OBRA:
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
MUNICIPIO: ALMOLOYA DE JUÁREZ
Clave Concepto
Unidad de
Medida
Cantidad Precio Unitario Total
I PRELIMINARES
1
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE
REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
m2 62125.00 $0.00
2
DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA (
MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA, EQUIPO.
m2 37275.00 $0.00
3
EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR
MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO
DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
m3 36343.13 $0.00
4
CARGA Y ACARREO EN CAMIÓN DE MATERIALES DE DESPERDICIO, PRODUCTO DE LA EXCAVACIÓN,
DEMOLICIONES, DESYERVES, LIMPIEZA, MATERIAL SOBRANTE, A TIRO LIBRE, VOLUMEN COMPACTO. INCLUYE:
MAQUINARIA, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
m3 38952.38 $0.00
II OBRAS DE DRENAJE
5
EXCAVACIÓN A CIELO ABIERTO A MÁQUINA EN MATERIAL TIPO II ("B"), DE 0.00 A -2.00 M, INCLUYE: CARGA A
CAMIÓN, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
m3 54.18 $0.00
6
CONCRETO EN ESTRUCTURA DE F'C=250 KG/CM2, HECHO EN OBRA,INCLUYE:ACARREOS,COLADO, VIBRADO,
MANO DE OBRA, EQUIPO Y HERRAMIENTA.
m3 40.68 $0.00
7
MURO DE PIEDRA BRAZA ACABADO ROSTREADO, ASENTADO CON MEZCLA CEMENTO ARENA 1:4, HASTA 3.5 M.
DE ALTURA. INCLUYE: MATERIALES, CIMBRA, DESCIMBRADO, ELEVACIÓN, ACARREOS DENTRO DE LA OBRA,
MANO DE OBRA, EQUIPO Y HERRAMIENTA
m3 208.98 $0.00
8
ACERO DE REFUERZO EN ESTRUCTURA DEL NO. 4 (1/2"), DE FY=4200 KG/CM2, INCLUYE: SUMINISTRO DE
MATERIALES, ACARREOS, ELEVACIONES, CORTES, TRASLAPES, GANCHOS, ESCUADRAS, DOBLECES, SILLETAS,
DESPERDICIOS, HABILITADO, AMARRES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
kg 4684.13 $0.00
9
ACARREO DE MATERIAL PRODUCTO DE DESMONTE, DESPALME, CORTE, EXCAVACIÓN, Y/O DEMOLICIÓN A TIRO
AUTORIZADO, EN CAMIÓN DE VOLTEO, AL 1ER KM., VOLUMEN COMPACTADO, INCLUYE: CARGA A MAQUINA,
MANO DE OBRA, EQUIPO Y HERRAMIENTA.
m3 70.43 $0.00
III TERRACERIAS
10
AFINE Y COMPACTACION DEL TERRENO NATURAL POR MEDIOS MECANICOS, SOBRE LA SUPERFICIE
DESCUBIERTA AL 85% DE LA PRUEBA PROCTOR, INCLUYE: MAQUINARIA, AFINES, CONFORMACION,
INCORPORACION DE AGUA, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
m2 62125.00 $0.00
PRESUPUESTO DE LA OBRA
H. AYUNTAMIENTO DE ALMOLOYA DE JUÁREZ
ADMINISTRACIÓN 2022-2024
DIRECCIÓN DE OBRAS PÚBLICAS
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL -
CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
11
CONSTRUCCION DE LA CAPA BASE CON MATERIAL DE BANCO DE LA ZONA DE MATERIAL, GRAVA CONTROLADA
70/30 (GRAVA 3/4", TEPETATE) TENDIDO Y COMPACTADO AL 95% PRUEBA PROCTOR EN UNA CAPA DE 20 CM
DE ESPESOR, COMPACTO, INCLUYE: MATERIALES DE BANCO, ACAMELLONADO, MAQUINARIA, AFINES,
CONFORMACION, INCORPORACION DE AGUA, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
m3 18637.50 $0.00
12
CARGA Y ACARREO DE LOS MATERIALES SELECCIONADOS QUE SERVIRÁN PARA LA CONSTRUCCIÓN DE LA CAPA
BASE A PRIMER KILOMETRO, INCLUYE: EQUIPO, HERRAMIENTA Y MANO DE OBRA.
m3 18637.50 $0.00
13
ACARREO DE LOS MATERIALES SELECCIONADOS QUE SERVIRÁN PARA LA CONSTRUCCIÓN DE LA BASE A
KILÓMETROS SUBSECUENTES (10 KM PROMEDIO), INCLUYE: EQUIPO, HERRAMIENTA Y MANO DE OBRA.
m3/km 186375.00 $0.00
IV CONCRETO HIDRAULICO
14
CONSTRUCCION PAVIMENTO DE CONCRETO PREMEZCLADO DE 15 cm DE ESPESOR, F'C=250 Kg/cm2, TAMAÑO
MAXIMO AGREGADO 3/4", REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: MATERIALES,
VIBRADO, CURADO, ACABADO RALLADO, DECIMBRADO, PRUEBA DE LABORATORIO, EQUIPO, HERRAMIENTA Y
MANO DE OBRA..
m2 62056.75 $0.00
15
CORTE DE PAVIMENTO DE CONCRETO EN UN TERCIO DE SU ESPESOR CON CORTADORA DE DISCO DE
DIAMANTE PARA SECCIONAR PIEDRAS EN DIMENCIONES MAXIMAS DE 3.00 M INCLUYE: EQUIPO,
HERRAMIENTA Y MANO DE OBRA.
ml 29861.00 $0.00
16
CONSTRUCCION DE CUNETAS DE CONCRETO F'C=150 KG/CM2 DE 8CM DE ESPESOR RELLENO COMPACTADO
PARA FORJADO,CERCHAS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.
ml 2664.00
17
CONSTRUCCIÓN DE TOPE VEHICULAR ELABORADO DE CONCRETO HIDRÁULICO F´C: 250 Kg/cm2 SIN MALLA, DE
SECCIÓN 1.80 M DE BASE MAYOR, 0.08 M DE ALTURA, 0.60 M DE BASE MENOR, CON FRANJAS DIAGONALES A
BASE DE PINTURA INCLUYE: ACARREO DE MATERIAL A OBRA, MATERIALES, HERRAMIENTA, MANO DE OBRA,
EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.
ml 14.00 $0.00
V SEÑALAMIENTEO HORIZONTAL
18
RAYA CONTINUA DE 10 CM DE ANCHO, COLOR BLANCO Y/O AMARILLO TRÁNSITO CON INCORPORACIÓN DE
MICRO ESFERA RETRO REFLEJANTE, SOBRE PAVIMENTO DE CONCRETO HIDRAULICO. INCLUYE: MATERIALES,
PREPARACIÓN DE LA SUPERFICIE, TRAZO, PREMARCADO, DELINEADO, APLICACIÓN DE PINTURA CON EQUIPO,
LIMPIEZA. EQUIPO, HERRAMIENTA Y MANO DE OBRA.
ml 26625.00 $0.00
19
SUMINISTRO Y COLOCACION DE BOLLAS METALICAS CAL.10 3 MM DE ESPESOR 21X21 CM 6CM DE ALTURA
@30CM, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO.
pza 312.00 $0.00
VI SEÑALAMIENTEO VERTICAL $0.00
20
SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-6 (61*61), INCLUYE: MATERIALES, MANO DE
OBRA, HERRAMIENTA Y EQUIPO.
pza 37.00 $0.00
21
SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-6l (61*61), INCLUYE: MATERIALES, MANO DE
OBRA, HERRAMIENTA Y EQUIPO.
pza 30.00 $0.00
22
SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-8 (61*61), INCLUYE: MATERIALES, MANO DE
OBRA, HERRAMIENTA Y EQUIPO.
pza 4.00 $0.00
23
SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-8l (61*61), INCLUYE: MATERIALES, MANO DE
OBRA, HERRAMIENTA Y EQUIPO.
pza 4.00 $0.00
24
SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-11 (61*61), INCLUYE: MATERIALES, MANO DE
OBRA, HERRAMIENTA Y EQUIPO.
pza 4.00 $0.00
25
SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-12 (61*61), INCLUYE: MATERIALES, MANO DE
OBRA, HERRAMIENTA Y EQUIPO.
pza 14.00 $0.00
26
SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-14 (61*61), INCLUYE: MATERIALES, MANO DE
OBRA, HERRAMIENTA Y EQUIPO.
pza 3.00 $0.00
27
SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-15 (61*61), INCLUYE: MATERIALES, MANO DE
OBRA, HERRAMIENTA Y EQUIPO.
pza 2.00 $0.00
28
SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-25A (61*61), INCLUYE: MATERIALES, MANO
DE OBRA, HERRAMIENTA Y EQUIPO.
pza 24.00 $0.00
29
SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-32 (61*61), INCLUYE: MATERIALES, MANO DE
OBRA, HERRAMIENTA Y EQUIPO.
pza 8.00 $0.00
30
SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-47 (61*61), INCLUYE: MATERIALES, MANO DE
OBRA, HERRAMIENTA Y EQUIPO.
pza 1.00 $0.00
31
SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO RESTRICTIVO SR-9 70 (61*61), INCLUYE: MATERIALES, MANO
DE OBRA, HERRAMIENTA Y EQUIPO.
pza 22.00 $0.00
VII OBRAS COMPLEMENTARIAS
32
REPARACIÓN DE DESCARGA SANITARIA DOMICILIARIA CON TUBERÍA DE CONCRETO SIMPLE DE 20 CM. DE
DIÁMETRO, EN UN DESARROLLO PROMEDIO DE 5.5 M. INCLUYE: MATERIALES, EXCAVACIÓN, INSTALACIÓN,
JUNTEO CON MEZCLA MORTERO ARENA 1:4, RELLENO COMPACTADO, EQUIPO, HERAMIENTA Y MANO DE
OBRA.
pza 100.00 $0.00
33
REPARACIÓN DE TOMA DOMICILIARIA DE AGUA POTABLE EN UN DESARROLLO PROMEDIO DE 6.0 M A BASE DE
POLIDUCTO HIDRAULICO DE 13 MM. Ø., CONECTORES, ABAZADERAS, INCLUYE: EXCAVACION, MATERIALES,
CONEXIONES, RELLENO COMPACTADO, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
pza 100.00 $0.00
34
RENIVELACION DE POZOS DE VISITA CON TABIQUE ROJO RECOSIDO DE 6 X 12 X 24 CM A TIZON, JUNTEADO
CON MEZCLA CEMENTO ARENA, 1:4, APLANADO PULIDO EN EL INTERIOR, INCLUYE: COLOCACION DE BROCAL Y
TAPA EXISTENTE, EQUIPO, HERRAMIENTA Y MANO DE OBRA..
pza 91.00 $0.00
35
LIMPIEZA GRUESA AL FINAL DE LA OBRA, RETIRANDO LOS MATERIALES SOBRANTES, DESPERDICIOS,
PRODUCTO DE LA EJECUCIÓN DE LOS TRABAJOS, PARA LA ENTREGA DE LOS TRABAJOS, INCLUYE: MATERIALES,
MANO DE OBRA, EQUIPO, HERRAMIENTA Y EQUIPO, P.U.O.T.
m2 62125.00 $0.00
SUBTOTAL $0.00
IVA $0.00
TOTAL $0.00
-
-
CLAVE UNIDAD DE MEDIDA
1 M2
TRAMO UNIDAD
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
DIRECTOR DE OBRAS PÚBLICAS
ING. FELIPE DE JESUS MORENO ROJAS
APROBO:
VOLUMEN CONTRATADO 62,125.00
VOLUMEN NO EJECUTADO -56805.00
VOLUMEN GENERADO HOJA 1 5,320.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
0+740.00 0+760.00 20.00 7.00 7.00 140.00
0+720.00 0+740.00 20.00 7.00 7.00 140.00
0+700.00 0+720.00 20.00 7.00 7.00 140.00
0+680.00 0+700.00 20.00 7.00 7.00 140.00
0+660.00 0+680.00 20.00 7.00 7.00 140.00
0+640.00 0+660.00 20.00 7.00 7.00 140.00
0+620.00 0+640.00 20.00 7.00 7.00 140.00
0+600.00 0+620.00 20.00 7.00 7.00 140.00
0+580.00 0+600.00 20.00 7.00 7.00 140.00
0+560.00 0+580.00 20.00 7.00 7.00 140.00
0+540.00 0+560.00 20.00 7.00 7.00 140.00
0+520.00 0+540.00 20.00 7.00 7.00 140.00
0+500.00 0+520.00 20.00 7.00 7.00 140.00
0+480.00 0+500.00 20.00 7.00 7.00 140.00
0+460.00 0+480.00 20.00 7.00 7.00 140.00
0+440.00 0+460.00 20.00 7.00 7.00 140.00
0+420.00 0+440.00 20.00 7.00 7.00 140.00
0+400.00 0+420.00 20.00 7.00 7.00 140.00
0+380.00 0+400.00 20.00 7.00 7.00 140.00
0+360.00 0+380.00 20.00 7.00 7.00 140.00
7.00 7.00 140.00
0+140.00 0+160.00 20.00 7.00 7.00 140.00
0+120.00 0+140.00 20.00 7.00 7.00 140.00
0+100.00 0+120.00 20.00 7.00 7.00 140.00
0+340.00 0+360.00 20.00 7.00 7.00 140.00
0+320.00 0+340.00 20.00 7.00 7.00 140.00
0+300.00 0+320.00 20.00 7.00 7.00 140.00
0+280.00 0+300.00 20.00 7.00 7.00 140.00
0+260.00 0+280.00 20.00 7.00 7.00 140.00
0+240.00 0+260.00 20.00 7.00 7.00 140.00
0+000.00 0+020.00 20.00 7.00 7.00 140.00
UNO
0+000.00 7.00
0+020.00 0+040.00 20.00 7.00
0+080.00 0+100.00 20.00 7.00 7.00 140.00
0+060.00 0+080.00 20.00 7.00 7.00 140.00
7.00 140.00
0+040.00
EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL
0+220.00 0+240.00 20.00 7.00 7.00 140.00
0+200.00 0+220.00 20.00 7.00 7.00 140.00
0+180.00 0+200.00 20.00 7.00 7.00 140.00
0+160.00 0+180.00 20.00 7.00 7.00 140.00
0+060.00 20.00
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL,
INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
1 M2
TRAMO UNIDAD
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
VOLUMEN CONTRATADO 62,125.00
VOLUMEN NO EJECUTADO 51485.00
VOLUMEN ACUMULADO HOJA 1 y 2 10,640.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
1+500.00 1+520.00 20.00 7.00 7.00 140.00
1+480.00 1+500.00 20.00 7.00 7.00 140.00
VOLUMEN GENERADO HOJA 2 5,320.00
1+460.00 1+480.00 20.00 7.00 7.00 140.00
1+440.00 1+460.00 20.00 7.00 7.00 140.00
1+420.00 1+440.00 20.00 7.00 7.00 140.00
1+400.00 1+420.00 20.00 7.00 7.00 140.00
1+380.00 1+400.00 20.00 7.00 7.00 140.00
1+360.00 1+380.00 20.00 7.00 7.00 140.00
1+340.00 1+360.00 20.00 7.00 7.00 140.00
1+320.00 1+340.00 20.00 7.00 7.00 140.00
1+300.00 1+320.00 20.00 7.00 7.00 140.00
1+280.00 1+300.00 20.00 7.00 7.00 140.00
1+260.00 1+280.00 20.00 7.00 7.00 140.00
1+240.00 1+260.00 20.00 7.00 7.00 140.00
1+220.00 1+240.00 20.00 7.00 7.00 140.00
1+200.00 1+220.00 20.00 7.00 7.00 140.00
1+180.00 1+200.00 20.00 7.00 7.00 140.00
1+160.00 1+180.00 20.00 7.00 7.00 140.00
1+140.00 1+160.00 20.00 7.00 7.00 140.00
1+120.00 1+140.00 20.00 7.00 7.00 140.00
20.00 7.00 7.00 140.00
0+900.00 0+920.00 20.00 7.00 7.00 140.00
0+880.00 0+900.00 20.00 7.00 7.00 140.00
1+100.00 1+120.00 20.00 7.00 7.00 140.00
1+080.00 1+100.00 20.00 7.00 7.00 140.00
1+060.00 1+080.00 20.00 7.00 7.00 140.00
1+040.00 1+060.00 20.00 7.00 7.00 140.00
1+020.00 1+040.00 20.00 7.00 7.00 140.00
1+000.00 1+020.00 20.00 7.00 7.00 140.00
0+800.00 0+820.00 20.00 7.00 7.00 140.00
0+780.00 0+800.00 20.00 7.00 7.00 140.00
ANCHO ANCHO PROMEDIO TOTAL
0+760.00 0+780.00 20.00 7.00 7.00 140.00
0+860.00 0+880.00 20.00 7.00 7.00 140.00
0+840.00 0+860.00 20.00 7.00
0+980.00 1+000.00 20.00 7.00 7.00 140.00
0+960.00 0+980.00 20.00 7.00 7.00 140.00
0+940.00 0+960.00 20.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
EST.1 EST.2 LONGITUD
UNO
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL,
INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
7.00 7.00 140.00
7.00 140.00
0+820.00 0+840.00 20.00 7.00 7.00 140.00
0+920.00 0+940.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
1 M2
TRAMO UNIDAD
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL,
INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL
UNO
1+520.00 1+540.00 20.00 7.00 7.00 140.00
1+540.00 1+560.00 20.00 7.00 7.00 140.00
1+560.00 1+580.00 20.00 7.00 7.00 140.00
1+580.00 1+600.00 20.00 7.00 7.00 140.00
1+600.00 1+620.00 20.00 7.00 7.00 140.00
1+620.00 1+640.00 20.00 7.00 7.00 140.00
1+640.00 1+660.00 20.00 7.00 7.00 140.00
1+660.00 1+680.00 20.00 7.00 7.00 140.00
1+680.00 1+700.00 20.00 7.00 7.00 140.00
1+700.00 1+720.00 20.00 7.00 7.00 140.00
1+720.00 1+740.00 20.00 7.00 7.00 140.00
1+740.00 1+760.00 20.00 7.00 7.00 140.00
1+760.00 1+780.00 20.00 7.00 7.00 140.00
1+780.00 1+800.00 20.00 7.00 7.00 140.00
1+800.00 1+820.00 20.00 7.00 7.00 140.00
1+820.00 1+840.00 20.00 7.00 7.00 140.00
1+840.00 1+860.00 20.00 7.00 7.00 140.00
1+860.00 1+880.00 20.00 7.00 7.00 140.00
1+880.00 1+900.00 20.00 7.00 7.00 140.00
1+900.00 1+920.00 20.00 7.00 7.00 140.00
1+920.00 1+940.00 20.00 7.00 7.00 140.00
1+940.00 1+960.00 20.00 7.00 7.00 140.00
1+960.00 1+980.00 20.00 7.00 7.00 140.00
1+980.00 2+000.00 20.00 7.00 7.00 140.00
2+000.00 2+020.00 20.00 7.00 7.00 140.00
2+020.00 2+040.00 20.00 7.00 7.00 140.00
2+040.00 2+060.00 20.00 7.00 7.00 140.00
2+060.00 2+080.00 20.00 7.00 7.00 140.00
2+080.00 2+100.00 20.00 7.00 7.00 140.00
2+100.00 2+120.00 20.00 7.00 7.00 140.00
2+120.00 2+140.00 20.00 7.00 7.00 140.00
2+140.00 2+160.00 20.00 7.00 7.00 140.00
2+160.00 2+180.00 20.00 7.00 7.00 140.00
2+180.00 2+200.00 20.00 7.00 7.00 140.00
2+200.00 2+220.00 20.00 7.00 7.00 140.00
VOLUMEN CONTRATADO 62,125.00
VOLUMEN NO EJECUTADO 46165.00
2+220.00 2+240.00 20.00 7.00 7.00 140.00
2+240.00 2+260.00 20.00 7.00 7.00 140.00
2+260.00 2+280.00 20.00 7.00 7.00 140.00
VOLUMEN GENERADO HOJA 3 5,320.00
VOLUMEN ACUMULADO HOJA 1,2,3 15,960.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
1 M2
TRAMO UNIDAD
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL,
INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL
UNO
2+280.00 2+300.00 20.00 7.00 7.00 140.00
2+300.00 2+320.00 20.00 7.00 7.00 140.00
2+320.00 2+340.00 20.00 7.00 7.00 140.00
2+340.00 2+360.00 20.00 7.00 7.00 140.00
2+360.00 2+380.00 20.00 7.00 7.00 140.00
2+380.00 2+400.00 20.00 7.00 7.00 140.00
2+400.00 2+420.00 20.00 7.00 7.00 140.00
2+420.00 2+440.00 20.00 7.00 7.00 140.00
2+440.00 2+460.00 20.00 7.00 7.00 140.00
2+460.00 2+480.00 20.00 7.00 7.00 140.00
2+480.00 2+500.00 20.00 7.00 7.00 140.00
2+500.00 2+520.00 20.00 7.00 7.00 140.00
2+520.00 2+540.00 20.00 7.00 7.00 140.00
2+540.00 2+560.00 20.00 7.00 7.00 140.00
2+560.00 2+580.00 20.00 7.00 7.00 140.00
2+580.00 2+600.00 20.00 7.00 7.00 140.00
2+600.00 2+620.00 20.00 7.00 7.00 140.00
2+620.00 2+640.00 20.00 7.00 7.00 140.00
2+640.00 2+660.00 20.00 7.00 7.00 140.00
2+660.00 2+680.00 20.00 7.00 7.00 140.00
2+680.00 2+700.00 20.00 7.00 7.00 140.00
2+700.00 2+720.00 20.00 7.00 7.00 140.00
2+720.00 2+740.00 20.00 7.00 7.00 140.00
2+740.00 2+760.00 20.00 7.00 7.00 140.00
2+760.00 2+780.00 20.00 7.00 7.00 140.00
2+780.00 2+800.00 20.00 7.00 7.00 140.00
2+800.00 2+820.00 20.00 7.00 7.00 140.00
2+820.00 2+840.00 20.00 7.00 7.00 140.00
2+840.00 2+860.00 20.00 7.00 7.00 140.00
2+860.00 2+880.00 20.00 7.00 7.00 140.00
2+880.00 2+900.00 20.00 7.00 7.00 140.00
2+900.00 2+920.00 20.00 7.00 7.00 140.00
2+920.00 2+940.00 20.00 7.00 7.00 140.00
2+940.00 2+960.00 20.00 7.00 7.00 140.00
2+960.00 2+980.00 20.00 7.00 7.00 140.00
2+980.00 3+000.00 20.00 7.00 7.00 140.00
3+000.00 3+020.00 20.00 7.00 7.00 140.00
3+020.00 3+040.00 20.00 7.00 7.00 140.00
VOLUMEN GENERADO HOJA 4 5,320.00
VOLUMEN ACUMULADO HOJA 1,2,3,4 21,280.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 62,125.00
VOLUMEN NO EJECUTADO 40845.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
1 M2
TRAMO UNIDAD
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL,
INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL
UNO
3+040.00 3+060.00 20.00 7.00 7.00 140.00
3+060.00 3+080.00 20.00 7.00 7.00 140.00
3+080.00 3+100.00 20.00 7.00 7.00 140.00
3+100.00 3+120.00 20.00 7.00 7.00 140.00
3+120.00 3+140.00 20.00 7.00 7.00 140.00
3+140.00 3+160.00 20.00 7.00 7.00 140.00
3+160.00 3+180.00 20.00 7.00 7.00 140.00
3+180.00 3+200.00 20.00 7.00 7.00 140.00
3+200.00 3+220.00 20.00 7.00 7.00 140.00
3+220.00 3+240.00 20.00 7.00 7.00 140.00
3+240.00 3+260.00 20.00 7.00 7.00 140.00
3+260.00 3+280.00 20.00 7.00 7.00 140.00
3+280.00 3+300.00 20.00 7.00 7.00 140.00
3+300.00 3+320.00 20.00 7.00 7.00 140.00
3+320.00 3+340.00 20.00 7.00 7.00 140.00
3+340.00 3+360.00 20.00 7.00 7.00 140.00
3+360.00 3+380.00 20.00 7.00 7.00 140.00
3+380.00 3+400.00 20.00 7.00 7.00 140.00
3+400.00 3+420.00 20.00 7.00 7.00 140.00
3+420.00 3+440.00 20.00 7.00 7.00 140.00
3+440.00 3+460.00 20.00 7.00 7.00 140.00
3+460.00 3+480.00 20.00 7.00 7.00 140.00
3+480.00 3+500.00 20.00 7.00 7.00 140.00
3+500.00 3+520.00 20.00 7.00 7.00 140.00
3+520.00 3+540.00 20.00 7.00 7.00 140.00
3+540.00 3+560.00 20.00 7.00 7.00 140.00
3+560.00 3+580.00 20.00 7.00 7.00 140.00
3+580.00 3+600.00 20.00 7.00 7.00 140.00
3+600.00 3+620.00 20.00 7.00 7.00 140.00
3+620.00 3+640.00 20.00 7.00 7.00 140.00
3+640.00 3+660.00 20.00 7.00 7.00 140.00
3+660.00 3+680.00 20.00 7.00 7.00 140.00
3+680.00 3+700.00 20.00 7.00 7.00 140.00
3+700.00 3+720.00 20.00 7.00 7.00 140.00
3+720.00 3+740.00 20.00 7.00 7.00 140.00
3+740.00 3+760.00 20.00 7.00 7.00 140.00
3+760.00 3+780.00 20.00 7.00 7.00 140.00
3+780.00 3+800.00 20.00 7.00 7.00 140.00
VOLUMEN GENERADO HOJA 5 5,320.00
VOLUMEN ACUMULADO HOJA 1,2,3,4,5 26,600.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 62,125.00
VOLUMEN NO EJECUTADO 35525.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
1 M2
TRAMO UNIDAD
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL,
INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL
UNO
3+800.00 3+820.00 20.00 7.00 7.00 140.00
3+820.00 3+840.00 20.00 7.00 7.00 140.00
3+840.00 3+860.00 20.00 7.00 7.00 140.00
3+860.00 3+880.00 20.00 7.00 7.00 140.00
3+880.00 3+900.00 20.00 7.00 7.00 140.00
3+900.00 3+920.00 20.00 7.00 7.00 140.00
