossgrove            Michael Kenyon               Jonathan Rubenstein
        Louis Dionne                Alex G. Morrison             Graham Wozniak
        Robert E. Doyle             Gerald Panneton
        Ingrid Hibbard
39
Contact Information

     Gerald Panneton
     President & CEO
     Email: gpanneton@detourgold.com
     Phone: 416.304.0800

     Laurie Gaborit
     Director Investor Relations
     Email: lgaborit@detourgold.com
     Phone: 416.304.0800


     www.detourgold.com




40

More Related Content

What's hot

21st Annual BMO Capital Markets Global Metals & Mining Conference
21st Annual BMO Capital Markets Global Metals & Mining Conference21st Annual BMO Capital Markets Global Metals & Mining Conference
21st Annual BMO Capital Markets Global Metals & Mining ConferenceDetourGold
 
July 24, 2012 Corporate Presentation
July 24, 2012 Corporate PresentationJuly 24, 2012 Corporate Presentation
July 24, 2012 Corporate PresentationDetourGold
 
Corporate Presentation June 18-22, 2012
Corporate Presentation June 18-22, 2012Corporate Presentation June 18-22, 2012
Corporate Presentation June 18-22, 2012DetourGold
 
Chevron 2008 2Q Earnings Conference Call Presentation (color)
Chevron 2008 2Q Earnings Conference Call Presentation (color)Chevron 2008 2Q Earnings Conference Call Presentation (color)
Chevron 2008 2Q Earnings Conference Call Presentation (color)finance1
 
Chevron 2008 3Q Earnings Conference Call Presentation (color)
Chevron 2008 3Q Earnings Conference Call Presentation (color)Chevron 2008 3Q Earnings Conference Call Presentation (color)
Chevron 2008 3Q Earnings Conference Call Presentation (color)finance1
 
Dgc 13 02_24-27_bmo metals and mining conference
Dgc 13 02_24-27_bmo metals and mining conferenceDgc 13 02_24-27_bmo metals and mining conference
Dgc 13 02_24-27_bmo metals and mining conferenceDetourGold
 
Avion corporate presentation - Jan 2011
Avion corporate presentation - Jan 2011Avion corporate presentation - Jan 2011
Avion corporate presentation - Jan 2011Avion Gold Corp
 
Exelon Corporation Investor Conference
Exelon Corporation Investor ConferenceExelon Corporation Investor Conference
Exelon Corporation Investor Conferencefinance14
 
Avion Corporate Presentation January 18 2011
Avion Corporate Presentation January 18 2011Avion Corporate Presentation January 18 2011
Avion Corporate Presentation January 18 2011Avion Gold Corp
 
John Hollowell – Deepwater operations
John Hollowell – Deepwater operationsJohn Hollowell – Deepwater operations
John Hollowell – Deepwater operationsShell plc
 
Scoffone citi climate_conference_06062011
Scoffone citi climate_conference_06062011Scoffone citi climate_conference_06062011
Scoffone citi climate_conference_06062011Shell plc
 
Media webcast presentation Royal Dutch Shell third quarter 2012 results
Media webcast presentation Royal Dutch Shell third quarter 2012 resultsMedia webcast presentation Royal Dutch Shell third quarter 2012 results
Media webcast presentation Royal Dutch Shell third quarter 2012 resultsShell plc
 
SPDC Flares Reduction Programme
SPDC Flares Reduction ProgrammeSPDC Flares Reduction Programme
SPDC Flares Reduction ProgrammeShell plc
 
Shell Q3 2008 Presentations
Shell Q3 2008 PresentationsShell Q3 2008 Presentations
Shell Q3 2008 Presentationsearningsreport
 
Credit Suisse Vertical Tour
Credit Suisse Vertical TourCredit Suisse Vertical Tour
Credit Suisse Vertical Tourfinance1
 
Analyst webcast presentation Royal Dutch Shell third quarter 2012 results
Analyst webcast presentation Royal Dutch Shell third quarter 2012 resultsAnalyst webcast presentation Royal Dutch Shell third quarter 2012 results
Analyst webcast presentation Royal Dutch Shell third quarter 2012 resultsShell plc
 
2011 strategy update - March 15, 2011
2011 strategy update - March 15, 2011 2011 strategy update - March 15, 2011
2011 strategy update - March 15, 2011 Shell plc
 
Evandro Gueiros - proposed Shell and Cosan Downstream & Biofuels JV in Brazil...
Evandro Gueiros - proposed Shell and Cosan Downstream & Biofuels JV in Brazil...Evandro Gueiros - proposed Shell and Cosan Downstream & Biofuels JV in Brazil...
Evandro Gueiros - proposed Shell and Cosan Downstream & Biofuels JV in Brazil...Shell plc
 
