Execution Coordination
Concerns
W.r.t MEP Shop Drawings & N&A Elevations & RCPS.
FOR LOUNG AREA
CONSULTANT’S HAS
PROPOSED THE 14 KW
FLOOR MOUNTED 1 NO AC
UNIT,. HOWEVER WE HAVE
PROPOSED THE 7.0 KW – 2
NOS FLOOR MOUNTED
UNITS. CAUSE OF NON
AVAILABLITY OF SINGLE 14
KW UNIT.
FOR WINE STORE AREA
CONSULTANT’S HAS
PROPOSED 14 KW FLOOR
MOUNTED UNIT 1 NO.
HOWEVER THE WINE STORE
REQUIREMENT IS
DIFFERENT AS CAME TO
KNOW BY MR. RIZWAN
HENCE HVAC CONCERN
THIS AREA IS ON HOLD TILL
FURTHER INPUTS. THIS IS
FOR YOUR INFO
BASEMENT
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP – REV-01
DATED 10-10-2020
DRG NO -01
2) PI2018-CSD-B-100
DATED 23-09-2021
REV - 0
LOUNGE & WINE STORE APPROVAL ON
SHOP DRG
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
GROUND FLOOR
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1)RCP- GROUND
FLOOR DATED – 19-11-
21 REV-00 DWG NO -01
2)PI2018-CSD-GF-100
DATED 23-09-21
REV-0
APPROVAL ON
SHOP DRG
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
FIRST FLOOR
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1)FIRST FLOOR
DATED -11-10-20
REV-0 DWG NO- 01
2) PI2018-CSD-L01-100
DATED 21-09-2021
REV-0
APPROVAL ON
SHOP DRG
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
SECOND FLOOR
KICHEN AREA EXHAUST
DUCTING & EXHAUST FAN
POSITION REVISED AS PER
SITE MEETING DISCUSSION
ACCESS DOOR POSITION
NEED TO BE REVISE
ACCORDINGLY
ACCESS DOOR SIZES
SHOWN IN RCP IS NOT
SUFFICE FOR FCU-2F-03 &
TFA-2F-02 NEED TO
INCREASE THE SIZE
Name______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1)RCP- 2ND FLOOR
DATED – 04-10-2020
REV-0
2) PI2018-CSD-L02-100
DATED21-09-2021
REV-0
APPROVAL ON
SHOP DRG
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
THIRD FLOOR
KICHEN AREA EXHAUST
DUCTING & EXHAUST FAN
POSITION REVISED AS PER
SITE MEETING DISCUSSION
ACCESS DOOR POSITION
NEED TO BE REVISE
ACCORDINGLY
GUEST –POWDER
BATHROOM EXHAUST FAN
LOCATION CHANGED TO
ACCOMMODATE THE
EXHAUST DUCT ACCESS
DOOR FOR THE SAME NEED
TO BE SHIFT
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP-DATED 28-11-
20- REV -00
2) PI 2018-CSD-L03
DATED 21-09-2021
REV-0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
FOURTH FLOOR
MASTER BATHROOM
EXHAUST FAN LOCATION
CHANGED TO
ACCOMMODATE THE
EXHAUST DUCT ACCESS
DOOR FOR THE SAME NEED
TO BE SHIFT
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP- DATED 18-11-
21- DWG-01 – REV-
0
2) PI2018-CSD-L04
DATED 29-09-21-
REV-0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
FIFTH FLOOR
KICHEN AREA EXHAUST
DUCTING & EXHAUST FAN
POSITION REVISED AS PER
SITE MEETING DISCUSSION
ACCESS DOOR POSITION
NEED TO BE REVISE
ACCORDINGLY
FAMILY ROOM BATHROOM
EXHAUST FAN LOCATION
CHANGED TO
ACCOMMODATE THE
EXHAUST DUCT ACCESS
DOOR FOR THE SAME NEED
TO BE SHIFT
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP- DATED 12-11-
20 – REV-0
2) PI2018-CSD-L05
DATED 23-09-21
REV-R0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
SIXTH FLOOR
MASTER BATROOM
EXHAUST AIR OPENING AT
RHS FACAD
NEED TO REVIEW BY ARCH
& CONFIRM ON SAME
ANAYA’S BED ROOM
38MM SLOT DIFFUSER
ADDED FOR RETURN AIR AS
EARLIER PROVIDED WAS
LESS
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP- DATED 12-11-
21- DWG-04 REV-0
2) PI2018-CSD- L06-
DATED 23-09-21
REV-R0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
SEVENTH FLOOR
KICHEN AREA EXHAUST
DUCTING & EXHAUST FAN
POSITION REVISED AS PER
SITE MEETING DISCUSSION
ACCESS DOOR POSITION
NEED TO BE REVISE
ACCORDINGLY
ISHITA’S BATROOM
EXHAUST AIR OPENING AT
RHS FACAD
NEED TO REVIEW BY ARCH
& CONFIRM ON SAME
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP-DATED 21-09-
21DWG-04 – REV-
R01
2) PI2018-CSD-L07-
DATED 31-10-21-
REV-0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
EIGHT FLOOR
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP-DATED 12-11-
20 DWG-01 – REV-
R01
2) PI2018-CSD-L08-
DATED 31-10-21-
REV-0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
NINETH FLOOR
KICHEN AREA EXHAUST
DUCTING & EXHAUST FAN
POSITION REVISED AS PER
SITE MEETING DISCUSSION
ACCESS DOOR POSITION
NEED TO BE REVISE
ACCORDINGLY
MASTER BATROOM
EXHAUST AIR OPENING AT
RHS FACAD
NEED TO REVIEW BY ARCH
& CONFIRM ON SAME
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP-DATED 18-11-
21 DWG-01 – REV-
R01
2) PI2018-CSD-L09-
DATED 04-10-21-
REV-0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
ELEVENTH FLOOR
GYM AREA
EXHAUST AIR OPENING AT
RHS FACAD
NEED TO REVIEW BY ARCH
& CONFIRM ON SAME
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) PI2018-M-AC-L11-
100- DATED 14-04
21 – REV-R0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
ROOF FLOOR
AS PER CONSULTANT’S
DRAWING
NO SPACE FOR HEATPUMP
AFTER LOCATED ALL THE
VRF ODU’S CONSULTANT’S
NEED TO GIVE SOLUTION
TO ACCOMMODATE HEAT
PUMP
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) PI2018-M-AC-RF-
100- DATED 15-04
21 – REV-R0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings

More Related Content

Similar to Coordination Concerns MEP Shop Drawings & N&A Elevations

AC HƯNG YÊN.pdf
AC HƯNG YÊN.pdfAC HƯNG YÊN.pdf
AC HƯNG YÊN.pdfVQuangNam4
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1Nasir Mahmood
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1Nasir Mahmood
 
Buildings so r 14 15
Buildings so r 14 15Buildings so r 14 15
Buildings so r 14 15Ptpg Stuc
 
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentationNSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentationsurajkumar844960
 
At of modern building which create abvolated view
At of modern building which create abvolated viewAt of modern building which create abvolated view
At of modern building which create abvolated viewdreem073
 
Peace, Property and Privacy: Objections to BSA 315-12-BZ
Peace, Property and Privacy: Objections to BSA 315-12-BZ  Peace, Property and Privacy: Objections to BSA 315-12-BZ
Peace, Property and Privacy: Objections to BSA 315-12-BZ nsutaria
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSunit Dhingra
 
4633-ZN03-GLC-401-Perspective Sketch - Corridor
4633-ZN03-GLC-401-Perspective Sketch  - Corridor4633-ZN03-GLC-401-Perspective Sketch  - Corridor
4633-ZN03-GLC-401-Perspective Sketch - CorridorBHARAT CHOPRA
 
Design_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdfDesign_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdfecep nurali
 
01. drop pit table august 2016
01. drop pit table  august 201601. drop pit table  august 2016
01. drop pit table august 2016Amin Paniwala
 
23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdfMODI20077
 
LIFTING PLAN ERECTION.pdf
LIFTING PLAN ERECTION.pdfLIFTING PLAN ERECTION.pdf
LIFTING PLAN ERECTION.pdfYogaSaputra89
 

Similar to Coordination Concerns MEP Shop Drawings & N&A Elevations (20)

AC HƯNG YÊN.pdf
AC HƯNG YÊN.pdfAC HƯNG YÊN.pdf
AC HƯNG YÊN.pdf
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1
 
DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1DRAUGHTSMAN Piping Mechanical_1
DRAUGHTSMAN Piping Mechanical_1
 
Buildings so r 14 15
Buildings so r 14 15Buildings so r 14 15
Buildings so r 14 15
 