3+920.00 3+940.00 20.00 7.00 7.00 140.00
3+940.00 3+960.00 20.00 7.00 7.00 140.00
3+960.00 3+980.00 20.00 7.00 7.00 140.00
3+980.00 4+000.00 20.00 7.00 7.00 140.00
4+000.00 4+020.00 20.00 7.00 7.00 140.00
4+020.00 4+040.00 20.00 7.00 7.00 140.00
4+040.00 4+060.00 20.00 7.00 7.00 140.00
4+060.00 4+080.00 20.00 7.00 7.00 140.00
4+080.00 4+100.00 20.00 7.00 7.00 140.00
4+100.00 4+120.00 20.00 7.00 7.00 140.00
4+120.00 4+140.00 20.00 7.00 7.00 140.00
4+140.00 4+160.00 20.00 7.00 7.00 140.00
4+160.00 4+180.00 20.00 7.00 7.00 140.00
4+180.00 4+200.00 20.00 7.00 7.00 140.00
4+200.00 4+220.00 20.00 7.00 7.00 140.00
4+220.00 4+240.00 20.00 7.00 7.00 140.00
4+240.00 4+260.00 20.00 7.00 7.00 140.00
4+260.00 4+280.00 20.00 7.00 7.00 140.00
4+280.00 4+300.00 20.00 7.00 7.00 140.00
4+300.00 4+320.00 20.00 7.00 7.00 140.00
4+320.00 4+340.00 20.00 7.00 7.00 140.00
4+340.00 4+360.00 20.00 7.00 7.00 140.00
4+360.00 4+380.00 20.00 7.00 7.00 140.00
4+380.00 4+400.00 20.00 7.00 7.00 140.00
4+400.00 4+420.00 20.00 7.00 7.00 140.00
4+420.00 4+440.00 20.00 7.00 7.00 140.00
4+440.00 4+460.00 20.00 7.00 7.00 140.00
4+460.00 4+480.00 20.00 7.00 7.00 140.00
4+480.00 4+500.00 20.00 7.00 7.00 140.00
4+500.00 4+520.00 20.00 7.00 7.00 140.00
4+520.00 4+540.00 20.00 7.00 7.00 140.00
4+540.00 4+560.00 20.00 7.00 7.00 140.00
VOLUMEN GENERADO HOJA 6 5,320.00
VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6 31,920.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 62,125.00
VOLUMEN NO EJECUTADO 30205.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
1 M2
TRAMO UNIDAD
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL,
INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL
UNO
4+560.00 4+580.00 20.00 7.00 7.00 140.00
4+580.00 4+600.00 20.00 7.00 7.00 140.00
4+600.00 4+620.00 20.00 7.00 7.00 140.00
4+620.00 4+640.00 20.00 7.00 7.00 140.00
4+640.00 4+660.00 20.00 7.00 7.00 140.00
4+660.00 4+680.00 20.00 7.00 7.00 140.00
4+680.00 4+700.00 20.00 7.00 7.00 140.00
4+700.00 4+720.00 20.00 7.00 7.00 140.00
4+720.00 4+740.00 20.00 7.00 7.00 140.00
4+740.00 4+760.00 20.00 7.00 7.00 140.00
4+760.00 4+780.00 20.00 7.00 7.00 140.00
4+780.00 4+800.00 20.00 7.00 7.00 140.00
4+800.00 4+820.00 20.00 7.00 7.00 140.00
4+820.00 4+840.00 20.00 7.00 7.00 140.00
4+840.00 4+860.00 20.00 7.00 7.00 140.00
4+860.00 4+880.00 20.00 7.00 7.00 140.00
4+880.00 4+900.00 20.00 7.00 7.00 140.00
4+900.00 4+920.00 20.00 7.00 7.00 140.00
4+920.00 4+940.00 20.00 7.00 7.00 140.00
4+940.00 4+960.00 20.00 7.00 7.00 140.00
4+960.00 4+980.00 20.00 7.00 7.00 140.00
4+980.00 5+000.00 20.00 7.00 7.00 140.00
5+000.00 5+020.00 20.00 7.00 7.00 140.00
5+020.00 5+040.00 20.00 7.00 7.00 140.00
5+040.00 5+060.00 20.00 7.00 7.00 140.00
5+060.00 5+080.00 20.00 7.00 7.00 140.00
5+080.00 5+100.00 20.00 7.00 7.00 140.00
5+100.00 5+120.00 20.00 7.00 7.00 140.00
5+120.00 5+140.00 20.00 7.00 7.00 140.00
5+140.00 5+160.00 20.00 7.00 7.00 140.00
5+160.00 5+180.00 20.00 7.00 7.00 140.00
5+180.00 5+200.00 20.00 7.00 7.00 140.00
5+200.00 5+220.00 20.00 7.00 7.00 140.00
5+220.00 5+240.00 20.00 7.00 7.00 140.00
5+240.00 5+260.00 20.00 7.00 7.00 140.00
5+260.00 5+280.00 20.00 7.00 7.00 140.00
5+280.00 5+300.00 20.00 7.00 7.00 140.00
5+300.00 5+320.00 20.00 7.00 7.00 140.00
VOLUMEN GENERADO HOJA 7 5,320.00
VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7 37,240.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 62,125.00
VOLUMEN NO EJECUTADO 24885.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
1 M2
TRAMO UNIDAD
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL,
INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL
UNO
5+320.00 5+340.00 20.00 7.00 7.00 140.00
5+340.00 5+360.00 20.00 7.00 7.00 140.00
5+360.00 5+380.00 20.00 7.00 7.00 140.00
5+380.00 5+400.00 20.00 7.00 7.00 140.00
5+400.00 5+420.00 20.00 7.00 7.00 140.00
5+420.00 5+440.00 20.00 7.00 7.00 140.00
5+440.00 5+460.00 20.00 7.00 7.00 140.00
5+460.00 5+480.00 20.00 7.00 7.00 140.00
5+480.00 5+500.00 20.00 7.00 7.00 140.00
5+500.00 5+520.00 20.00 7.00 7.00 140.00
5+520.00 5+540.00 20.00 7.00 7.00 140.00
5+540.00 5+560.00 20.00 7.00 7.00 140.00
5+560.00 5+580.00 20.00 7.00 7.00 140.00
5+580.00 5+600.00 20.00 7.00 7.00 140.00
5+600.00 5+620.00 20.00 7.00 7.00 140.00
5+620.00 5+640.00 20.00 7.00 7.00 140.00
5+640.00 5+660.00 20.00 7.00 7.00 140.00
5+660.00 5+680.00 20.00 7.00 7.00 140.00
5+680.00 5+700.00 20.00 7.00 7.00 140.00
5+700.00 5+720.00 20.00 7.00 7.00 140.00
5+720.00 5+740.00 20.00 7.00 7.00 140.00
5+740.00 5+760.00 20.00 7.00 7.00 140.00
5+760.00 5+780.00 20.00 7.00 7.00 140.00
5+780.00 5+800.00 20.00 7.00 7.00 140.00
5+800.00 5+820.00 20.00 7.00 7.00 140.00
5+820.00 5+840.00 20.00 7.00 7.00 140.00
5+840.00 5+860.00 20.00 7.00 7.00 140.00
5+860.00 5+880.00 20.00 7.00 7.00 140.00
5+880.00 5+900.00 20.00 7.00 7.00 140.00
5+900.00 5+920.00 20.00 7.00 7.00 140.00
5+920.00 5+940.00 20.00 7.00 7.00 140.00
5+940.00 5+960.00 20.00 7.00 7.00 140.00
5+960.00 5+980.00 20.00 7.00 7.00 140.00
5+980.00 6+000.00 20.00 7.00 7.00 140.00
6+000.00 6+020.00 20.00 7.00 7.00 140.00
6+020.00 6+040.00 20.00 7.00 7.00 140.00
6+040.00 6+060.00 20.00 7.00 7.00 140.00
6+060.00 6+080.00 20.00 7.00 7.00 140.00
VOLUMEN GENERADO HOJA 8 5,320.00
VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7,8 42,560.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 62,125.00
VOLUMEN NO EJECUTADO 19565.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
1 M2
TRAMO UNIDAD
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL,
INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL
UNO
6+080.00 6+100.00 20.00 7.00 7.00 140.00
6+100.00 6+120.00 20.00 7.00 7.00 140.00
6+120.00 6+140.00 20.00 7.00 7.00 140.00
6+140.00 6+160.00 20.00 7.00 7.00 140.00
6+160.00 6+180.00 20.00 7.00 7.00 140.00
6+180.00 6+200.00 20.00 7.00 7.00 140.00
6+200.00 6+220.00 20.00 7.00 7.00 140.00
6+220.00 6+240.00 20.00 7.00 7.00 140.00
6+240.00 6+260.00 20.00 7.00 7.00 140.00
6+260.00 6+280.00 20.00 7.00 7.00 140.00
6+280.00 6+300.00 20.00 7.00 7.00 140.00
6+300.00 6+320.00 20.00 7.00 7.00 140.00
6+320.00 6+340.00 20.00 7.00 7.00 140.00
6+340.00 6+360.00 20.00 7.00 7.00 140.00
6+360.00 6+380.00 20.00 7.00 7.00 140.00
6+380.00 6+400.00 20.00 7.00 7.00 140.00
6+400.00 6+420.00 20.00 7.00 7.00 140.00
6+420.00 6+440.00 20.00 7.00 7.00 140.00
6+440.00 6+460.00 20.00 7.00 7.00 140.00
6+460.00 6+480.00 20.00 7.00 7.00 140.00
6+480.00 6+500.00 20.00 7.00 7.00 140.00
6+500.00 6+520.00 20.00 7.00 7.00 140.00
6+520.00 6+540.00 20.00 7.00 7.00 140.00
6+540.00 6+560.00 20.00 7.00 7.00 140.00
6+560.00 6+580.00 20.00 7.00 7.00 140.00
6+580.00 6+600.00 20.00 7.00 7.00 140.00
6+600.00 6+620.00 20.00 7.00 7.00 140.00
6+620.00 6+640.00 20.00 7.00 7.00 140.00
6+640.00 6+660.00 20.00 7.00 7.00 140.00
6+660.00 6+680.00 20.00 7.00 7.00 140.00
6+680.00 6+700.00 20.00 7.00 7.00 140.00
6+700.00 6+720.00 20.00 7.00 7.00 140.00
6+720.00 6+740.00 20.00 7.00 7.00 140.00
6+740.00 6+760.00 20.00 7.00 7.00 140.00
6+760.00 6+780.00 20.00 7.00 7.00 140.00
6+780.00 6+800.00 20.00 7.00 7.00 140.00
6+800.00 6+820.00 20.00 7.00 7.00 140.00
6+820.00 6+840.00 20.00 7.00 7.00 140.00
VOLUMEN GENERADO HOJA 9 5,320.00
VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7,8,9 47,880.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 62,125.00
VOLUMEN NO EJECUTADO 14245.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
1 M2
TRAMO UNIDAD
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL,
INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL
UNO
6+840.00 6+860.00 20.00 7.00 7.00 140.00
6+860.00 6+880.00 20.00 7.00 7.00 140.00
6+880.00 6+900.00 20.00 7.00 7.00 140.00
6+900.00 6+920.00 20.00 7.00 7.00 140.00
6+920.00 6+940.00 20.00 7.00 7.00 140.00
6+940.00 6+960.00 20.00 7.00 7.00 140.00
6+960.00 6+980.00 20.00 7.00 7.00 140.00
6+980.00 7+000.00 20.00 7.00 7.00 140.00
7+000.00 7+020.00 20.00 7.00 7.00 140.00
7+020.00 7+040.00 20.00 7.00 7.00 140.00
7+040.00 7+060.00 20.00 7.00 7.00 140.00
7+060.00 7+080.00 20.00 7.00 7.00 140.00
7+080.00 7+100.00 20.00 7.00 7.00 140.00
7+100.00 7+120.00 20.00 7.00 7.00 140.00
7+120.00 7+140.00 20.00 7.00 7.00 140.00
7+140.00 7+160.00 20.00 7.00 7.00 140.00
7+160.00 7+180.00 20.00 7.00 7.00 140.00
7+180.00 7+200.00 20.00 7.00 7.00 140.00
7+200.00 7+220.00 20.00 7.00 7.00 140.00
7+220.00 7+240.00 20.00 7.00 7.00 140.00
7+240.00 7+260.00 20.00 7.00 7.00 140.00
7+260.00 7+280.00 20.00 7.00 7.00 140.00
7+280.00 7+300.00 20.00 7.00 7.00 140.00
7+300.00 7+320.00 20.00 7.00 7.00 140.00
7+320.00 7+340.00 20.00 7.00 7.00 140.00
7+340.00 7+360.00 20.00 7.00 7.00 140.00
7+360.00 7+380.00 20.00 7.00 7.00 140.00
7+380.00 7+400.00 20.00 7.00 7.00 140.00
7+400.00 7+420.00 20.00 7.00 7.00 140.00
7+420.00 7+440.00 20.00 7.00 7.00 140.00
7+440.00 7+460.00 20.00 7.00 7.00 140.00
7+460.00 7+480.00 20.00 7.00 7.00 140.00
7+480.00 7+500.00 20.00 7.00 7.00 140.00
7+500.00 7+520.00 20.00 7.00 7.00 140.00
7+520.00 7+540.00 20.00 7.00 7.00 140.00
7+540.00 7+560.00 20.00 7.00 7.00 140.00
7+560.00 7+580.00 20.00 7.00 7.00 140.00
7+580.00 7+600.00 20.00 7.00 7.00 140.00
VOLUMEN GENERADO HOJA 10 5,320.00
VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7,8,9,10 53,200.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 62,125.00
VOLUMEN NO EJECUTADO 8925.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
1 M2
TRAMO UNIDAD
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL,
INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL
UNO
7+600.00 7+620.00 20.00 7.00 7.00 140.00
7+620.00 7+640.00 20.00 7.00 7.00 140.00
7+640.00 7+660.00 20.00 7.00 7.00 140.00
7+660.00 7+680.00 20.00 7.00 7.00 140.00
7+680.00 7+700.00 20.00 7.00 7.00 140.00
7+700.00 7+720.00 20.00 7.00 7.00 140.00
7+720.00 7+740.00 20.00 7.00 7.00 140.00
7+740.00 7+760.00 20.00 7.00 7.00 140.00
7+760.00 7+780.00 20.00 7.00 7.00 140.00
7+780.00 7+800.00 20.00 7.00 7.00 140.00
7+800.00 7+820.00 20.00 7.00 7.00 140.00
7+820.00 7+840.00 20.00 7.00 7.00 140.00
7+840.00 7+860.00 20.00 7.00 7.00 140.00
7+860.00 7+880.00 20.00 7.00 7.00 140.00
7+880.00 7+900.00 20.00 7.00 7.00 140.00
7+900.00 7+920.00 20.00 7.00 7.00 140.00
7+920.00 7+940.00 20.00 7.00 7.00 140.00
7+940.00 7+960.00 20.00 7.00 7.00 140.00
7+960.00 7+980.00 20.00 7.00 7.00 140.00
7+980.00 8+000.00 20.00 7.00 7.00 140.00
8+000.00 8+020.00 20.00 7.00 7.00 140.00
8+020.00 8+040.00 20.00 7.00 7.00 140.00
8+040.00 8+060.00 20.00 7.00 7.00 140.00
8+060.00 8+080.00 20.00 7.00 7.00 140.00
8+080.00 8+100.00 20.00 7.00 7.00 140.00
8+100.00 8+120.00 20.00 7.00 7.00 140.00
8+120.00 8+140.00 20.00 7.00 7.00 140.00
8+140.00 8+160.00 20.00 7.00 7.00 140.00
8+160.00 8+180.00 20.00 7.00 7.00 140.00
8+180.00 8+200.00 20.00 7.00 7.00 140.00
8+200.00 8+220.00 20.00 7.00 7.00 140.00
8+220.00 8+240.00 20.00 7.00 7.00 140.00
8+240.00 8+260.00 20.00 7.00 7.00 140.00
8+260.00 8+280.00 20.00 7.00 7.00 140.00
8+280.00 8+300.00 20.00 7.00 7.00 140.00
8+300.00 8+320.00 20.00 7.00 7.00 140.00
8+320.00 8+340.00 20.00 7.00 7.00 140.00
8+340.00 8+360.00 20.00 7.00 7.00 140.00
VOLUMEN GENERADO HOJA 11 5,320.00
VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7,8,9,10,11 58,520.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 62,125.00
VOLUMEN NO EJECUTADO 3605.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
1 M2
TRAMO UNIDAD
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL,
INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL
UNO
8+360.00 8+380.00 20.00 7.00 7.00 140.00
8+380.00 8+400.00 20.00 7.00 7.00 140.00
8+400.00 8+420.00 20.00 7.00 7.00 140.00
8+420.00 8+440.00 20.00 7.00 7.00 140.00
8+440.00 8+460.00 20.00 7.00 7.00 140.00
8+460.00 8+480.00 20.00 7.00 7.00 140.00
8+480.00 8+500.00 20.00 7.00 7.00 140.00
8+500.00 8+520.00 20.00 7.00 7.00 140.00
8+520.00 8+540.00 20.00 7.00 7.00 140.00
8+540.00 8+560.00 20.00 7.00 7.00 140.00
8+560.00 8+580.00 20.00 7.00 7.00 140.00
8+580.00 8+600.00 20.00 7.00 7.00 140.00
8+600.00 8+620.00 20.00 7.00 7.00 140.00
8+620.00 8+640.00 20.00 7.00 7.00 140.00
8+640.00 8+660.00 20.00 7.00 7.00 140.00
8+660.00 8+680.00 20.00 7.00 7.00 140.00
8+680.00 8+700.00 20.00 7.00 7.00 140.00
8+700.00 8+720.00 20.00 7.00 7.00 140.00
8+720.00 8+740.00 20.00 7.00 7.00 140.00
8+740.00 8+760.00 20.00 7.00 7.00 140.00
8+760.00 8+780.00 20.00 7.00 7.00 140.00
8+780.00 8+800.00 20.00 7.00 7.00 140.00
8+800.00 8+820.00 20.00 7.00 7.00 140.00
8+820.00 8+840.00 20.00 7.00 7.00 140.00
8+840.00 8+860.00 20.00 7.00 7.00 140.00
8+860.00 8+875.00 15.00 7.00 7.00 105.00
VOLUMEN GENERADO HOJA 12 3,605.00
VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7,8,9,10,11,12 62,125.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 62,125.00
VOLUMEN NO EJECUTADO 0.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
2 M2
TRAMO LARGO ANCHO UNIDAD
7.00
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
0+780.00 0+800.00 7.00 0.07 140.00
0+800.00 0+820.00 7.00 0.07 140.00
0+740.00 0+760.00 7.00 0.07 140.00
0+760.00 0+780.00 7.00 0.07 140.00
0+700.00 0+720.00 7.00 0.07 140.00
0+720.00
VOLUMEN CONTRATADO 37275.00
VOLUMEN NO EJECUTADO -31535.00
VOLUMEN GENERADO HOJA 1 5740.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
0+740.00 7.00 0.07 140.00
0+660.00 0+680.00 7.00 0.07 140.00
0+680.00 0+700.00 7.00 0.07 140.00
0+620.00 0+640.00 7.00 0.07 140.00
0+640.00 0+660.00 7.00 0.07 140.00
0+580.00 0+600.00 7.00 0.07 140.00
0+600.00 0+620.00 7.00 0.07 140.00
0+540.00 0+560.00 7.00 0.07 140.00
0+560.00 0+580.00 7.00 0.07 140.00
0+500.00 0+520.00 7.00 0.07 140.00
0+520.00 0+540.00 7.00 0.07 140.00
0+460.00 0+480.00 7.00 0.07 140.00
0+480.00 0+500.00 7.00 0.07 140.00
0+420.00 0+440.00 7.00 0.07 140.00
0+440.00 0+460.00 7.00 0.07 140.00
0+380.00 0+400.00 7.00 0.07 140.00
0+400.00 0+420.00 7.00 0.07 140.00
0+340.00 0+360.00 7.00 0.07 140.00
0+360.00 0+380.00 7.00 0.07 140.00
0+300.00 0+320.00 7.00 0.07 140.00
0+320.00 0+340.00 7.00 0.07 140.00
0+260.00 0+280.00 7.00 0.07 140.00
0+280.00 0+300.00 7.00 0.07 140.00
7.00 0.07 140.00
0+240.00 0+260.00 7.00 0.07 140.00
0+180.00 0+200.00 7.00 0.07 140.00
0+200.00 0+220.00 7.00 0.07 140.00
0+140.00 0+160.00 7.00 0.07 140.00
0+160.00 0+180.00 7.00 0.07 140.00
0+100.00 0+120.00 7.00 0.07 140.00
0+120.00 0+140.00 7.00 0.07 140.00
0+100.00 7.00 0.07 140.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
0+020.00 0+040.00 7.00 0.07 140.00
0+040.00 0+060.00 7.00 0.07 140.00
0+000.00 0+020.00 7.00 0.07 140.00
EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL
UNO
0+000.00
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA,
EQUIPO.
0+060.00 0+080.00 7.00 0.07 140.00
0+080.00
0+220.00 0+240.00
ING. FELIPE DE JESUS MORENO ROJAS
APROBO:
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
2 M2
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA,
EQUIPO.
0+820.00 0+840.00
0+940.00 0+960.00 7.00 0.07 140.00
0+960.00 0+980.00 7.00 0.07 140.00
0+980.00 1+000.00 7.00 0.07 140.00
1+060.00 1+080.00 7.00 0.07 140.00
1+080.00 1+100.00 7.00 0.07 140.00
0+900.00 0+920.00 7.00 0.07 140.00
0+920.00 0+940.00
7.00 0.07 140.00
0+840.00 0+860.00 7.00 0.07 140.00
0+860.00 0+880.00 7.00 0.07 140.00
0+880.00 0+900.00 7.00 0.07 140.00
7.00 0.07 140.00
1+100.00 1+120.00 7.00 0.07 140.00
1+000.00 1+020.00 7.00 0.07 140.00
1+020.00 1+040.00 7.00 0.07 140.00
1+040.00 1+060.00 7.00 0.07 140.00
1+180.00 1+200.00 7.00 0.07 140.00
1+200.00 1+220.00 7.00 0.07 140.00
1+220.00 1+240.00 7.00 0.07 140.00
1+120.00 1+140.00 7.00 0.07 140.00
1+140.00 1+160.00 7.00 0.07 140.00
1+160.00 1+180.00 7.00 0.07 140.00
1+240.00 1+260.00 7.00 0.07 140.00
1+260.00 1+280.00 7.00 0.07 140.00
1+280.00 1+300.00 7.00 0.07 140.00
140.00
1+420.00 1+440.00 7.00 0.07 140.00
1+440.00 1+460.00 7.00 0.07 140.00
1+460.00 1+480.00 7.00 0.07 140.00
1+360.00 1+380.00 7.00 0.07 140.00
1+380.00 1+400.00 7.00 0.07 140.00
1+400.00 1+420.00 7.00 0.07 140.00
1+540.00 1+560.00 7.00 0.07 140.00
1+560.00 1+580.00 7.00 0.07 140.00
1+580.00 1+600.00 7.00 0.07 140.00
1+300.00 1+320.00 7.00 0.07 140.00
1+320.00 1+340.00 7.00 0.07 140.00
1+340.00 1+360.00 7.00 0.07 140.00
1+600.00 1+620.00 140.00
1+620.00 1+640.00 140.00
VOLUMEN GENERADO HOJA 2 5,740.00
VOLUMEN ACUMULADO HOJA 1,2 11,480.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN NO EJECUTADO -25795.00
UNO
7.00 0.07
7.00 0.07
1+480.00 1+500.00 7.00 0.07 140.00
1+500.00 1+520.00 7.00 0.07 140.00
1+520.00 1+540.00 7.00 0.07
VOLUMEN CONTRATADO 37275.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONCEPTO
EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
2 M2
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
CONCEPTO
EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL
UNO
1+820.00 1+840.00 7.00 0.07 140.00
1+840.00 1+860.00 7.00 0.07 140.00
1+740.00 1+760.00 7.00 0.07 140.00
1+760.00 1+780.00 7.00 0.07 140.00
1+780.00 1+800.00 7.00 0.07 140.00
1+920.00 1+940.00 7.00
1+640.00 1+660.00 7.00 0.07 140.00
1+660.00 1+680.00 7.00 0.07 140.00
1+680.00 1+700.00 7.00 0.07 140.00
1+700.00 1+720.00 7.00 0.07 140.00
1+720.00 1+740.00 7.00 0.07 140.00
1+800.00 1+820.00 7.00 0.07 140.00
0.07 140.00
1+940.00 1+960.00 7.00 0.07 140.00
1+960.00 1+980.00 7.00 0.07 140.00
1+860.00 1+880.00 7.00 0.07 140.00
1+880.00 1+900.00 7.00 0.07 140.00
1+900.00 1+920.00 7.00 0.07 140.00
2+040.00 2+060.00 7.00 0.07 140.00
2+060.00 2+080.00 7.00 0.07 140.00
2+080.00 2+100.00 7.00 0.07 140.00
1+980.00 2+000.00 7.00 0.07 140.00
2+000.00 2+020.00 7.00 0.07 140.00
2+020.00 2+040.00 7.00 0.07 140.00
2+460.00 7.00 0.07
VOLUMEN GENERADO HOJA 3 5,740.00
VOLUMEN ACUMULADO HOJA 1,2,3 17,220.00
2+160.00 2+180.00 7.00 0.07 140.00
2+180.00 2+200.00 7.00 0.07 140.00
2+200.00 2+220.00 7.00 0.07 140.00
2+100.00 2+120.00 7.00 0.07 140.00
2+120.00 2+140.00 7.00 0.07 140.00
2+140.00 2+160.00 7.00 0.07 140.00
2+280.00 2+300.00 7.00 0.07 140.00
2+300.00 2+320.00 7.00 0.07 140.00
2+320.00 2+340.00 7.00 0.07 140.00
2+220.00 2+240.00 7.00 0.07 140.00
2+240.00 2+260.00 7.00 0.07 140.00
2+260.00 2+280.00 7.00 0.07 140.00
2+420.00 2+440.00 140.00
140.00
VOLUMEN CONTRATADO 37275.00
7.00 0.07
2+440.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA,
EQUIPO.