Media webcast presentation Royal Dutch Shell third quarter 2011 results
Media webcast presentation Royal Dutch Shell third quarter 2011 resultsMedia webcast presentation Royal Dutch Shell third quarter 2011 results
Media webcast presentation Royal Dutch Shell third quarter 2011 resultsShell plc
 

What's hot (19)

21st Annual BMO Capital Markets Global Metals & Mining Conference
21st Annual BMO Capital Markets Global Metals & Mining Conference21st Annual BMO Capital Markets Global Metals & Mining Conference
21st Annual BMO Capital Markets Global Metals & Mining Conference
 
July 24, 2012 Corporate Presentation
July 24, 2012 Corporate PresentationJuly 24, 2012 Corporate Presentation
July 24, 2012 Corporate Presentation
 
Corporate Presentation June 18-22, 2012
Corporate Presentation June 18-22, 2012Corporate Presentation June 18-22, 2012
Corporate Presentation June 18-22, 2012
 
Chevron 2008 2Q Earnings Conference Call Presentation (color)
Chevron 2008 2Q Earnings Conference Call Presentation (color)Chevron 2008 2Q Earnings Conference Call Presentation (color)
Chevron 2008 2Q Earnings Conference Call Presentation (color)
 
Chevron 2008 3Q Earnings Conference Call Presentation (color)
Chevron 2008 3Q Earnings Conference Call Presentation (color)Chevron 2008 3Q Earnings Conference Call Presentation (color)
Chevron 2008 3Q Earnings Conference Call Presentation (color)
 
Dgc 13 02_24-27_bmo metals and mining conference
Dgc 13 02_24-27_bmo metals and mining conferenceDgc 13 02_24-27_bmo metals and mining conference
Dgc 13 02_24-27_bmo metals and mining conference
 
Avion corporate presentation - Jan 2011
Avion corporate presentation - Jan 2011Avion corporate presentation - Jan 2011
Avion corporate presentation - Jan 2011
 
Exelon Corporation Investor Conference
Exelon Corporation Investor ConferenceExelon Corporation Investor Conference
Exelon Corporation Investor Conference
 
Avion Corporate Presentation January 18 2011
Avion Corporate Presentation January 18 2011Avion Corporate Presentation January 18 2011
Avion Corporate Presentation January 18 2011
 
John Hollowell – Deepwater operations
John Hollowell – Deepwater operationsJohn Hollowell – Deepwater operations
John Hollowell – Deepwater operations
 
Scoffone citi climate_conference_06062011
Scoffone citi climate_conference_06062011Scoffone citi climate_conference_06062011
Scoffone citi climate_conference_06062011
 
Media webcast presentation Royal Dutch Shell third quarter 2012 results
Media webcast presentation Royal Dutch Shell third quarter 2012 resultsMedia webcast presentation Royal Dutch Shell third quarter 2012 results
Media webcast presentation Royal Dutch Shell third quarter 2012 results
 
SPDC Flares Reduction Programme
SPDC Flares Reduction ProgrammeSPDC Flares Reduction Programme
SPDC Flares Reduction Programme
 
Shell Q3 2008 Presentations
Shell Q3 2008 PresentationsShell Q3 2008 Presentations
Shell Q3 2008 Presentations
 
Credit Suisse Vertical Tour
Credit Suisse Vertical TourCredit Suisse Vertical Tour
Credit Suisse Vertical Tour
 
Analyst webcast presentation Royal Dutch Shell third quarter 2012 results
Analyst webcast presentation Royal Dutch Shell third quarter 2012 resultsAnalyst webcast presentation Royal Dutch Shell third quarter 2012 results
Analyst webcast presentation Royal Dutch Shell third quarter 2012 results
 
2011 strategy update - March 15, 2011
2011 strategy update - March 15, 2011 2011 strategy update - March 15, 2011
2011 strategy update - March 15, 2011
 
Evandro Gueiros - proposed Shell and Cosan Downstream & Biofuels JV in Brazil...
Evandro Gueiros - proposed Shell and Cosan Downstream & Biofuels JV in Brazil...Evandro Gueiros - proposed Shell and Cosan Downstream & Biofuels JV in Brazil...
Evandro Gueiros - proposed Shell and Cosan Downstream & Biofuels JV in Brazil...
 
