SlideShare a Scribd company logo
1 of 31
Download to read offline
`
Purest Silver Publicly Listed Company +90% Revenues from Silver
Corporate Presentation
IPT:TSXV / ISVLF:US / IKL:FR
16 Years of Exploration & Production Success in Mexico
DEC 2021
Disclosure
Forward-Looking Statements
This presentation may contain certain “forward-looking” statements and information relating to IMPACT Silver Corp. (“IMPACT” or the “Company”) that are based on the
beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Such statements reflect the current
risks, uncertainties and assumptions related to certain factors including but not limited to, exploration and development risks, expenditure and financing
requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with
vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one
or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary
materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement. The factors that could cause actual results
to differ materially include, but are not limited to, the following: general economic conditions; changes in financial markets; the impact of exchange rates; political
conditions and developments in countries in which the Company operates; changes in the supply, demand and pricing of the metal commodities which the Company
mines or hopes to find and successfully mine; changes in regulatory requirements impacting the Company’s operations; the ability to properly and efficiently staff the
Company’s operations; the sufficiency of current working capital and the estimated cost and availability of funding for the continued exploration and development of
the Company’s exploration properties. This list is not exhaustive and these and other factors should be considered carefully, and readers should not place undue
reliance on the Company’s forward-looking statements. As a result of the foregoing and other factors, no assurance can be given as to any such future results, levels
of activity or achievements and neither the Company nor any other person assumes responsibility for the accuracy and completeness of these forward-looking
statements.
Cautionary Statement
The Company’s decision to place a mine into production, expand a mine, make other production related decisions or otherwise carry out mining and processing
operations, is largely based on internal non-public Company data and reports based on exploration, development and mining work by the Company’s geologists and
engineers. The results of this work are evident in the discovery and building of multiple mines for the Company, and in the track record of mineral production and
financial returns of the Company since 2006. Under NI43-101 the Company is required to disclose that it has not based its production decisions on NI43-101-
compliant mineral resource or reserve estimates, preliminary economic assessments or feasibility studies, and historically such projects have increased uncertainty
and risk of failure.
NI 43-101 Qualified Person
George Gorzynski, P. Eng., Vice President, Exploration and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the
technical information in this presentation with the exception of the Capire project mineral resource estimate. Steven Ristorcelli, C.P.G. (U.S.A.), Principal Geologist for
Mine Development Associates and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the Capire mineral resource
estimate and directly related information.
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
2
ESG. Silver Capital of World. IPT.
• Largest silver producer in the world.
– Strong geological data and past production records to
help IMPACT team find the next 10-100 million ounces
silver.
• Focus on ESG (Environmental, Social,
Governance)
– Staff is 99% local. Generated significant job
opportunities 15+ years while adhering to high
environmental standards.
• Foreign companies can hold mineral title
• Proximity to North America & ports to international
customers
• We are in a proven district with 500+ years of
production records and have used just 2% of land
package.
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
3
0.00
20.00
40.00
60.00
80.00
100.00
POLICY & MINING POTENTIAL INDEX 2020
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
INVESTMENT ATTRACTIVENESS 2020
MEXICO continues
to rank near top of
South America
mining rich
potential and
investment
attractiveness
Royal Mines of Zacualpan
500+ Years of Production
Production summary so far
  