7.00 0.07
7.00 0.07
7.00 0.07
2+340.00 2+360.00 7.00 0.07 140.00
2+360.00 2+380.00 140.00
2+380.00 2+400.00 140.00
2+400.00 2+420.00 140.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN NO EJECUTADO -20055.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
2 M2
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
2+480.00 2+500.00 7.00 0.07 140.00
2+500.00 2+520.00 7.00 0.07 140.00
2+520.00 2+540.00 7.00 0.07 140.00
2+660.00 2+680.00 7.00 0.07 140.00
2+600.00 2+620.00 7.00 0.07 140.00
2+620.00 2+640.00 7.00 0.07 140.00
2+640.00 2+660.00 7.00 0.07 140.00
2+940.00 2+960.00 7.00 0.07 140.00
2+840.00 2+860.00 7.00 0.07 140.00
2+860.00 2+880.00 7.00 0.07 140.00
2+880.00 2+900.00 7.00 0.07 140.00
2+680.00 2+700.00 7.00 0.07 140.00
2+700.00 2+720.00 7.00 0.07 140.00
EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL
2+460.00 2+480.00 7.00 0.07 140.00
2+920.00 7.00 0.07
2+780.00 2+800.00 7.00 0.07 140.00
2+800.00 2+820.00 7.00 0.07 140.00
2+540.00 2+560.00 7.00 0.07 140.00
2+560.00 2+580.00 7.00 0.07 140.00
2+580.00 2+600.00 7.00 0.07 140.00
140.00
2+920.00 2+940.00 7.00 0.07 140.00
3+040.00 3+060.00 7.00
140.00
140.00
3+000.00 3+020.00 7.00 0.07
3+140.00 3+160.00 140.00
3+160.00 3+180.00 140.00
3+180.00 3+200.00 140.00
140.00
3+080.00 3+100.00 7.00 0.07 140.00
3+100.00 3+120.00
VOLUMEN GENERADO HOJA 4 5,740.00
VOLUMEN CONTRATADO 37275.00
2+820.00 2+840.00 7.00 0.07 140.00
2+720.00 2+740.00 7.00 0.07 140.00
2+740.00 2+760.00 7.00 0.07 140.00
2+760.00 2+780.00 7.00 0.07 140.00
2+900.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA,
EQUIPO.
UNO
7.00 0.07
7.00 0.07
7.00 0.07
7.00 0.07
3+200.00 3+220.00 7.00 0.07
3+220.00 3+240.00 7.00 0.07 140.00
7.00 0.07 140.00
3+120.00 3+140.00 140.00
3+020.00 3+040.00 7.00 0.07 140.00
0.07 140.00
3+060.00 3+080.00 7.00 0.07 140.00
2+960.00 2+980.00 7.00 0.07 140.00
2+980.00 3+000.00 7.00 0.07
3+240.00 3+260.00 7.00 0.07 140.00
3+260.00 3+280.00 7.00 0.07 140.00
VOLUMEN ACUMULADO HOJA 1,2,3,4 22,960.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN NO EJECUTADO -14315.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
2 M2
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 37275.00
VOLUMEN NO EJECUTADO -8575.00
4+060.00 4+080.00 7.00 0.07 140.00
4+080.00 4+100.00 7.00 0.07 140.00
VOLUMEN GENERADO HOJA 5 5,740.00
VOLUMEN ACUMULADO HOJA 1,2,3,4,5 28,700.00
3+980.00 4+000.00 7.00 0.07 140.00
4+000.00 4+020.00 7.00 0.07 140.00
4+020.00 4+040.00 7.00 0.07 140.00
4+040.00 4+060.00 7.00 0.07 140.00
3+900.00 3+920.00 7.00 0.07 140.00
3+920.00 3+940.00 7.00 0.07 140.00
3+940.00 3+960.00 7.00 0.07 140.00
3+960.00 3+980.00 7.00 0.07 140.00
3+820.00 3+840.00 7.00 0.07 140.00
3+840.00 3+860.00 7.00 0.07 140.00
3+860.00 3+880.00 7.00 0.07 140.00
3+880.00 3+900.00 7.00 0.07 140.00
3+760.00 3+780.00 7.00 0.07 140.00
3+780.00 3+800.00 7.00 0.07 140.00
3+800.00 3+820.00 7.00 0.07 140.00
3+660.00 3+680.00 7.00 0.07 140.00
3+680.00 3+700.00 7.00 0.07 140.00
3+700.00 3+720.00 7.00 0.07 140.00
3+720.00 3+740.00 7.00 0.07 140.00
3+620.00 3+640.00 7.00 0.07 140.00
3+640.00 3+660.00 7.00 0.07 140.00
3+500.00 3+520.00 7.00 0.07 140.00
3+520.00 3+540.00 7.00 0.07 140.00
3+540.00 3+560.00 7.00 0.07 140.00
3+560.00 3+580.00 7.00 0.07 140.00
3+740.00 3+760.00 7.00 0.07 140.00
3+460.00 3+480.00 7.00 0.07 140.00
3+480.00 3+500.00 7.00 0.07 140.00
0.07 140.00
3+360.00 3+380.00 7.00 0.07 140.00
3+380.00 3+400.00 7.00 0.07 140.00
3+400.00 3+420.00 7.00 0.07 140.00
3+580.00 3+600.00 7.00 0.07 140.00
3+600.00 3+620.00 7.00 0.07 140.00
EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL
UNO
3+280.00 3+300.00 7.00 0.07 140.00
3+300.00 3+320.00 7.00 0.07 140.00
3+320.00 3+340.00 7.00 0.07 140.00
3+340.00 3+360.00 7.00
3+420.00 3+440.00 7.00 0.07 140.00
3+440.00 3+460.00 7.00 0.07 140.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA,
EQUIPO.
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
2 M2
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 37275.00
VOLUMEN NO EJECUTADO -2835.00
4+880.00 4+900.00 7.00 0.07 140.00
4+900.00 4+920.00 7.00 0.07 140.00
VOLUMEN GENERADO HOJA 6 5,740.00
VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6 34,440.00
4+800.00 4+820.00 7.00 0.07 140.00
4+820.00 4+840.00 7.00 0.07 140.00
4+840.00 4+860.00 7.00 0.07 140.00
4+860.00 4+880.00 7.00 0.07 140.00
4+720.00 4+740.00 7.00 0.07 140.00
4+740.00 4+760.00 7.00 0.07 140.00
4+760.00 4+780.00 7.00 0.07 140.00
4+780.00 4+800.00 7.00 0.07 140.00
4+640.00 4+660.00 7.00 0.07 140.00
4+660.00 4+680.00 7.00 0.07 140.00
4+680.00 4+700.00 7.00 0.07 140.00
4+700.00 4+720.00 7.00 0.07 140.00
4+560.00 4+580.00 7.00 0.07 140.00
4+580.00 4+600.00 7.00 0.07 140.00
4+600.00 4+620.00 7.00 0.07 140.00
4+620.00 4+640.00 7.00 0.07 140.00
4+480.00 4+500.00 7.00 0.07 140.00
4+500.00 4+520.00 7.00 0.07 140.00
4+520.00 4+540.00 7.00 0.07 140.00
4+540.00 4+560.00 7.00 0.07 140.00
4+180.00 4+200.00 7.00 0.07 140.00
4+200.00 4+220.00 7.00 0.07 140.00
4+220.00 4+240.00 7.00 0.07 140.00
4+400.00 4+420.00 7.00 0.07 140.00
4+420.00 4+440.00 7.00 0.07 140.00
4+440.00 4+460.00 7.00 0.07 140.00
4+460.00 4+480.00 7.00 0.07 140.00
4+320.00 4+340.00 7.00 0.07 140.00
4+340.00 4+360.00 7.00 0.07 140.00
4+360.00 4+380.00 7.00 0.07 140.00
4+380.00 4+400.00 7.00 0.07 140.00
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA,
EQUIPO.
EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL
UNO
4+100.00 4+120.00 7.00 0.07 140.00
4+120.00 4+140.00 7.00 0.07 140.00
4+140.00 4+160.00 7.00 0.07 140.00
4+160.00 4+180.00 7.00
4+240.00 4+260.00 7.00 0.07 140.00
4+260.00 4+280.00 7.00 0.07 140.00
4+280.00 4+300.00 7.00 0.07 140.00
4+300.00 4+320.00 7.00 0.07 140.00
0.07 140.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
2 M2
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
20.00 7.00 M2
5.00 7.00 M2
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 37275.00
VOLUMEN NO EJECUTADO 0.00
VOLUMEN GENERADO HOJA 7 2,835.00
VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7 37,275.00
5+300.00 5+320.00 7.00 0.07 140.00
5+320.00 5+325.00 7.00 0.07 35.00
5+000.00 5+020.00 7.00 0.07 140.00
5+020.00 5+040.00 7.00 0.07 140.00
5+040.00 5+060.00 7.00 0.07 140.00
5+220.00 5+240.00 7.00 0.07 140.00
5+240.00 5+260.00 7.00 0.07 140.00
5+260.00 5+280.00 7.00 0.07 140.00
5+280.00 5+300.00 7.00 0.07 140.00
5+140.00 5+160.00 7.00 0.07 140.00
5+160.00 5+180.00 7.00 0.07 140.00
5+180.00 5+200.00 7.00 0.07 140.00
5+200.00 5+220.00 7.00 0.07 140.00
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA,
EQUIPO.
EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL
UNO
4+920.00 4+940.00 7.00 0.07 140.00
4+940.00 4+960.00 7.00 0.07 140.00
4+960.00 4+980.00 7.00 0.07 140.00
4+980.00 5+000.00 7.00
5+060.00 5+080.00 7.00 0.07 140.00
5+080.00 5+100.00 7.00 0.07 140.00
5+100.00 5+120.00 7.00 0.07 140.00
5+120.00 5+140.00 7.00 0.07 140.00
0.07 140.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
3 M3
TRAMO LARGO ANCHO UNIDAD
7.00
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
VOLUMEN NO EJECUTADO -32821.43
0+780.00 0+800.00 7.00 0.45 63.00
0+720.00 0+740.00 7.00 0.45 63.00
0+740.00 0+760.00 7.00 0.45 63.00
0+840.00 0+860.00 7.00 0.45 63.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 36343.13
VOLUMEN GENERADO HOJA 1 3521.70
7.00 0.45 63.00
ABUNDAMIENTO 30% 812.70
0+680.00 0+700.00 7.00 0.45 63.00
0.45 63.00
0+800.00 0+820.00 7.00 0.45 63.00
0+820.00 0+840.00 7.00 0.45 63.00
0+540.00 0+560.00 7.00
SUBTOTAL 2709.00
0+700.00 0+720.00 7.00 0.45 63.00
0+640.00 0+660.00 7.00 0.45 63.00
0+660.00 0+680.00 7.00 0.45 63.00
0+760.00 0+780.00 7.00 0.45 63.00
0+620.00 0+640.00
0+480.00 0+500.00 7.00 0.45 63.00
0+500.00 0+520.00 7.00 0.45 63.00
0+600.00 0+620.00 7.00 0.45 63.00
0.45 63.00
0+460.00 0+480.00 7.00 0.45 63.00
0+400.00 0+420.00 7.00 0.45 63.00
0+420.00 0+440.00 7.00 0.45 63.00
0+520.00 0+540.00 7.00 0.45 63.00
0+560.00 0+580.00 7.00
0+580.00 0+600.00 7.00 0.45 63.00
0+380.00 0+400.00 7.00 0.45 63.00
0+320.00 0+340.00 7.00 0.45 63.00
0+340.00 0+360.00 7.00 0.45 63.00
0+440.00 0+460.00 7.00 0.45 63.00
0+300.00 0+320.00 7.00 0.45 63.00
0+240.00 0+260.00 7.00 0.45 63.00
0+260.00 0+280.00 7.00 0.45 63.00
0+360.00 0+380.00 7.00 0.45 63.00
0.45 63.00
0+140.00
EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO
LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN,
EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL
0+220.00 0+240.00 7.00 0.45 63.00
0+160.00 0+180.00 7.00 0.45 63.00
0+180.00 0+200.00 7.00 0.45 63.00
0+280.00 0+300.00 7.00 0.45 63.00
0+160.00 7.00 0.45 63.00
0+080.00 0+100.00 7.00 0.45 63.00
0+100.00 0+120.00 7.00 0.45 63.00
0+200.00 0+220.00 7.00 0.45 63.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
UNO
0+000.00
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
0+040.00 0+060.00 7.00 0.45 63.00
0+060.00 0+080.00 7.00 0.45 63.00
63.00
0+020.00 0+040.00 7.00 0.45 63.00
0+000.00 0+020.00 7.00 0.45
0+120.00 0+140.00 7.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
3 M3
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
VOLUMEN NO EJECUTADO -29299.73
VOLUMEN GENERADO HOJA 2 3521.70
ABUNDAMIENTO 30% 812.70
ACUMULADO HOJA 1,2 7043.40
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 36343.13
1+680.00 1+700.00 7.00 0.45 63.00
1+700.00 1+720.00 7.00 0.45 63.00
SUBTOTAL 2709.00
1+600.00 1+620.00 7.00 0.45 63.00
1+620.00 1+640.00 7.00 0.45 63.00
1+640.00 1+660.00 7.00 0.45 63.00
1+660.00 1+680.00 7.00 0.45 63.00
1+520.00 1+540.00 7.00 0.45 63.00
1+540.00 1+560.00 7.00 0.45 63.00
1+560.00 1+580.00 7.00 0.45 63.00
1+580.00 1+600.00 7.00 0.45 63.00
1+440.00 1+460.00 7.00 0.45 63.00
1+460.00 1+480.00 7.00 0.45 63.00
1+480.00 1+500.00 7.00 0.45 63.00
1+500.00 1+520.00 7.00 0.45 63.00
1+360.00 1+380.00 7.00 0.45 63.00
1+380.00 1+400.00 7.00 0.45 63.00
1+400.00 1+420.00 7.00 0.45 63.00
1+420.00 1+440.00 7.00 0.45 63.00
1+300.00 1+320.00 7.00 0.45 63.00
1+320.00 1+340.00 7.00 0.45 63.00
1+340.00 1+360.00 7.00 0.45 63.00
1+200.00 1+220.00 7.00 0.45 63.00
1+220.00 1+240.00 7.00 0.45 63.00
1+240.00 1+260.00 7.00 0.45 63.00
1+260.00 1+280.00 7.00 0.45 63.00
1+160.00 1+180.00 7.00 0.45 63.00
1+180.00 1+200.00 7.00 0.45 63.00
1+040.00 1+060.00 7.00 0.45 63.00
1+060.00 1+080.00 7.00 0.45 63.00
1+080.00 1+100.00 7.00 0.45 63.00
1+100.00 1+120.00 7.00 0.45 63.00
1+280.00 1+300.00 7.00 0.45 63.00
UNO
0+860.00 0+880.00 7.00 0.45 63.00
0+880.00 0+900.00 7.00
63.00
0+980.00 1+000.00 7.00 0.45 63.00
1+000.00 1+020.00 7.00 0.45 63.00
1+020.00 1+040.00 7.00 0.45 63.00
EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL
1+120.00 1+140.00 7.00 0.45 63.00
1+140.00 1+160.00 7.00 0.45 63.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO
LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN,
EQUIPO, HERRAMIENTA Y MANO DE OBRA.
0+960.00 0+980.00 7.00 0.45
0.45 63.00
0+900.00 0+920.00 7.00 0.45 63.00
0+920.00 0+940.00 7.00 0.45 63.00
0+940.00 0+960.00 7.00 0.45 63.00
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
3 M3
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
VOLUMEN GENERADO HOJA 3 3521.70
ACUMULADO HOJA 1,2,3 10565.10
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 36343.13
VOLUMEN NO EJECUTADO -25778.03
2+540.00 2+560.00 7.00 0.45 63.00
2+560.00 2+580.00 7.00 0.45 63.00
SUBTOTAL 2709.00
ABUNDAMIENTO 30% 812.70
2+460.00 2+480.00 7.00 0.45 63.00
2+480.00 2+500.00 7.00 0.45 63.00
2+500.00 2+520.00 7.00 0.45 63.00
2+520.00 2+540.00 7.00 0.45 63.00
2+380.00 2+400.00 7.00 0.45 63.00
2+400.00 2+420.00 7.00 0.45 63.00
2+420.00 2+440.00 7.00 0.45 63.00
2+440.00 2+460.00 7.00 0.45 63.00
2+300.00 2+320.00 7.00 0.45 63.00
2+320.00 2+340.00 7.00 0.45 63.00
2+340.00 2+360.00 7.00 0.45 63.00
2+360.00 2+380.00 7.00 0.45 63.00
2+220.00 2+240.00 7.00 0.45 63.00
2+240.00 2+260.00 7.00 0.45 63.00
2+260.00 2+280.00 7.00 0.45 63.00
2+280.00 2+300.00 7.00 0.45 63.00
2+140.00 2+160.00 7.00 0.45 63.00
2+160.00 2+180.00 7.00 0.45 63.00
2+180.00 2+200.00 7.00 0.45 63.00
2+200.00 2+220.00 7.00 0.45 63.00
63.00
1+860.00 1+880.00 7.00 0.45 63.00
1+880.00 1+900.00 7.00 0.45 63.00
2+060.00 2+080.00 7.00 0.45 63.00
2+080.00 2+100.00 7.00 0.45 63.00
2+100.00 2+120.00 7.00 0.45 63.00
2+120.00 2+140.00 7.00 0.45 63.00
1+980.00 2+000.00 7.00 0.45 63.00
2+000.00 2+020.00 7.00 0.45 63.00
2+020.00 2+040.00 7.00 0.45 63.00
2+040.00 2+060.00 7.00 0.45 63.00
EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO
LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN,
EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL
UNO
1+720.00 1+740.00 7.00 0.45 63.00
1+740.00 1+760.00 7.00 0.45 63.00
1+760.00 1+780.00 7.00 0.45 63.00
1+780.00 1+800.00 7.00 0.45 63.00
1+800.00 1+820.00 7.00 0.45
1+900.00 1+920.00 7.00 0.45 63.00
1+920.00 1+940.00 7.00 0.45 63.00
1+940.00 1+960.00 7.00 0.45 63.00
1+960.00 1+980.00 7.00 0.45 63.00
63.00
1+820.00 1+840.00 7.00 0.45 63.00
1+840.00 1+860.00 7.00 0.45
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
3 M3
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
ACUMULADO HOJA 1,2,3,4 14086.80
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 36343.13
VOLUMEN NO EJECUTADO -22256.33
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
3+420.00 3+440.00 7.00 0.45 63.00
SUBTOTAL 2709.00
ABUNDAMIENTO 30% 812.70
VOLUMEN GENERADO HOJA 4 3521.70
3+340.00 3+360.00 7.00 0.45 63.00
3+360.00 3+380.00 7.00 0.45 63.00
3+380.00 3+400.00 7.00 0.45 63.00
3+400.00 3+420.00 7.00 0.45 63.00
3+260.00 3+280.00 7.00 0.45 63.00
3+280.00 3+300.00 7.00 0.45 63.00
3+300.00 3+320.00 7.00 0.45 63.00
3+320.00 3+340.00 7.00 0.45 63.00
3+180.00 3+200.00 7.00 0.45 63.00
3+200.00 3+220.00 7.00 0.45 63.00
3+220.00 3+240.00 7.00 0.45 63.00
3+240.00 3+260.00 7.00 0.45 63.00
3+100.00 3+120.00 7.00 0.45 63.00
3+120.00 3+140.00 7.00 0.45 63.00
3+140.00 3+160.00 7.00 0.45 63.00
3+160.00 3+180.00 7.00 0.45 63.00
3+020.00 3+040.00 7.00 0.45 63.00
3+040.00 3+060.00 7.00 0.45 63.00
3+060.00 3+080.00 7.00 0.45 63.00
3+080.00 3+100.00 7.00 0.45 63.00
0.45 63.00
2+760.00 2+780.00 7.00 0.45 63.00
2+940.00 2+960.00 7.00 0.45 63.00
2+960.00 2+980.00 7.00 0.45 63.00
2+980.00 3+000.00 7.00 0.45 63.00
3+000.00 3+020.00 7.00 0.45 63.00
2+860.00 2+880.00 7.00 0.45 63.00
2+880.00 2+900.00 7.00 0.45 63.00
2+900.00 2+920.00 7.00 0.45 63.00
2+920.00 2+940.00 7.00 0.45 63.00
UNO
2+580.00 2+600.00 7.00 0.45 63.00
2+600.00 2+620.00 7.00 0.45 63.00
2+620.00 2+640.00 7.00 0.45 63.00
2+640.00 2+660.00 7.00 0.45 63.00
2+660.00 2+680.00 7.00 0.45 63.00
2+680.00 2+700.00 7.00 0.45 63.00
2+700.00
2+780.00 2+800.00 7.00 0.45 63.00
2+800.00 2+820.00 7.00 0.45 63.00
2+820.00 2+840.00 7.00 0.45 63.00
2+840.00 2+860.00 7.00 0.45 63.00
2+720.00 7.00 0.45 63.00
2+720.00 2+740.00 7.00 0.45 63.00
2+740.00 2+760.00 7.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO
LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN,
EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL
APROBO:
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
3 M3
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
ACUMULADO HOJA 1,2,3,4,5 17608.50
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 36343.13
VOLUMEN NO EJECUTADO -18734.63
4+280.00 4+300.00 7.00 0.45 63.00
SUBTOTAL 2709.00
ABUNDAMIENTO 30% 812.70
VOLUMEN GENERADO HOJA 5 3521.70
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
4+200.00 4+220.00 7.00 0.45 63.00
4+220.00 4+240.00 7.00 0.45 63.00
4+240.00 4+260.00 7.00 0.45 63.00
4+260.00 4+280.00 7.00 0.45 63.00
4+120.00 4+140.00 7.00 0.45 63.00
4+140.00 4+160.00 7.00 0.45 63.00
4+160.00 4+180.00 7.00 0.45 63.00
4+180.00 4+200.00 7.00 0.45 63.00
4+060.00 4+080.00 7.00 0.45 63.00
4+080.00 4+100.00 7.00 0.45 63.00
4+100.00 4+120.00 7.00 0.45 63.00
3+960.00 3+980.00 7.00 0.45 63.00
3+980.00 4+000.00 7.00 0.45 63.00
4+000.00 4+020.00 7.00 0.45 63.00
4+020.00 4+040.00 7.00 0.45 63.00
3+920.00 3+940.00 7.00 0.45 63.00
3+940.00 3+960.00 7.00 0.45 63.00
3+800.00 3+820.00 7.00 0.45 63.00
3+820.00 3+840.00 7.00 0.45 63.00
3+840.00 3+860.00 7.00 0.45 63.00
3+860.00 3+880.00 7.00 0.45 63.00
4+040.00 4+060.00 7.00 0.45 63.00
0.45 63.00
3+780.00 3+800.00 7.00 0.45 63.00
3+640.00 3+660.00 7.00 0.45 63.00
3+660.00 3+680.00 7.00 0.45 63.00
3+680.00 3+700.00 7.00 0.45 63.00
3+700.00 3+720.00 7.00 0.45 63.00
3+880.00 3+900.00 7.00 0.45 63.00
3+900.00 3+920.00 7.00 0.45 63.00
3+580.00 7.00 0.45 63.00
3+580.00 3+600.00 7.00 0.45 63.00
3+600.00 3+620.00 7.00 0.45 63.00
3+620.00 3+640.00 7.00 0.45 63.00
UNO
3+440.00 3+460.00 7.00 0.45 63.00
3+460.00 3+480.00 7.00 0.45 63.00
3+480.00 3+500.00 7.00 0.45 63.00
3+500.00 3+520.00 7.00 0.45 63.00
3+520.00 3+540.00 7.00 0.45 63.00
3+540.00 3+560.00 7.00 0.45 63.00
3+560.00
3+720.00 3+740.00 7.00 0.45 63.00
3+740.00 3+760.00 7.00 0.45 63.00
3+760.00 3+780.00 7.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO
LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN,
EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
3 M3
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
ACUMULADO HOJA 1,2,3,4,5,6 21130.20
