Visibly even with a small number with 2 colors, it is difficult -without training to count different objects at the same time, as if the object were the same (there is a likelihood of measure errors (confusions)...as the result is a counting risk → a counting uncertainty...So, as I worked on a new method of counting, which is the fragmentation method based on the knowledge of what are the counting that matters, to design a counting protocol. As the difficulty visibly is the travel through the domains, which are making the counting difficult The modeling and Modeling conditions (internal and external organization environment SWOT analysis has to be unchanged and is based on The counting time (CT) / CT=1’30 Time of counting (T)/ T= 10.20 (for BULAC Library) So, my assumption, if I can control these data through business modeling, the method could be used for other organizations. The protocol would be the same organization before counting would look at the Time of counting (hours when the time duration starts and counting time (time duration). By doing so, without a software, but only with a pen and paper, by counting specific places (strategic or tactical places) which are representing the organization nodes, it would be possible to know exactly the organization staff frequency, and how to build capabilities in the organization (improve performance with more agile and flexible organizations with real-time management to avoid to allocate resources administratively, because it creates disarticulate organizations with pockets of wealthy organizations and poor organizations.