EVM was developed in 1960’s by Department of Defence (DOD) to keep track of defence projects and currently is most preferred project management technique world over. EVM provides organisations with methodology needed to integrate the management of project scope, schedule and cost and provides a platform to integrate the three important baselines viz; schedule, cost and scope and is hence referred to as Performance Measurement Baseline.