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 36343.13
VOLUMEN NO EJECUTADO -15212.93
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
5+140.00 5+160.00 7.00 0.45 63.00
SUBTOTAL 2709.00
ABUNDAMIENTO 30% 812.70
VOLUMEN GENERADO HOJA 6 3521.70
5+060.00 5+080.00 7.00 0.45 63.00
5+080.00 5+100.00 7.00 0.45 63.00
5+100.00 5+120.00 7.00 0.45 63.00
5+120.00 5+140.00 7.00 0.45 63.00
4+980.00 5+000.00 7.00 0.45 63.00
5+000.00 5+020.00 7.00 0.45 63.00
5+020.00 5+040.00 7.00 0.45 63.00
5+040.00 5+060.00 7.00 0.45 63.00
4+900.00 4+920.00 7.00 0.45 63.00
4+920.00 4+940.00 7.00 0.45 63.00
4+940.00 4+960.00 7.00 0.45 63.00
4+960.00 4+980.00 7.00 0.45 63.00
4+820.00 4+840.00 7.00 0.45 63.00
4+840.00 4+860.00 7.00 0.45 63.00
4+860.00 4+880.00 7.00 0.45 63.00
4+880.00 4+900.00 7.00 0.45 63.00
4+740.00 4+760.00 7.00 0.45 63.00
4+760.00 4+780.00 7.00 0.45 63.00
4+780.00 4+800.00 7.00 0.45 63.00
4+800.00 4+820.00 7.00 0.45 63.00
7.00 0.45 63.00
4+460.00 4+480.00 7.00 0.45 63.00
4+480.00 4+500.00 7.00 0.45 63.00
4+660.00 4+680.00 7.00 0.45 63.00
4+680.00 4+700.00 7.00 0.45 63.00
4+700.00 4+720.00 7.00 0.45 63.00
4+720.00 4+740.00 7.00 0.45 63.00
4+580.00 4+600.00 7.00 0.45 63.00
4+600.00 4+620.00 7.00 0.45 63.00
4+620.00 4+640.00 7.00 0.45 63.00
4+640.00 4+660.00 7.00 0.45 63.00
UNO
4+300.00 4+320.00 7.00 0.45 63.00
4+320.00 4+340.00 7.00 0.45 63.00
4+340.00 4+360.00 7.00 0.45 63.00
4+360.00 4+380.00 7.00 0.45 63.00
4+380.00 4+400.00 7.00 0.45 63.00
4+400.00 4+420.00 7.00 0.45 63.00
4+420.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
4+500.00 4+520.00 7.00 0.45 63.00
4+520.00 4+540.00 7.00 0.45 63.00
4+540.00 4+560.00 7.00 0.45 63.00
4+560.00 4+580.00 7.00 0.45 63.00
4+440.00 7.00 0.45 63.00
4+440.00 4+460.00
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO
LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN,
EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
3 M3
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
ACUMULADO HOJA 1,2,3,4,5,6,7 24651.90
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 36343.13
VOLUMEN NO EJECUTADO -11691.23
6+000.00 6+020.00 7.00 0.45 63.00
SUBTOTAL 2709.00
ABUNDAMIENTO 30% 812.70
VOLUMEN GENERADO HOJA 7 3521.70
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
5+920.00 5+940.00 7.00 0.45 63.00
5+940.00 5+960.00 7.00 0.45 63.00
5+960.00 5+980.00 7.00 0.45 63.00
5+980.00 6+000.00 7.00 0.45 63.00
5+840.00 5+860.00 7.00 0.45 63.00
5+860.00 5+880.00 7.00 0.45 63.00
5+880.00 5+900.00 7.00 0.45 63.00
5+900.00 5+920.00 7.00 0.45 63.00
5+780.00 5+800.00 7.00 0.45 63.00
5+800.00 5+820.00 7.00 0.45 63.00
5+820.00 5+840.00 7.00 0.45 63.00
5+680.00 5+700.00 7.00 0.45 63.00
5+700.00 5+720.00 7.00 0.45 63.00
5+720.00 5+740.00 7.00 0.45 63.00
5+740.00 5+760.00 7.00 0.45 63.00
5+640.00 5+660.00 7.00 0.45 63.00
5+660.00 5+680.00 7.00 0.45 63.00
5+520.00 5+540.00 7.00 0.45 63.00
5+540.00 5+560.00 7.00 0.45 63.00
5+560.00 5+580.00 7.00 0.45 63.00
5+580.00 5+600.00 7.00 0.45 63.00
5+760.00 5+780.00 7.00 0.45 63.00
0.45 63.00
5+500.00 5+520.00 7.00 0.45 63.00
5+360.00 5+380.00 7.00 0.45 63.00
5+380.00 5+400.00 7.00 0.45 63.00
5+400.00 5+420.00 7.00 0.45 63.00
5+420.00 5+440.00 7.00 0.45 63.00
5+600.00 5+620.00 7.00 0.45 63.00
5+620.00 5+640.00 7.00 0.45 63.00
5+300.00 7.00 0.45 63.00
5+300.00 5+320.00 7.00 0.45 63.00
5+320.00 5+340.00 7.00 0.45 63.00
5+340.00 5+360.00 7.00 0.45 63.00
UNO
5+160.00 5+180.00 7.00 0.45 63.00
5+180.00 5+200.00 7.00 0.45 63.00
5+200.00 5+220.00 7.00 0.45 63.00
5+220.00 5+240.00 7.00 0.45 63.00
5+240.00 5+260.00 7.00 0.45 63.00
5+260.00 5+280.00 7.00 0.45 63.00
5+280.00
5+440.00 5+460.00 7.00 0.45 63.00
5+460.00 5+480.00 7.00 0.45 63.00
5+480.00 5+500.00 7.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO
LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN,
EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
3 M3
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
ACUMULADO HOJA 1,2,3,4,5,6,7,8 28173.60
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 36343.13
VOLUMEN NO EJECUTADO -8169.53
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
6+860.00 6+880.00 7.00 0.45 63.00
SUBTOTAL 2709.00
ABUNDAMIENTO 30% 812.70
VOLUMEN GENERADO HOJA 7,8 3521.70
6+780.00 6+800.00 7.00 0.45 63.00
6+800.00 6+820.00 7.00 0.45 63.00
6+820.00 6+840.00 7.00 0.45 63.00
6+840.00 6+860.00 7.00 0.45 63.00
6+700.00 6+720.00 7.00 0.45 63.00
6+720.00 6+740.00 7.00 0.45 63.00
6+740.00 6+760.00 7.00 0.45 63.00
6+760.00 6+780.00 7.00 0.45 63.00
6+620.00 6+640.00 7.00 0.45 63.00
6+640.00 6+660.00 7.00 0.45 63.00
6+660.00 6+680.00 7.00 0.45 63.00
6+680.00 6+700.00 7.00 0.45 63.00
6+540.00 6+560.00 7.00 0.45 63.00
6+560.00 6+580.00 7.00 0.45 63.00
6+580.00 6+600.00 7.00 0.45 63.00
6+600.00 6+620.00 7.00 0.45 63.00
6+460.00 6+480.00 7.00 0.45 63.00
6+480.00 6+500.00 7.00 0.45 63.00
6+500.00 6+520.00 7.00 0.45 63.00
6+520.00 6+540.00 7.00 0.45 63.00
7.00 0.45 63.00
6+180.00 6+200.00 7.00 0.45 63.00
6+200.00 6+220.00 7.00 0.45 63.00
6+380.00 6+400.00 7.00 0.45 63.00
6+400.00 6+420.00 7.00 0.45 63.00
6+420.00 6+440.00 7.00 0.45 63.00
6+440.00 6+460.00 7.00 0.45 63.00
6+300.00 6+320.00 7.00 0.45 63.00
6+320.00 6+340.00 7.00 0.45 63.00
6+340.00 6+360.00 7.00 0.45 63.00
6+360.00 6+380.00 7.00 0.45 63.00
UNO
6+020.00 6+040.00 7.00 0.45 63.00
6+040.00 6+060.00 7.00 0.45 63.00
6+060.00 6+080.00 7.00 0.45 63.00
6+080.00 6+100.00 7.00 0.45 63.00
6+100.00 6+120.00 7.00 0.45 63.00
6+120.00 6+140.00 7.00 0.45 63.00
6+140.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
6+220.00 6+240.00 7.00 0.45 63.00
6+240.00 6+260.00 7.00 0.45 63.00
6+260.00 6+280.00 7.00 0.45 63.00
6+280.00 6+300.00 7.00 0.45 63.00
6+160.00 7.00 0.45 63.00
6+160.00 6+180.00
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO
LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN,
EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
3 M3
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
ACUMULADO HOJA 1,2,3,4,5,6,7,8,9 31695.30
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 36343.13
VOLUMEN NO EJECUTADO -4647.83
7+720.00 7+740.00 7.00 0.45 63.00
SUBTOTAL 2709.00
ABUNDAMIENTO 30% 812.70
VOLUMEN GENERADO HOJA 9 3521.70
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
7+640.00 7+660.00 7.00 0.45 63.00
7+660.00 7+680.00 7.00 0.45 63.00
7+680.00 7+700.00 7.00 0.45 63.00
7+700.00 7+720.00 7.00 0.45 63.00
7+560.00 7+580.00 7.00 0.45 63.00
7+580.00 7+600.00 7.00 0.45 63.00
7+600.00 7+620.00 7.00 0.45 63.00
7+620.00 7+640.00 7.00 0.45 63.00
7+500.00 7+520.00 7.00 0.45 63.00
7+520.00 7+540.00 7.00 0.45 63.00
7+540.00 7+560.00 7.00 0.45 63.00
7+400.00 7+420.00 7.00 0.45 63.00
7+420.00 7+440.00 7.00 0.45 63.00
7+440.00 7+460.00 7.00 0.45 63.00
7+460.00 7+480.00 7.00 0.45 63.00
7+360.00 7+380.00 7.00 0.45 63.00
7+380.00 7+400.00 7.00 0.45 63.00
7+240.00 7+260.00 7.00 0.45 63.00
7+260.00 7+280.00 7.00 0.45 63.00
7+280.00 7+300.00 7.00 0.45 63.00
7+300.00 7+320.00 7.00 0.45 63.00
7+480.00 7+500.00 7.00 0.45 63.00
0.45 63.00
7+220.00 7+240.00 7.00 0.45 63.00
7+080.00 7+100.00 7.00 0.45 63.00
7+100.00 7+120.00 7.00 0.45 63.00
7+120.00 7+140.00 7.00 0.45 63.00
7+140.00 7+160.00 7.00 0.45 63.00
7+320.00 7+340.00 7.00 0.45 63.00
7+340.00 7+360.00 7.00 0.45 63.00
7+020.00 7.00 0.45 63.00
7+020.00 7+040.00 7.00 0.45 63.00
7+040.00 7+060.00 7.00 0.45 63.00
7+060.00 7+080.00 7.00 0.45 63.00
UNO
6+880.00 6+900.00 7.00 0.45 63.00
6+900.00 6+920.00 7.00 0.45 63.00
6+920.00 6+940.00 7.00 0.45 63.00
6+940.00 6+960.00 7.00 0.45 63.00
6+960.00 6+980.00 7.00 0.45 63.00
6+980.00 7+000.00 7.00 0.45 63.00
7+000.00
7+160.00 7+180.00 7.00 0.45 63.00
7+180.00 7+200.00 7.00 0.45 63.00
7+200.00 7+220.00 7.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO
LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN,
EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
3 M3
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
ACUMULADO HOJA 1,2,3,4,5,6,7,8,9,10 35217.00
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 36343.13
VOLUMEN NO EJECUTADO -1126.13
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
8+580.00 8+600.00 7.00 0.45 63.00
SUBTOTAL 2709.00
ABUNDAMIENTO 30% 812.70
VOLUMEN GENERADO HOJA 9,10 3521.70
8+500.00 8+520.00 7.00 0.45 63.00
8+520.00 8+540.00 7.00 0.45 63.00
8+540.00 8+560.00 7.00 0.45 63.00
8+560.00 8+580.00 7.00 0.45 63.00
8+420.00 8+440.00 7.00 0.45 63.00
8+440.00 8+460.00 7.00 0.45 63.00
8+460.00 8+480.00 7.00 0.45 63.00
8+480.00 8+500.00 7.00 0.45 63.00
8+340.00 8+360.00 7.00 0.45 63.00
8+360.00 8+380.00 7.00 0.45 63.00
8+380.00 8+400.00 7.00 0.45 63.00
8+400.00 8+420.00 7.00 0.45 63.00
8+260.00 8+280.00 7.00 0.45 63.00
8+280.00 8+300.00 7.00 0.45 63.00
8+300.00 8+320.00 7.00 0.45 63.00
8+320.00 8+340.00 7.00 0.45 63.00
8+180.00 8+200.00 7.00 0.45 63.00
8+200.00 8+220.00 7.00 0.45 63.00
8+220.00 8+240.00 7.00 0.45 63.00
8+240.00 8+260.00 7.00 0.45 63.00
7.00 0.45 63.00
7+900.00 7+920.00 7.00 0.45 63.00
7+920.00 7+940.00 7.00 0.45 63.00
8+100.00 8+120.00 7.00 0.45 63.00
8+120.00 8+140.00 7.00 0.45 63.00
8+140.00 8+160.00 7.00 0.45 63.00
8+160.00 8+180.00 7.00 0.45 63.00
8+020.00 8+040.00 7.00 0.45 63.00
8+040.00 8+060.00 7.00 0.45 63.00
8+060.00 8+080.00 7.00 0.45 63.00
8+080.00 8+100.00 7.00 0.45 63.00
UNO
7+740.00 7+760.00 7.00 0.45 63.00
7+760.00 7+780.00 7.00 0.45 63.00
7+780.00 7+800.00 7.00 0.45 63.00
7+800.00 7+820.00 7.00 0.45 63.00
7+820.00 7+840.00 7.00 0.45 63.00
7+840.00 7+860.00 7.00 0.45 63.00
7+860.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
7+940.00 7+960.00 7.00 0.45 63.00
7+960.00 7+980.00 7.00 0.45 63.00
7+980.00 8+000.00 7.00 0.45 63.00
8+000.00 8+020.00 7.00 0.45 63.00
7+880.00 7.00 0.45 63.00
7+880.00 7+900.00
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO
LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN,
EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
3 M3
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
15.00 7.00 M3
DIRECTOR DE OBRAS PÚBLICAS
ACUMULADO HOJA 1,2,3,4,5,6,7,8,9,10 36343.13
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 36343.13
VOLUMEN NO EJECUTADO 0.00
SUBTOTAL 866.25
ABUNDAMIENTO 30% 259.88
VOLUMEN GENERADO HOJA 9,10 1126.13
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
8+800.00 8+820.00 7.00 0.45 63.00
8+820.00 8+840.00 7.00 0.45 63.00
8+840.00 8+860.00 7.00 0.45 63.00
8+860.00 8+875.00 7.00 0.45 47.25
8+740.00 7.00 0.45 63.00
8+740.00 8+760.00 7.00 0.45 63.00
8+760.00 8+780.00 7.00 0.45 63.00
8+780.00 8+800.00 7.00 0.45 63.00
UNO
8+600.00 8+620.00 7.00 0.45 63.00
8+620.00 8+640.00 7.00 0.45 63.00
8+640.00 8+660.00 7.00 0.45 63.00
8+660.00 8+680.00 7.00 0.45 63.00
8+680.00 8+700.00 7.00 0.45 63.00
8+700.00 8+720.00 7.00 0.45 63.00
8+720.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO
LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN,
EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
4 M3
TRAMO LARGO ANCHO UNIDAD
7.00
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
CARPETA
0+760.00 0+780.00 7.00 0.07 9.80
0+700.00 0+720.00 7.00 0.07 9.80
0+720.00 0+740.00 7.00 0.07 9.80
0+520.00 0+540.00 7.00 0.07 9.80
0+460.00 0+480.00 7.00 0.07 9.80
0+480.00
0+360.00 0+380.00 7.00 0.07 9.80
0+220.00 0+240.00 7.00 0.07 9.80
0+500.00 7.00 0.07 9.80
0+440.00
DIRECTOR DE OBRAS PÚBLICAS
VOLUMEN NO EJECUTADO -38560.38
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 38952.38
0+780.00 0+800.00 7.00 0.07 9.80
VOLUMEN GENERADO HOJA 1 392.00
0.07 9.80
0+680.00 0+700.00 7.00 0.07 9.80
0+620.00 0+640.00 7.00 0.07 9.80
0+640.00 0+660.00 7.00 0.07 9.80
0+740.00 0+760.00 7.00 0.07 9.80
0+600.00 0+620.00 7.00 0.07 9.80
0+540.00 0+560.00 7.00 0.07 9.80
0+560.00 0+580.00 7.00 0.07 9.80
0+660.00 0+680.00 7.00 0.07 9.80
0+580.00 0+600.00 7.00 0.07 9.80
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
0+460.00
7.00 0.07 9.80
0+080.00 0+100.00 7.00 0.07 9.80
0+100.00
7.00 0.07 9.80
0+400.00 0+420.00 7.00 0.07 9.80
0+420.00 0+440.00 7.00 0.07 9.80
0+500.00 0+520.00 7.00 0.07 9.80
0+380.00 0+400.00 7.00 0.07 9.80
0+120.00 7.00 0.07 9.80
0+200.00 0+220.00 7.00 0.07 9.80
0+320.00 0+340.00 7.00 0.07 9.80
0+340.00 0+360.00 7.00 0.07 9.80
0+300.00 0+320.00 7.00 0.07 9.80
0+240.00 0+260.00 7.00 0.07 9.80
0+260.00 0+280.00 7.00
0+040.00 0+060.00 7.00 0.07 9.80
0+060.00 0+080.00 7.00 0.07 9.80
9.80
0+020.00 0+040.00 7.00 0.07 9.80
UNO
0+000.00
0+000.00 0+020.00 7.00 0.07
0+120.00 0+140.00 7.00 0.07 9.80
0+140.00
CARGA Y ACARREO EN CAMIÓN DE MATERIALES DE DESPERDICIO, PRODUCTO DE LA EXCAVACIÓN, DEMOLICIONES, DESYERVES, LIMPIEZA,
MATERIAL SOBRANTE, A TIRO LIBRE, VOLUMEN COMPACTO. INCLUYE: MAQUINARIA, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL
0+160.00 0+180.00 7.00 0.07 9.80
0+180.00 0+200.00 7.00 0.07 9.80
0+280.00 0+300.00 7.00 0.07 9.80
0+160.00
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
4 M3
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
UNO
9.80
0+800.00 0+820.00 7.00 0.07 9.80
ACUMULADO HOJA 1,2 793.80
1+480.00 1+500.00 7.00 0.07 9.80
1+500.00 1+520.00 7.00 0.07 9.80
1+520.00 1+540.00 7.00 0.07 9.80
1+540.00 1+560.00 7.00 0.07
VOLUMEN GENERADO HOJA 2 401.80
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
VOLUMEN CONTRATADO 38952.38
VOLUMEN NO EJECUTADO -38158.58
1+560.00 1+580.00 7.00 0.07 9.80
1+580.00 1+600.00 7.00 0.07 9.80
1+600.00 1+620.00 7.00 0.07 9.80
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
9.80
1+400.00 1+420.00 7.00 0.07 9.80
1+420.00 1+440.00 7.00 0.07 9.80
1+440.00 1+460.00 7.00 0.07 9.80
1+460.00 1+480.00 7.00 0.07 9.80
1+320.00 1+340.00 7.00 0.07 9.80
1+340.00 1+360.00 7.00 0.07 9.80
1+360.00 1+380.00 7.00 0.07 9.80
1+380.00 1+400.00 7.00 0.07 9.80
1+240.00 1+260.00 7.00 0.07 9.80
1+260.00 1+280.00 7.00 0.07 9.80
1+280.00 1+300.00 7.00 0.07 9.80
1+300.00 1+320.00 7.00 0.07 9.80
1+160.00 1+180.00 7.00 0.07 9.80
1+180.00 1+200.00 7.00 0.07 9.80
1+200.00 1+220.00 7.00 0.07 9.80
1+220.00 1+240.00 7.00 0.07 9.80
1+080.00 1+100.00 7.00 0.07 9.80
1+100.00 1+120.00 7.00 0.07 9.80
1+120.00 1+140.00 7.00 0.07 9.80
1+140.00 1+160.00 7.00 0.07 9.80
1+000.00 1+020.00 7.00 0.07 9.80
1+020.00 1+040.00 7.00 0.07 9.80
1+040.00 1+060.00 7.00 0.07 9.80
1+060.00 1+080.00 7.00 0.07 9.80
1+000.00 7.00 0.07 9.80
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
CONCEPTO
CARGA Y ACARREO EN CAMIÓN DE MATERIALES DE DESPERDICIO, PRODUCTO DE LA EXCAVACIÓN, DEMOLICIONES, DESYERVES, LIMPIEZA,
MATERIAL SOBRANTE, A TIRO LIBRE, VOLUMEN COMPACTO. INCLUYE: MAQUINARIA, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL
0+820.00 0+840.00 7.00 0.07 9.80
0+840.00 0+860.00 7.00 0.07
0+860.00 0+880.00 7.00 0.07 9.80
0+880.00 0+900.00 7.00 0.07 9.80
0+900.00 0+920.00 7.00 0.07 9.80
0+920.00 0+940.00 7.00 0.07 9.80
0+940.00 0+960.00 7.00 0.07 9.80
0+960.00 0+980.00 7.00 0.07 9.80
0+980.00 M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
-
-
CLAVE UNIDAD DE MEDIDA
4 M3
TRAMO LARGO ANCHO UNIDAD
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
20.00 7.00 M3
VOLUMEN CONTRATADO 38952.38
VOLUMEN NO EJECUTADO -37756.78
UNO
2+420.00 2+440.00 7.00 0.07 9.80
VOLUMEN GENERADO HOJA 3 401.80
ACUMULADO HOJA 1,2,3 1195.60
VOLUMEN COBRADO EN ESTA ESTIMACIÓN
2+340.00 2+360.00 7.00 0.07 9.80
2+360.00 2+380.00 7.00 0.07 9.80
2+380.00 2+400.00 7.00 0.07 9.80
2+400.00 2+420.00 7.00 0.07 9.80
2+260.00 2+280.00 7.00 0.07 9.80
2+280.00 2+300.00 7.00 0.07 9.80
2+300.00 2+320.00 7.00 0.07 9.80
2+320.00 2+340.00 7.00 0.07 9.80
2+180.00 2+200.00 7.00 0.07 9.80
2+200.00 2+220.00 7.00 0.07 9.80
2+220.00 2+240.00 7.00 0.07 9.80
2+240.00 2+260.00 7.00 0.07 9.80
2+100.00 2+120.00 7.00 0.07 9.80
2+120.00 2+140.00 7.00 0.07 9.80
2+140.00 2+160.00 7.00 0.07 9.80
2+160.00 2+180.00 7.00 0.07 9.80
2+020.00 2+040.00 7.00 0.07 9.80
2+040.00 2+060.00 7.00 0.07 9.80
2+060.00 2+080.00 7.00 0.07 9.80
2+080.00 2+100.00 7.00 0.07 9.80
1+940.00 1+960.00 7.00 0.07 9.80
1+960.00 1+980.00 7.00 0.07 9.80
1+980.00 2+000.00 7.00 0.07 9.80
2+000.00 2+020.00 7.00 0.07 9.80
1+860.00 1+880.00 7.00 0.07 9.80
1+880.00 1+900.00 7.00 0.07 9.80
1+900.00 1+920.00 7.00 0.07 9.80
1+920.00 1+940.00 7.00 0.07 9.80
1+780.00 1+800.00 7.00 0.07 9.80
1+800.00 1+820.00 7.00 0.07 9.80
1+820.00 1+840.00 7.00 0.07 9.80
1+840.00 1+860.00 7.00 0.07 9.80
0.07 9.80
1+720.00 1+740.00 7.00 0.07 9.80
1+740.00 1+760.00 7.00 0.07 9.80
1+760.00 1+780.00 7.00 0.07 9.80
CONCEPTO
CARGA Y ACARREO EN CAMIÓN DE MATERIALES DE DESPERDICIO, PRODUCTO DE LA EXCAVACIÓN, DEMOLICIONES, DESYERVES, LIMPIEZA,
MATERIAL SOBRANTE, A TIRO LIBRE, VOLUMEN COMPACTO. INCLUYE: MAQUINARIA, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL
1+620.00 1+640.00 7.00 0.07 9.80
1+640.00 1+660.00 7.00 0.07 9.80
1+660.00 1+680.00 7.00 0.07 9.80
1+680.00 1+700.00 7.00 0.07 9.80
1+700.00 1+720.00 7.00
N U M E R O S G E N E R A D O R E S
OBRA:
CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN
DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
-
CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V.