Media webcast presentation Royal Dutch Shell third quarter 2011 results
Media webcast presentation Royal Dutch Shell third quarter 2011 resultsMedia webcast presentation Royal Dutch Shell third quarter 2011 results
Media webcast presentation Royal Dutch Shell third quarter 2011 results
 

Viewers also liked (20)

Cap1 limites e continuidade
Cap1   limites e continuidadeCap1   limites e continuidade
Cap1 limites e continuidade
 
25 01-12 1è
25 01-12 1è25 01-12 1è
25 01-12 1è
 
Cambios de base
Cambios de baseCambios de base
Cambios de base
 
Informativo=março
Informativo=marçoInformativo=março
Informativo=março
 
565656
565656 565656
565656
 
Test11
Test11Test11
Test11
 
1234567
12345671234567
1234567
 
Bubble sort
Bubble sortBubble sort
Bubble sort
 
Robotica .1
Robotica .1Robotica .1
Robotica .1
 
Coleção Novos Comunicadores
Coleção Novos ComunicadoresColeção Novos Comunicadores
Coleção Novos Comunicadores
 
777777
777777777777
777777
 
Formatos capacidad de carga impresion
Formatos capacidad de carga   impresionFormatos capacidad de carga   impresion
Formatos capacidad de carga impresion
 
FRSA Flash 9 DEC 2011
FRSA Flash 9 DEC  2011FRSA Flash 9 DEC  2011
FRSA Flash 9 DEC 2011
 
Olimpiada excel formato
Olimpiada excel formatoOlimpiada excel formato
Olimpiada excel formato
 
123 system
123 system123 system
123 system
 
Gggggg
GgggggGggggg
Gggggg
 
Luna1
Luna1Luna1
Luna1
 
11. cambios base
11. cambios base11. cambios base
11. cambios base
 
44444444
4444444444444444
44444444
 
AEMAB-24: informe mensual noviembre 2015
AEMAB-24: informe mensual noviembre 2015AEMAB-24: informe mensual noviembre 2015
AEMAB-24: informe mensual noviembre 2015
 

Similar to Corporate Presentation

Corporate Presentation - June 2012
Corporate Presentation - June 2012Corporate Presentation - June 2012
Corporate Presentation - June 2012DetourGold
 
Avion Corporate Presentation Feb 2011
Avion Corporate Presentation Feb 2011Avion Corporate Presentation Feb 2011
Avion Corporate Presentation Feb 2011Avion Gold Corp
 
Dgc 13 01_20-21_cambridge house vric
Dgc 13 01_20-21_cambridge house vricDgc 13 01_20-21_cambridge house vric
Dgc 13 01_20-21_cambridge house vricDetourGold
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate PresentationAvion Gold Corp
 
презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010
презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010
презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010evraz_company
 
Avion Corporate Presentation 2011 03-22
Avion Corporate Presentation 2011 03-22Avion Corporate Presentation 2011 03-22
Avion Corporate Presentation 2011 03-22Avion Gold Corp
 
Avion corporate presentation 2011 03-24
Avion corporate presentation 2011 03-24Avion corporate presentation 2011 03-24
Avion corporate presentation 2011 03-24Avion Gold Corp
 
Simon Henry - Credit Suisse conference in Vail Colorado, February 8, 2012
Simon Henry - Credit Suisse conference in Vail Colorado, February 8, 2012Simon Henry - Credit Suisse conference in Vail Colorado, February 8, 2012
Simon Henry - Credit Suisse conference in Vail Colorado, February 8, 2012Shell plc
 
National Bank Financial London Gold Conference Corporate Presentation
National Bank Financial London Gold Conference Corporate PresentationNational Bank Financial London Gold Conference Corporate Presentation
National Bank Financial London Gold Conference Corporate PresentationDetourGold
 
terex Gabelli120408
terex Gabelli120408terex Gabelli120408
terex Gabelli120408finance42
 
terex Gabelli120408
terex Gabelli120408terex Gabelli120408
terex Gabelli120408finance42
 
Avion Corporate Presentation 2011-06-09
Avion Corporate Presentation 2011-06-09Avion Corporate Presentation 2011-06-09
Avion Corporate Presentation 2011-06-09Avion Gold Corp
 
Avion Corporate Presentation 2011-06-15
Avion Corporate Presentation 2011-06-15Avion Corporate Presentation 2011-06-15
Avion Corporate Presentation 2011-06-15Avion Gold Corp
 
Corporate presentation april
Corporate presentation   aprilCorporate presentation   april
Corporate presentation aprilMPX_RI
 
Avion Gold Corporate Presentation
Avion Gold Corporate PresentationAvion Gold Corporate Presentation
Avion Gold Corporate PresentationAvion Gold Corp
 
Institutional presentation eng
Institutional presentation  engInstitutional presentation  eng
Institutional presentation engosxri
 
Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate PresentationDetourGold
 

Similar to Corporate Presentation (20)

Corporate Presentation - June 2012
Corporate Presentation - June 2012Corporate Presentation - June 2012
Corporate Presentation - June 2012
 
Avion Corporate Presentation Feb 2011
Avion Corporate Presentation Feb 2011Avion Corporate Presentation Feb 2011
Avion Corporate Presentation Feb 2011
 
Q4 & 2012 Earnings
Q4 & 2012 EarningsQ4 & 2012 Earnings
Q4 & 2012 Earnings
 
02252013 bmo presentationupdated
02252013 bmo presentationupdated02252013 bmo presentationupdated
02252013 bmo presentationupdated
 
