3. Chaplin Station Construction Update
Activity Location Approx. Date & Duration
Dewatering System
Maintenance
Cleaning of tanks using hydro-
vacuum truck
Latimer Ave and Eglinton
Ave work zone and
Shoppers Drug Mart
parking lot
Weekly or as needed into
2021
5:00 a.m. – 8:00 a.m. for
one (1) hour
Extended Hours for Deep
Excavation of the Station
Box and Tunnel
Demolition
Station Box beneath
Eglinton Ave (access from
the Main Entrance work
zone)
Underway Monday –
Sunday, 24 hours through:
• Late May 2020 – Tunnel
Demo
• Mid-June 2020 – Excavation
Tertiary Entrance
Construction
Concrete works and rebar
installation
South side of Eglinton
Ave, east of Chaplin Cres
and adjacent Toronto Fire
Station 135
Underway into Winter 2021
4. Chaplin Station Construction Update
Activity Location Approx. Date & Duration
Main Entrance
Construction
Concrete works, mechanical
and electrical work
North side of Eglinton
Ave, between Chaplin
Cres and Gilgorm Ave
(former Chaplin Parkette)
Underway into Winter 2021
Tower Crane Installation Tertiary Entrance
May 6, 2020 from 4:00 a.m.
– 11:00 p.m.
Intersection Closure for
Traffic Bridge Removal
and Utility Reinstatement
Intersection of Chaplin
Cres and Eglinton Ave
Early June 2020 for approx.
one (1) month
Station Box Construction
Structural Works
Beneath Eglinton Ave Beginning June 2020
6. Upcoming Concrete Pours
• Several concrete pours will be conducted
between May and June 2020 at the Main
and Tertiary entrances
• The concrete will form the walls and slabs
of the Tertiary Entrance and Station Box
beneath Eglinton Ave
• Concrete pumps will be placed within work
zones and concrete trucks will queue in
traffic tapers before entering the work
zone; 10+ concrete trucks per hour
• Concrete pours will begin as early as 5:00
a.m. and last for five (5) or more hours
• Pours may be rescheduled due to inclement
weather
Main Entrance Tertiary Entrance
• May 6
• May 11
• May 20
• May 23
• May 27
• June 2
• May 12
• May 15
• May 22
7. Tower Crane Installation
• As early as May 6, a tower crane will be installed at the Tertiary Entrance
between 4:00 a.m. – 11:00 p.m.
• The crane will be used to lift equipment and material in-and-out of the
station box and shaft
• While the crane is installed, the following traffic changes will be in effect:
– Chaplin Cres will be closed b/w Eglinton Ave and Russell Hill Rd; emergency
service vehicles excepted
– The Chaplin-Russell Hill laneway will be closed; local access from east end of
laneway
– Parking on Russell Hill Rd will be prohibited to make way for TTC detour
• TTC bus route #14 Glencairn will detour on Russell Hill Rd
12. 12
Avenue Station Construction Update
Activity Location
Approx. Date &
Duration
Impact
Mining Excavation
East of the Secondary
Entrance between Oriole
Parkway and Eastbourne
Avenue
Ongoing through July 2020
• Overnight noise from drilling
activity
• Road occupation on Eglinton Ave
Mining Excavation
East of the Secondary
Entrance between Oriole
Parkway and Eastbourne
Avenue
Underway throughout July
2020
• Overnight noise from drilling
activity
• Lane reductions on Eglinton Ave
Concrete Pours
Between Main and
Secondary Entrances
December 2019; beginning
at 3 a.m. for approx. 16
hours
• Southbound lane closure – one
lane in each direction on Avenue
Road.
• Truck Traffic
Activity Location
Approx. Date &
Duration
What to Expect
Mining
Excavation
East of the
Secondary close to
Lascelles Blvd
Will end mid-May
2020
• Noise from mining activity
• Road occupation on Eglinton Ave
Wall Demolition
Cavern
(underground)
Will end mid-May
2020
• Noise and vibration
Concrete Pours
Between Main and
Secondary
Entrances
Approx. three (3)
pours per week
beginning at 5:00
a.m. for 12-18 hours
• Concrete truck activity
• Occupation of the westbound curb lane
during some pours
Dewatering Well
Maintenance
Eglinton Ave
between Braemar
Ave and Lascelles
Blvd
Periodically through
2021; 9:00 a.m. –
4:00 p.m.
• Road occupancy around well
• Use of hydro-vac truck
Equipment
Monitoring
Eglinton Ave
between Braemar
Ave and Lascelles
Blvd
Periodically through
2021
• Short-term road occupancy