APROBO:
ING. FELIPE DE JESUS MORENO ROJAS
DIRECTOR DE OBRAS PÚBLICAS
M -3.1
M -3.1
M -1.3
M -1.3
M -11.1
POZO DE VISITA COMUN
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf
CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf

More Related Content

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Recently uploaded (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 

Featured

How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...DevGAMM Conference
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationErica Santiago
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellSaba Software
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming LanguageSimplilearn
 

Featured (20)

How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming Language
 

CATALOGO PROYECTO 1 ALMOLOYA (0+000.00 - 8+875.00).pdf

  • 1. OBRA: LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 MUNICIPIO: ALMOLOYA DE JUÁREZ Clave Concepto Unidad de Medida Cantidad Precio Unitario Total I PRELIMINARES 1 TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. m2 62125.00 $0.00 2 DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA, EQUIPO. m2 37275.00 $0.00 3 EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA. m3 36343.13 $0.00 4 CARGA Y ACARREO EN CAMIÓN DE MATERIALES DE DESPERDICIO, PRODUCTO DE LA EXCAVACIÓN, DEMOLICIONES, DESYERVES, LIMPIEZA, MATERIAL SOBRANTE, A TIRO LIBRE, VOLUMEN COMPACTO. INCLUYE: MAQUINARIA, EQUIPO, HERRAMIENTA Y MANO DE OBRA. m3 38952.38 $0.00 II OBRAS DE DRENAJE 5 EXCAVACIÓN A CIELO ABIERTO A MÁQUINA EN MATERIAL TIPO II ("B"), DE 0.00 A -2.00 M, INCLUYE: CARGA A CAMIÓN, MANO DE OBRA, EQUIPO Y HERRAMIENTA. m3 54.18 $0.00 6 CONCRETO EN ESTRUCTURA DE F'C=250 KG/CM2, HECHO EN OBRA,INCLUYE:ACARREOS,COLADO, VIBRADO, MANO DE OBRA, EQUIPO Y HERRAMIENTA. m3 40.68 $0.00 7 MURO DE PIEDRA BRAZA ACABADO ROSTREADO, ASENTADO CON MEZCLA CEMENTO ARENA 1:4, HASTA 3.5 M. DE ALTURA. INCLUYE: MATERIALES, CIMBRA, DESCIMBRADO, ELEVACIÓN, ACARREOS DENTRO DE LA OBRA, MANO DE OBRA, EQUIPO Y HERRAMIENTA m3 208.98 $0.00 8 ACERO DE REFUERZO EN ESTRUCTURA DEL NO. 4 (1/2"), DE FY=4200 KG/CM2, INCLUYE: SUMINISTRO DE MATERIALES, ACARREOS, ELEVACIONES, CORTES, TRASLAPES, GANCHOS, ESCUADRAS, DOBLECES, SILLETAS, DESPERDICIOS, HABILITADO, AMARRES, MANO DE OBRA, EQUIPO Y HERRAMIENTA. kg 4684.13 $0.00 9 ACARREO DE MATERIAL PRODUCTO DE DESMONTE, DESPALME, CORTE, EXCAVACIÓN, Y/O DEMOLICIÓN A TIRO AUTORIZADO, EN CAMIÓN DE VOLTEO, AL 1ER KM., VOLUMEN COMPACTADO, INCLUYE: CARGA A MAQUINA, MANO DE OBRA, EQUIPO Y HERRAMIENTA. m3 70.43 $0.00 III TERRACERIAS 10 AFINE Y COMPACTACION DEL TERRENO NATURAL POR MEDIOS MECANICOS, SOBRE LA SUPERFICIE DESCUBIERTA AL 85% DE LA PRUEBA PROCTOR, INCLUYE: MAQUINARIA, AFINES, CONFORMACION, INCORPORACION DE AGUA, EQUIPO, HERRAMIENTA Y MANO DE OBRA. m2 62125.00 $0.00 PRESUPUESTO DE LA OBRA H. AYUNTAMIENTO DE ALMOLOYA DE JUÁREZ ADMINISTRACIÓN 2022-2024 DIRECCIÓN DE OBRAS PÚBLICAS CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875
  • 2. 11 CONSTRUCCION DE LA CAPA BASE CON MATERIAL DE BANCO DE LA ZONA DE MATERIAL, GRAVA CONTROLADA 70/30 (GRAVA 3/4", TEPETATE) TENDIDO Y COMPACTADO AL 95% PRUEBA PROCTOR EN UNA CAPA DE 20 CM DE ESPESOR, COMPACTO, INCLUYE: MATERIALES DE BANCO, ACAMELLONADO, MAQUINARIA, AFINES, CONFORMACION, INCORPORACION DE AGUA, EQUIPO, HERRAMIENTA Y MANO DE OBRA. m3 18637.50 $0.00 12 CARGA Y ACARREO DE LOS MATERIALES SELECCIONADOS QUE SERVIRÁN PARA LA CONSTRUCCIÓN DE LA CAPA BASE A PRIMER KILOMETRO, INCLUYE: EQUIPO, HERRAMIENTA Y MANO DE OBRA. m3 18637.50 $0.00 13 ACARREO DE LOS MATERIALES SELECCIONADOS QUE SERVIRÁN PARA LA CONSTRUCCIÓN DE LA BASE A KILÓMETROS SUBSECUENTES (10 KM PROMEDIO), INCLUYE: EQUIPO, HERRAMIENTA Y MANO DE OBRA. m3/km 186375.00 $0.00 IV CONCRETO HIDRAULICO 14 CONSTRUCCION PAVIMENTO DE CONCRETO PREMEZCLADO DE 15 cm DE ESPESOR, F'C=250 Kg/cm2, TAMAÑO MAXIMO AGREGADO 3/4", REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: MATERIALES, VIBRADO, CURADO, ACABADO RALLADO, DECIMBRADO, PRUEBA DE LABORATORIO, EQUIPO, HERRAMIENTA Y MANO DE OBRA.. m2 62056.75 $0.00 15 CORTE DE PAVIMENTO DE CONCRETO EN UN TERCIO DE SU ESPESOR CON CORTADORA DE DISCO DE DIAMANTE PARA SECCIONAR PIEDRAS EN DIMENCIONES MAXIMAS DE 3.00 M INCLUYE: EQUIPO, HERRAMIENTA Y MANO DE OBRA. ml 29861.00 $0.00 16 CONSTRUCCION DE CUNETAS DE CONCRETO F'C=150 KG/CM2 DE 8CM DE ESPESOR RELLENO COMPACTADO PARA FORJADO,CERCHAS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO. ml 2664.00 17 CONSTRUCCIÓN DE TOPE VEHICULAR ELABORADO DE CONCRETO HIDRÁULICO F´C: 250 Kg/cm2 SIN MALLA, DE SECCIÓN 1.80 M DE BASE MAYOR, 0.08 M DE ALTURA, 0.60 M DE BASE MENOR, CON FRANJAS DIAGONALES A BASE DE PINTURA INCLUYE: ACARREO DE MATERIAL A OBRA, MATERIALES, HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. ml 14.00 $0.00 V SEÑALAMIENTEO HORIZONTAL 18 RAYA CONTINUA DE 10 CM DE ANCHO, COLOR BLANCO Y/O AMARILLO TRÁNSITO CON INCORPORACIÓN DE MICRO ESFERA RETRO REFLEJANTE, SOBRE PAVIMENTO DE CONCRETO HIDRAULICO. INCLUYE: MATERIALES, PREPARACIÓN DE LA SUPERFICIE, TRAZO, PREMARCADO, DELINEADO, APLICACIÓN DE PINTURA CON EQUIPO, LIMPIEZA. EQUIPO, HERRAMIENTA Y MANO DE OBRA. ml 26625.00 $0.00 19 SUMINISTRO Y COLOCACION DE BOLLAS METALICAS CAL.10 3 MM DE ESPESOR 21X21 CM 6CM DE ALTURA @30CM, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 312.00 $0.00 VI SEÑALAMIENTEO VERTICAL $0.00 20 SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-6 (61*61), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 37.00 $0.00 21 SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-6l (61*61), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 30.00 $0.00 22 SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-8 (61*61), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 4.00 $0.00 23 SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-8l (61*61), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 4.00 $0.00 24 SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-11 (61*61), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 4.00 $0.00 25 SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-12 (61*61), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 14.00 $0.00 26 SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-14 (61*61), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 3.00 $0.00 27 SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-15 (61*61), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 2.00 $0.00 28 SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-25A (61*61), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 24.00 $0.00
  • 3. 29 SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-32 (61*61), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 8.00 $0.00 30 SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO PREVENTIVO SP-47 (61*61), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 1.00 $0.00 31 SUMINISTRO Y COLOCACIÓN DE SEÑALAMIENTO RESTRICTIVO SR-9 70 (61*61), INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO. pza 22.00 $0.00 VII OBRAS COMPLEMENTARIAS 32 REPARACIÓN DE DESCARGA SANITARIA DOMICILIARIA CON TUBERÍA DE CONCRETO SIMPLE DE 20 CM. DE DIÁMETRO, EN UN DESARROLLO PROMEDIO DE 5.5 M. INCLUYE: MATERIALES, EXCAVACIÓN, INSTALACIÓN, JUNTEO CON MEZCLA MORTERO ARENA 1:4, RELLENO COMPACTADO, EQUIPO, HERAMIENTA Y MANO DE OBRA. pza 100.00 $0.00 33 REPARACIÓN DE TOMA DOMICILIARIA DE AGUA POTABLE EN UN DESARROLLO PROMEDIO DE 6.0 M A BASE DE POLIDUCTO HIDRAULICO DE 13 MM. Ø., CONECTORES, ABAZADERAS, INCLUYE: EXCAVACION, MATERIALES, CONEXIONES, RELLENO COMPACTADO, EQUIPO, HERRAMIENTA Y MANO DE OBRA. pza 100.00 $0.00 34 RENIVELACION DE POZOS DE VISITA CON TABIQUE ROJO RECOSIDO DE 6 X 12 X 24 CM A TIZON, JUNTEADO CON MEZCLA CEMENTO ARENA, 1:4, APLANADO PULIDO EN EL INTERIOR, INCLUYE: COLOCACION DE BROCAL Y TAPA EXISTENTE, EQUIPO, HERRAMIENTA Y MANO DE OBRA.. pza 91.00 $0.00 35 LIMPIEZA GRUESA AL FINAL DE LA OBRA, RETIRANDO LOS MATERIALES SOBRANTES, DESPERDICIOS, PRODUCTO DE LA EJECUCIÓN DE LOS TRABAJOS, PARA LA ENTREGA DE LOS TRABAJOS, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA Y EQUIPO, P.U.O.T. m2 62125.00 $0.00 SUBTOTAL $0.00 IVA $0.00 TOTAL $0.00
  • 4. - - CLAVE UNIDAD DE MEDIDA 1 M2 TRAMO UNIDAD M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 DIRECTOR DE OBRAS PÚBLICAS ING. FELIPE DE JESUS MORENO ROJAS APROBO: VOLUMEN CONTRATADO 62,125.00 VOLUMEN NO EJECUTADO -56805.00 VOLUMEN GENERADO HOJA 1 5,320.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN 0+740.00 0+760.00 20.00 7.00 7.00 140.00 0+720.00 0+740.00 20.00 7.00 7.00 140.00 0+700.00 0+720.00 20.00 7.00 7.00 140.00 0+680.00 0+700.00 20.00 7.00 7.00 140.00 0+660.00 0+680.00 20.00 7.00 7.00 140.00 0+640.00 0+660.00 20.00 7.00 7.00 140.00 0+620.00 0+640.00 20.00 7.00 7.00 140.00 0+600.00 0+620.00 20.00 7.00 7.00 140.00 0+580.00 0+600.00 20.00 7.00 7.00 140.00 0+560.00 0+580.00 20.00 7.00 7.00 140.00 0+540.00 0+560.00 20.00 7.00 7.00 140.00 0+520.00 0+540.00 20.00 7.00 7.00 140.00 0+500.00 0+520.00 20.00 7.00 7.00 140.00 0+480.00 0+500.00 20.00 7.00 7.00 140.00 0+460.00 0+480.00 20.00 7.00 7.00 140.00 0+440.00 0+460.00 20.00 7.00 7.00 140.00 0+420.00 0+440.00 20.00 7.00 7.00 140.00 0+400.00 0+420.00 20.00 7.00 7.00 140.00 0+380.00 0+400.00 20.00 7.00 7.00 140.00 0+360.00 0+380.00 20.00 7.00 7.00 140.00 7.00 7.00 140.00 0+140.00 0+160.00 20.00 7.00 7.00 140.00 0+120.00 0+140.00 20.00 7.00 7.00 140.00 0+100.00 0+120.00 20.00 7.00 7.00 140.00 0+340.00 0+360.00 20.00 7.00 7.00 140.00 0+320.00 0+340.00 20.00 7.00 7.00 140.00 0+300.00 0+320.00 20.00 7.00 7.00 140.00 0+280.00 0+300.00 20.00 7.00 7.00 140.00 0+260.00 0+280.00 20.00 7.00 7.00 140.00 0+240.00 0+260.00 20.00 7.00 7.00 140.00 0+000.00 0+020.00 20.00 7.00 7.00 140.00 UNO 0+000.00 7.00 0+020.00 0+040.00 20.00 7.00 0+080.00 0+100.00 20.00 7.00 7.00 140.00 0+060.00 0+080.00 20.00 7.00 7.00 140.00 7.00 140.00 0+040.00 EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL 0+220.00 0+240.00 20.00 7.00 7.00 140.00 0+200.00 0+220.00 20.00 7.00 7.00 140.00 0+180.00 0+200.00 20.00 7.00 7.00 140.00 0+160.00 0+180.00 20.00 7.00 7.00 140.00 0+060.00 20.00 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 5. - - CLAVE UNIDAD DE MEDIDA 1 M2 TRAMO UNIDAD M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 VOLUMEN CONTRATADO 62,125.00 VOLUMEN NO EJECUTADO 51485.00 VOLUMEN ACUMULADO HOJA 1 y 2 10,640.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN 1+500.00 1+520.00 20.00 7.00 7.00 140.00 1+480.00 1+500.00 20.00 7.00 7.00 140.00 VOLUMEN GENERADO HOJA 2 5,320.00 1+460.00 1+480.00 20.00 7.00 7.00 140.00 1+440.00 1+460.00 20.00 7.00 7.00 140.00 1+420.00 1+440.00 20.00 7.00 7.00 140.00 1+400.00 1+420.00 20.00 7.00 7.00 140.00 1+380.00 1+400.00 20.00 7.00 7.00 140.00 1+360.00 1+380.00 20.00 7.00 7.00 140.00 1+340.00 1+360.00 20.00 7.00 7.00 140.00 1+320.00 1+340.00 20.00 7.00 7.00 140.00 1+300.00 1+320.00 20.00 7.00 7.00 140.00 1+280.00 1+300.00 20.00 7.00 7.00 140.00 1+260.00 1+280.00 20.00 7.00 7.00 140.00 1+240.00 1+260.00 20.00 7.00 7.00 140.00 1+220.00 1+240.00 20.00 7.00 7.00 140.00 1+200.00 1+220.00 20.00 7.00 7.00 140.00 1+180.00 1+200.00 20.00 7.00 7.00 140.00 1+160.00 1+180.00 20.00 7.00 7.00 140.00 1+140.00 1+160.00 20.00 7.00 7.00 140.00 1+120.00 1+140.00 20.00 7.00 7.00 140.00 20.00 7.00 7.00 140.00 0+900.00 0+920.00 20.00 7.00 7.00 140.00 0+880.00 0+900.00 20.00 7.00 7.00 140.00 1+100.00 1+120.00 20.00 7.00 7.00 140.00 1+080.00 1+100.00 20.00 7.00 7.00 140.00 1+060.00 1+080.00 20.00 7.00 7.00 140.00 1+040.00 1+060.00 20.00 7.00 7.00 140.00 1+020.00 1+040.00 20.00 7.00 7.00 140.00 1+000.00 1+020.00 20.00 7.00 7.00 140.00 0+800.00 0+820.00 20.00 7.00 7.00 140.00 0+780.00 0+800.00 20.00 7.00 7.00 140.00 ANCHO ANCHO PROMEDIO TOTAL 0+760.00 0+780.00 20.00 7.00 7.00 140.00 0+860.00 0+880.00 20.00 7.00 7.00 140.00 0+840.00 0+860.00 20.00 7.00 0+980.00 1+000.00 20.00 7.00 7.00 140.00 0+960.00 0+980.00 20.00 7.00 7.00 140.00 0+940.00 0+960.00 20.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 EST.1 EST.2 LONGITUD UNO - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. 7.00 7.00 140.00 7.00 140.00 0+820.00 0+840.00 20.00 7.00 7.00 140.00 0+920.00 0+940.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 6. - - CLAVE UNIDAD DE MEDIDA 1 M2 TRAMO UNIDAD M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL UNO 1+520.00 1+540.00 20.00 7.00 7.00 140.00 1+540.00 1+560.00 20.00 7.00 7.00 140.00 1+560.00 1+580.00 20.00 7.00 7.00 140.00 1+580.00 1+600.00 20.00 7.00 7.00 140.00 1+600.00 1+620.00 20.00 7.00 7.00 140.00 1+620.00 1+640.00 20.00 7.00 7.00 140.00 1+640.00 1+660.00 20.00 7.00 7.00 140.00 1+660.00 1+680.00 20.00 7.00 7.00 140.00 1+680.00 1+700.00 20.00 7.00 7.00 140.00 1+700.00 1+720.00 20.00 7.00 7.00 140.00 1+720.00 1+740.00 20.00 7.00 7.00 140.00 1+740.00 1+760.00 20.00 7.00 7.00 140.00 1+760.00 1+780.00 20.00 7.00 7.00 140.00 1+780.00 1+800.00 20.00 7.00 7.00 140.00 1+800.00 1+820.00 20.00 7.00 7.00 140.00 1+820.00 1+840.00 20.00 7.00 7.00 140.00 1+840.00 1+860.00 20.00 7.00 7.00 140.00 1+860.00 1+880.00 20.00 7.00 7.00 140.00 1+880.00 1+900.00 20.00 7.00 7.00 140.00 1+900.00 1+920.00 20.00 7.00 7.00 140.00 1+920.00 1+940.00 20.00 7.00 7.00 140.00 1+940.00 1+960.00 20.00 7.00 7.00 140.00 1+960.00 1+980.00 20.00 7.00 7.00 140.00 1+980.00 2+000.00 20.00 7.00 7.00 140.00 2+000.00 2+020.00 20.00 7.00 7.00 140.00 2+020.00 2+040.00 20.00 7.00 7.00 140.00 2+040.00 2+060.00 20.00 7.00 7.00 140.00 2+060.00 2+080.00 20.00 7.00 7.00 140.00 2+080.00 2+100.00 20.00 7.00 7.00 140.00 2+100.00 2+120.00 20.00 7.00 7.00 140.00 2+120.00 2+140.00 20.00 7.00 7.00 140.00 2+140.00 2+160.00 20.00 7.00 7.00 140.00 2+160.00 2+180.00 20.00 7.00 7.00 140.00 2+180.00 2+200.00 20.00 7.00 7.00 140.00 2+200.00 2+220.00 20.00 7.00 7.00 140.00 VOLUMEN CONTRATADO 62,125.00 VOLUMEN NO EJECUTADO 46165.00 2+220.00 2+240.00 20.00 7.00 7.00 140.00 2+240.00 2+260.00 20.00 7.00 7.00 140.00 2+260.00 2+280.00 20.00 7.00 7.00 140.00 VOLUMEN GENERADO HOJA 3 5,320.00 VOLUMEN ACUMULADO HOJA 1,2,3 15,960.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 7. - - CLAVE UNIDAD DE MEDIDA 1 M2 TRAMO UNIDAD M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL UNO 2+280.00 2+300.00 20.00 7.00 7.00 140.00 2+300.00 2+320.00 20.00 7.00 7.00 140.00 2+320.00 2+340.00 20.00 7.00 7.00 140.00 2+340.00 2+360.00 20.00 7.00 7.00 140.00 2+360.00 2+380.00 20.00 7.00 7.00 140.00 2+380.00 2+400.00 20.00 7.00 7.00 140.00 2+400.00 2+420.00 20.00 7.00 7.00 140.00 2+420.00 2+440.00 20.00 7.00 7.00 140.00 2+440.00 2+460.00 20.00 7.00 7.00 140.00 2+460.00 2+480.00 20.00 7.00 7.00 140.00 2+480.00 2+500.00 20.00 7.00 7.00 140.00 2+500.00 2+520.00 20.00 7.00 7.00 140.00 2+520.00 2+540.00 20.00 7.00 7.00 140.00 2+540.00 2+560.00 20.00 7.00 7.00 140.00 2+560.00 2+580.00 20.00 7.00 7.00 140.00 2+580.00 2+600.00 20.00 7.00 7.00 140.00 2+600.00 2+620.00 20.00 7.00 7.00 140.00 2+620.00 2+640.00 20.00 7.00 7.00 140.00 2+640.00 2+660.00 20.00 7.00 7.00 140.00 2+660.00 2+680.00 20.00 7.00 7.00 140.00 2+680.00 2+700.00 20.00 7.00 7.00 140.00 2+700.00 2+720.00 20.00 7.00 7.00 140.00 2+720.00 2+740.00 20.00 7.00 7.00 140.00 2+740.00 2+760.00 20.00 7.00 7.00 140.00 2+760.00 2+780.00 20.00 7.00 7.00 140.00 2+780.00 2+800.00 20.00 7.00 7.00 140.00 2+800.00 2+820.00 20.00 7.00 7.00 140.00 2+820.00 2+840.00 20.00 7.00 7.00 140.00 2+840.00 2+860.00 20.00 7.00 7.00 140.00 2+860.00 2+880.00 20.00 7.00 7.00 140.00 2+880.00 2+900.00 20.00 7.00 7.00 140.00 2+900.00 2+920.00 20.00 7.00 7.00 140.00 2+920.00 2+940.00 20.00 7.00 7.00 140.00 2+940.00 2+960.00 20.00 7.00 7.00 140.00 2+960.00 2+980.00 20.00 7.00 7.00 140.00 2+980.00 3+000.00 20.00 7.00 7.00 140.00 3+000.00 3+020.00 20.00 7.00 7.00 140.00 3+020.00 3+040.00 20.00 7.00 7.00 140.00 VOLUMEN GENERADO HOJA 4 5,320.00 VOLUMEN ACUMULADO HOJA 1,2,3,4 21,280.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 62,125.00 VOLUMEN NO EJECUTADO 40845.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 8. - - CLAVE UNIDAD DE MEDIDA 1 M2 TRAMO UNIDAD M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL UNO 3+040.00 3+060.00 20.00 7.00 7.00 140.00 3+060.00 3+080.00 20.00 7.00 7.00 140.00 3+080.00 3+100.00 20.00 7.00 7.00 140.00 3+100.00 3+120.00 20.00 7.00 7.00 140.00 3+120.00 3+140.00 20.00 7.00 7.00 140.00 3+140.00 3+160.00 20.00 7.00 7.00 140.00 3+160.00 3+180.00 20.00 7.00 7.00 140.00 3+180.00 3+200.00 20.00 7.00 7.00 140.00 3+200.00 3+220.00 20.00 7.00 7.00 140.00 3+220.00 3+240.00 20.00 7.00 7.00 140.00 3+240.00 3+260.00 20.00 7.00 7.00 140.00 3+260.00 3+280.00 20.00 7.00 7.00 140.00 3+280.00 3+300.00 20.00 7.00 7.00 140.00 3+300.00 3+320.00 20.00 7.00 7.00 140.00 3+320.00 3+340.00 20.00 7.00 7.00 140.00 3+340.00 3+360.00 20.00 7.00 7.00 140.00 3+360.00 3+380.00 20.00 7.00 7.00 140.00 3+380.00 3+400.00 20.00 7.00 7.00 140.00 3+400.00 3+420.00 20.00 7.00 7.00 140.00 3+420.00 3+440.00 20.00 7.00 7.00 140.00 3+440.00 3+460.00 20.00 7.00 7.00 140.00 3+460.00 3+480.00 20.00 7.00 7.00 140.00 3+480.00 3+500.00 20.00 7.00 7.00 140.00 3+500.00 3+520.00 20.00 7.00 7.00 140.00 3+520.00 3+540.00 20.00 7.00 7.00 140.00 3+540.00 3+560.00 20.00 7.00 7.00 140.00 3+560.00 3+580.00 20.00 7.00 7.00 140.00 3+580.00 3+600.00 20.00 7.00 7.00 140.00 3+600.00 3+620.00 20.00 7.00 7.00 140.00 3+620.00 3+640.00 20.00 7.00 7.00 140.00 3+640.00 3+660.00 20.00 7.00 7.00 140.00 3+660.00 3+680.00 20.00 7.00 7.00 140.00 3+680.00 3+700.00 20.00 7.00 7.00 140.00 3+700.00 3+720.00 20.00 7.00 7.00 140.00 3+720.00 3+740.00 20.00 7.00 7.00 140.00 3+740.00 3+760.00 20.00 7.00 7.00 140.00 3+760.00 3+780.00 20.00 7.00 7.00 140.00 3+780.00 3+800.00 20.00 7.00 7.00 140.00 VOLUMEN GENERADO HOJA 5 5,320.00 VOLUMEN ACUMULADO HOJA 1,2,3,4,5 26,600.