BMO Global Metals & Mining Conference 2013
BMO Global Metals & Mining Conference 2013BMO Global Metals & Mining Conference 2013
BMO Global Metals & Mining Conference 2013
 
Dgc 13 01_20-21_cambridge house vric
Dgc 13 01_20-21_cambridge house vricDgc 13 01_20-21_cambridge house vric
Dgc 13 01_20-21_cambridge house vric
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate Presentation
 
презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010
презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010
презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010
 
Avion Corporate Presentation 2011 03-22
Avion Corporate Presentation 2011 03-22Avion Corporate Presentation 2011 03-22
Avion Corporate Presentation 2011 03-22
 
Avion corporate presentation 2011 03-24
Avion corporate presentation 2011 03-24Avion corporate presentation 2011 03-24
Avion corporate presentation 2011 03-24
 
Simon Henry - Credit Suisse conference in Vail Colorado, February 8, 2012
Simon Henry - Credit Suisse conference in Vail Colorado, February 8, 2012Simon Henry - Credit Suisse conference in Vail Colorado, February 8, 2012
Simon Henry - Credit Suisse conference in Vail Colorado, February 8, 2012
 
National Bank Financial London Gold Conference Corporate Presentation
National Bank Financial London Gold Conference Corporate PresentationNational Bank Financial London Gold Conference Corporate Presentation
National Bank Financial London Gold Conference Corporate Presentation
 
terex Gabelli120408
terex Gabelli120408terex Gabelli120408
terex Gabelli120408
 
terex Gabelli120408
terex Gabelli120408terex Gabelli120408
terex Gabelli120408
 
Avion Corporate Presentation 2011-06-09
Avion Corporate Presentation 2011-06-09Avion Corporate Presentation 2011-06-09
Avion Corporate Presentation 2011-06-09
 
Avion Corporate Presentation 2011-06-15
Avion Corporate Presentation 2011-06-15Avion Corporate Presentation 2011-06-15
Avion Corporate Presentation 2011-06-15
 
Corporate presentation april
Corporate presentation   aprilCorporate presentation   april
Corporate presentation april
 
Avion Gold Corporate Presentation
Avion Gold Corporate PresentationAvion Gold Corporate Presentation
Avion Gold Corporate Presentation
 
Institutional presentation eng
Institutional presentation  engInstitutional presentation  eng
Institutional presentation eng
 
Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate Presentation
 

More from DetourGold

Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDetourGold
 
Dgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDetourGold
 
Dgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDetourGold
 
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation   dgc 17-01_31 _ q4 ops 2017 guidance webcastPresentation   dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcastDetourGold
 
Dgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDetourGold
 
Dgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDetourGold
 
Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1DetourGold
 
Dgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDetourGold
 
Dgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDetourGold
 
Dgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDetourGold
 
Dgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDetourGold
 
BMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLBMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLDetourGold
 
Dgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDetourGold
 
Dgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDetourGold
 
Dgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDetourGold
 
Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1DetourGold
 
Dgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDetourGold
 
Dgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conferenceDgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conferenceDetourGold
 
Dgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentationDgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentationDetourGold
 
Dgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDetourGold
 

More from DetourGold (20)

Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentationDgc 17 04_4-6_dgf zurich corporate 1x1 presentation
Dgc 17 04_4-6_dgf zurich corporate 1x1 presentation
 
Dgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentationDgc 17 03_24_corporate presentation
Dgc 17 03_24_corporate presentation
 
Dgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_finalDgc 17 02_27 - bmo presentation_final
Dgc 17 02_27 - bmo presentation_final
 
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation   dgc 17-01_31 _ q4 ops 2017 guidance webcastPresentation   dgc 17-01_31 _ q4 ops 2017 guidance webcast
Presentation dgc 17-01_31 _ q4 ops 2017 guidance webcast
 
Dgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentationDgc 16 11_8-9 - corporate presentation
Dgc 16 11_8-9 - corporate presentation
 
Dgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentationDgc 16 11_02 - corporate presentation
Dgc 16 11_02 - corporate presentation
 
Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1Dgc 16 09_18-21 - dgf conference_1x1
Dgc 16 09_18-21 - dgf conference_1x1
 
Dgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conferenceDgc 16 09_08 - baml conference
Dgc 16 09_08 - baml conference
 
Dgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentationDgc 16 08_30-31 - corporate presentation
Dgc 16 08_30-31 - corporate presentation
 
Dgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conferenceDgc 16 06_14-15 - rbc conference
Dgc 16 06_14-15 - rbc conference
 
Dgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conferenceDgc 16 05_10-12 - BAML conference
Dgc 16 05_10-12 - BAML conference
 
BMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FLBMO Global Metals & Mining Conference - Hollywood, FL
BMO Global Metals & Mining Conference - Hollywood, FL
 
Dgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentationDgc 16 02_09-10 - corporate presentation
Dgc 16 02_09-10 - corporate presentation
 
Dgc 16 01_26 - td conference
Dgc 16 01_26 - td conferenceDgc 16 01_26 - td conference
Dgc 16 01_26 - td conference
 
Dgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conference
 
Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1Dgc 15 12_1-2 - scotia mining conference 1-1
Dgc 15 12_1-2 - scotia mining conference 1-1
 
Dgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forumDgc 15 11_17 - rj texas gold investor forum
Dgc 15 11_17 - rj texas gold investor forum
 
Dgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conferenceDgc 15 11_10 - nbf-tsx canadian miners conference
Dgc 15 11_10 - nbf-tsx canadian miners conference
 
Dgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentationDgc 15 10_29 - corporate presentation
Dgc 15 10_29 - corporate presentation
 
Dgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentationDgc 15 09_20-23 - dgf 1x1 presentation
Dgc 15 09_20-23 - dgf 1x1 presentation
 

Corporate Presentation

  • 1. CANADA’S NEXT INTERMEDIATE GOLD PRODUCER Corporate Presentation January 16, 2013 1
  • 2. Forward Looking Information This presentation contains certain forward-looking information as defined in applicable securities laws (referred to herein as “forward-looking statements”). Specifically, this presentation contains forward-looking statements regarding the reserve and resource estimates, ore grade, expected mine life, anticipated gold production, gold recovery, cash operating costs and other costs, capital costs, sensitivity to metal prices and other sensitivities, financial analysis of the project, commencement of operations, potential expansion opportunities, and plans for organic growth. Forward-looking statements involve known and unknown risks, uncertainties and other factors which are beyond Detour Gold’s ability to predict or control and may cause Detour Gold’s actual results, performance or achievements to be materially different from any of its future results, performance or achievements expressed or implied by forward-looking statements. These risks, uncertainties and other factors include, but are not limited to, gold price volatility, changes in debt and equity markets, the uncertainties involved in interpreting geological data, increases in costs, environmental compliance and changes in environmental legislation and regulation, interest rate and exchange rate fluctuations, general economic conditions and other risks involved in the gold exploration and development industry, as well as those risk factors discussed in the section entitled “Description of Business - Risk Factors” in Detour Gold’s 2011 AIF and in the continuous disclosure documents filed by Detour Gold on and available on SEDAR at www.sedar.com. Such forward-looking statements are also based on a number of assumptions which may prove to be incorrect, including, but not limited to, assumptions about the following: the supply and demand for gold, and the level and volatility of the price of gold; the availability of financing for exploration and development activities; the estimated timeline for the development of the Detour Lake gold project; the expected mine life; anticipated gold production; gold recovery; the development schedule; cash operating costs and other costs; the financial analysis for the project; capital costs; sensitivity to metal prices and other sensitivities; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; the receipt of necessary permits; market competition; ongoing relations with employees and impacted communities; and general business and economic conditions. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date hereof, or such other date or dates specified in such statements. Detour Gold undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein whether as a result of new information or future events or otherwise, except as may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements. 2
