SlideShare a Scribd company logo
1 of 14
© 2014 Autodesk, Inc.
© 2014 Autodesk
The Value of BIM for Owners:
Save Time and Money During the Building Lifecycle
Presenter Name
Title
Event Name / Date
© 2014 Autodesk, Inc.
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
The cost to owners
Owner’s burden is about 2/3 of those
costs during ongoing operations.
Poor use of data coupled with highly fragmented teams cost the
US capital facilities industry $15.8 billion annually1
$15.8 billion
annually
© 2014 Autodesk, Inc.
© 2014 Autodesk
Problems owners face
30% of
construction
cost is rework2
Over 60% of major capital
programs fail to meet cost
and schedule targets1
55% of
maintenance
remains reactive3
© 2014 Autodesk, Inc.
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
A foundational, intelligent model-based process for business and
industry transformation
Building Information Modeling (BIM)
Uses 3D models to
capture, explore, and
maintain consistent
and coordinated
planning, design,
construction, and
operational data
Provides greater
project insight for
cost, schedule, and
constructability
Uses and shares the
same consistent data
whether you’re at
your desk or in the
field
Enables prompt
response to change
with processes that
are smarter and
faster
© 2014 Autodesk, Inc.
© 2014 Autodesk
Using BIM, owners can:
 Improve building quality
 Significantly reduce building
lifecycle costs
 Better understand design
projects from beginning to end
 Optimize operational efficiencies
 Increase occupancy and use
rates
BIM empowers owners
Transparency
Efficiency
Quality
BIM
© 2014 Autodesk, Inc.
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
Top BIM benefits for owners
17%
22%
30%
36%
61%
Reduced document errors and omissions
Reduced rework
Reduced construction cost
Reduce project duration
Fewer claims/litigation
Top internal business benefits of using BIM for construction
projects for owners
© 2014 Autodesk, Inc.
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
How BIM saves owners’ time and money
throughout the building lifecycle
Design Construction Management
© 2014 Autodesk, Inc.
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
BIM saves time and money in the design phase
Area
Conceptual design
Sustainable
building design
Create a building model and complete set of designs documents in an integrated
database, where everything is interconnected and there is real-time self-coordination of
information
Description Example
Quickly iterate on design elements
including building form,
sustainability, client requests,
municipal regulations, budget, and
more.
Conduct analyses and simulation
The Beck Group created 100 visualizations for a
church in Seoul and adjusted the shape of the
building to appear curved, but with flat glass, saving
over $1 million on glazing and mullions, and 1,000
hours of design time
Complete energy analysis early in
the design stage to reduce
ongoing energy consumption
Using BIM to evaluate design scenarios for energy
savings, NASA’s 50,000’ building in Silicon Valley
yielded features such as a steel-frame exoskeleton,
geothermal wells, natural ventilation, wastewater
treatment, and a photovoltaic roof that will provide
30% of the building’s power
Design Documentation
© 2014 Autodesk, Inc.
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
BIM saves time and money in the construction phase
Area Description Example
General construction
Pre-fabrication,
modular construction
 Links project planning to
construction planning and
simulation, as well as visualization
during construction and digital
fabrication
 Enhances project communication
and collaboration among teams
 Create more accurate cost
estimates
 Deliver more projects on time and
within budget
Contractor Robins and Morton used BIM to
design and construct an Augusta, Maine
hospital. Due to greater collaboration, the
project was completed ten months ahead of
schedule and returned approximately US$20
million in value-added savings.
 Extract information from BIM to pre-
fabricate building components to
improve project schedule, reduce
cost, improve site safety, and
produce greener construction
practices by reducing material waste
J.C. Cannistraro used BIM and pre-
fabrication to upgrade the central utility plant
for University of Massachusetts's Boston
campus helping to minimize installation time
of a new HVAC system and hangers
© 2014 Autodesk, Inc.
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
BIM saves time and money in the management phase
Area Description Examples
Lifecycle costs  Reuse building models and data to
better manage facility operations
 Analyze data-rich models to
optimize resources and reduce
waste and lower lifetime
maintenance and operation costs
 Use intelligent 3D models to help
manage space and perform spatial
validation for tenant chargebacks
 Shanghai Tower Construction &
Development Co. Ltd. used BIM not only
to design and build, but also to inform
operations of their super high-rise tower.
STC&D plans to use BIM for emergency
and property management going forward.
 The Government Services Administration
(GSA) is creating a database of its 3D
models to inform O&M and future
projects. Additional software leveraging
the 3D models will use its data for
security, updates, analysis, and reporting.
[We plan to] “extend the value of BIM to help our facility management staff plan
efficiently and manage the building scientifically.”
—Jianping Gu, Director and General Manager of STC&D
© 2014 Autodesk, Inc.
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
Adoption is increasing through mandates, smart building
initiatives, and owner edicts—creating a BIM tidal wave
 44% of owners predict they will
be at very high level of BIM
implementation by 2014
 BIM usage is increasing across
the board
Percentage of owners using BIM on
more than 60% of their projects1
18%
30%
44%
2009 2011 2014*
© 2014 Autodesk, Inc.
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
Customer ROI on BIM
Australia-wide adoption of
BIM/VDC across the supply
chain could enhance industry
productivity by up to
9 percent … ROI for BIM
implementation has been
reported as high as
500 percent.
U.S.-based Holder
Construction Group
calculated that based on
direct collision detection
savings, their return
on BIM has been
three to five times
direct BIM cost.
On a U.S. GSA federal
building renovation in
Portland, Oregon, the
integrated project delivery
team estimated that the use
of BIM for coordination
helped generate an
approximately
300 percent ROI.
© 2014 Autodesk, Inc.
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
The future of the building lifecycle
The relationship between digital systems and connected physical
things will only increase and strengthen
BIM empowers owners to capitalize
on the Era of Connection
 Compare design and construction
alternatives in context
 Leverage the Internet of Things for
ongoing operations
 Use BIM-enabled efficiencies and
capabilities as a new baseline for
owners
© 2014 Autodesk, Inc.
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
© 2014 Autodesk
Learn more
Download the McGraw-Hill
Construction Smart Report.
Download the Economist
Intelligence Unit report.