0 ,/ / ,2 1
silver produced since 2006
One of the purest silver producers with
   
of revenues from silver in Q1 2021
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
4
457
349
636
824
750
834
621
683
726
950 953
908
744
664 647
307
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Q2 so 
far
Silver Production Since Acquiring the Project in 2006 (000 oz)
Located NW-SE of large silver epithermal belt of
Mexico. NW from Taxco district
$0.00
$0.20
$0.40
$0.60
$0.80
$1.00
$1.20
$1.40
2015 ‐ 2021 IMPACT Share Price 
Highly Leveraged to Silver Prices
Silver vs IPT Share Price
• One of the best leveraged silver plays in rising silver market
– In 2016, 2019, and 2020’s recent silver rally, IMPACT’s share price generated significantly higher returns than holding silver bullion
– Every $1 increment in silver prices represents direct increases to profit and value of ounces in ground
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
5
Jan 4 – Aug
2, 2016:
854% return
Jan 4 – Aug 2,
2016: 50% return
Jun 4 –
July 30,
2019:
90%
return
Jun 4 –
July 30,
2019:
12%
return
Mar 2 – July
26, 2020
149% return
Mar 2 – July
26, 2020
37% return
$0.00
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
$35.00
Silver Prices
Royal Mines of Zacualpan
Property Overview
• 100% ownership of two contiguous mining districts covering
211 km² in south-central Mexico
• A 3.5-hour drive southwest from Mexico City
– Paved road access
• Connected to a modern power grid with ample water supply
and a skilled, 99% Mexican workforce
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
6
• 535 tpd Guadalupe Plant processing mineral from three
underground mines (Guadalupe, San Ramon and Cuchara)
and the Veta Negra open pit mine (all within close proximity)
• 200 tpd Capire Pilot Plant is on care and maintenance
– Most recently used to bulk test the processing of gold and copper
feed from the Carlos Pacheco Zone
Capital Structure
Tickers TSXV:IPT, US:ISVLF, FR:IKL
Share Price (Dec 7, 2021) C$0.45
52-Week Range C$0.43 – C$1.25
Shares Outstanding (basic) 143.8M
Shares Outstanding (FD)* 161.7M
Market Capitalization (basic) C$66.5M
Cash  Cash Equivalents (C$M) C $22.4 M
Debt (C$M) None
Capital Structure 12 Month Share Price Performance
Share Ownership
Retail 70%
Institutional Funds (Sprott, GR Asset, BCV, Commodity
Discovery, EOP,  Crescat)
20%
Management  Insiders 10%
*Includes 5,185,000 options outstanding with a weighted average exercise price of C$0.55 and 30,504,322
warrants outstanding with a weighted average exercise price of C$0.36
Source: Stockwatch / Yahoo Finance Dec 2021
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
7
Summary of Operating Results
Production by Metal Value (Q3 2021)
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
8
Q3 2021 2020
Q4
2020
Q4 2019 2019 2018 2017
Tonnes processed 34,587 140,069 40,815 36,528 140,878 173,217 194,266
Throughput (tonnes/day) 376 383 444 397 386 475 532
Average grade (g/t Ag) 156 172 166 182 173 159 172
Silver production (oz) 147,597 646,534 184,303 180,670 664,056 743,950 907,848
Lead production (tonnes) 54 240 68 78 275 329 481
Gold production (oz) 69 321 92 113 376 469 540
Silver sales (oz) 152,026 633,357 156,885 182,670 667,628 733,267 907,848
Lead sales (tonnes) 51 225 53 76 287 344 481
Gold sales (oz) 60 293 69 112 367 489 540
Revenue per tonne of ore
processed (US$)
$114.52 $116.47 $131.87 $105.47 $92.82 $74.88 $79.62
Direct costs per tonne of
ore processed (US$)
$91.31 $80.82 $92.21 $82.60 $82.55 $83.63 $76.49
Mine-level EBITDA (C$M) $3.20 $2.70 $1.46 $0.87 $1.37 -$1.68 $0.47
Silver
90%
Gold
5%
Lead
5%
• 2018 strategic change led to significant decline in operating costs per tonne
and an improvement in average grade
• Q3 2021 revenue mix from ore sites changed from previous quarters due to
logistics and balancing exploration vs development at sites.
Veta Negra
• New small open
pit operation
which
commenced
production in
September 2019
• 4 km northwest
of the Guadalupe
mill
• 3% of Q3 2021
production
San Ramon
• Began
production in
2004
• Current high-
grade silver
production
from large vein
at depth – San
Ramon Deeps
• 15% of Q3
2021
production
Cuchara
• Corridor of
epithermal
veins linking new
and legacy
mines
• Production is
from medium
grade
epithermal silver
and lead-zinc
veins
• 35% of Q3 2021
production
Guadalupe
• Historic
producer
located
beside
Guadalupe
mill
• Epithermal
silver-lead-
zinc veins
• 47% of Q3
2021
production