  • 3. NI-43 101 Disclosure Information Containing Estimates of Mineral Reserves and Resources The mineral reserve and resource estimates reported in this presentation were prepared in accordance with Canadian National Instrument 43-101Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities regulatory authorities. For United States reporting purposes, the United States Securities and Exchange Commission (“SEC”) applies different standards in order to classify mineralization as a reserve. In particular, while the terms “measured,” “indicated” and “inferred” mineral resources are required pursuant to NI 43-101, the SEC does not recognize such terms. Canadian standards differ significantly from the requirements of the SEC. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories constitute or will ever be converted into reserves. In addition, “inferred” mineral resources have a great amount of uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian securities laws, issuers must not make any disclosure of results of an economic analysis that includes inferred mineral resources, except in rare cases. On September 4, 2012, Detour Gold announced an updated mine production plan for the Detour Lake project. The NI 43-101 compliant Technical Report for this update was filed on SEDAR on October 18, 2012. The following QPs participated in this update: BBA Inc., under the direction of André Allaire, Eng., Vice-President, Markets – Mining and Metals and Patrice Live, Eng., Mining Manager; SGS Canada Inc., under the direction of Michel Dagbert, Eng., Senior Geostatistician and Maxime Dupéré, P.Geo., Senior Geologist; and AMEC Environment & Infrastructure, a Division of AMEC Americas Limited, David G. Ritchie M.Eng., P.Eng, Senior Associate Geotechnical Engineer. 3
  • 4. Invest in Detour Gold Our Vision  Focus on a world-class asset – Detour Lake  Canada’s largest pure gold play with 15.6 M oz in reserves  Gold processing initiated in January 2013  One of the best cash flow/share opportunities  Average annual gold production of 657,000 oz  Excellent organic growth potential (5 year plan)  Potential expansion of mill throughput 4
  • 5. Share Capital OPTIONS & FN SHARE COMMITMENTS ISSUED AND 8.9 M OUTSTANDING FULLY DILUTED CONVERTIBLE 117.6M 139.5 M NOTES 13.0 M  Market cap: C$2.8 billion  Cash position: C$236 million  Major shareholders:  Paulson & Co. 15%  Carmignac Gestion 5%  Detour Gold Mgmt <2%  Institutions total >90% Note: Cash position and share data at December 31, 2012. An additional 0.3 M shares were issued in January 2013 following partial exercise of the over- allotment option. 5
  • 6. Share Capital 1000% Share Issuance vs. Performance 900% 800% 580% total DGC DGC 08/11 01/12 DGC return since IPO Jan. 2007 to Present Total Return 700% 11/12 DGC 600% 07/10 500% DGC 04/08 400% Randgold DGC 300% 11/09 DGC 200% 07/09 AGI Eldorado Osisko Buenaventura 100% (239%) Aurizon Yamana Newcrest IMG NEM G IPO ABX AEM 0% Anglo Gold Ashanti Hecla AuRico CG Goldfields Kinross Great Basin GSC Gabriel Eco Oro (209%) Andina -100% 0 50 100 150 200 Jan. 2007 to Present % Change in Shares Outstanding Source: BMO, Nov. 2012 Note: Date of DGC equity financings 6
  • 7. Successful Focused Approach Record Timing from “Discovery” to Projected Production Detour Lake in 6 years 2007 2009 2010 2011-12 2013 PRODUCTION 2013 ACQUISITION PRE-FEASIBILITY FEASIBILITY DEVELOPMENT PRODUCTION /DISCOVERY STUDY STUDY & PERMITTING 7
  • 8. 2013 Objectives H1 2013  First gold pour  Commissioning of second production line  Securing $90 million credit facility  20,000 m drilling program targeting high-grade gold mineralization H2 2013  Declaring commercial production  Gold production target of +350,000 ounces for the year  Completing pre-feasibility study on Block A  Advancing evaluation of mine expansion scenarios  Revising block model for Detour Lake 8
  • 9. Detour Lake Profile September 2012 Detour Lake Mine Plan(1) Open pit Production Start Q1 2013 @ 0.5 g/t cut-off 20,600E OP Reserves (M oz) 15.6 Mill throughput (tpd) 55,000 Strip Ratio (waste:ore) 3.7 Gold recoveries 91% 16,500E Average grade (g/t) 1.03 Estimated mine life (yrs) 21.5 700 m 1.0 g/t Au Avg. Production (oz/yr) 657,000 0.5 - 1.0 g/t Au Cash operating costs (C$/oz) $710 <0.5 g/t Au Total cash costs (C$/oz) $749 Initial Capex (C$ B)(2) 1.45 (1) Gold price assumptions: US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015. (2) Revised to approx. C$1.5 B in news release dated November 8, 2012. 9
