MoEF Notification on EIA 2006
Presentation Plan
 Ministry of Environment, Forests &
Climate Change
 Environmental Impact Assessment
 The Notification
 Categorization
 Stages in Environmental Clearance
 Terms of Reference
 The Flowchart
Ministry of Environment & Forests
 Environment Protection (Article 48-A)
The State shall endeavour to protect and improve the
environment and to safeguard the forests and wildlife of
the country.
 Objectives of MoEF
 Conservation and survey of flora, fauna, forests and
wildlife
 Prevention and control of pollution
 Afforestation and regeneration of degraded areas
 Protection of environment and
 Ensuring the welfare of animals
Environment Impact Assessment
 Environment Impact Assessment, 2006
 Derives authority from Environmental Rules (1986)
 1997 Amendment to include Public Hearing
 Over 13 amendments with latest one in 2006
 What is EIA?
 A study to predict the effect of a proposed activity on
the environment
 It compares various alternatives for a project and
seeks to identify the one which represents the best
combination of economic and environmental costs and
benefits
The Notification
 Any expansion or modernization of any activity shall
NOT be undertaken in any part of India unless it
has been accorded EC by Centre as per the
procedure specified in the notification
 All new projects or activities listed in this notification
 Expansion and modernization of existing projects which
cross threshold limit for concerned sector
 Any change in product-mix in existing manufacturing unit
included in Schedule beyond the specified range
Categorization
EC from MoEF on
recommendation of
Expert Appraisal
Committee (EAC)
In absence of
SEIAA or SEAC
category B shall be
treated as Category
A project
Category
A
projects EC from SEIAA
based on
recommendations
from SEAC
Category B further
divided as B1 and
B2, however
guidelines for
distinction have not
been worked out
Category
B
projects
Categorized based on spatial extent of potential impacts on human
health and natural and man-made resources
Environmental Clearance
 Application shall be made in Form 1 and
supplementary Form 1A after identification of site
before commencing any construction activity
 Along with the application a pre-feasibility project
report also needs to be furnished.
 Exception to the above are construction projects
where conceptual plan needs to be furnished
Stages in Environmental Clearance
Screening (Category B projects)
Scrutiny to determine if project requires further studies for EIA
report
Scoping
Process by which EAC/SEAC determine comprehensive Termsof
Reference (exceptions Construction/Township/Housing)
Public Consultation
Process by which concerns of local affected persons are
ascertained
Appraisal
Detailed scrutiny by EAC/SEAC for grant of EC with
recommendations to regulator leading to grant or
rejection
Terms of Reference
• statement of need for and objectives of the proposal
• project background and description
• study area or impact zone(s)
• applicable policy and institutional considerations
• EIA requirements and decision-making particulars
• provisions for public involvement
• alternatives to be examined
• the impacts and issues to be studied
• the requirements for mitigation and monitoring
• the timeframe for completion of the EIA process
• the means for making changes to the ToR if necessary
Environmental Clearance contd..
 Project Management to submit half-yearly
compliance reports to regulatory authority on 1st
June and 1st December of each calendar year
 All compliance reports shall be public documents
and shall also be displayed on website of regulator
 Prior EC granted for a specific project may be
transferred during its validity to another legal
person with “no objection” by transferor and
regulatory authority on same terms and conditions
under which EC was initially granted and for the
same validity period

More Related Content

Similar to EIA.pptx

Eia act 2006
Eia act 2006Eia act 2006
Eia act 2006
Tej Kiran
 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
ChandanLawrence
 
The Planning Series 10 - Environmental Impact Assessment
The Planning Series 10 - Environmental Impact AssessmentThe Planning Series 10 - Environmental Impact Assessment
The Planning Series 10 - Environmental Impact Assessment
Dr Georgette Kluiters
 

Similar to EIA.pptx (20)

What is eia
What is eiaWhat is eia
What is eia
 
Eia act 2006
Eia act 2006Eia act 2006
Eia act 2006
 
Section 13 Planning Law and Environment protection CAPE2020 2021.pptx
Section 13 Planning Law and Environment protection CAPE2020 2021.pptxSection 13 Planning Law and Environment protection CAPE2020 2021.pptx
Section 13 Planning Law and Environment protection CAPE2020 2021.pptx
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
EIA
EIAEIA
EIA
 
Environmental acts
Environmental actsEnvironmental acts
Environmental acts
 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
 