POWER SYSTEM.pdf
POWER SYSTEM.pdfPOWER SYSTEM.pdf
POWER SYSTEM.pdf
 
Mukusi Guesthouse
Mukusi GuesthouseMukusi Guesthouse
Mukusi Guesthouse
 
Airport Commerce
Airport CommerceAirport Commerce
Airport Commerce
 
Lowe's Carmel, IN
Lowe's   Carmel, INLowe's   Carmel, IN
Lowe's Carmel, IN
 
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentationNSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
NSPL-ME-VDR-ST-GAD-002.pdf- Purchse and procurement with drawing presentation
 
At of modern building which create abvolated view
At of modern building which create abvolated viewAt of modern building which create abvolated view
At of modern building which create abvolated view
 
Peace, Property and Privacy: Objections to BSA 315-12-BZ
Peace, Property and Privacy: Objections to BSA 315-12-BZ  Peace, Property and Privacy: Objections to BSA 315-12-BZ
Peace, Property and Privacy: Objections to BSA 315-12-BZ
 
ID-101b
ID-101bID-101b
ID-101b
 
IS252_PAA
IS252_PAAIS252_PAA
IS252_PAA
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
 
4633-ZN03-GLC-401-Perspective Sketch - Corridor
4633-ZN03-GLC-401-Perspective Sketch  - Corridor4633-ZN03-GLC-401-Perspective Sketch  - Corridor
4633-ZN03-GLC-401-Perspective Sketch - Corridor
 
Design_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdfDesign_Guidelines_and_Standard_Drawings.pdf
Design_Guidelines_and_Standard_Drawings.pdf
 
Forge Water House
Forge Water HouseForge Water House
Forge Water House
 
01. drop pit table august 2016
01. drop pit table  august 201601. drop pit table  august 2016
01. drop pit table august 2016
 
23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf
 
LIFTING PLAN ERECTION.pdf
LIFTING PLAN ERECTION.pdfLIFTING PLAN ERECTION.pdf
LIFTING PLAN ERECTION.pdf
 

Recently uploaded

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 

Recently uploaded (20)