  • 10. Updated LOM Gold Production Gold Production (‘000 oz) Grade (g/t Au) 800 1.6 Avg. 657,000 oz/yr 700 1.4 600 1.2 500 1.0 400 0.8 300 0.6 200 0.4 100 0.2 0 0 10
  • 11. Updated LOM Operating Costs Breakdown of 2013-14 TCC Operating Costs (LOM) C$/t milled C$/t mined C$/oz Mining costs 11.65 2.49 388 LABOUR Processing cost 7.83 -- 260 18% POWER G&A 1.86 -- 62 12% DIESEL Cash operating costs 21.34 -- 710 MAINTENANCE 8% Royalty (2%) and other 1.26 -- 42 22% G&A Refining 0.12 -- 4 5% Silver credit (0.20) -- (7) CONSUMABLES ROYALTY+ OTHER Total cash costs (TCC) 22.52 -- 749 29% (2% NSR) 6% A 10% change in: Diesel or power costs = $9/oz change in TCC Cdn$ FX rate = $63/oz in TCC 11
  • 12. Financial Analysis Base Case Assumptions  Gold - US$1,200/oz (1)  Power Cdn $0.065/kwh  F/X - $Cdn/$US = 1.00  Diesel US$100/barrel (WTI) Base Case (1) US$ Billions Undiscounted (0%) 5.0% Pre-tax cash flow 4.3 1.7 Net cash flow after tax 3.0 1.1 Pre-tax IRR 14.4% 1. Gold price US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015. @ US$1,600/oz 12-12-23 US$ Billions Undiscounted (0%) 5.0% Pre-tax cash flow 9.4 4.4 Net cash flow after tax 6.6 3.0 Pre-tax IRR 24.6% 12 49
  • 14. 2013 Forecast Guidance  350,000 oz to 400,000 oz of gold  Total cash costs between C$800/oz and C$900/oz (on commercial production of 200,000 oz to 250,000 oz sold)  Estimated LOM sustaining capital of C$1.2 B:  2013 = C$180 M (<$80 M in H1)  2014 = C$140 M 14
  • 15. Mining Production Status 2012 Pre-Stripping (Year-end 2012) Overburden/Till 15.1 Mt Waste 7.7 Mt Low Grade (0.3-0.5 g/t) 1.1 Mt Ore 2.2 Mt Total 26.1 Mt  2.2 Mt ore inventory on ROMs and short-term stockpiles (reconciled average grade of approx. 0.7 g/t) (till dilution on first bench)  Average mining rates of +115,000 tpd in December 2012  Mining operation on 24 hrs/day, 365 days/yr 15
  • 16. Mining Production NORTH WASTE MINERALIZED DUMP PLANT SITE ZONE CAMPBELL PIT CURRENT PIT SHAPE APPROX. PIT SHELL AT END OF LOM Satellite image dated July 2012 16
  • 17. Detour Lake Open Pit Mine 12-10-22 17
  • 19. Overview Detour Lake Facilities SECONDARY CRUSHERS STOCKPILE RECLAIM GEODESIC DOME PRIMARY CRUSHER 12-10-22 19
  • 20. Primary Crusher (100,000 tpd capacity) 12-10-02 Gyro is 9 m high 35 m to surface 20
  • 21. Stockpile Reclaim (2 days capacity) 12-12-02 12-12-23 12-12-23 21
  • 22. Processing Plant  Conventional gravity and CIP plant  55,000 tpd (=92% availability of 60,000 tpd capacity)  2 parallel lines (each with 1 secondary cone crusher + 1 SAG & 1 ball mill)  Estimated gravity recovery: 30-40%  Estimated overall gold recovery: 91.0%  Leach time 29 hours; leach feed size 80% passing 95 μm 12-12-23 22
  • 23. Simple Process Plant @ 92% Availability Stockpile Gyratory 12 h live capacity crusher: 60” x 113” 90,000 tpd Secondary crushers: 2 X XL-1100 Ball mills: SAG mills: 2 X 26’ x 40’6’’, 15MW 67,000 tpd 2 X 36’ x 20’, 15MW 55,000 tpd Pebble crushers: 55,000 tpd 2 X XL-1100 To 73,000 tpd leaching circuit To gravity circuit Circ. load Circ. load From 28 % Leach circuit: 250 % gravity circuit  55,000 tpd + 15% contingency in piping capacity 23
  • 24. Tailings Management Area (TMA) 12-10-22 24
  • 25. DGC Employees: Hiring Local First On track with ramp up schedule: 423 employees at December 31, 2012* DIVISION OF LABOUR WORKFORCE ORIGIN COCHRANE FRONT LINE AREA COCHRANE 81% 26% 25% REST OF PROFESSIONAL ONTARIO NORTHERN 19% ONTARIO 3% 43% OTHER 2%  Professional are: MGMT, Eng., Geo., Supt.  Front Line are: Operators, Admin, Support  Continuing focus on hiring local/regional * Excludes Corporate office.  25% of employees are Aboriginal 25
  • 26. PLANNING FOR 26 ORGANIC GROWTH Under-Explored Greenstone Belt
  • 27. Planning for Organic Growth 5 Year Plan for Successful Organic Growth Large prospective land position of approx. 566 km2 • Two main gold structures with total strike length of >80km • Continue focus on Detour Lake deposit extension (northern structure i.e. Block A) • Test targets on structure south of Detour Lake Future objectives  Grow reserve base to +20 M oz (@ US$850/oz)  Increase mill throughput to above 75,000 tpd for gold production output of +800,000 oz/yr  Find high-grade ore near-surface within trucking distance to supplement mill 27
