2. FOR LOUNG AREA
CONSULTANT’S HAS
PROPOSED THE 14 KW
FLOOR MOUNTED 1 NO AC
UNIT,. HOWEVER WE HAVE
PROPOSED THE 7.0 KW – 2
NOS FLOOR MOUNTED
UNITS. CAUSE OF NON
AVAILABLITY OF SINGLE 14
KW UNIT.
FOR WINE STORE AREA
CONSULTANT’S HAS
PROPOSED 14 KW FLOOR
MOUNTED UNIT 1 NO.
HOWEVER THE WINE STORE
REQUIREMENT IS
DIFFERENT AS CAME TO
KNOW BY MR. RIZWAN
HENCE HVAC CONCERN
THIS AREA IS ON HOLD TILL
FURTHER INPUTS. THIS IS
FOR YOUR INFO
BASEMENT
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP – REV-01
DATED 10-10-2020
DRG NO -01
2) PI2018-CSD-B-100
DATED 23-09-2021
REV - 0
LOUNGE & WINE STORE APPROVAL ON
SHOP DRG
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
3. GROUND FLOOR
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1)RCP- GROUND
FLOOR DATED – 19-11-
21 REV-00 DWG NO -01
2)PI2018-CSD-GF-100
DATED 23-09-21
REV-0
APPROVAL ON
SHOP DRG
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
4. FIRST FLOOR
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1)FIRST FLOOR
DATED -11-10-20
REV-0 DWG NO- 01
2) PI2018-CSD-L01-100
DATED 21-09-2021
REV-0
APPROVAL ON
SHOP DRG
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
5. SECOND FLOOR
KICHEN AREA EXHAUST
DUCTING & EXHAUST FAN
POSITION REVISED AS PER
SITE MEETING DISCUSSION
ACCESS DOOR POSITION
NEED TO BE REVISE
ACCORDINGLY
ACCESS DOOR SIZES
SHOWN IN RCP IS NOT
SUFFICE FOR FCU-2F-03 &
TFA-2F-02 NEED TO
INCREASE THE SIZE
Name______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1)RCP- 2ND FLOOR
DATED – 04-10-2020
REV-0
2) PI2018-CSD-L02-100
DATED21-09-2021
REV-0
APPROVAL ON
SHOP DRG
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
6. THIRD FLOOR
KICHEN AREA EXHAUST
DUCTING & EXHAUST FAN
POSITION REVISED AS PER
SITE MEETING DISCUSSION
ACCESS DOOR POSITION
NEED TO BE REVISE
ACCORDINGLY
GUEST –POWDER
BATHROOM EXHAUST FAN
LOCATION CHANGED TO
ACCOMMODATE THE
EXHAUST DUCT ACCESS
DOOR FOR THE SAME NEED
TO BE SHIFT
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP-DATED 28-11-
20- REV -00
2) PI 2018-CSD-L03
DATED 21-09-2021
REV-0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
7. FOURTH FLOOR
MASTER BATHROOM
EXHAUST FAN LOCATION
CHANGED TO
ACCOMMODATE THE
EXHAUST DUCT ACCESS
DOOR FOR THE SAME NEED
TO BE SHIFT
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP- DATED 18-11-
21- DWG-01 – REV-
0
2) PI2018-CSD-L04
DATED 29-09-21-
REV-0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
8. FIFTH FLOOR
KICHEN AREA EXHAUST
DUCTING & EXHAUST FAN
POSITION REVISED AS PER
SITE MEETING DISCUSSION
ACCESS DOOR POSITION
NEED TO BE REVISE
ACCORDINGLY
FAMILY ROOM BATHROOM
EXHAUST FAN LOCATION
CHANGED TO
ACCOMMODATE THE
EXHAUST DUCT ACCESS
DOOR FOR THE SAME NEED
TO BE SHIFT
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP- DATED 12-11-
20 – REV-0
2) PI2018-CSD-L05
DATED 23-09-21
REV-R0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
9. SIXTH FLOOR
MASTER BATROOM
EXHAUST AIR OPENING AT
RHS FACAD
NEED TO REVIEW BY ARCH
& CONFIRM ON SAME
ANAYA’S BED ROOM
38MM SLOT DIFFUSER
ADDED FOR RETURN AIR AS
EARLIER PROVIDED WAS
LESS
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP- DATED 12-11-
21- DWG-04 REV-0
2) PI2018-CSD- L06-
DATED 23-09-21
REV-R0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
10. SEVENTH FLOOR
KICHEN AREA EXHAUST
DUCTING & EXHAUST FAN
POSITION REVISED AS PER
SITE MEETING DISCUSSION
ACCESS DOOR POSITION
NEED TO BE REVISE
ACCORDINGLY
ISHITA’S BATROOM
EXHAUST AIR OPENING AT
RHS FACAD
NEED TO REVIEW BY ARCH
& CONFIRM ON SAME
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP-DATED 21-09-
21DWG-04 – REV-
R01
2) PI2018-CSD-L07-
DATED 31-10-21-
REV-0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
11. EIGHT FLOOR
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP-DATED 12-11-
20 DWG-01 – REV-
R01
2) PI2018-CSD-L08-
DATED 31-10-21-
REV-0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
12. NINETH FLOOR
KICHEN AREA EXHAUST
DUCTING & EXHAUST FAN
POSITION REVISED AS PER
SITE MEETING DISCUSSION
ACCESS DOOR POSITION
NEED TO BE REVISE
ACCORDINGLY
MASTER BATROOM
EXHAUST AIR OPENING AT
RHS FACAD
NEED TO REVIEW BY ARCH
& CONFIRM ON SAME
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) RCP-DATED 18-11-
21 DWG-01 – REV-
R01
2) PI2018-CSD-L09-
DATED 04-10-21-
REV-0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
13. ELEVENTH FLOOR
GYM AREA
EXHAUST AIR OPENING AT
RHS FACAD
NEED TO REVIEW BY ARCH
& CONFIRM ON SAME
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) PI2018-M-AC-L11-
100- DATED 14-04
21 – REV-R0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings
14. ROOF FLOOR
AS PER CONSULTANT’S
DRAWING
NO SPACE FOR HEATPUMP
AFTER LOCATED ALL THE
VRF ODU’S CONSULTANT’S
NEED TO GIVE SOLUTION
TO ACCOMMODATE HEAT
PUMP
Name______________
Sign :_______________
Photos of Site Photos of Site
Photos of MEP
Drawings
Photos of MEP
Drawings
SN N&A Drawing No Concern with Area Site Clearance Dependencies
1) PI2018-M-AC-RF-
100- DATED 15-04
21 – REV-R0
N&A
RCP/ELEVATIONS
MEP Shop
Drawings/Tender
Drawings