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 

Coordination Concerns MEP Shop Drawings & N&A Elevations

  • 1. Execution Coordination Concerns W.r.t MEP Shop Drawings & N&A Elevations & RCPS.
  • 2. FOR LOUNG AREA CONSULTANT’S HAS PROPOSED THE 14 KW FLOOR MOUNTED 1 NO AC UNIT,. HOWEVER WE HAVE PROPOSED THE 7.0 KW – 2 NOS FLOOR MOUNTED UNITS. CAUSE OF NON AVAILABLITY OF SINGLE 14 KW UNIT. FOR WINE STORE AREA CONSULTANT’S HAS PROPOSED 14 KW FLOOR MOUNTED UNIT 1 NO. HOWEVER THE WINE STORE REQUIREMENT IS DIFFERENT AS CAME TO KNOW BY MR. RIZWAN HENCE HVAC CONCERN THIS AREA IS ON HOLD TILL FURTHER INPUTS. THIS IS FOR YOUR INFO BASEMENT Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1) RCP – REV-01 DATED 10-10-2020 DRG NO -01 2) PI2018-CSD-B-100 DATED 23-09-2021 REV - 0 LOUNGE & WINE STORE APPROVAL ON SHOP DRG N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings
  • 3. GROUND FLOOR Name______________ Sign :_______________ Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1)RCP- GROUND FLOOR DATED – 19-11- 21 REV-00 DWG NO -01 2)PI2018-CSD-GF-100 DATED 23-09-21 REV-0 APPROVAL ON SHOP DRG N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings
  • 4. FIRST FLOOR Name______________ Sign :_______________ Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1)FIRST FLOOR DATED -11-10-20 REV-0 DWG NO- 01 2) PI2018-CSD-L01-100 DATED 21-09-2021 REV-0 APPROVAL ON SHOP DRG N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings
  • 5. SECOND FLOOR KICHEN AREA EXHAUST DUCTING & EXHAUST FAN POSITION REVISED AS PER SITE MEETING DISCUSSION ACCESS DOOR POSITION NEED TO BE REVISE ACCORDINGLY ACCESS DOOR SIZES SHOWN IN RCP IS NOT SUFFICE FOR FCU-2F-03 & TFA-2F-02 NEED TO INCREASE THE SIZE Name______________ Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1)RCP- 2ND FLOOR DATED – 04-10-2020 REV-0 2) PI2018-CSD-L02-100 DATED21-09-2021 REV-0 APPROVAL ON SHOP DRG N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings
  • 6. THIRD FLOOR KICHEN AREA EXHAUST DUCTING & EXHAUST FAN POSITION REVISED AS PER SITE MEETING DISCUSSION ACCESS DOOR POSITION NEED TO BE REVISE ACCORDINGLY GUEST –POWDER BATHROOM EXHAUST FAN LOCATION CHANGED TO ACCOMMODATE THE EXHAUST DUCT ACCESS DOOR FOR THE SAME NEED TO BE SHIFT Name______________ Sign :_______________ Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1) RCP-DATED 28-11- 20- REV -00 2) PI 2018-CSD-L03 DATED 21-09-2021 REV-0 N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings
  • 7. FOURTH FLOOR MASTER BATHROOM EXHAUST FAN LOCATION CHANGED TO ACCOMMODATE THE EXHAUST DUCT ACCESS DOOR FOR THE SAME NEED TO BE SHIFT Name______________ Sign :_______________ Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1) RCP- DATED 18-11- 21- DWG-01 – REV- 0 2) PI2018-CSD-L04 DATED 29-09-21- REV-0 N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings
  • 8. FIFTH FLOOR KICHEN AREA EXHAUST DUCTING & EXHAUST FAN POSITION REVISED AS PER SITE MEETING DISCUSSION ACCESS DOOR POSITION NEED TO BE REVISE ACCORDINGLY FAMILY ROOM BATHROOM EXHAUST FAN LOCATION CHANGED TO ACCOMMODATE THE EXHAUST DUCT ACCESS DOOR FOR THE SAME NEED TO BE SHIFT Name______________ Sign :_______________ Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1) RCP- DATED 12-11- 20 – REV-0 2) PI2018-CSD-L05 DATED 23-09-21 REV-R0 N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings
  • 9. SIXTH FLOOR MASTER BATROOM EXHAUST AIR OPENING AT RHS FACAD NEED TO REVIEW BY ARCH & CONFIRM ON SAME ANAYA’S BED ROOM 38MM SLOT DIFFUSER ADDED FOR RETURN AIR AS EARLIER PROVIDED WAS LESS Name______________ Sign :_______________ Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1) RCP- DATED 12-11- 21- DWG-04 REV-0 2) PI2018-CSD- L06- DATED 23-09-21 REV-R0 N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings
  • 10. SEVENTH FLOOR KICHEN AREA EXHAUST DUCTING & EXHAUST FAN POSITION REVISED AS PER SITE MEETING DISCUSSION ACCESS DOOR POSITION NEED TO BE REVISE ACCORDINGLY ISHITA’S BATROOM EXHAUST AIR OPENING AT RHS FACAD NEED TO REVIEW BY ARCH & CONFIRM ON SAME Name______________ Sign :_______________ Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1) RCP-DATED 21-09- 21DWG-04 – REV- R01 2) PI2018-CSD-L07- DATED 31-10-21- REV-0 N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings
  • 11. EIGHT FLOOR Name______________ Sign :_______________ Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1) RCP-DATED 12-11- 20 DWG-01 – REV- R01 2) PI2018-CSD-L08- DATED 31-10-21- REV-0 N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings
  • 12. NINETH FLOOR KICHEN AREA EXHAUST DUCTING & EXHAUST FAN POSITION REVISED AS PER SITE MEETING DISCUSSION ACCESS DOOR POSITION NEED TO BE REVISE ACCORDINGLY MASTER BATROOM EXHAUST AIR OPENING AT RHS FACAD NEED TO REVIEW BY ARCH & CONFIRM ON SAME Name______________ Sign :_______________ Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1) RCP-DATED 18-11- 21 DWG-01 – REV- R01 2) PI2018-CSD-L09- DATED 04-10-21- REV-0 N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings
  • 13. ELEVENTH FLOOR GYM AREA EXHAUST AIR OPENING AT RHS FACAD NEED TO REVIEW BY ARCH & CONFIRM ON SAME Name______________ Sign :_______________ Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1) PI2018-M-AC-L11- 100- DATED 14-04 21 – REV-R0 N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings
  • 14. ROOF FLOOR AS PER CONSULTANT’S DRAWING NO SPACE FOR HEATPUMP AFTER LOCATED ALL THE VRF ODU’S CONSULTANT’S NEED TO GIVE SOLUTION TO ACCOMMODATE HEAT PUMP Name______________ Sign :_______________ Photos of Site Photos of Site Photos of MEP Drawings Photos of MEP Drawings SN N&A Drawing No Concern with Area Site Clearance Dependencies 1) PI2018-M-AC-RF- 100- DATED 15-04 21 – REV-R0 N&A RCP/ELEVATIONS MEP Shop Drawings/Tender Drawings