Ore Feed Mine Sources (Q3 2021)
Royal Mines of Zacualpan
Prolific History of High-Grade Silver Mining
• One of the oldest mining districts in the Americas
– Almost 500 years of recorded mining history
• IMPACT’s exploration work has catalogued over 5,000 old mine workings
and 42 historic processing plants, indicating extensive historical mining,
large exploration potential and forming an invaluable database for modern
and effective exploration
• Taxco has historical records of over 300 million ounces silver produced.
(South of IMPACT projects)
Nombre de
Dios La Cadena
La Zorra El Calvario
La Fortuna
Some of the 42 historic processing plants in the
Zacualpan District
Many acted as historical centralized processing
centers for old mine workings
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
9
Guadalupe Processing Plant
• 535 TPD
• Currently processing all ore for IPT
• Running below capacity 400TPD Q1 2021
Capire Processing Plant
• 200TPD
• On care and maintenance since 2014
• Currently checking XRT process to lower cost
Experienced Management  Board
Frederick W. Davidson, CA,
CPA
President, CEO, Director
• +35 years of mining experience, including holding various senior positions at Erickson Gold Mines Ltd. and Mt. Skukum
Gold Mines. Former CEO of Energold Drilling Corp. and CFO of TOTAL Energold (a partially owned subsidiary of TOTAL Oil of
France with oil, gas and gold production)
• Former Director of Wheaten River Minerals (acquired by Goldcorp in 2014 for $2.4 billion)
• MBA from TUBC and CA, CPA
George Gorzynski, P. Eng.
VP Exploration, Director
• +37 years of exploration and mining experience
• Director of Fireweed Zinc Ltd.
Jerry Huang, MBA
CFO
• +12 years of venture capital markets experience raising over $120 million for various small cap companies.
• Former advisor for HNW at CIBC, director of gold/copper and lithium projects on TSXV, banking advisory roles.
• MBA from University of British Columbia and CPA PEP from CPABC.
Armando Alexandri, P.Eng
COO
• +35 years of mining experience in underground and open-pit mines as well as flotation and cyanidation processing plants
Victor Tanaka, P. Geo
Director
• +40 years of exploration experience
• Current Director of Fjordland Exploration, Westhaven Ventures and Consolidated Woodjam Copper
• Held senior positions at Asamera Inc., Freeport McMoRan Gold Corp., Cominco Ltd., and Aber Resources
Richard Mazur, P. Geo, MBA
Director
• President and CEO of Forum Energy Metals Corp. and CEO of Alto Ventures Ltd.
• Held senior positions at Canamax Resources and IMPACT Minerals
Peter Tredger, P. Eng., MBA
Director
• Former Senior Officer of Thompson Creek Metals Company
• Held senior positions at Glencairn Gold (now B2Gold) and Wheaton River Minerals (now Goldcorp)
Robert W. Lishman
Director
• +40 years of investment industry and business experience with strong portfolio management and financing expertise
• Currently Managing General Partner of investment fund Yellowjacket, LP
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
10
Significant Exploration Upside
• Exploration continues to evaluate the 5,000+ historic
mine workings located on hundreds of mapped veins
(red lines on map) on an extensive mineralizing system
• Area 1: Brownfields exploration for silver veins within
close trucking distance to the Guadalupe plant; area
includes the San Ramon, Cuchara and Veta Negra
mines
• Area 2: Early stage exploration for Zacualpan southeast
extension silver veins
• Area 3: Brownfields and greenfields exploration on
silver-rich VMS and vein targets; includes the open pit
Capire mine
• Area 4: Brownfields and greenfields exploration on
copper-gold and silver vein targets
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
11
Area 1
Guadalupe to Alacran Exploration Area
• Fertile exploration area between two large
historic Mines
• The Guadalupe Mine to the north produced
over 10 million ounces silver between
1972-1991, and much more since first
recorded production in 1529; Sept 2018
drill results:
– 2.61 m of 1,263 g/t Ag  8.82 m of 306 g/t Ag
• The Alacran Mine to the south is marked by
extensive underground workings with
historic reports of very high-grade (1,000’s
of g/t) silver and gold mining beginning
before 1527
Guadalupe Mine
+10M oz Ag historic production
Drill Targets
Guadalupe Deeps
El Paso
San Ignacio
Remedios
El Progresso
Alacran Deeps
Alacran Mine
Large historic Ag/Au production
1,200 m zone
Alacran Deeps Drill Target