  • 28. Successful Growth of Resources Resource Growth Exceeding 750% Since IPO Date Accumulative Resources/Reserves (M oz) DGC Drilling Inferred M&I 2P 10M 20M 30M 2005-05 Estimated by Pelangio 2006-09 DGC due diligence 2007-12 50,000m 2008-06 123,000m 2009-09 249,000m 8.8 2010-06 334,000m $850/oz 11.4 2011-01 430,000m $850/oz 14.9 2012-01 523,000m $850/oz 15.6 28
  • 29. Priority #1 – Block A Target Block A Pre-feasibility  Block A pre-feasibility study by year-end 2013  Evaluate potential expansion options *Not updated with TWD Dec. 30th PR. On Dec. 1, 2011, Detour Gold announced the acquisition of TWD. 29
  • 30. Priority #1 – Block A Target Block A near-surface resource 2012 DH 2012 extension DH Detour Lake DH included in 2011 year-end 2011 year-end reserves = 15.6 M oz reserves DH not included in 2011 year-end reserves Historical DH 30
  • 31. Priority #2 – South Structure 15.6 M oz in Reserves 20,000 m in 2013 MMI Survey Coverage MMI Au Anomaly Existing DDH Gold occurrence (OGS) DDH intersection >1g/2m DDH intersection >1g/10m *Note: Excludes drilling around Detour Lake and M zone (Block A). 31
  • 32. Invest in Detour Gold Our Vision  Focus on a world-class asset – Detour Lake  Canada’s largest pure gold play with 15.6 M oz in reserves  Gold processing initiated in January 2013  One of the best cash flow/share opportunities  Average annual gold production of 657,000 oz  Excellent organic growth potential (5 year plan)  Potential expansion of mill throughput 32
  • 34. Detour Lake Profile January 2011 September 2012 Detour Lake Update (2) Mine Plan(3) Gold price (US$/oz) (1) 850 1,200 Foreign exchange rate (US$/Cdn$) 1.10 1.00 Assumptions Fuel price (US$/barrel) 80 100 Income/mining tax rate (%) 25/10 25/10 Net Smelter Royalty (%) 2 2 Ore milled (Mt) 449.6 470.0 Waste mined (Mt) (4) 1,654 1,734 Mine Strip ratio (waste:ore) 3.9 3.7 Parameters Average gold grade (g/t) 1.03 1.03 Total contained gold (M oz) 14.9 15.6 Estimated gold recovery (%) 91.0 91.0 Total recovered gold (M oz) 13.5 14.1 Mine life (years) 21 21.5 Average annual gold production (oz) 657,000 657,000 1. US$1,600/oz for 2013, US$1,500/oz for 2014, and US$1,400/oz for 2015. 2. Press release Jan. 31, 2011 with Technical Report dated Mar. 15, 2011. 3. Press release Sept. 4, 2012 with Technical Report dated Oct. 18, 2012. 4. Includes low-grade stockpile. 34
  • 35. Gold Production/Cost Profile Gold Production (‘000 oz) Total Cash Costs (C$/oz) 800 Avg. C$749/oz 900 700 850 600 800 500 750 400 700 300 650 200 600 100 550 0 500 Note: Excludes stripping adjustments. 35
  • 36. Detour Lake Reserves & Resources As at December 31, 2011 Tonnes Grade Contained Gold @ US$850/oz (millions) (g/t) (‘000 oz) Reserves (1) Proven 101.6 1.29 4,222 Probable 368.4 0.96 11,351 P&P 470.0 1.03 15,573 Resources (2) Measured 124.5 1.36 5,424 Indicated 554.3 1.00 17,836 M&I 678.8 1.07 23,261 Inferred 208.5 0.86 5,785 1. After a 95% mining recovery rate; Mining dilution factor of 15.5%. 2. Inclusive of mineral reserves. 36
  • 37. Block Model – Gold Distribution Approx. 3 M oz between 0.3-0.5 g/t Au 1,600 Stockpile over LOM OK (oz Au) 0.3-0.5 g/t material ID3 (oz Au) 1,400 1,200 Ounces (000’s) 1,000 800 600 400 200 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0 Cut-off BINs 37
  • 38. Grade Control DDH RC G/C Bench 6264m DDH RC G/C Bench 6252m 38
  • 39. Management & Directors Management  Gerald Panneton  Pat Donovan  Andrew Croal Founder, President & CEO VP Corporate Development Director Technical Services Director  James Mavor  Laurie Gaborit  Michael Kenyon VP Finance Director Investor Relations Executive Chairman  Rachel Pineault  Jean-Francois Metail  Paul Martin VP HR & Northern Affairs Director Reserves and Resources CFO  James Robertson  Greg Miazga  Pierre Beaudoin VP Environment & Director Construction & Engineering Sr VP Capital Projects Sustainability  Bill Snelling  Derek Teevan  Eric Josipovic Director Corporate Systems & Controls Sr VP External & Controller  Christian Brousseau Aboriginal Affairs  Drew Anwyll Project Manager  Julie Galloway Director of Operations Sr VP General Counsel &  Patrik Gillerstedt Corporate Secretary Mine Manager Directors  Peter Crossgrove  Michael Kenyon  Jonathan Rubenstein  Louis Dionne  Alex G. Morrison  Graham Wozniak  Robert E. Doyle  Gerald Panneton  Ingrid Hibbard 39
  • 40. Contact Information Gerald Panneton President & CEO Email: gpanneton@detourgold.com Phone: 416.304.0800 Laurie Gaborit Director Investor Relations Email: lgaborit@detourgold.com Phone: 416.304.0800 www.detourgold.com 40