More Related Content

Similar to BIM for Owners.pptx

3D Modeling and Energy Analysis of a Residential Building using BIM Tools
3D Modeling and Energy Analysis of a Residential Building using BIM Tools3D Modeling and Energy Analysis of a Residential Building using BIM Tools
3D Modeling and Energy Analysis of a Residential Building using BIM ToolsIRJET Journal
 
Citation- Enchanted Storybrook Castle2
Citation- Enchanted Storybrook Castle2Citation- Enchanted Storybrook Castle2
Citation- Enchanted Storybrook Castle2Christian Munoz
 
Cape Cod Networking-BIM_MDESK
Cape Cod Networking-BIM_MDESKCape Cod Networking-BIM_MDESK
Cape Cod Networking-BIM_MDESKClarke Morrison
 
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)Bram Mommers
 
Zeidler_BIM_Brochure_08
Zeidler_BIM_Brochure_08Zeidler_BIM_Brochure_08
Zeidler_BIM_Brochure_08Ian Fairlie
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modelingNI BT
 
Benefits of Point Cloud to Revit Modeling for Architectural Projects.pdf
Benefits of Point Cloud to Revit Modeling for Architectural Projects.pdfBenefits of Point Cloud to Revit Modeling for Architectural Projects.pdf
Benefits of Point Cloud to Revit Modeling for Architectural Projects.pdfMax Stokes
 
BIM Dominating The Future of Architectural Design.pptx
BIM Dominating The Future of Architectural Design.pptxBIM Dominating The Future of Architectural Design.pptx
BIM Dominating The Future of Architectural Design.pptxTop BIM Company
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling reportKiran Birdi
 
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET Journal
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGIRJET Journal
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...IRJET Journal
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwaresRuchy Lakhani
 
As Built to BIM Services | Offshore Outsourcing India.pptx
As Built to BIM Services | Offshore Outsourcing India.pptxAs Built to BIM Services | Offshore Outsourcing India.pptx
As Built to BIM Services | Offshore Outsourcing India.pptxOffshore outsourcing India
 
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital constructionBIMLABS GLOBAL
 