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
12
Area 1: Alacran Gold-Silver Mine
Two historic reports indicate super high grades
Lewis (1920) “…At enriched places, 
lenses of silver sulphides are found, 30 
to 70cm. wide, the ores carrying 20 to 
60 kg. silver per metric tonne. The wall‐
rock for a short distance is also 
impregnated to the point of making 
good mill‐ore. The unenriched spaces 
between the ore bodies usually assay 
400 to 500 gm. Silver. All the high‐grade 
ores carry gold, with a characteristic 
accompaniment of iron and copper 
sulphides……”
Garcia (1921) reports “The Alacran Mine employed 500 
workers who produced 8 to 10 tonnes per day of 
direct shipping ore assaying 35kg/tonne which was 
exported to Penoles in Toluca and 40 tonnes per day 
of less than 10kg/tonne which was sent to the Cuchara 
flotation plant.
Do the math: 50 tpd operation producing about 7 million 
ounces silver per year
13
Area 1: Pachuqueno
Recent Nov 2021 Exploration News
14
The Pachuqueno area is located in the west workings 
of the Guadalupe Mine and is connected to the main 
shaft by 900m of underground railroad on Level 195. 
This area is host to a swarm of veins that were last 
mined over 30 years ago. 
‐ Holes MPZ‐UG‐021‐21 to MPZ‐UG‐036‐21 intersected 
the Dolores, Carolina and La Rata Veins from two 
underground drill stations on Level 195.
‐ All vein intersections are located close to existing 
mine infrastructure, favourable for near term mining, 
and remain open for expansion.
Area 2
Tasco North  Pregones Exploration Areas
• Area is synonymous with silver in Mexico – Taxco is the most
famous silver mine in Mexico
• To the north, IMPACT’s early exploration efforts have discovered
numerous old mines and old processing plants
• Taxco district still owned  explored by majors (Grupo Mexico.)
Old Mines Old Processing Plants
Epithermal silver veins
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
15
Area 3
Capire: Potential Quick Expansion of Production
• 43-101openpitresourceof4.5MozSilver@79g/t+lead-zincinopenpitwithexpansion/explorationupside
• 200tpdpilotplantoncaremaintenance;turnkeytorestartwithrisingsilverprices
• Infrastructurepre-builtfor1,000tpdplant
• VMSsilver-lead-zinc(-gold-copper)deposit;otherVMSprospectswithupsidenearby
• XRT sorting technology has potential to materially reduce operating costs and extend mine life
• 30k tonnes produced, 12 million oz silver eq 43-101 resource. Ability to fast-track production
200 tpd pilot plant
Open-pit
3D model of
planned
open-pit
Mill
Tailings Facility
Capire open-pit 3D model
Capire open-pit mine and pilot plant on VMS
Ag-Pb-Zn deposit (currently on standby)
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
16
Area 4
Chapanial Gold Discovery
• Located 7 km west of the Guadalupe processing plant
southwest of Veta Negra Mine
• Sampling results from 2020 exploration include:
– 97.5 g/t Au and 97.9 g/t Ag over a true width of 0.8 m
– 18.25 g/t Au and 75.4 g/t Ag over a true width of 0.2 m
• Close to historic Chapanial mine which produced on three levels
over 45 m depth and along strike for 100 m
• Vein is associated with a major structure which hosts a sulphide
bearing polymictic breccia up to 8m in width
• Many other veins and anomalies are currently being explored
Chapanial
Highlighted Channel Sampling Results
Chapanial
Norte
Chapania
Sur
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
17
10.3
1.2
8.5
23
11
‐16
24
‐20
65
65
113
Silver Dollar
Silver Elephant
Silverbear
IMPACT
Excellon
Santa Cruz
Great Panther
Americas Gold Silver
Sierra Metals
GoGold
Endeavour
Market Capitalization (C$M) Working Capital (C $M)
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
18
Source: SP Capital IQ and company filings May 2021
IPT – Undervalued Silver Miner
Market Cap low despite higher Working Capital  Efficient EPS
29
42
64
62
72
102
180
170
440
769
880
Silver Dollar
Silver Elephant
Silverbear
IMPACT
Excellon
Santa Cruz
Great Panther
Americas Gold
Silver
Sierra Metals
GoGold
Endeavour
Earnings Per Share (C$/Share)
0
‐0.03
‐0.01
0.02
‐0.55
0.02
0
‐0.24
0.14
0.19
0.01
Silver Dollar
Silver Elephant
Silverbear
IMPACT
Excellon
Santa Cruz
Great Panther
Americas Gold Silver
Sierra Metals
GoGold
Endeavour
Rapid Exploration to Mine Development
Exploration and mine development process flowchart
RESEARCH
Compile old
mines/ prospects
from historic
maps
DRILLING
Drilling in
phases based
on success
MINE
DEVELOPMENT
Mine Planning,
Permitting and