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 62,125.00 VOLUMEN NO EJECUTADO 35525.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 9. - - CLAVE UNIDAD DE MEDIDA 1 M2 TRAMO UNIDAD M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL UNO 3+800.00 3+820.00 20.00 7.00 7.00 140.00 3+820.00 3+840.00 20.00 7.00 7.00 140.00 3+840.00 3+860.00 20.00 7.00 7.00 140.00 3+860.00 3+880.00 20.00 7.00 7.00 140.00 3+880.00 3+900.00 20.00 7.00 7.00 140.00 3+900.00 3+920.00 20.00 7.00 7.00 140.00 3+920.00 3+940.00 20.00 7.00 7.00 140.00 3+940.00 3+960.00 20.00 7.00 7.00 140.00 3+960.00 3+980.00 20.00 7.00 7.00 140.00 3+980.00 4+000.00 20.00 7.00 7.00 140.00 4+000.00 4+020.00 20.00 7.00 7.00 140.00 4+020.00 4+040.00 20.00 7.00 7.00 140.00 4+040.00 4+060.00 20.00 7.00 7.00 140.00 4+060.00 4+080.00 20.00 7.00 7.00 140.00 4+080.00 4+100.00 20.00 7.00 7.00 140.00 4+100.00 4+120.00 20.00 7.00 7.00 140.00 4+120.00 4+140.00 20.00 7.00 7.00 140.00 4+140.00 4+160.00 20.00 7.00 7.00 140.00 4+160.00 4+180.00 20.00 7.00 7.00 140.00 4+180.00 4+200.00 20.00 7.00 7.00 140.00 4+200.00 4+220.00 20.00 7.00 7.00 140.00 4+220.00 4+240.00 20.00 7.00 7.00 140.00 4+240.00 4+260.00 20.00 7.00 7.00 140.00 4+260.00 4+280.00 20.00 7.00 7.00 140.00 4+280.00 4+300.00 20.00 7.00 7.00 140.00 4+300.00 4+320.00 20.00 7.00 7.00 140.00 4+320.00 4+340.00 20.00 7.00 7.00 140.00 4+340.00 4+360.00 20.00 7.00 7.00 140.00 4+360.00 4+380.00 20.00 7.00 7.00 140.00 4+380.00 4+400.00 20.00 7.00 7.00 140.00 4+400.00 4+420.00 20.00 7.00 7.00 140.00 4+420.00 4+440.00 20.00 7.00 7.00 140.00 4+440.00 4+460.00 20.00 7.00 7.00 140.00 4+460.00 4+480.00 20.00 7.00 7.00 140.00 4+480.00 4+500.00 20.00 7.00 7.00 140.00 4+500.00 4+520.00 20.00 7.00 7.00 140.00 4+520.00 4+540.00 20.00 7.00 7.00 140.00 4+540.00 4+560.00 20.00 7.00 7.00 140.00 VOLUMEN GENERADO HOJA 6 5,320.00 VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6 31,920.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 62,125.00 VOLUMEN NO EJECUTADO 30205.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 10. - - CLAVE UNIDAD DE MEDIDA 1 M2 TRAMO UNIDAD M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL UNO 4+560.00 4+580.00 20.00 7.00 7.00 140.00 4+580.00 4+600.00 20.00 7.00 7.00 140.00 4+600.00 4+620.00 20.00 7.00 7.00 140.00 4+620.00 4+640.00 20.00 7.00 7.00 140.00 4+640.00 4+660.00 20.00 7.00 7.00 140.00 4+660.00 4+680.00 20.00 7.00 7.00 140.00 4+680.00 4+700.00 20.00 7.00 7.00 140.00 4+700.00 4+720.00 20.00 7.00 7.00 140.00 4+720.00 4+740.00 20.00 7.00 7.00 140.00 4+740.00 4+760.00 20.00 7.00 7.00 140.00 4+760.00 4+780.00 20.00 7.00 7.00 140.00 4+780.00 4+800.00 20.00 7.00 7.00 140.00 4+800.00 4+820.00 20.00 7.00 7.00 140.00 4+820.00 4+840.00 20.00 7.00 7.00 140.00 4+840.00 4+860.00 20.00 7.00 7.00 140.00 4+860.00 4+880.00 20.00 7.00 7.00 140.00 4+880.00 4+900.00 20.00 7.00 7.00 140.00 4+900.00 4+920.00 20.00 7.00 7.00 140.00 4+920.00 4+940.00 20.00 7.00 7.00 140.00 4+940.00 4+960.00 20.00 7.00 7.00 140.00 4+960.00 4+980.00 20.00 7.00 7.00 140.00 4+980.00 5+000.00 20.00 7.00 7.00 140.00 5+000.00 5+020.00 20.00 7.00 7.00 140.00 5+020.00 5+040.00 20.00 7.00 7.00 140.00 5+040.00 5+060.00 20.00 7.00 7.00 140.00 5+060.00 5+080.00 20.00 7.00 7.00 140.00 5+080.00 5+100.00 20.00 7.00 7.00 140.00 5+100.00 5+120.00 20.00 7.00 7.00 140.00 5+120.00 5+140.00 20.00 7.00 7.00 140.00 5+140.00 5+160.00 20.00 7.00 7.00 140.00 5+160.00 5+180.00 20.00 7.00 7.00 140.00 5+180.00 5+200.00 20.00 7.00 7.00 140.00 5+200.00 5+220.00 20.00 7.00 7.00 140.00 5+220.00 5+240.00 20.00 7.00 7.00 140.00 5+240.00 5+260.00 20.00 7.00 7.00 140.00 5+260.00 5+280.00 20.00 7.00 7.00 140.00 5+280.00 5+300.00 20.00 7.00 7.00 140.00 5+300.00 5+320.00 20.00 7.00 7.00 140.00 VOLUMEN GENERADO HOJA 7 5,320.00 VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7 37,240.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 62,125.00 VOLUMEN NO EJECUTADO 24885.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 11. - - CLAVE UNIDAD DE MEDIDA 1 M2 TRAMO UNIDAD M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL UNO 5+320.00 5+340.00 20.00 7.00 7.00 140.00 5+340.00 5+360.00 20.00 7.00 7.00 140.00 5+360.00 5+380.00 20.00 7.00 7.00 140.00 5+380.00 5+400.00 20.00 7.00 7.00 140.00 5+400.00 5+420.00 20.00 7.00 7.00 140.00 5+420.00 5+440.00 20.00 7.00 7.00 140.00 5+440.00 5+460.00 20.00 7.00 7.00 140.00 5+460.00 5+480.00 20.00 7.00 7.00 140.00 5+480.00 5+500.00 20.00 7.00 7.00 140.00 5+500.00 5+520.00 20.00 7.00 7.00 140.00 5+520.00 5+540.00 20.00 7.00 7.00 140.00 5+540.00 5+560.00 20.00 7.00 7.00 140.00 5+560.00 5+580.00 20.00 7.00 7.00 140.00 5+580.00 5+600.00 20.00 7.00 7.00 140.00 5+600.00 5+620.00 20.00 7.00 7.00 140.00 5+620.00 5+640.00 20.00 7.00 7.00 140.00 5+640.00 5+660.00 20.00 7.00 7.00 140.00 5+660.00 5+680.00 20.00 7.00 7.00 140.00 5+680.00 5+700.00 20.00 7.00 7.00 140.00 5+700.00 5+720.00 20.00 7.00 7.00 140.00 5+720.00 5+740.00 20.00 7.00 7.00 140.00 5+740.00 5+760.00 20.00 7.00 7.00 140.00 5+760.00 5+780.00 20.00 7.00 7.00 140.00 5+780.00 5+800.00 20.00 7.00 7.00 140.00 5+800.00 5+820.00 20.00 7.00 7.00 140.00 5+820.00 5+840.00 20.00 7.00 7.00 140.00 5+840.00 5+860.00 20.00 7.00 7.00 140.00 5+860.00 5+880.00 20.00 7.00 7.00 140.00 5+880.00 5+900.00 20.00 7.00 7.00 140.00 5+900.00 5+920.00 20.00 7.00 7.00 140.00 5+920.00 5+940.00 20.00 7.00 7.00 140.00 5+940.00 5+960.00 20.00 7.00 7.00 140.00 5+960.00 5+980.00 20.00 7.00 7.00 140.00 5+980.00 6+000.00 20.00 7.00 7.00 140.00 6+000.00 6+020.00 20.00 7.00 7.00 140.00 6+020.00 6+040.00 20.00 7.00 7.00 140.00 6+040.00 6+060.00 20.00 7.00 7.00 140.00 6+060.00 6+080.00 20.00 7.00 7.00 140.00 VOLUMEN GENERADO HOJA 8 5,320.00 VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7,8 42,560.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 62,125.00 VOLUMEN NO EJECUTADO 19565.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 12. - - CLAVE UNIDAD DE MEDIDA 1 M2 TRAMO UNIDAD M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL UNO 6+080.00 6+100.00 20.00 7.00 7.00 140.00 6+100.00 6+120.00 20.00 7.00 7.00 140.00 6+120.00 6+140.00 20.00 7.00 7.00 140.00 6+140.00 6+160.00 20.00 7.00 7.00 140.00 6+160.00 6+180.00 20.00 7.00 7.00 140.00 6+180.00 6+200.00 20.00 7.00 7.00 140.00 6+200.00 6+220.00 20.00 7.00 7.00 140.00 6+220.00 6+240.00 20.00 7.00 7.00 140.00 6+240.00 6+260.00 20.00 7.00 7.00 140.00 6+260.00 6+280.00 20.00 7.00 7.00 140.00 6+280.00 6+300.00 20.00 7.00 7.00 140.00 6+300.00 6+320.00 20.00 7.00 7.00 140.00 6+320.00 6+340.00 20.00 7.00 7.00 140.00 6+340.00 6+360.00 20.00 7.00 7.00 140.00 6+360.00 6+380.00 20.00 7.00 7.00 140.00 6+380.00 6+400.00 20.00 7.00 7.00 140.00 6+400.00 6+420.00 20.00 7.00 7.00 140.00 6+420.00 6+440.00 20.00 7.00 7.00 140.00 6+440.00 6+460.00 20.00 7.00 7.00 140.00 6+460.00 6+480.00 20.00 7.00 7.00 140.00 6+480.00 6+500.00 20.00 7.00 7.00 140.00 6+500.00 6+520.00 20.00 7.00 7.00 140.00 6+520.00 6+540.00 20.00 7.00 7.00 140.00 6+540.00 6+560.00 20.00 7.00 7.00 140.00 6+560.00 6+580.00 20.00 7.00 7.00 140.00 6+580.00 6+600.00 20.00 7.00 7.00 140.00 6+600.00 6+620.00 20.00 7.00 7.00 140.00 6+620.00 6+640.00 20.00 7.00 7.00 140.00 6+640.00 6+660.00 20.00 7.00 7.00 140.00 6+660.00 6+680.00 20.00 7.00 7.00 140.00 6+680.00 6+700.00 20.00 7.00 7.00 140.00 6+700.00 6+720.00 20.00 7.00 7.00 140.00 6+720.00 6+740.00 20.00 7.00 7.00 140.00 6+740.00 6+760.00 20.00 7.00 7.00 140.00 6+760.00 6+780.00 20.00 7.00 7.00 140.00 6+780.00 6+800.00 20.00 7.00 7.00 140.00 6+800.00 6+820.00 20.00 7.00 7.00 140.00 6+820.00 6+840.00 20.00 7.00 7.00 140.00 VOLUMEN GENERADO HOJA 9 5,320.00 VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7,8,9 47,880.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 62,125.00 VOLUMEN NO EJECUTADO 14245.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 13. - - CLAVE UNIDAD DE MEDIDA 1 M2 TRAMO UNIDAD M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL UNO 6+840.00 6+860.00 20.00 7.00 7.00 140.00 6+860.00 6+880.00 20.00 7.00 7.00 140.00 6+880.00 6+900.00 20.00 7.00 7.00 140.00 6+900.00 6+920.00 20.00 7.00 7.00 140.00 6+920.00 6+940.00 20.00 7.00 7.00 140.00 6+940.00 6+960.00 20.00 7.00 7.00 140.00 6+960.00 6+980.00 20.00 7.00 7.00 140.00 6+980.00 7+000.00 20.00 7.00 7.00 140.00 7+000.00 7+020.00 20.00 7.00 7.00 140.00 7+020.00 7+040.00 20.00 7.00 7.00 140.00 7+040.00 7+060.00 20.00 7.00 7.00 140.00 7+060.00 7+080.00 20.00 7.00 7.00 140.00 7+080.00 7+100.00 20.00 7.00 7.00 140.00 7+100.00 7+120.00 20.00 7.00 7.00 140.00 7+120.00 7+140.00 20.00 7.00 7.00 140.00 7+140.00 7+160.00 20.00 7.00 7.00 140.00 7+160.00 7+180.00 20.00 7.00 7.00 140.00 7+180.00 7+200.00 20.00 7.00 7.00 140.00 7+200.00 7+220.00 20.00 7.00 7.00 140.00 7+220.00 7+240.00 20.00 7.00 7.00 140.00 7+240.00 7+260.00 20.00 7.00 7.00 140.00 7+260.00 7+280.00 20.00 7.00 7.00 140.00 7+280.00 7+300.00 20.00 7.00 7.00 140.00 7+300.00 7+320.00 20.00 7.00 7.00 140.00 7+320.00 7+340.00 20.00 7.00 7.00 140.00 7+340.00 7+360.00 20.00 7.00 7.00 140.00 7+360.00 7+380.00 20.00 7.00 7.00 140.00 7+380.00 7+400.00 20.00 7.00 7.00 140.00 7+400.00 7+420.00 20.00 7.00 7.00 140.00 7+420.00 7+440.00 20.00 7.00 7.00 140.00 7+440.00 7+460.00 20.00 7.00 7.00 140.00 7+460.00 7+480.00 20.00 7.00 7.00 140.00 7+480.00 7+500.00 20.00 7.00 7.00 140.00 7+500.00 7+520.00 20.00 7.00 7.00 140.00 7+520.00 7+540.00 20.00 7.00 7.00 140.00 7+540.00 7+560.00 20.00 7.00 7.00 140.00 7+560.00 7+580.00 20.00 7.00 7.00 140.00 7+580.00 7+600.00 20.00 7.00 7.00 140.00 VOLUMEN GENERADO HOJA 10 5,320.00 VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7,8,9,10 53,200.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 62,125.00 VOLUMEN NO EJECUTADO 8925.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 14. - - CLAVE UNIDAD DE MEDIDA 1 M2 TRAMO UNIDAD M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL UNO 7+600.00 7+620.00 20.00 7.00 7.00 140.00 7+620.00 7+640.00 20.00 7.00 7.00 140.00 7+640.00 7+660.00 20.00 7.00 7.00 140.00 7+660.00 7+680.00 20.00 7.00 7.00 140.00 7+680.00 7+700.00 20.00 7.00 7.00 140.00 7+700.00 7+720.00 20.00 7.00 7.00 140.00 7+720.00 7+740.00 20.00 7.00 7.00 140.00 7+740.00 7+760.00 20.00 7.00 7.00 140.00 7+760.00 7+780.00 20.00 7.00 7.00 140.00 7+780.00 7+800.00 20.00 7.00 7.00 140.00 7+800.00 7+820.00 20.00 7.00 7.00 140.00 7+820.00 7+840.00 20.00 7.00 7.00 140.00 7+840.00 7+860.00 20.00 7.00 7.00 140.00 7+860.00 7+880.00 20.00 7.00 7.00 140.00 7+880.00 7+900.00 20.00 7.00 7.00 140.00 7+900.00 7+920.00 20.00 7.00 7.00 140.00 7+920.00 7+940.00 20.00 7.00 7.00 140.00 7+940.00 7+960.00 20.00 7.00 7.00 140.00 7+960.00 7+980.00 20.00 7.00 7.00 140.00 7+980.00 8+000.00 20.00 7.00 7.00 140.00 8+000.00 8+020.00 20.00 7.00 7.00 140.00 8+020.00 8+040.00 20.00 7.00 7.00 140.00 8+040.00 8+060.00 20.00 7.00 7.00 140.00 8+060.00 8+080.00 20.00 7.00 7.00 140.00 8+080.00 8+100.00 20.00 7.00 7.00 140.00 8+100.00 8+120.00 20.00 7.00 7.00 140.00 8+120.00 8+140.00 20.00 7.00 7.00 140.00 8+140.00 8+160.00 20.00 7.00 7.00 140.00 8+160.00 8+180.00 20.00 7.00 7.00 140.00 8+180.00 8+200.00 20.00 7.00 7.00 140.00 8+200.00 8+220.00 20.00 7.00 7.00 140.00 8+220.00 8+240.00 20.00 7.00 7.00 140.00 8+240.00 8+260.00 20.00 7.00 7.00 140.00 8+260.00 8+280.00 20.00 7.00 7.00 140.00 8+280.00 8+300.00 20.00 7.00 7.00 140.00 8+300.00 8+320.00 20.00 7.00 7.00 140.00 8+320.00 8+340.00 20.00 7.00 7.00 140.00 8+340.00 8+360.00 20.00 7.00 7.00 140.00 VOLUMEN GENERADO HOJA 11 5,320.00 VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7,8,9,10,11 58,520.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 62,125.00 VOLUMEN NO EJECUTADO 3605.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 15. - - CLAVE UNIDAD DE MEDIDA 1 M2 TRAMO UNIDAD M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO TRAZO Y NIVELACIÓN EN TERRENO PARA PAVIMENTOS CON EQUIPO TOPOGRÁFICO ESTABLECIENDO EJES DE REFERENCIA Y BANCO DE NIVEL, INCLUYE: MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 LONGITUD ANCHO ANCHO PROMEDIO TOTAL UNO 8+360.00 8+380.00 20.00 7.00 7.00 140.00 8+380.00 8+400.00 20.00 7.00 7.00 140.00 8+400.00 8+420.00 20.00 7.00 7.00 140.00 8+420.00 8+440.00 20.00 7.00 7.00 140.00 8+440.00 8+460.00 20.00 7.00 7.00 140.00 8+460.00 8+480.00 20.00 7.00 7.00 140.00 8+480.00 8+500.00 20.00 7.00 7.00 140.00 8+500.00 8+520.00 20.00 7.00 7.00 140.00 8+520.00 8+540.00 20.00 7.00 7.00 140.00 8+540.00 8+560.00 20.00 7.00 7.00 140.00 8+560.00 8+580.00 20.00 7.00 7.00 140.00 8+580.00 8+600.00 20.00 7.00 7.00 140.00 8+600.00 8+620.00 20.00 7.00 7.00 140.00 8+620.00 8+640.00 20.00 7.00 7.00 140.00 8+640.00 8+660.00 20.00 7.00 7.00 140.00 8+660.00 8+680.00 20.00 7.00 7.00 140.00 8+680.00 8+700.00 20.00 7.00 7.00 140.00 8+700.00 8+720.00 20.00 7.00 7.00 140.00 8+720.00 8+740.00 20.00 7.00 7.00 140.00 8+740.00 8+760.00 20.00 7.00 7.00 140.00 8+760.00 8+780.00 20.00 7.00 7.00 140.00 8+780.00 8+800.00 20.00 7.00 7.00 140.00 8+800.00 8+820.00 20.00 7.00 7.00 140.00 8+820.00 8+840.00 20.00 7.00 7.00 140.00 8+840.00 8+860.00 20.00 7.00 7.00 140.00 8+860.00 8+875.00 15.00 7.00 7.00 105.00 VOLUMEN GENERADO HOJA 12 3,605.00 VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7,8,9,10,11,12 62,125.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 62,125.00 VOLUMEN NO EJECUTADO 0.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 16. - - CLAVE UNIDAD DE MEDIDA 2 M2 TRAMO LARGO ANCHO UNIDAD 7.00 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 0+780.00 0+800.00 7.00 0.07 140.00 0+800.00 0+820.00 7.00 0.07 140.00 0+740.00 0+760.00 7.00 0.07 140.00 0+760.00 0+780.00 7.00 0.07 140.00 0+700.00 0+720.00 7.00 0.07 140.00 0+720.00 VOLUMEN CONTRATADO 37275.00 VOLUMEN NO EJECUTADO -31535.00 VOLUMEN GENERADO HOJA 1 5740.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN 0+740.00 7.00 0.07 140.00 0+660.00 0+680.00 7.00 0.07 140.00 0+680.00 0+700.00 7.00 0.07 140.00 0+620.00 0+640.00 7.00 0.07 140.00 0+640.00 0+660.00 7.00 0.07 140.00 0+580.00 0+600.00 7.00 0.07 140.00 0+600.00 0+620.00 7.00 0.07 140.00 0+540.00 0+560.00 7.00 0.07 140.00 0+560.00 0+580.00 7.00 0.07 140.00 0+500.00 0+520.00 7.00 0.07 140.00 0+520.00 0+540.00 7.00 0.07 140.00 0+460.00 0+480.00 7.00 0.07 140.00 0+480.00 0+500.00 7.00 0.07 140.00 0+420.00 0+440.00 7.00 0.07 140.00 0+440.00 0+460.00 7.00 0.07 140.00 0+380.00 0+400.00 7.00 0.07 140.00 0+400.00 0+420.00 7.00 0.07 140.00 0+340.00 0+360.00 7.00 0.07 140.00 0+360.00 0+380.00 7.00 0.07 140.00 0+300.00 0+320.00 7.00 0.07 140.00 0+320.00 0+340.00 7.00 0.07 140.00 0+260.00 0+280.00 7.00 0.07 140.00 0+280.00 0+300.00 7.00 0.07 140.00 7.00 0.07 140.00 0+240.00 0+260.00 7.00 0.07 140.00 0+180.00 0+200.00 7.00 0.07 140.00 0+200.00 0+220.00 7.00 0.07 140.00 0+140.00 0+160.00 7.00 0.07 140.00 0+160.00 0+180.00 7.00 0.07 140.00 0+100.00 0+120.00 7.00 0.07 140.00 0+120.00 0+140.00 7.00 0.07 140.00 0+100.00 7.00 0.07 140.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 0+020.00 0+040.00 7.00 0.07 140.00 0+040.00 0+060.00 7.00 0.07 140.00 0+000.00 0+020.00 7.00 0.07 140.00 EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL UNO 0+000.00 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA, EQUIPO. 0+060.00 0+080.00 7.00 0.07 140.00 0+080.00 0+220.00 0+240.00 ING. FELIPE DE JESUS MORENO ROJAS APROBO: DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 17. - - CLAVE UNIDAD DE MEDIDA 2 M2 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA, EQUIPO. 0+820.00 0+840.00 0+940.00 0+960.00 7.00 0.07 140.00 0+960.00 0+980.00 7.00 0.07 140.00 0+980.00 1+000.00 7.00 0.07 140.00 1+060.00 1+080.00 7.00 0.07 140.00 1+080.00 1+100.00 7.00 0.07 140.00 0+900.00 0+920.00 7.00 0.07 140.00 0+920.00 0+940.00 7.00 0.07 140.00 0+840.00 0+860.00 7.00 0.07 140.00 0+860.00 0+880.00 7.00 0.07 140.00 0+880.00 0+900.00 7.00 0.07 140.00 7.00 0.07 140.00 1+100.00 1+120.00 7.00 0.07 140.00 1+000.00 1+020.00 7.00 0.07 140.00 1+020.00 1+040.00 7.00 0.07 140.00 1+040.00 1+060.00 7.00 0.07 140.00 1+180.00 1+200.00 7.00 0.07 140.00 1+200.00 1+220.00 7.00 0.07 140.00 1+220.00 1+240.00 7.00 0.07 140.00 1+120.00 1+140.00 7.00 0.07 140.00 1+140.00 1+160.00 7.00 0.07 140.00 1+160.00 1+180.00 7.00 0.07 140.00 1+240.00 1+260.00 7.00 0.07 140.00 1+260.00 1+280.00 7.00 0.07 140.00 1+280.00 1+300.00 7.00 0.07 140.00 140.00 1+420.00 1+440.00 7.00 0.07 140.00 1+440.00 1+460.00 7.00 0.07 140.00 1+460.00 1+480.00 7.00 0.07 140.00 1+360.00 1+380.00 7.00 0.07 140.00 1+380.00 1+400.00 7.00 0.07 140.00 1+400.00 1+420.00 7.00 0.07 140.00 1+540.00 1+560.00 7.00 0.07 140.00 1+560.00 1+580.00 7.00 0.07 140.00 1+580.00 1+600.00 7.00 0.07 140.00 1+300.00 1+320.00 7.00 0.07 140.00 1+320.00 1+340.00 7.00 0.07 140.00 1+340.00 1+360.00 7.00 0.07 140.00 1+600.00 1+620.00 140.00 1+620.00 1+640.00 140.00 VOLUMEN GENERADO HOJA 2 5,740.00 VOLUMEN ACUMULADO HOJA 1,2 11,480.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN NO EJECUTADO -25795.00 UNO 7.00 0.07 7.00 0.07 1+480.00 1+500.00 7.00 0.07 140.00 1+500.00 1+520.00 7.00 0.07 140.00 1+520.00 1+540.00 7.00 0.07 VOLUMEN CONTRATADO 37275.