BIM for substainable design-white paper
BIM for substainable design-white paperBIM for substainable design-white paper
BIM for substainable design-white paperMuhannad AbdulRaouf
 

Similar to BIM for Owners.pptx (20)

3D Modeling and Energy Analysis of a Residential Building using BIM Tools
3D Modeling and Energy Analysis of a Residential Building using BIM Tools3D Modeling and Energy Analysis of a Residential Building using BIM Tools
3D Modeling and Energy Analysis of a Residential Building using BIM Tools
 
Bim overview
Bim overviewBim overview
Bim overview
 
Citation- Enchanted Storybrook Castle2
Citation- Enchanted Storybrook Castle2Citation- Enchanted Storybrook Castle2
Citation- Enchanted Storybrook Castle2
 
Bim
BimBim
Bim
 
Cape Cod Networking-BIM_MDESK
Cape Cod Networking-BIM_MDESKCape Cod Networking-BIM_MDESK
Cape Cod Networking-BIM_MDESK
 
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
 
Zeidler_BIM_Brochure_08
Zeidler_BIM_Brochure_08Zeidler_BIM_Brochure_08
Zeidler_BIM_Brochure_08
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
Benefits of Point Cloud to Revit Modeling for Architectural Projects.pdf
Benefits of Point Cloud to Revit Modeling for Architectural Projects.pdfBenefits of Point Cloud to Revit Modeling for Architectural Projects.pdf
Benefits of Point Cloud to Revit Modeling for Architectural Projects.pdf
 
BIM Dominating The Future of Architectural Design.pptx
BIM Dominating The Future of Architectural Design.pptxBIM Dominating The Future of Architectural Design.pptx
BIM Dominating The Future of Architectural Design.pptx
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 
Bim&revit
Bim&revitBim&revit
Bim&revit
 
As Built to BIM Services | Offshore Outsourcing India.pptx
As Built to BIM Services | Offshore Outsourcing India.pptxAs Built to BIM Services | Offshore Outsourcing India.pptx
As Built to BIM Services | Offshore Outsourcing India.pptx
 
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital construction
 
BIM for substainable design-white paper
BIM for substainable design-white paperBIM for substainable design-white paper
BIM for substainable design-white paper
 
bim ppt 2 final
bim ppt 2 finalbim ppt 2 final
bim ppt 2 final
 

Recently uploaded

Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...nagunakhan
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation decktbatkhuu1
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Douxkojalkojal131
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️soniya singh
 
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...Amil baba
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Yantram Animation Studio Corporation
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...kumaririma588
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxTusharBahuguna2
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfParomita Roy
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptxVanshNarang19
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...BarusRa
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CANestorGamez6
 

Recently uploaded (20)

Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
Punjabi Housewife Call Girls Service Gomti Nagar \ 9548273370 Indian Call Gir...
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
NO1 Trending kala jadu Love Marriage Black Magic Punjab Powerful Black Magic ...
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
escort service sasti (*~Call Girls in Prasad Nagar Metro❤️9953056974
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
B. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdfB. Smith. (Architectural Portfolio.).pdf
B. Smith. (Architectural Portfolio.).pdf
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptx
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
 