Construction
FIELD WORK
Surface 
underground
sampling,
mapping
MINE
PRODUCTION 
CASH FLOW
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
19
• Preliminary test from 
Haylard Engineering for pre‐
mining treatment was 
positive – 20‐30% reduction 
in cost per ounces
• well‐known that the 
crushing and grinding of ore 
consumes around 60 per 
cent of a mine’s operating 
and energy costs in addition 
to creating most of the 
greenhouse gas emissions
Ongoing Cost Reduction through technology - XRT
Why IMPACT Silver?
www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL
20
Thank you.
Questions? inquiries@impactsilver.com
Twitter: @impact_silver
One of the purest
play silver producers
~90% of revenues from
silver in Q1 2020
Long-term, stable
production
Over the last 12 months, sold
~695K oz Ag and generated
C$1.7M in mine-level EBITDA
Near-term
development
opportunity at Capire
Expandable 200 tpd mill and
4.6M oz Ag open pit resource.
Potential to lower costs through
DMS technology
District exploration
upside
Hundreds of epithermal vein
targets and 5,000 historic
workings across the property
Exciting new
Chapanial discovery
Sampled 97.5 g/t Au and 97.9
g/t Ag over true width of 0.8 m
Refurbishing Historic Infrastructure at Guadalupe
• Refurbishing old assets and
equipment – in this case the
mine shaft and underground
railroad to lower cost and speed
up tonnage being hauled out of
mine
21
Area 1: Alacran Gold-Silver Mine
1918-1926 Mining Areas Long Section
1.2+ km zone
22
Technical App: Guadalupe (Pachuqueno) Mine
• Over 5,000 underground workings, digitized maps from Sept 1989
23
Technical App: Guadalupe area
• Vein system overhead view
• Sampling and drilling then 
determines an internal 
tonnage model which then 
moves the project to near‐
term production stage.
24
Technical App: Long Section
• IMPACT team visits projects and catalogues the 
opportunity.
• Sampling and drilling then determines an internal 
tonnage model which then moves the project to 
near‐term production stage.
25
Long Section cont..
26
Photos
• Refurbishing old assets and 
equipments – in this case mine 
shaft and railroad underground to 
lower cost and speed up tonnage 
being hauled out
27
Veta Negra
• Open pit low cost expansion 
potential 
• High grade and past major’s 
project (Penoles)
• Already contributing to feed in 
Q1 2020
28
Veta Negra
Plan view
• Plan view 
Sample average grade 
and widths
• Example of how fast
IPT team can explore, 
develop, and produce  
from vast amount of  
geological data 
29
XRT Discussions
• Preliminary test from Haylard Engineering 
for pre‐mining treatment was positive –
20‐30% reduction in cost per ounces
• well‐known that the crushing and 
grinding of ore consumes around 60 per 
cent of a mine’s operating and energy 
costs in addition to creating most of the 
greenhouse gas emissions
• X‐ray transmission may be a good solution 
if your rock has differences in density, 
which usually translate to atomic density 
differences. X‐ray transmission measures 
how many x‐rays come through a particle 
because when different minerals are x‐
rayed, a difference in the attenuation of 
the mineral is found.
30
XRT Steiner Facilities Cont..
• Example at MINSUR Peru’s large Tin operation, Osisko’s Cariboo, Fireweed, Renison tin, 
Sokamo Silver, Rambler Metals
XRT Discussions
• Added value: XRT sensor‐based ore sorting is converting uneconomic waste material 
into economic ore, as material below the cut‐off for the main plant can be treated with 
lower operating costs and converted into reserves.
• Increased capacity in the main plant, from 2,950 tpd before implementation to today’s 
3,200 tpd, as a result of the crushing operation at the XRT‐sorting plant.
• Significant improvement in the overall recovery in the main plant, from 90.5% to 
92.5%. This is because sensor‐based ore sorting rejects particles with very fine 
mineralized Cassiterite that is too small for detection ‐ resulting in higher grade and 
size of mineralization.
• Extended life‐of‐mine: today, about 24% of the feed to the sensor‐based ore sorting 
plant is contributed by low grade ore from underground, which in the past would have 
been excluded for being below cut‐off. 
• Elimination of liabilities through the treatment and proper disposal of 100% of the 
stockpile.
• Decreased tailings disposal, as the sensor‐based ore sorting system reduces the 
amount of waste by increasing the grade in the feed to the plant.
31