EIA PPT.pptx
EIA PPT.pptxEIA PPT.pptx
EIA PPT.pptx
 
EIA PPT.pdf
EIA PPT.pdfEIA PPT.pdf
EIA PPT.pdf
 
EIA-process
 EIA-process EIA-process
EIA-process
 
EIA and Environmental Permit: Tools for Sustainable Tropical Peatland Manage...
EIA and  Environmental Permit: Tools for Sustainable Tropical Peatland Manage...EIA and  Environmental Permit: Tools for Sustainable Tropical Peatland Manage...
EIA and Environmental Permit: Tools for Sustainable Tropical Peatland Manage...
 
manunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdfmanunath1-copy-170405123133 (1).pdf
manunath1-copy-170405123133 (1).pdf
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airports
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
 
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)ENVIRONMENTAL  IMPACTS ASSESMENT (EIA)
ENVIRONMENTAL IMPACTS ASSESMENT (EIA)
 
Environmental Impact Evaluation of Mining
Environmental Impact Evaluation of MiningEnvironmental Impact Evaluation of Mining
Environmental Impact Evaluation of Mining
 
FUNCTIONS OF EPA
FUNCTIONS OF EPAFUNCTIONS OF EPA
FUNCTIONS OF EPA
 
The Planning Series 10 - Environmental Impact Assessment
The Planning Series 10 - Environmental Impact AssessmentThe Planning Series 10 - Environmental Impact Assessment
The Planning Series 10 - Environmental Impact Assessment
 
CEQA Overview
CEQA OverviewCEQA Overview
CEQA Overview
 
EIA;- EC
EIA;- ECEIA;- EC
EIA;- EC
 

Recently uploaded

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
SoniaTolstoy
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Recently uploaded (20)

social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 

EIA.pptx

  • 2. Presentation Plan  Ministry of Environment, Forests & Climate Change  Environmental Impact Assessment  The Notification  Categorization  Stages in Environmental Clearance  Terms of Reference  The Flowchart
  • 3. Ministry of Environment & Forests  Environment Protection (Article 48-A) The State shall endeavour to protect and improve the environment and to safeguard the forests and wildlife of the country.  Objectives of MoEF  Conservation and survey of flora, fauna, forests and wildlife  Prevention and control of pollution  Afforestation and regeneration of degraded areas  Protection of environment and  Ensuring the welfare of animals
  • 4. Environment Impact Assessment  Environment Impact Assessment, 2006  Derives authority from Environmental Rules (1986)  1997 Amendment to include Public Hearing  Over 13 amendments with latest one in 2006  What is EIA?  A study to predict the effect of a proposed activity on the environment  It compares various alternatives for a project and seeks to identify the one which represents the best combination of economic and environmental costs and benefits
  • 5. The Notification  Any expansion or modernization of any activity shall NOT be undertaken in any part of India unless it has been accorded EC by Centre as per the procedure specified in the notification  All new projects or activities listed in this notification  Expansion and modernization of existing projects which cross threshold limit for concerned sector  Any change in product-mix in existing manufacturing unit included in Schedule beyond the specified range
  • 6. Categorization EC from MoEF on recommendation of Expert Appraisal Committee (EAC) In absence of SEIAA or SEAC category B shall be treated as Category A project Category A projects EC from SEIAA based on recommendations from SEAC Category B further divided as B1 and B2, however guidelines for distinction have not been worked out Category B projects Categorized based on spatial extent of potential impacts on human health and natural and man-made resources
  • 7. Environmental Clearance  Application shall be made in Form 1 and supplementary Form 1A after identification of site before commencing any construction activity  Along with the application a pre-feasibility project report also needs to be furnished.  Exception to the above are construction projects where conceptual plan needs to be furnished
  • 8. Stages in Environmental Clearance Screening (Category B projects) Scrutiny to determine if project requires further studies for EIA report Scoping Process by which EAC/SEAC determine comprehensive Termsof Reference (exceptions Construction/Township/Housing) Public Consultation Process by which concerns of local affected persons are ascertained Appraisal Detailed scrutiny by EAC/SEAC for grant of EC with recommendations to regulator leading to grant or rejection
  • 9. Terms of Reference • statement of need for and objectives of the proposal • project background and description • study area or impact zone(s) • applicable policy and institutional considerations • EIA requirements and decision-making particulars • provisions for public involvement • alternatives to be examined • the impacts and issues to be studied • the requirements for mitigation and monitoring • the timeframe for completion of the EIA process • the means for making changes to the ToR if necessary
  • 10. Environmental Clearance contd..  Project Management to submit half-yearly compliance reports to regulatory authority on 1st June and 1st December of each calendar year  All compliance reports shall be public documents and shall also be displayed on website of regulator  Prior EC granted for a specific project may be transferred during its validity to another legal person with “no objection” by transferor and regulatory authority on same terms and conditions under which EC was initially granted and for the same validity period