3. Centralization of Core Functions (ORs, ICUs, Diagnostic)
Centralized ORs
-Reduction of management
costs
- Management flexibility
- Time optimization using
- Reduction of the average
lenght of stay
-Allows integrated planning
Objectives
4. Centralization of diagnostic facilities
Centralized Imaging
Diagnostic
Centralized Laboratories
Example of centralization of diagnostic facilities
5. Centralization of Operating Rooms and ICU’s facilities
Centralized ICUs
Centralized ORs
Example of centralization of ORs and ICUs
6. Increased quality for patient
In most of cases design of wards
with 2 beds per room with
dedicated bathroom
7. The design allows to build energy efficient buildings
- Buildings designed with high level of insulation (glass,
windows and walls) in order to achieve a low transmittance value
- Sun protection and sun shadowing systems are applied
- High efficiency equipments (pumps, ventilators, motors) in
air conditioning systems
- Heat recovery in AHUs
- Low consumption lights
Main solutions for energy efficiency
9. BUILDING 1
Surgery
General, Digestive, Endocrine &
Chest Surgery: 120 beds
Orthopaedic Surgery &
Traumatology: 50 beds
Neurosurgery: 36 Beds
Urology: 48 beds
Ophthalmology: 35 beds
BUILDING 4
Gynaecology & Obstetrics
Gynaecology and obstetrics
department: 240 beds
Neonatology: 80 cradles
BUILDING 8
Neurology
Neurology department: 50 beds
BUILDING 9
Paediatric Clinic & Surgery
Paediatrics surgery: 65 beds
Paediatrics clinic: 80 beds
BUILDING 12 & 30
Mental Health Centre &
Psychiatric Clinic in Toponica (off
site)
Psychiatry: 96 beds
BUILDING 31
Pneumology and Oncology Clinic
in Knez Selo (off site)
Pneumology: 140 beds
Oncology: 130 beds
BUILDING 23
Oncology, Nephrology &
Endocrinology OPD
Nephrology Department: 24 beds
BUILDING 17
ENT Clinic
ENT and MSN: 45 beds
BUILDING 19
Infectious Diseases Services
Infectious Diseases: 70 beds
BUILDING 25
Internal Medicine Clinic
Haematology: 30 beds
Gastroenterology: 45 beds
Endocrinology: 20 Beds
Cardiology-Coronary Unit: 52
beds
BUILDING 26
Dermatology Clinic
Dermatology Department: 25
beds
Previous Situation: subdivision into a series of buildings which house the different
functions, both healthcare and other.
11. • Based on the analysis of
CCN the solution had to:
– reorganize accesses ,
internal traffic & flows of
different users
– concentrate diagnostics,
surgery blocks and
intensive care units
– strengthen day care
– increase comfort levels
and hygiene in wards
– concentrate hospital on
1 site
Poor conditions of existing
buildings, not fit for their
functions
12. Building 27
SURGERY & EMERGENCY CENTRE
Buildings 28A & 28B
EXAMINATION, TREATMENT & NURSING
CARE WARDS – DAY CARE
Buildings 3 & 4
GYNAECOLOGY &
OBSTETRICS CLINIC
Buildings 7, 8 & 9
PAEDIATRICS CLINIC
Building 19
INFECTIOUS DISEASES
CENTRE
Building 10
KITCHEN & LAUNDRY
Building 1
HOTEL / RESIDENCE
Building 25
RESEARCH & TEACHING
CENTRE
Buildings 22, 23 & 24
ADMINISTRATION &
BUSINESS OFFICES
Building 6
EXECUTIVE MANAGEMENT
CENTRE
MULTILEVEL PARKING
(alternatively besides
buildings 15)
The Proposed Master Plan for CCN: Final Configuration
13. Total building area for
new building 28A,
existing building 27,
technological buildings
T1 & T2, parking lots
P1 and P2, all new and
existing internal
service roads is
≈46.117 m2
Construction
Area
Construction Phase
14. Building 28A
construction of new building 28A which will become
the “Ward Units Block”;
construction of central connection and two
emergency footbridges between buildings 27 & 28A;
Traffic solution
soft and hard landscaping around buildings
27 & 28A ;
parking lots P1 and P2.
Technical blocks
Construction of new technical blocks (T1) to
supply buildings 27 & 28A hosting the
Electrical Transformers station and the Chillers
Yard;
Construction of the new Medical and Technical
gases Station (T2);
Building 27
Reconstruction and
refurbishment to create
“Examination & Treatment
Block”;
construction of technical space
at the second floor for building
AHUs;
Implemented solution: main interventions
15. Numerical data
BUILDING 27
1.038Existing Radiotherapy Department (not included in the design)
3.642Lower Ground Floor
C.S.S.D. (Central Sterilization Service Department), Imaging / Radiology
Department
3.506Ground Floor
Emergency Centre
3.598First Floor
Operating Theatres
2.246Second Floor
Surgical ICUs
1.033Technical space for AHUs
15.063Total gross area
BUILDING 28A
2.965Lower Ground Floor
Laboratories, Pharmacy spaces, General Staff Changing facilities,
Technical spaces for installations
3.280Ground Floor
Main entrance hall, cafeteria and shops, Medical ICUs
3.330First Floor
Surgical ward units
3.245Second Floor
Surgical ward units
3.120Third Floor
Surgical ward units
3.120Fourth Floor
Medical ward units
3.120Fifth Floor
Medical ward units
1.540Technical Floor
23.720Total gross area
Buildings 27 + 28A
Gross area:
44,408 m2
Total number of beds:
609
513 ordinary acute beds
38 surgical ICU beds
42 surgical HDU beds
6 beds for Transplant Unit
10 beds in Observation Unit
Total number of operating
theatres:
15 + 2 emergency operating
theatres
Construction costs:
Tendered: ≈ 40.2 Million €
Offered by Construction
company ≈ 31.5 Million €
17. Intensive care ceiling assembly
Images of the construction works
Façade works above main entrance
Main entrance interior works Operating theatre ceiling assembly
18. Single stud, double layer, 125 mm thick,
sound insulation wall
Wall sound insulation most commonly used
Sound reduction from 46-53 dB
19. Images of the finalized Clinical Centre in Nis
Corridor
Main entrance façade
Main entrance