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONCEPTO EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 18. - - CLAVE UNIDAD DE MEDIDA 2 M2 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 CONCEPTO EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL UNO 1+820.00 1+840.00 7.00 0.07 140.00 1+840.00 1+860.00 7.00 0.07 140.00 1+740.00 1+760.00 7.00 0.07 140.00 1+760.00 1+780.00 7.00 0.07 140.00 1+780.00 1+800.00 7.00 0.07 140.00 1+920.00 1+940.00 7.00 1+640.00 1+660.00 7.00 0.07 140.00 1+660.00 1+680.00 7.00 0.07 140.00 1+680.00 1+700.00 7.00 0.07 140.00 1+700.00 1+720.00 7.00 0.07 140.00 1+720.00 1+740.00 7.00 0.07 140.00 1+800.00 1+820.00 7.00 0.07 140.00 0.07 140.00 1+940.00 1+960.00 7.00 0.07 140.00 1+960.00 1+980.00 7.00 0.07 140.00 1+860.00 1+880.00 7.00 0.07 140.00 1+880.00 1+900.00 7.00 0.07 140.00 1+900.00 1+920.00 7.00 0.07 140.00 2+040.00 2+060.00 7.00 0.07 140.00 2+060.00 2+080.00 7.00 0.07 140.00 2+080.00 2+100.00 7.00 0.07 140.00 1+980.00 2+000.00 7.00 0.07 140.00 2+000.00 2+020.00 7.00 0.07 140.00 2+020.00 2+040.00 7.00 0.07 140.00 2+460.00 7.00 0.07 VOLUMEN GENERADO HOJA 3 5,740.00 VOLUMEN ACUMULADO HOJA 1,2,3 17,220.00 2+160.00 2+180.00 7.00 0.07 140.00 2+180.00 2+200.00 7.00 0.07 140.00 2+200.00 2+220.00 7.00 0.07 140.00 2+100.00 2+120.00 7.00 0.07 140.00 2+120.00 2+140.00 7.00 0.07 140.00 2+140.00 2+160.00 7.00 0.07 140.00 2+280.00 2+300.00 7.00 0.07 140.00 2+300.00 2+320.00 7.00 0.07 140.00 2+320.00 2+340.00 7.00 0.07 140.00 2+220.00 2+240.00 7.00 0.07 140.00 2+240.00 2+260.00 7.00 0.07 140.00 2+260.00 2+280.00 7.00 0.07 140.00 2+420.00 2+440.00 140.00 140.00 VOLUMEN CONTRATADO 37275.00 7.00 0.07 2+440.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA, EQUIPO. 7.00 0.07 7.00 0.07 7.00 0.07 2+340.00 2+360.00 7.00 0.07 140.00 2+360.00 2+380.00 140.00 2+380.00 2+400.00 140.00 2+400.00 2+420.00 140.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN NO EJECUTADO -20055.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 19. - - CLAVE UNIDAD DE MEDIDA 2 M2 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 2+480.00 2+500.00 7.00 0.07 140.00 2+500.00 2+520.00 7.00 0.07 140.00 2+520.00 2+540.00 7.00 0.07 140.00 2+660.00 2+680.00 7.00 0.07 140.00 2+600.00 2+620.00 7.00 0.07 140.00 2+620.00 2+640.00 7.00 0.07 140.00 2+640.00 2+660.00 7.00 0.07 140.00 2+940.00 2+960.00 7.00 0.07 140.00 2+840.00 2+860.00 7.00 0.07 140.00 2+860.00 2+880.00 7.00 0.07 140.00 2+880.00 2+900.00 7.00 0.07 140.00 2+680.00 2+700.00 7.00 0.07 140.00 2+700.00 2+720.00 7.00 0.07 140.00 EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL 2+460.00 2+480.00 7.00 0.07 140.00 2+920.00 7.00 0.07 2+780.00 2+800.00 7.00 0.07 140.00 2+800.00 2+820.00 7.00 0.07 140.00 2+540.00 2+560.00 7.00 0.07 140.00 2+560.00 2+580.00 7.00 0.07 140.00 2+580.00 2+600.00 7.00 0.07 140.00 140.00 2+920.00 2+940.00 7.00 0.07 140.00 3+040.00 3+060.00 7.00 140.00 140.00 3+000.00 3+020.00 7.00 0.07 3+140.00 3+160.00 140.00 3+160.00 3+180.00 140.00 3+180.00 3+200.00 140.00 140.00 3+080.00 3+100.00 7.00 0.07 140.00 3+100.00 3+120.00 VOLUMEN GENERADO HOJA 4 5,740.00 VOLUMEN CONTRATADO 37275.00 2+820.00 2+840.00 7.00 0.07 140.00 2+720.00 2+740.00 7.00 0.07 140.00 2+740.00 2+760.00 7.00 0.07 140.00 2+760.00 2+780.00 7.00 0.07 140.00 2+900.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA, EQUIPO. UNO 7.00 0.07 7.00 0.07 7.00 0.07 7.00 0.07 3+200.00 3+220.00 7.00 0.07 3+220.00 3+240.00 7.00 0.07 140.00 7.00 0.07 140.00 3+120.00 3+140.00 140.00 3+020.00 3+040.00 7.00 0.07 140.00 0.07 140.00 3+060.00 3+080.00 7.00 0.07 140.00 2+960.00 2+980.00 7.00 0.07 140.00 2+980.00 3+000.00 7.00 0.07 3+240.00 3+260.00 7.00 0.07 140.00 3+260.00 3+280.00 7.00 0.07 140.00 VOLUMEN ACUMULADO HOJA 1,2,3,4 22,960.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN NO EJECUTADO -14315.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 20. - - CLAVE UNIDAD DE MEDIDA 2 M2 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 37275.00 VOLUMEN NO EJECUTADO -8575.00 4+060.00 4+080.00 7.00 0.07 140.00 4+080.00 4+100.00 7.00 0.07 140.00 VOLUMEN GENERADO HOJA 5 5,740.00 VOLUMEN ACUMULADO HOJA 1,2,3,4,5 28,700.00 3+980.00 4+000.00 7.00 0.07 140.00 4+000.00 4+020.00 7.00 0.07 140.00 4+020.00 4+040.00 7.00 0.07 140.00 4+040.00 4+060.00 7.00 0.07 140.00 3+900.00 3+920.00 7.00 0.07 140.00 3+920.00 3+940.00 7.00 0.07 140.00 3+940.00 3+960.00 7.00 0.07 140.00 3+960.00 3+980.00 7.00 0.07 140.00 3+820.00 3+840.00 7.00 0.07 140.00 3+840.00 3+860.00 7.00 0.07 140.00 3+860.00 3+880.00 7.00 0.07 140.00 3+880.00 3+900.00 7.00 0.07 140.00 3+760.00 3+780.00 7.00 0.07 140.00 3+780.00 3+800.00 7.00 0.07 140.00 3+800.00 3+820.00 7.00 0.07 140.00 3+660.00 3+680.00 7.00 0.07 140.00 3+680.00 3+700.00 7.00 0.07 140.00 3+700.00 3+720.00 7.00 0.07 140.00 3+720.00 3+740.00 7.00 0.07 140.00 3+620.00 3+640.00 7.00 0.07 140.00 3+640.00 3+660.00 7.00 0.07 140.00 3+500.00 3+520.00 7.00 0.07 140.00 3+520.00 3+540.00 7.00 0.07 140.00 3+540.00 3+560.00 7.00 0.07 140.00 3+560.00 3+580.00 7.00 0.07 140.00 3+740.00 3+760.00 7.00 0.07 140.00 3+460.00 3+480.00 7.00 0.07 140.00 3+480.00 3+500.00 7.00 0.07 140.00 0.07 140.00 3+360.00 3+380.00 7.00 0.07 140.00 3+380.00 3+400.00 7.00 0.07 140.00 3+400.00 3+420.00 7.00 0.07 140.00 3+580.00 3+600.00 7.00 0.07 140.00 3+600.00 3+620.00 7.00 0.07 140.00 EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL UNO 3+280.00 3+300.00 7.00 0.07 140.00 3+300.00 3+320.00 7.00 0.07 140.00 3+320.00 3+340.00 7.00 0.07 140.00 3+340.00 3+360.00 7.00 3+420.00 3+440.00 7.00 0.07 140.00 3+440.00 3+460.00 7.00 0.07 140.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA, EQUIPO. APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 21. - - CLAVE UNIDAD DE MEDIDA 2 M2 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 37275.00 VOLUMEN NO EJECUTADO -2835.00 4+880.00 4+900.00 7.00 0.07 140.00 4+900.00 4+920.00 7.00 0.07 140.00 VOLUMEN GENERADO HOJA 6 5,740.00 VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6 34,440.00 4+800.00 4+820.00 7.00 0.07 140.00 4+820.00 4+840.00 7.00 0.07 140.00 4+840.00 4+860.00 7.00 0.07 140.00 4+860.00 4+880.00 7.00 0.07 140.00 4+720.00 4+740.00 7.00 0.07 140.00 4+740.00 4+760.00 7.00 0.07 140.00 4+760.00 4+780.00 7.00 0.07 140.00 4+780.00 4+800.00 7.00 0.07 140.00 4+640.00 4+660.00 7.00 0.07 140.00 4+660.00 4+680.00 7.00 0.07 140.00 4+680.00 4+700.00 7.00 0.07 140.00 4+700.00 4+720.00 7.00 0.07 140.00 4+560.00 4+580.00 7.00 0.07 140.00 4+580.00 4+600.00 7.00 0.07 140.00 4+600.00 4+620.00 7.00 0.07 140.00 4+620.00 4+640.00 7.00 0.07 140.00 4+480.00 4+500.00 7.00 0.07 140.00 4+500.00 4+520.00 7.00 0.07 140.00 4+520.00 4+540.00 7.00 0.07 140.00 4+540.00 4+560.00 7.00 0.07 140.00 4+180.00 4+200.00 7.00 0.07 140.00 4+200.00 4+220.00 7.00 0.07 140.00 4+220.00 4+240.00 7.00 0.07 140.00 4+400.00 4+420.00 7.00 0.07 140.00 4+420.00 4+440.00 7.00 0.07 140.00 4+440.00 4+460.00 7.00 0.07 140.00 4+460.00 4+480.00 7.00 0.07 140.00 4+320.00 4+340.00 7.00 0.07 140.00 4+340.00 4+360.00 7.00 0.07 140.00 4+360.00 4+380.00 7.00 0.07 140.00 4+380.00 4+400.00 7.00 0.07 140.00 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA, EQUIPO. EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL UNO 4+100.00 4+120.00 7.00 0.07 140.00 4+120.00 4+140.00 7.00 0.07 140.00 4+140.00 4+160.00 7.00 0.07 140.00 4+160.00 4+180.00 7.00 4+240.00 4+260.00 7.00 0.07 140.00 4+260.00 4+280.00 7.00 0.07 140.00 4+280.00 4+300.00 7.00 0.07 140.00 4+300.00 4+320.00 7.00 0.07 140.00 0.07 140.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 22. - - CLAVE UNIDAD DE MEDIDA 2 M2 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 20.00 7.00 M2 5.00 7.00 M2 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 37275.00 VOLUMEN NO EJECUTADO 0.00 VOLUMEN GENERADO HOJA 7 2,835.00 VOLUMEN ACUMULADO HOJA 1,2,3,4,5,6,7 37,275.00 5+300.00 5+320.00 7.00 0.07 140.00 5+320.00 5+325.00 7.00 0.07 35.00 5+000.00 5+020.00 7.00 0.07 140.00 5+020.00 5+040.00 7.00 0.07 140.00 5+040.00 5+060.00 7.00 0.07 140.00 5+220.00 5+240.00 7.00 0.07 140.00 5+240.00 5+260.00 7.00 0.07 140.00 5+260.00 5+280.00 7.00 0.07 140.00 5+280.00 5+300.00 7.00 0.07 140.00 5+140.00 5+160.00 7.00 0.07 140.00 5+160.00 5+180.00 7.00 0.07 140.00 5+180.00 5+200.00 7.00 0.07 140.00 5+200.00 5+220.00 7.00 0.07 140.00 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO DEMOLICION DE ASFALTO DE 7CM POR MEDIOS MECANICOS, INCLUYE: MAQUINARIA ( MOTOCONFORMADORA), MANO DE OBRA, HERRAMIENTA, EQUIPO. EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL UNO 4+920.00 4+940.00 7.00 0.07 140.00 4+940.00 4+960.00 7.00 0.07 140.00 4+960.00 4+980.00 7.00 0.07 140.00 4+980.00 5+000.00 7.00 5+060.00 5+080.00 7.00 0.07 140.00 5+080.00 5+100.00 7.00 0.07 140.00 5+100.00 5+120.00 7.00 0.07 140.00 5+120.00 5+140.00 7.00 0.07 140.00 0.07 140.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 23. - - CLAVE UNIDAD DE MEDIDA 3 M3 TRAMO LARGO ANCHO UNIDAD 7.00 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 VOLUMEN NO EJECUTADO -32821.43 0+780.00 0+800.00 7.00 0.45 63.00 0+720.00 0+740.00 7.00 0.45 63.00 0+740.00 0+760.00 7.00 0.45 63.00 0+840.00 0+860.00 7.00 0.45 63.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 36343.13 VOLUMEN GENERADO HOJA 1 3521.70 7.00 0.45 63.00 ABUNDAMIENTO 30% 812.70 0+680.00 0+700.00 7.00 0.45 63.00 0.45 63.00 0+800.00 0+820.00 7.00 0.45 63.00 0+820.00 0+840.00 7.00 0.45 63.00 0+540.00 0+560.00 7.00 SUBTOTAL 2709.00 0+700.00 0+720.00 7.00 0.45 63.00 0+640.00 0+660.00 7.00 0.45 63.00 0+660.00 0+680.00 7.00 0.45 63.00 0+760.00 0+780.00 7.00 0.45 63.00 0+620.00 0+640.00 0+480.00 0+500.00 7.00 0.45 63.00 0+500.00 0+520.00 7.00 0.45 63.00 0+600.00 0+620.00 7.00 0.45 63.00 0.45 63.00 0+460.00 0+480.00 7.00 0.45 63.00 0+400.00 0+420.00 7.00 0.45 63.00 0+420.00 0+440.00 7.00 0.45 63.00 0+520.00 0+540.00 7.00 0.45 63.00 0+560.00 0+580.00 7.00 0+580.00 0+600.00 7.00 0.45 63.00 0+380.00 0+400.00 7.00 0.45 63.00 0+320.00 0+340.00 7.00 0.45 63.00 0+340.00 0+360.00 7.00 0.45 63.00 0+440.00 0+460.00 7.00 0.45 63.00 0+300.00 0+320.00 7.00 0.45 63.00 0+240.00 0+260.00 7.00 0.45 63.00 0+260.00 0+280.00 7.00 0.45 63.00 0+360.00 0+380.00 7.00 0.45 63.00 0.45 63.00 0+140.00 EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL 0+220.00 0+240.00 7.00 0.45 63.00 0+160.00 0+180.00 7.00 0.45 63.00 0+180.00 0+200.00 7.00 0.45 63.00 0+280.00 0+300.00 7.00 0.45 63.00 0+160.00 7.00 0.45 63.00 0+080.00 0+100.00 7.00 0.45 63.00 0+100.00 0+120.00 7.00 0.45 63.00 0+200.00 0+220.00 7.00 0.45 63.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 UNO 0+000.00 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO 0+040.00 0+060.00 7.00 0.45 63.00 0+060.00 0+080.00 7.00 0.45 63.00 63.00 0+020.00 0+040.00 7.00 0.45 63.00 0+000.00 0+020.00 7.00 0.45 0+120.00 0+140.00 7.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 24. - - CLAVE UNIDAD DE MEDIDA 3 M3 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 VOLUMEN NO EJECUTADO -29299.73 VOLUMEN GENERADO HOJA 2 3521.70 ABUNDAMIENTO 30% 812.70 ACUMULADO HOJA 1,2 7043.40 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 36343.13 1+680.00 1+700.00 7.00 0.45 63.00 1+700.00 1+720.00 7.00 0.45 63.00 SUBTOTAL 2709.00 1+600.00 1+620.00 7.00 0.45 63.00 1+620.00 1+640.00 7.00 0.45 63.00 1+640.00 1+660.00 7.00 0.45 63.00 1+660.00 1+680.00 7.00 0.45 63.00 1+520.00 1+540.00 7.00 0.45 63.00 1+540.00 1+560.00 7.00 0.45 63.00 1+560.00 1+580.00 7.00 0.45 63.00 1+580.00 1+600.00 7.00 0.45 63.00 1+440.00 1+460.00 7.00 0.45 63.00 1+460.00 1+480.00 7.00 0.45 63.00 1+480.00 1+500.00 7.00 0.45 63.00 1+500.00 1+520.00 7.00 0.45 63.00 1+360.00 1+380.00 7.00 0.45 63.00 1+380.00 1+400.00 7.00 0.45 63.00 1+400.00 1+420.00 7.00 0.45 63.00 1+420.00 1+440.00 7.00 0.45 63.00 1+300.00 1+320.00 7.00 0.45 63.00 1+320.00 1+340.00 7.00 0.45 63.00 1+340.00 1+360.00 7.00 0.45 63.00 1+200.00 1+220.00 7.00 0.45 63.00 1+220.00 1+240.00 7.00 0.45 63.00 1+240.00 1+260.00 7.00 0.45 63.00 1+260.00 1+280.00 7.00 0.45 63.00 1+160.00 1+180.00 7.00 0.45 63.00 1+180.00 1+200.00 7.00 0.45 63.00 1+040.00 1+060.00 7.00 0.45 63.00 1+060.00 1+080.00 7.00 0.45 63.00 1+080.00 1+100.00 7.00 0.45 63.00 1+100.00 1+120.00 7.00 0.45 63.00 1+280.00 1+300.00 7.00 0.45 63.00 UNO 0+860.00 0+880.00 7.00 0.45 63.00 0+880.00 0+900.00 7.00 63.00 0+980.00 1+000.00 7.00 0.45 63.00 1+000.00 1+020.00 7.00 0.45 63.00 1+020.00 1+040.00 7.00 0.45 63.00 EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL 1+120.00 1+140.00 7.00 0.45 63.00 1+140.00 1+160.00 7.00 0.45 63.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA. 0+960.00 0+980.00 7.00 0.45 0.45 63.00 0+900.00 0+920.00 7.00 0.45 63.00 0+920.00 0+940.00 7.00 0.45 63.00 0+940.00 0+960.00 7.00 0.45 63.00 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 25. - - CLAVE UNIDAD DE MEDIDA 3 M3 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 VOLUMEN GENERADO HOJA 3 3521.70 ACUMULADO HOJA 1,2,3 10565.10 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 36343.13 VOLUMEN NO EJECUTADO -25778.03 2+540.00 2+560.00 7.00 0.45 63.00 2+560.00 2+580.00 7.00 0.45 63.00 SUBTOTAL 2709.00 ABUNDAMIENTO 30% 812.70 2+460.00 2+480.00 7.00 0.45 63.00 2+480.00 2+500.00 7.00 0.45 63.00 2+500.00 2+520.00 7.00 0.45 63.00 2+520.00 2+540.00 7.00 0.45 63.00 2+380.00 2+400.00 7.00 0.45 63.00 2+400.00 2+420.00 7.00 0.45 63.00 2+420.00 2+440.00 7.00 0.45 63.00 2+440.00 2+460.00 7.00 0.45 63.00 2+300.00 2+320.00 7.00 0.45 63.00 2+320.00 2+340.00 7.00 0.45 63.00 2+340.00 2+360.00 7.00 0.45 63.00 2+360.00 2+380.00 7.00 0.45 63.00 2+220.00 2+240.00 7.00 0.45 63.00 2+240.00 2+260.00 7.00 0.45 63.00 2+260.00 2+280.00 7.00 0.45 63.00 2+280.00 2+300.00 7.00 0.45 63.00 2+140.00 2+160.00 7.00 0.45 63.00 2+160.00 2+180.00 7.00 0.45 63.00 2+180.00 2+200.00 7.00 0.45 63.00 2+200.00 2+220.00 7.00 0.45 63.00 63.00 1+860.00 1+880.00 7.00 0.45 63.00 1+880.00 1+900.00 7.00 0.45 63.00 2+060.00 2+080.00 7.00 0.45 63.00 2+080.00 2+100.00 7.00 0.45 63.00 2+100.00 2+120.00 7.00 0.45 63.00 2+120.00 2+140.00 7.00 0.45 63.00 1+980.00 2+000.00 7.00 0.45 63.00 2+000.00 2+020.00 7.00 0.45 63.00 2+020.00 2+040.00 7.00 0.45 63.00 2+040.00 2+060.00 7.00 0.45 63.00 EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL UNO 1+720.00 1+740.00 7.00 0.45 63.00 1+740.00 1+760.00 7.00 0.45 63.00 1+760.00 1+780.00 7.00 0.45 63.00 1+780.00 1+800.00 7.00 0.45 63.00 1+800.00 1+820.00 7.00 0.45 1+900.00 1+920.00 7.00 0.45 63.00 1+920.00 1+940.00 7.00 0.45 63.00 1+940.00 1+960.00 7.00 0.45 63.00 1+960.00 1+980.00 7.00 0.45 63.00 63.00 1+820.00 1+840.00 7.00 0.45 63.00 1+840.00 1+860.00 7.00 0.45 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 26. - - CLAVE UNIDAD DE MEDIDA 3 M3 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 ACUMULADO HOJA 1,2,3,4 14086.80 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 36343.13 VOLUMEN NO EJECUTADO -22256.33 ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS 3+420.00 3+440.00 7.00 0.45 63.00 SUBTOTAL 2709.00 ABUNDAMIENTO 30% 812.70 VOLUMEN GENERADO HOJA 4 3521.70 3+340.00 3+360.00 7.00 0.45 63.00 3+360.00 3+380.00 7.00 0.45 63.00 3+380.00 3+400.00 7.00 0.45 63.00 3+400.00 3+420.00 7.00 0.45 63.00 3+260.00 3+280.00 7.00 0.45 63.00 3+280.00 3+300.00 7.00 0.45 63.00 3+300.00 3+320.00 7.00 0.45 63.00 3+320.00 3+340.00 7.00 0.45 63.00 3+180.00 3+200.00 7.00 0.45 63.00 3+200.00 3+220.00 7.00 0.45 63.00 3+220.00 3+240.00 7.00 0.45 63.00 3+240.00 3+260.00 7.00 0.45 63.00 3+100.00 3+120.00 7.00 0.45 63.00 3+120.00 3+140.00 7.00 0.45 63.00 3+140.00 3+160.00 7.00 0.45 63.00 3+160.00 3+180.00 7.00 0.45 63.00 3+020.00 3+040.00 7.00 0.45 63.00 3+040.00 3+060.00 7.00 0.45 63.00 3+060.00 3+080.00 7.00 0.45 63.00 3+080.00 3+100.00 7.00 0.45 63.00 0.45 63.00 2+760.00 2+780.00 7.00 0.45 63.00 2+940.00 2+960.00 7.00 0.45 63.00 2+960.00 2+980.00 7.00 0.45 63.00 2+980.00 3+000.00 7.00 0.45 63.00 3+000.00 3+020.00 7.00 0.45 63.00 2+860.00 2+880.00 7.00 0.45 63.00 2+880.00 2+900.00 7.00 0.45 63.00 2+900.00 2+920.00 7.00 0.45 63.00 2+920.00 2+940.00 7.00 0.45 63.00 UNO 2+580.00 2+600.00 7.00 0.45 63.00 2+600.00 2+620.00 7.00 0.45 63.00 2+620.00 2+640.00 7.00 0.45 63.00 2+640.00 2+660.00 7.00 0.45 63.00 2+660.00 2+680.00 7.00 0.45 63.00 2+680.00 2+700.00 7.00 0.45 63.00 2+700.00 2+780.00 2+800.00 7.00 0.45 63.00 2+800.00 2+820.00 7.00 0.45 63.00 2+820.00 2+840.00 7.00 0.45 63.00 2+840.00 2+860.00 7.00 0.45 63.00 2+720.00 7.00 0.45 63.00 2+720.00 2+740.00 7.00 0.45 63.00 2+740.00 2+760.00 7.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL APROBO: M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 27. - - CLAVE UNIDAD DE MEDIDA 3 M3 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 ACUMULADO HOJA 1,2,3,4,5 17608.50 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 36343.13 VOLUMEN NO EJECUTADO -18734.63 4+280.00 4+300.00 7.00 0.45 63.00 SUBTOTAL 2709.00 ABUNDAMIENTO 30% 812.70 VOLUMEN GENERADO HOJA 5 3521.70 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS 4+200.00 4+220.00 7.00 0.45 63.00 4+220.00 4+240.00 7.00 0.45 63.00 4+240.00 4+260.00 7.00 0.45 63.00 4+260.00 4+280.00 7.00 0.45 63.00 4+120.00 4+140.00 7.00 0.45 63.00 4+140.00 4+160.00 7.00 0.45 63.00 4+160.00 4+180.00 7.00 0.45 63.00 4+180.00 4+200.00 7.00 0.45 63.00 4+060.00 4+080.00 7.00 0.45 63.00 4+080.00 4+100.00 7.00 0.45 63.00 4+100.00 4+120.00 7.00 0.45 63.00 3+960.00 3+980.00 7.00 0.45 63.00 3+980.00 4+000.00 7.00 0.45 63.00 4+000.00 4+020.00 7.00 0.45 63.00 4+020.00 4+040.00 7.00 0.45 63.00 3+920.00 3+940.00 7.00 0.45 63.00 3+940.00 3+960.00 7.00 0.45 63.00 3+800.00 3+820.00 7.00 0.45 63.00 3+820.00 3+840.00 7.00 0.45 63.00 3+840.00 3+860.00 7.00 0.45 63.00 3+860.00 3+880.00 7.00 0.45 63.00 4+040.00 4+060.00 7.00 0.45 63.00 0.45 63.00 3+780.00 3+800.00 7.00 0.45 63.00 3+640.00 3+660.00 7.00 0.45 63.00 3+660.00 3+680.00 7.00 0.45 63.00 3+680.00 3+700.00 7.00 0.45 63.00 3+700.00 3+720.00 7.00 0.45 63.00 3+880.00 3+900.00 7.00 0.45 63.00 3+900.00 3+920.00 7.00 0.45 63.00 3+580.00 7.00 0.45 63.00 3+580.00 3+600.00 7.00 0.45 63.00 3+600.00 3+620.00 7.00 0.45 63.00 3+620.00 3+640.00 7.00 0.45 63.00 UNO 3+440.00 3+460.00 7.00 0.45 63.00 3+460.00 3+480.00 7.00 0.45 63.00 3+480.00 3+500.00 7.00 0.45 63.00 3+500.00 3+520.00 7.00 0.45 63.00 3+520.00 3+540.00 7.00 0.45 63.00 3+540.00 3+560.00 7.00 0.45 63.00 3+560.00 3+720.00 3+740.00 7.00 0.45 63.00 3+740.00 3+760.00 7.00 0.45 63.00 3+760.00 3+780.00 7.