BIM for Owners.pptx

  • 1. © 2014 Autodesk, Inc. © 2014 Autodesk The Value of BIM for Owners: Save Time and Money During the Building Lifecycle Presenter Name Title Event Name / Date
  • 2. © 2014 Autodesk, Inc. © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk The cost to owners Owner’s burden is about 2/3 of those costs during ongoing operations. Poor use of data coupled with highly fragmented teams cost the US capital facilities industry $15.8 billion annually1 $15.8 billion annually
  • 3. © 2014 Autodesk, Inc. © 2014 Autodesk Problems owners face 30% of construction cost is rework2 Over 60% of major capital programs fail to meet cost and schedule targets1 55% of maintenance remains reactive3
  • 4. © 2014 Autodesk, Inc. © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk A foundational, intelligent model-based process for business and industry transformation Building Information Modeling (BIM) Uses 3D models to capture, explore, and maintain consistent and coordinated planning, design, construction, and operational data Provides greater project insight for cost, schedule, and constructability Uses and shares the same consistent data whether you’re at your desk or in the field Enables prompt response to change with processes that are smarter and faster
  • 5. © 2014 Autodesk, Inc. © 2014 Autodesk Using BIM, owners can:  Improve building quality  Significantly reduce building lifecycle costs  Better understand design projects from beginning to end  Optimize operational efficiencies  Increase occupancy and use rates BIM empowers owners Transparency Efficiency Quality BIM
  • 6. © 2014 Autodesk, Inc. © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk Top BIM benefits for owners 17% 22% 30% 36% 61% Reduced document errors and omissions Reduced rework Reduced construction cost Reduce project duration Fewer claims/litigation Top internal business benefits of using BIM for construction projects for owners
  • 7. © 2014 Autodesk, Inc. © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk How BIM saves owners’ time and money throughout the building lifecycle Design Construction Management
  • 8. © 2014 Autodesk, Inc. © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk BIM saves time and money in the design phase Area Conceptual design Sustainable building design Create a building model and complete set of designs documents in an integrated database, where everything is interconnected and there is real-time self-coordination of information Description Example Quickly iterate on design elements including building form, sustainability, client requests, municipal regulations, budget, and more. Conduct analyses and simulation The Beck Group created 100 visualizations for a church in Seoul and adjusted the shape of the building to appear curved, but with flat glass, saving over $1 million on glazing and mullions, and 1,000 hours of design time Complete energy analysis early in the design stage to reduce ongoing energy consumption Using BIM to evaluate design scenarios for energy savings, NASA’s 50,000’ building in Silicon Valley yielded features such as a steel-frame exoskeleton, geothermal wells, natural ventilation, wastewater treatment, and a photovoltaic roof that will provide 30% of the building’s power Design Documentation
  • 9. © 2014 Autodesk, Inc. © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk BIM saves time and money in the construction phase Area Description Example General construction Pre-fabrication, modular construction  Links project planning to construction planning and simulation, as well as visualization during construction and digital fabrication  Enhances project communication and collaboration among teams  Create more accurate cost estimates  Deliver more projects on time and within budget Contractor Robins and Morton used BIM to design and construct an Augusta, Maine hospital. Due to greater collaboration, the project was completed ten months ahead of schedule and returned approximately US$20 million in value-added savings.  Extract information from BIM to pre- fabricate building components to improve project schedule, reduce cost, improve site safety, and produce greener construction practices by reducing material waste J.C. Cannistraro used BIM and pre- fabrication to upgrade the central utility plant for University of Massachusetts's Boston campus helping to minimize installation time of a new HVAC system and hangers
  • 10. © 2014 Autodesk, Inc. © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk BIM saves time and money in the management phase Area Description Examples Lifecycle costs  Reuse building models and data to better manage facility operations  Analyze data-rich models to optimize resources and reduce waste and lower lifetime maintenance and operation costs  Use intelligent 3D models to help manage space and perform spatial validation for tenant chargebacks  Shanghai Tower Construction & Development Co. Ltd. used BIM not only to design and build, but also to inform operations of their super high-rise tower. STC&D plans to use BIM for emergency and property management going forward.  The Government Services Administration (GSA) is creating a database of its 3D models to inform O&M and future projects. Additional software leveraging the 3D models will use its data for security, updates, analysis, and reporting. [We plan to] “extend the value of BIM to help our facility management staff plan efficiently and manage the building scientifically.” —Jianping Gu, Director and General Manager of STC&D
  • 11. © 2014 Autodesk, Inc. © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk Adoption is increasing through mandates, smart building initiatives, and owner edicts—creating a BIM tidal wave  44% of owners predict they will be at very high level of BIM implementation by 2014  BIM usage is increasing across the board Percentage of owners using BIM on more than 60% of their projects1 18% 30% 44% 2009 2011 2014*
  • 12. © 2014 Autodesk, Inc. © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk Customer ROI on BIM Australia-wide adoption of BIM/VDC across the supply chain could enhance industry productivity by up to 9 percent … ROI for BIM implementation has been reported as high as 500 percent. U.S.-based Holder Construction Group calculated that based on direct collision detection savings, their return on BIM has been three to five times direct BIM cost. On a U.S. GSA federal building renovation in Portland, Oregon, the integrated project delivery team estimated that the use of BIM for coordination helped generate an approximately 300 percent ROI.
  • 13. © 2014 Autodesk, Inc. © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk The future of the building lifecycle The relationship between digital systems and connected physical things will only increase and strengthen BIM empowers owners to capitalize on the Era of Connection  Compare design and construction alternatives in context  Leverage the Internet of Things for ongoing operations  Use BIM-enabled efficiencies and capabilities as a new baseline for owners
  • 14. © 2014 Autodesk, Inc. © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk © 2014 Autodesk Learn more Download the McGraw-Hill Construction Smart Report. Download the Economist Intelligence Unit report.