More Related Content

What's hot

OZ Corporate Presentation November 2021
OZ Corporate Presentation November 2021OZ Corporate Presentation November 2021
OZ Corporate Presentation November 2021CarolynGraham14
 
ATAC Resources Ltd. Corporate Presentation September 2021
ATAC Resources Ltd. Corporate Presentation September 2021ATAC Resources Ltd. Corporate Presentation September 2021
ATAC Resources Ltd. Corporate Presentation September 2021ATAC Resources Ltd
 
Clean Air Metals - January 2022 Presentation (Jan 20)
Clean Air Metals - January 2022 Presentation (Jan 20)Clean Air Metals - January 2022 Presentation (Jan 20)
Clean Air Metals - January 2022 Presentation (Jan 20)Adnet Communications
 
TriStar Gold Corporate Presentation
TriStar Gold Corporate PresentationTriStar Gold Corporate Presentation
TriStar Gold Corporate PresentationAdnet Communications
 
TriStar - August 2021 Corporate Presentation
TriStar - August 2021 Corporate PresentationTriStar - August 2021 Corporate Presentation
TriStar - August 2021 Corporate PresentationAdnet Communications
 
ATAC Resources Ltd. Corporate Presentation December 2021
ATAC Resources Ltd. Corporate Presentation December 2021ATAC Resources Ltd. Corporate Presentation December 2021
ATAC Resources Ltd. Corporate Presentation December 2021ATAC Resources Ltd
 
Lion One Metals Presentation Nov 2021
Lion One Metals Presentation Nov 2021Lion One Metals Presentation Nov 2021
Lion One Metals Presentation Nov 2021Lion One Metals
 
2021.09.07 prb pea presentation final
2021.09.07 prb pea presentation final2021.09.07 prb pea presentation final
2021.09.07 prb pea presentation finalProbe Gold
 
2021.08.03 probe corporate presentation final
2021.08.03 probe corporate presentation final2021.08.03 probe corporate presentation final
2021.08.03 probe corporate presentation finalProbe Gold
 
January 2016 Corporate Presentation
January 2016 Corporate PresentationJanuary 2016 Corporate Presentation
January 2016 Corporate PresentationChris Donaldson
 
Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Joe Gray
 
NOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD 2016 First Quarter Financials & Project UpdateNOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD 2016 First Quarter Financials & Project UpdateNOVAGOLD
 
Lm slides 2021 05-18
Lm slides 2021 05-18Lm slides 2021 05-18
Lm slides 2021 05-18AdnetNew
 
QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Gold Corporation
 
Impact silver corp-pres-july2021
Impact silver corp-pres-july2021Impact silver corp-pres-july2021
Impact silver corp-pres-july2021AdnetNew
 
2022.01.10 prb presentation final
2022.01.10 prb presentation final2022.01.10 prb presentation final
2022.01.10 prb presentation finalProbe Gold
 

What's hot (20)

OZ Corporate Presentation November 2021
OZ Corporate Presentation November 2021OZ Corporate Presentation November 2021
OZ Corporate Presentation November 2021
 
ATAC Resources Ltd. Corporate Presentation September 2021
ATAC Resources Ltd. Corporate Presentation September 2021ATAC Resources Ltd. Corporate Presentation September 2021
ATAC Resources Ltd. Corporate Presentation September 2021
 
Clean Air Metals - January 2022 Presentation (Jan 20)
Clean Air Metals - January 2022 Presentation (Jan 20)Clean Air Metals - January 2022 Presentation (Jan 20)
Clean Air Metals - January 2022 Presentation (Jan 20)
 
Tri star jan 2022
Tri star   jan 2022Tri star   jan 2022
Tri star jan 2022
 
TriStar Gold Corporate Presentation
TriStar Gold Corporate PresentationTriStar Gold Corporate Presentation
TriStar Gold Corporate Presentation
 
TriStar - August 2021 Corporate Presentation
TriStar - August 2021 Corporate PresentationTriStar - August 2021 Corporate Presentation
TriStar - August 2021 Corporate Presentation
 