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 28. - - CLAVE UNIDAD DE MEDIDA 3 M3 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 ACUMULADO HOJA 1,2,3,4,5,6 21130.20 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 36343.13 VOLUMEN NO EJECUTADO -15212.93 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS 5+140.00 5+160.00 7.00 0.45 63.00 SUBTOTAL 2709.00 ABUNDAMIENTO 30% 812.70 VOLUMEN GENERADO HOJA 6 3521.70 5+060.00 5+080.00 7.00 0.45 63.00 5+080.00 5+100.00 7.00 0.45 63.00 5+100.00 5+120.00 7.00 0.45 63.00 5+120.00 5+140.00 7.00 0.45 63.00 4+980.00 5+000.00 7.00 0.45 63.00 5+000.00 5+020.00 7.00 0.45 63.00 5+020.00 5+040.00 7.00 0.45 63.00 5+040.00 5+060.00 7.00 0.45 63.00 4+900.00 4+920.00 7.00 0.45 63.00 4+920.00 4+940.00 7.00 0.45 63.00 4+940.00 4+960.00 7.00 0.45 63.00 4+960.00 4+980.00 7.00 0.45 63.00 4+820.00 4+840.00 7.00 0.45 63.00 4+840.00 4+860.00 7.00 0.45 63.00 4+860.00 4+880.00 7.00 0.45 63.00 4+880.00 4+900.00 7.00 0.45 63.00 4+740.00 4+760.00 7.00 0.45 63.00 4+760.00 4+780.00 7.00 0.45 63.00 4+780.00 4+800.00 7.00 0.45 63.00 4+800.00 4+820.00 7.00 0.45 63.00 7.00 0.45 63.00 4+460.00 4+480.00 7.00 0.45 63.00 4+480.00 4+500.00 7.00 0.45 63.00 4+660.00 4+680.00 7.00 0.45 63.00 4+680.00 4+700.00 7.00 0.45 63.00 4+700.00 4+720.00 7.00 0.45 63.00 4+720.00 4+740.00 7.00 0.45 63.00 4+580.00 4+600.00 7.00 0.45 63.00 4+600.00 4+620.00 7.00 0.45 63.00 4+620.00 4+640.00 7.00 0.45 63.00 4+640.00 4+660.00 7.00 0.45 63.00 UNO 4+300.00 4+320.00 7.00 0.45 63.00 4+320.00 4+340.00 7.00 0.45 63.00 4+340.00 4+360.00 7.00 0.45 63.00 4+360.00 4+380.00 7.00 0.45 63.00 4+380.00 4+400.00 7.00 0.45 63.00 4+400.00 4+420.00 7.00 0.45 63.00 4+420.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 4+500.00 4+520.00 7.00 0.45 63.00 4+520.00 4+540.00 7.00 0.45 63.00 4+540.00 4+560.00 7.00 0.45 63.00 4+560.00 4+580.00 7.00 0.45 63.00 4+440.00 7.00 0.45 63.00 4+440.00 4+460.00 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 29. - - CLAVE UNIDAD DE MEDIDA 3 M3 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 ACUMULADO HOJA 1,2,3,4,5,6,7 24651.90 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 36343.13 VOLUMEN NO EJECUTADO -11691.23 6+000.00 6+020.00 7.00 0.45 63.00 SUBTOTAL 2709.00 ABUNDAMIENTO 30% 812.70 VOLUMEN GENERADO HOJA 7 3521.70 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS 5+920.00 5+940.00 7.00 0.45 63.00 5+940.00 5+960.00 7.00 0.45 63.00 5+960.00 5+980.00 7.00 0.45 63.00 5+980.00 6+000.00 7.00 0.45 63.00 5+840.00 5+860.00 7.00 0.45 63.00 5+860.00 5+880.00 7.00 0.45 63.00 5+880.00 5+900.00 7.00 0.45 63.00 5+900.00 5+920.00 7.00 0.45 63.00 5+780.00 5+800.00 7.00 0.45 63.00 5+800.00 5+820.00 7.00 0.45 63.00 5+820.00 5+840.00 7.00 0.45 63.00 5+680.00 5+700.00 7.00 0.45 63.00 5+700.00 5+720.00 7.00 0.45 63.00 5+720.00 5+740.00 7.00 0.45 63.00 5+740.00 5+760.00 7.00 0.45 63.00 5+640.00 5+660.00 7.00 0.45 63.00 5+660.00 5+680.00 7.00 0.45 63.00 5+520.00 5+540.00 7.00 0.45 63.00 5+540.00 5+560.00 7.00 0.45 63.00 5+560.00 5+580.00 7.00 0.45 63.00 5+580.00 5+600.00 7.00 0.45 63.00 5+760.00 5+780.00 7.00 0.45 63.00 0.45 63.00 5+500.00 5+520.00 7.00 0.45 63.00 5+360.00 5+380.00 7.00 0.45 63.00 5+380.00 5+400.00 7.00 0.45 63.00 5+400.00 5+420.00 7.00 0.45 63.00 5+420.00 5+440.00 7.00 0.45 63.00 5+600.00 5+620.00 7.00 0.45 63.00 5+620.00 5+640.00 7.00 0.45 63.00 5+300.00 7.00 0.45 63.00 5+300.00 5+320.00 7.00 0.45 63.00 5+320.00 5+340.00 7.00 0.45 63.00 5+340.00 5+360.00 7.00 0.45 63.00 UNO 5+160.00 5+180.00 7.00 0.45 63.00 5+180.00 5+200.00 7.00 0.45 63.00 5+200.00 5+220.00 7.00 0.45 63.00 5+220.00 5+240.00 7.00 0.45 63.00 5+240.00 5+260.00 7.00 0.45 63.00 5+260.00 5+280.00 7.00 0.45 63.00 5+280.00 5+440.00 5+460.00 7.00 0.45 63.00 5+460.00 5+480.00 7.00 0.45 63.00 5+480.00 5+500.00 7.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 30. - - CLAVE UNIDAD DE MEDIDA 3 M3 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 ACUMULADO HOJA 1,2,3,4,5,6,7,8 28173.60 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 36343.13 VOLUMEN NO EJECUTADO -8169.53 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS 6+860.00 6+880.00 7.00 0.45 63.00 SUBTOTAL 2709.00 ABUNDAMIENTO 30% 812.70 VOLUMEN GENERADO HOJA 7,8 3521.70 6+780.00 6+800.00 7.00 0.45 63.00 6+800.00 6+820.00 7.00 0.45 63.00 6+820.00 6+840.00 7.00 0.45 63.00 6+840.00 6+860.00 7.00 0.45 63.00 6+700.00 6+720.00 7.00 0.45 63.00 6+720.00 6+740.00 7.00 0.45 63.00 6+740.00 6+760.00 7.00 0.45 63.00 6+760.00 6+780.00 7.00 0.45 63.00 6+620.00 6+640.00 7.00 0.45 63.00 6+640.00 6+660.00 7.00 0.45 63.00 6+660.00 6+680.00 7.00 0.45 63.00 6+680.00 6+700.00 7.00 0.45 63.00 6+540.00 6+560.00 7.00 0.45 63.00 6+560.00 6+580.00 7.00 0.45 63.00 6+580.00 6+600.00 7.00 0.45 63.00 6+600.00 6+620.00 7.00 0.45 63.00 6+460.00 6+480.00 7.00 0.45 63.00 6+480.00 6+500.00 7.00 0.45 63.00 6+500.00 6+520.00 7.00 0.45 63.00 6+520.00 6+540.00 7.00 0.45 63.00 7.00 0.45 63.00 6+180.00 6+200.00 7.00 0.45 63.00 6+200.00 6+220.00 7.00 0.45 63.00 6+380.00 6+400.00 7.00 0.45 63.00 6+400.00 6+420.00 7.00 0.45 63.00 6+420.00 6+440.00 7.00 0.45 63.00 6+440.00 6+460.00 7.00 0.45 63.00 6+300.00 6+320.00 7.00 0.45 63.00 6+320.00 6+340.00 7.00 0.45 63.00 6+340.00 6+360.00 7.00 0.45 63.00 6+360.00 6+380.00 7.00 0.45 63.00 UNO 6+020.00 6+040.00 7.00 0.45 63.00 6+040.00 6+060.00 7.00 0.45 63.00 6+060.00 6+080.00 7.00 0.45 63.00 6+080.00 6+100.00 7.00 0.45 63.00 6+100.00 6+120.00 7.00 0.45 63.00 6+120.00 6+140.00 7.00 0.45 63.00 6+140.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 6+220.00 6+240.00 7.00 0.45 63.00 6+240.00 6+260.00 7.00 0.45 63.00 6+260.00 6+280.00 7.00 0.45 63.00 6+280.00 6+300.00 7.00 0.45 63.00 6+160.00 7.00 0.45 63.00 6+160.00 6+180.00 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 31. - - CLAVE UNIDAD DE MEDIDA 3 M3 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 ACUMULADO HOJA 1,2,3,4,5,6,7,8,9 31695.30 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 36343.13 VOLUMEN NO EJECUTADO -4647.83 7+720.00 7+740.00 7.00 0.45 63.00 SUBTOTAL 2709.00 ABUNDAMIENTO 30% 812.70 VOLUMEN GENERADO HOJA 9 3521.70 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS 7+640.00 7+660.00 7.00 0.45 63.00 7+660.00 7+680.00 7.00 0.45 63.00 7+680.00 7+700.00 7.00 0.45 63.00 7+700.00 7+720.00 7.00 0.45 63.00 7+560.00 7+580.00 7.00 0.45 63.00 7+580.00 7+600.00 7.00 0.45 63.00 7+600.00 7+620.00 7.00 0.45 63.00 7+620.00 7+640.00 7.00 0.45 63.00 7+500.00 7+520.00 7.00 0.45 63.00 7+520.00 7+540.00 7.00 0.45 63.00 7+540.00 7+560.00 7.00 0.45 63.00 7+400.00 7+420.00 7.00 0.45 63.00 7+420.00 7+440.00 7.00 0.45 63.00 7+440.00 7+460.00 7.00 0.45 63.00 7+460.00 7+480.00 7.00 0.45 63.00 7+360.00 7+380.00 7.00 0.45 63.00 7+380.00 7+400.00 7.00 0.45 63.00 7+240.00 7+260.00 7.00 0.45 63.00 7+260.00 7+280.00 7.00 0.45 63.00 7+280.00 7+300.00 7.00 0.45 63.00 7+300.00 7+320.00 7.00 0.45 63.00 7+480.00 7+500.00 7.00 0.45 63.00 0.45 63.00 7+220.00 7+240.00 7.00 0.45 63.00 7+080.00 7+100.00 7.00 0.45 63.00 7+100.00 7+120.00 7.00 0.45 63.00 7+120.00 7+140.00 7.00 0.45 63.00 7+140.00 7+160.00 7.00 0.45 63.00 7+320.00 7+340.00 7.00 0.45 63.00 7+340.00 7+360.00 7.00 0.45 63.00 7+020.00 7.00 0.45 63.00 7+020.00 7+040.00 7.00 0.45 63.00 7+040.00 7+060.00 7.00 0.45 63.00 7+060.00 7+080.00 7.00 0.45 63.00 UNO 6+880.00 6+900.00 7.00 0.45 63.00 6+900.00 6+920.00 7.00 0.45 63.00 6+920.00 6+940.00 7.00 0.45 63.00 6+940.00 6+960.00 7.00 0.45 63.00 6+960.00 6+980.00 7.00 0.45 63.00 6+980.00 7+000.00 7.00 0.45 63.00 7+000.00 7+160.00 7+180.00 7.00 0.45 63.00 7+180.00 7+200.00 7.00 0.45 63.00 7+200.00 7+220.00 7.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 32. - - CLAVE UNIDAD DE MEDIDA 3 M3 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 ACUMULADO HOJA 1,2,3,4,5,6,7,8,9,10 35217.00 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 36343.13 VOLUMEN NO EJECUTADO -1126.13 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS 8+580.00 8+600.00 7.00 0.45 63.00 SUBTOTAL 2709.00 ABUNDAMIENTO 30% 812.70 VOLUMEN GENERADO HOJA 9,10 3521.70 8+500.00 8+520.00 7.00 0.45 63.00 8+520.00 8+540.00 7.00 0.45 63.00 8+540.00 8+560.00 7.00 0.45 63.00 8+560.00 8+580.00 7.00 0.45 63.00 8+420.00 8+440.00 7.00 0.45 63.00 8+440.00 8+460.00 7.00 0.45 63.00 8+460.00 8+480.00 7.00 0.45 63.00 8+480.00 8+500.00 7.00 0.45 63.00 8+340.00 8+360.00 7.00 0.45 63.00 8+360.00 8+380.00 7.00 0.45 63.00 8+380.00 8+400.00 7.00 0.45 63.00 8+400.00 8+420.00 7.00 0.45 63.00 8+260.00 8+280.00 7.00 0.45 63.00 8+280.00 8+300.00 7.00 0.45 63.00 8+300.00 8+320.00 7.00 0.45 63.00 8+320.00 8+340.00 7.00 0.45 63.00 8+180.00 8+200.00 7.00 0.45 63.00 8+200.00 8+220.00 7.00 0.45 63.00 8+220.00 8+240.00 7.00 0.45 63.00 8+240.00 8+260.00 7.00 0.45 63.00 7.00 0.45 63.00 7+900.00 7+920.00 7.00 0.45 63.00 7+920.00 7+940.00 7.00 0.45 63.00 8+100.00 8+120.00 7.00 0.45 63.00 8+120.00 8+140.00 7.00 0.45 63.00 8+140.00 8+160.00 7.00 0.45 63.00 8+160.00 8+180.00 7.00 0.45 63.00 8+020.00 8+040.00 7.00 0.45 63.00 8+040.00 8+060.00 7.00 0.45 63.00 8+060.00 8+080.00 7.00 0.45 63.00 8+080.00 8+100.00 7.00 0.45 63.00 UNO 7+740.00 7+760.00 7.00 0.45 63.00 7+760.00 7+780.00 7.00 0.45 63.00 7+780.00 7+800.00 7.00 0.45 63.00 7+800.00 7+820.00 7.00 0.45 63.00 7+820.00 7+840.00 7.00 0.45 63.00 7+840.00 7+860.00 7.00 0.45 63.00 7+860.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 7+940.00 7+960.00 7.00 0.45 63.00 7+960.00 7+980.00 7.00 0.45 63.00 7+980.00 8+000.00 7.00 0.45 63.00 8+000.00 8+020.00 7.00 0.45 63.00 7+880.00 7.00 0.45 63.00 7+880.00 7+900.00 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 33. - - CLAVE UNIDAD DE MEDIDA 3 M3 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 15.00 7.00 M3 DIRECTOR DE OBRAS PÚBLICAS ACUMULADO HOJA 1,2,3,4,5,6,7,8,9,10 36343.13 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 36343.13 VOLUMEN NO EJECUTADO 0.00 SUBTOTAL 866.25 ABUNDAMIENTO 30% 259.88 VOLUMEN GENERADO HOJA 9,10 1126.13 APROBO: ING. FELIPE DE JESUS MORENO ROJAS 8+800.00 8+820.00 7.00 0.45 63.00 8+820.00 8+840.00 7.00 0.45 63.00 8+840.00 8+860.00 7.00 0.45 63.00 8+860.00 8+875.00 7.00 0.45 47.25 8+740.00 7.00 0.45 63.00 8+740.00 8+760.00 7.00 0.45 63.00 8+760.00 8+780.00 7.00 0.45 63.00 8+780.00 8+800.00 7.00 0.45 63.00 UNO 8+600.00 8+620.00 7.00 0.45 63.00 8+620.00 8+640.00 7.00 0.45 63.00 8+640.00 8+660.00 7.00 0.45 63.00 8+660.00 8+680.00 7.00 0.45 63.00 8+680.00 8+700.00 7.00 0.45 63.00 8+700.00 8+720.00 7.00 0.45 63.00 8+720.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO EXCAVACIÓN EN CAJA DE TERRENO NATURAL POR MEDIOS MECÁNICOS EN MATERIAL TIPO B. PARA RECIBIR MATERIAL DE BANCO. RETIRANDO LA CAPA VEGETAL SUPERFICIAL, COLOCANDO EL MATERIAL A UN COSTADO DEL CAMINO, INCLUYE; MAQUINARIA, AFINES,CONFORMACIÓN, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ALTURA TOTAL M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 34. - - CLAVE UNIDAD DE MEDIDA 4 M3 TRAMO LARGO ANCHO UNIDAD 7.00 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 CARPETA 0+760.00 0+780.00 7.00 0.07 9.80 0+700.00 0+720.00 7.00 0.07 9.80 0+720.00 0+740.00 7.00 0.07 9.80 0+520.00 0+540.00 7.00 0.07 9.80 0+460.00 0+480.00 7.00 0.07 9.80 0+480.00 0+360.00 0+380.00 7.00 0.07 9.80 0+220.00 0+240.00 7.00 0.07 9.80 0+500.00 7.00 0.07 9.80 0+440.00 DIRECTOR DE OBRAS PÚBLICAS VOLUMEN NO EJECUTADO -38560.38 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 38952.38 0+780.00 0+800.00 7.00 0.07 9.80 VOLUMEN GENERADO HOJA 1 392.00 0.07 9.80 0+680.00 0+700.00 7.00 0.07 9.80 0+620.00 0+640.00 7.00 0.07 9.80 0+640.00 0+660.00 7.00 0.07 9.80 0+740.00 0+760.00 7.00 0.07 9.80 0+600.00 0+620.00 7.00 0.07 9.80 0+540.00 0+560.00 7.00 0.07 9.80 0+560.00 0+580.00 7.00 0.07 9.80 0+660.00 0+680.00 7.00 0.07 9.80 0+580.00 0+600.00 7.00 0.07 9.80 APROBO: ING. FELIPE DE JESUS MORENO ROJAS 0+460.00 7.00 0.07 9.80 0+080.00 0+100.00 7.00 0.07 9.80 0+100.00 7.00 0.07 9.80 0+400.00 0+420.00 7.00 0.07 9.80 0+420.00 0+440.00 7.00 0.07 9.80 0+500.00 0+520.00 7.00 0.07 9.80 0+380.00 0+400.00 7.00 0.07 9.80 0+120.00 7.00 0.07 9.80 0+200.00 0+220.00 7.00 0.07 9.80 0+320.00 0+340.00 7.00 0.07 9.80 0+340.00 0+360.00 7.00 0.07 9.80 0+300.00 0+320.00 7.00 0.07 9.80 0+240.00 0+260.00 7.00 0.07 9.80 0+260.00 0+280.00 7.00 0+040.00 0+060.00 7.00 0.07 9.80 0+060.00 0+080.00 7.00 0.07 9.80 9.80 0+020.00 0+040.00 7.00 0.07 9.80 UNO 0+000.00 0+000.00 0+020.00 7.00 0.07 0+120.00 0+140.00 7.00 0.07 9.80 0+140.00 CARGA Y ACARREO EN CAMIÓN DE MATERIALES DE DESPERDICIO, PRODUCTO DE LA EXCAVACIÓN, DEMOLICIONES, DESYERVES, LIMPIEZA, MATERIAL SOBRANTE, A TIRO LIBRE, VOLUMEN COMPACTO. INCLUYE: MAQUINARIA, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL 0+160.00 0+180.00 7.00 0.07 9.80 0+180.00 0+200.00 7.00 0.07 9.80 0+280.00 0+300.00 7.00 0.07 9.80 0+160.00 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 35. - - CLAVE UNIDAD DE MEDIDA 4 M3 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 UNO 9.80 0+800.00 0+820.00 7.00 0.07 9.80 ACUMULADO HOJA 1,2 793.80 1+480.00 1+500.00 7.00 0.07 9.80 1+500.00 1+520.00 7.00 0.07 9.80 1+520.00 1+540.00 7.00 0.07 9.80 1+540.00 1+560.00 7.00 0.07 VOLUMEN GENERADO HOJA 2 401.80 VOLUMEN COBRADO EN ESTA ESTIMACIÓN VOLUMEN CONTRATADO 38952.38 VOLUMEN NO EJECUTADO -38158.58 1+560.00 1+580.00 7.00 0.07 9.80 1+580.00 1+600.00 7.00 0.07 9.80 1+600.00 1+620.00 7.00 0.07 9.80 APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS 9.80 1+400.00 1+420.00 7.00 0.07 9.80 1+420.00 1+440.00 7.00 0.07 9.80 1+440.00 1+460.00 7.00 0.07 9.80 1+460.00 1+480.00 7.00 0.07 9.80 1+320.00 1+340.00 7.00 0.07 9.80 1+340.00 1+360.00 7.00 0.07 9.80 1+360.00 1+380.00 7.00 0.07 9.80 1+380.00 1+400.00 7.00 0.07 9.80 1+240.00 1+260.00 7.00 0.07 9.80 1+260.00 1+280.00 7.00 0.07 9.80 1+280.00 1+300.00 7.00 0.07 9.80 1+300.00 1+320.00 7.00 0.07 9.80 1+160.00 1+180.00 7.00 0.07 9.80 1+180.00 1+200.00 7.00 0.07 9.80 1+200.00 1+220.00 7.00 0.07 9.80 1+220.00 1+240.00 7.00 0.07 9.80 1+080.00 1+100.00 7.00 0.07 9.80 1+100.00 1+120.00 7.00 0.07 9.80 1+120.00 1+140.00 7.00 0.07 9.80 1+140.00 1+160.00 7.00 0.07 9.80 1+000.00 1+020.00 7.00 0.07 9.80 1+020.00 1+040.00 7.00 0.07 9.80 1+040.00 1+060.00 7.00 0.07 9.80 1+060.00 1+080.00 7.00 0.07 9.80 1+000.00 7.00 0.07 9.80 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. CONCEPTO CARGA Y ACARREO EN CAMIÓN DE MATERIALES DE DESPERDICIO, PRODUCTO DE LA EXCAVACIÓN, DEMOLICIONES, DESYERVES, LIMPIEZA, MATERIAL SOBRANTE, A TIRO LIBRE, VOLUMEN COMPACTO. INCLUYE: MAQUINARIA, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL 0+820.00 0+840.00 7.00 0.07 9.80 0+840.00 0+860.00 7.00 0.07 0+860.00 0+880.00 7.00 0.07 9.80 0+880.00 0+900.00 7.00 0.07 9.80 0+900.00 0+920.00 7.00 0.07 9.80 0+920.00 0+940.00 7.00 0.07 9.80 0+940.00 0+960.00 7.00 0.07 9.80 0+960.00 0+980.00 7.00 0.07 9.80 0+980.00 M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN
  • 36. - - CLAVE UNIDAD DE MEDIDA 4 M3 TRAMO LARGO ANCHO UNIDAD 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 20.00 7.00 M3 VOLUMEN CONTRATADO 38952.38 VOLUMEN NO EJECUTADO -37756.78 UNO 2+420.00 2+440.00 7.00 0.07 9.80 VOLUMEN GENERADO HOJA 3 401.80 ACUMULADO HOJA 1,2,3 1195.60 VOLUMEN COBRADO EN ESTA ESTIMACIÓN 2+340.00 2+360.00 7.00 0.07 9.80 2+360.00 2+380.00 7.00 0.07 9.80 2+380.00 2+400.00 7.00 0.07 9.80 2+400.00 2+420.00 7.00 0.07 9.80 2+260.00 2+280.00 7.00 0.07 9.80 2+280.00 2+300.00 7.00 0.07 9.80 2+300.00 2+320.00 7.00 0.07 9.80 2+320.00 2+340.00 7.00 0.07 9.80 2+180.00 2+200.00 7.00 0.07 9.80 2+200.00 2+220.00 7.00 0.07 9.80 2+220.00 2+240.00 7.00 0.07 9.80 2+240.00 2+260.00 7.00 0.07 9.80 2+100.00 2+120.00 7.00 0.07 9.80 2+120.00 2+140.00 7.00 0.07 9.80 2+140.00 2+160.00 7.00 0.07 9.80 2+160.00 2+180.00 7.00 0.07 9.80 2+020.00 2+040.00 7.00 0.07 9.80 2+040.00 2+060.00 7.00 0.07 9.80 2+060.00 2+080.00 7.00 0.07 9.80 2+080.00 2+100.00 7.00 0.07 9.80 1+940.00 1+960.00 7.00 0.07 9.80 1+960.00 1+980.00 7.00 0.07 9.80 1+980.00 2+000.00 7.00 0.07 9.80 2+000.00 2+020.00 7.00 0.07 9.80 1+860.00 1+880.00 7.00 0.07 9.80 1+880.00 1+900.00 7.00 0.07 9.80 1+900.00 1+920.00 7.00 0.07 9.80 1+920.00 1+940.00 7.00 0.07 9.80 1+780.00 1+800.00 7.00 0.07 9.80 1+800.00 1+820.00 7.00 0.07 9.80 1+820.00 1+840.00 7.00 0.07 9.80 1+840.00 1+860.00 7.00 0.07 9.80 0.07 9.80 1+720.00 1+740.00 7.00 0.07 9.80 1+740.00 1+760.00 7.00 0.07 9.80 1+760.00 1+780.00 7.00 0.07 9.80 CONCEPTO CARGA Y ACARREO EN CAMIÓN DE MATERIALES DE DESPERDICIO, PRODUCTO DE LA EXCAVACIÓN, DEMOLICIONES, DESYERVES, LIMPIEZA, MATERIAL SOBRANTE, A TIRO LIBRE, VOLUMEN COMPACTO. INCLUYE: MAQUINARIA, EQUIPO, HERRAMIENTA Y MANO DE OBRA. EST.1 EST.2 ANCHO PROMEDIO ESPESOR TOTAL 1+620.00 1+640.00 7.00 0.07 9.80 1+640.00 1+660.00 7.00 0.07 9.80 1+660.00 1+680.00 7.00 0.07 9.80 1+680.00 1+700.00 7.00 0.07 9.80 1+700.00 1+720.00 7.00 N U M E R O S G E N E R A D O R E S OBRA: CONSTRUCCIÓN DE PAVIMENTACIÓN CON CONCRETO HIDRÁULICO, EN ALMOLOYA DE JUÁREZ, LOCALIDADES EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 LOCALIDAD: EJIDO SAN DIEGO - SAN CRISTÓBAL - CIENEGUILLAS DE GUADALUPE, TRAMO DEL KM. 0+000 AL KM. 8+875 - CONTRATISTA: JUAROS CONSTRUCCIONES S.A. DE C.V. APROBO: ING. FELIPE DE JESUS MORENO ROJAS DIRECTOR DE OBRAS PÚBLICAS M -3.1 M -3.1 M -1.3 M -1.3 M -11.1 POZO DE VISITA COMUN