Editor's Notes

  1. Owners shoulder 2/3 of the ongoing operating cost (estimated at $15.8 billion annually) that are a result of poor data and highly fragmented teams. 1 Michael P. Gallaher, Alan C. O’Connor, John L. Dettbarn, Jr., and Linda T. Gilday, “Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry”, August 2004
  2. Owners face several challenges when trying to contain costs and deliver on schedule. 1 Independent Project Analysis Institute 2 Rethinking Construction, John Egan 3 US Department of Energy, Operations and Maintenance Best Practices Guide, August 2010.
  3. Building Information Modeling (BIM) is a process that begins with the creation of an intelligent 3D model to capture, explore, and maintain planning, design, construction, and operational data in order to better inform decision making for building and infrastructure projects. The information in the model remains coordinated and consistent an Create and use a data-rich 3D model to improve how buildings and infrastructure are planned, designed, built, and managed Provides greater project insight on things like cost, schedule, and constructability Share and use the same consistent data whether you’re at your desk or in the field Respond quickly to change with processes that are smarter and faster d is available for simulation, analysis, collaboration, and communication throughout the lifecycle of the project.
  4. BIM allows owners to take control and harness the power of the Era of Connection. BIM increases transparency, quality, and efficiency so owners can: Improve building quality Significantly reduce building lifecycle costs Better understand design projects from beginning to end Optimize operational efficiencies Increase occupancy and use rates
  5. A McGraw-Hill survey found that owners enjoy a reduction in document errors and omissions; rework; costs; project duration; and claims. Source: McGraw-Hill Construction, 2012
  6. BIM saves time and money throughout all phases of design, construction, and ongoing property management.
  7. Let’s review some examples of how BIM can help the design process run smoother and faster.
  8. Here are some examples of BIM at work in the construction phase.
  9. Finally, here are some examples of how BIM saves time and money in the management phase of a project – often the phase most closely associated with owners.
  10. Adoption is increasing through mandates, smart building initiatives, and owner edicts—creating a BIM tidal wave. 44% of owners predict they will be at very high level of BIM implementation by 2014 1 Source: Smart Market Report by McGraw Hill Construction, 2012 *Projected Reference Notes: The McGraw Hill Smart Market Report—The Business Value of BIM is available on autodesk.com/bim
  11. Customers using BIM have sited real world savings and ROI – from Australia to Portland, OR. Citations in order from the above bullets: Judy A. Kraatz ,Adriana X. Sanchez, Keith D. Hampson, “Digital Modeling, Integrated Project Delivery and Industry Transformation: An Australian Case Study”, 2014. Michael LeFevre, “No BIM for You: The Case for Not Doing BIM”, 2011. American Institute Of Architects (AIA) 2012 TAP/BIM Awards, “Edith Green Wendell Wyatt (EGWW) Federal Building Modification”, 2012.
  12. BIM empowers owners to capitalize on the Era of Connection and leverage the Internet of Things for ongoing building operational and maintenance improvements.
  13. BIM empowers owners to capitalize on the Era of Connection and leverage the Internet of Things for ongoing building operational and maintenance improvements. McGraw Hill Report: http://i2sl.org/elibrary/documents/Business_Value_of_BIM_for_Owners_SMR_(2014).pdf Economist Report: http://static-dc.autodesk.net/content/dam/autodesk/www/solutions/building-information-modeling/construction/EIU_Autodesk_Construction_WEB.pdf