ATAC Resources Ltd. Corporate Presentation December 2021
ATAC Resources Ltd. Corporate Presentation December 2021ATAC Resources Ltd. Corporate Presentation December 2021
ATAC Resources Ltd. Corporate Presentation December 2021
 
Lion One Metals Presentation Nov 2021
Lion One Metals Presentation Nov 2021Lion One Metals Presentation Nov 2021
Lion One Metals Presentation Nov 2021
 
2021.09.07 prb pea presentation final
2021.09.07 prb pea presentation final2021.09.07 prb pea presentation final
2021.09.07 prb pea presentation final
 
2021.08.03 probe corporate presentation final
2021.08.03 probe corporate presentation final2021.08.03 probe corporate presentation final
2021.08.03 probe corporate presentation final
 
January 2016 Corporate Presentation
January 2016 Corporate PresentationJanuary 2016 Corporate Presentation
January 2016 Corporate Presentation
 
Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021
 
NOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD 2016 First Quarter Financials & Project UpdateNOVAGOLD 2016 First Quarter Financials & Project Update
NOVAGOLD 2016 First Quarter Financials & Project Update
 
Lm slides 2021 05-18
Lm slides 2021 05-18Lm slides 2021 05-18
Lm slides 2021 05-18
 
QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Corporate Presentation (English)
QMX Corporate Presentation (English)
 
November 2021 mnd ir ppt
November 2021 mnd ir pptNovember 2021 mnd ir ppt
November 2021 mnd ir ppt
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Impact silver corp-pres-july2021
Impact silver corp-pres-july2021Impact silver corp-pres-july2021
Impact silver corp-pres-july2021
 
Impact Silver Presentation
Impact Silver PresentationImpact Silver Presentation
Impact Silver Presentation
 
2022.01.10 prb presentation final
2022.01.10 prb presentation final2022.01.10 prb presentation final
2022.01.10 prb presentation final
 

Similar to Impact Silver Corporate Presentation - December 2021

Impact Silver Corporate Presentation July 2021
Impact Silver Corporate Presentation July 2021Impact Silver Corporate Presentation July 2021
Impact Silver Corporate Presentation July 2021Adnet Communications
 
IMPACTSilver-CorpPres-May2021draft.pdf
IMPACTSilver-CorpPres-May2021draft.pdfIMPACTSilver-CorpPres-May2021draft.pdf
IMPACTSilver-CorpPres-May2021draft.pdfjerry308821
 
IMPACTSilver-CorpPres-Mar2022-Q4.pdf
IMPACTSilver-CorpPres-Mar2022-Q4.pdfIMPACTSilver-CorpPres-Mar2022-Q4.pdf
IMPACTSilver-CorpPres-Mar2022-Q4.pdfAdnetNew
 
IMPACTSilver-CorpPres-Q2-Nov2022.pdf
IMPACTSilver-CorpPres-Q2-Nov2022.pdfIMPACTSilver-CorpPres-Q2-Nov2022.pdf
IMPACTSilver-CorpPres-Q2-Nov2022.pdfAdnet Communications
 
IMPACTSilver-CorpPresQ1-2023-Plo-add.pdf
IMPACTSilver-CorpPresQ1-2023-Plo-add.pdfIMPACTSilver-CorpPresQ1-2023-Plo-add.pdf
IMPACTSilver-CorpPresQ1-2023-Plo-add.pdfSelinaFay
 
Impact Silver Corporate Presentation May 2023
Impact Silver Corporate Presentation May 2023Impact Silver Corporate Presentation May 2023
Impact Silver Corporate Presentation May 2023Adnet Communications
 
Impact Silver Corporate Presentation March 31 2023
Impact Silver Corporate Presentation March 31 2023Impact Silver Corporate Presentation March 31 2023
Impact Silver Corporate Presentation March 31 2023Adnet Communications
 
Impact silver corporate presentation-sept2020
Impact silver   corporate presentation-sept2020Impact silver   corporate presentation-sept2020
Impact silver corporate presentation-sept2020Adnet Communications
 
Impact Silver Corporate Presentation June 2020
Impact Silver Corporate Presentation June 2020Impact Silver Corporate Presentation June 2020
Impact Silver Corporate Presentation June 2020Adnet Communications
 
Impact Silver Corporate Presentation May 2020
Impact Silver Corporate Presentation May 2020Impact Silver Corporate Presentation May 2020
Impact Silver Corporate Presentation May 2020Adnet Communications
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationAdnet Communications
 

Similar to Impact Silver Corporate Presentation - December 2021 (20)

Impact Silver Corporate Presentation July 2021
Impact Silver Corporate Presentation July 2021Impact Silver Corporate Presentation July 2021
Impact Silver Corporate Presentation July 2021
 
IMPACTSilver-CorpPres-May2021draft.pdf
IMPACTSilver-CorpPres-May2021draft.pdfIMPACTSilver-CorpPres-May2021draft.pdf
IMPACTSilver-CorpPres-May2021draft.pdf
 
IMPACTSilver-CorpPres-Mar2022-Q4.pdf
IMPACTSilver-CorpPres-Mar2022-Q4.pdfIMPACTSilver-CorpPres-Mar2022-Q4.pdf
IMPACTSilver-CorpPres-Mar2022-Q4.pdf
 
IMPACTSilver-CorpPres-Q2-Nov2022.pdf
IMPACTSilver-CorpPres-Q2-Nov2022.pdfIMPACTSilver-CorpPres-Q2-Nov2022.pdf
IMPACTSilver-CorpPres-Q2-Nov2022.pdf
 
IMPACTSilver-CorpPresQ1-2023-Plo-add.pdf
IMPACTSilver-CorpPresQ1-2023-Plo-add.pdfIMPACTSilver-CorpPresQ1-2023-Plo-add.pdf
IMPACTSilver-CorpPresQ1-2023-Plo-add.pdf
 
Impact Silver Corporate Presentation May 2023
Impact Silver Corporate Presentation May 2023Impact Silver Corporate Presentation May 2023
Impact Silver Corporate Presentation May 2023
 
Impact Silver Corporate Presentation March 31 2023
Impact Silver Corporate Presentation March 31 2023Impact Silver Corporate Presentation March 31 2023
Impact Silver Corporate Presentation March 31 2023
 
20230701-IPT-PPT.pdf
20230701-IPT-PPT.pdf20230701-IPT-PPT.pdf
20230701-IPT-PPT.pdf
 
Impact silver corporate presentation-sept2020
Impact silver   corporate presentation-sept2020Impact silver   corporate presentation-sept2020
Impact silver corporate presentation-sept2020
 
20230901-IPT-PPT.pdf
20230901-IPT-PPT.pdf20230901-IPT-PPT.pdf
20230901-IPT-PPT.pdf
 
2023-11-01-IPT-PPT.pdf
2023-11-01-IPT-PPT.pdf2023-11-01-IPT-PPT.pdf
2023-11-01-IPT-PPT.pdf
 
Impact Silver Corporate Presentation June 2020
Impact Silver Corporate Presentation June 2020Impact Silver Corporate Presentation June 2020
Impact Silver Corporate Presentation June 2020
 
Impact Silver Corporate Presentation May 2020
Impact Silver Corporate Presentation May 2020Impact Silver Corporate Presentation May 2020
Impact Silver Corporate Presentation May 2020
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate Presentation
 
201307 presentation
201307 presentation201307 presentation
201307 presentation
 

More from Adnet Communications

Bitterroot Resources - Nighthawk Gold Project - April 30 2024
Bitterroot Resources - Nighthawk Gold Project - April 30 2024Bitterroot Resources - Nighthawk Gold Project - April 30 2024
Bitterroot Resources - Nighthawk Gold Project - April 30 2024Adnet Communications
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdfAdnet Communications
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdfAdnet Communications
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfAdnet Communications
 
2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation2024.03 Strategic Resources Presentation
2024.03 Strategic Resources PresentationAdnet Communications
 
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfTriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfAdnet Communications
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateAdnet Communications
 
2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdfAdnet Communications
 
2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentationAdnet Communications
 
https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/Adnet Communications
 
Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Adnet Communications
 
TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024Adnet Communications
 
20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor PresentationAdnet Communications
 
TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024Adnet Communications
 
Q4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfQ4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfAdnet Communications
 
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdfAdnet Communications
 
Strategic Resources corporate presentation
Strategic Resources corporate presentationStrategic Resources corporate presentation
Strategic Resources corporate presentationAdnet Communications
 

More from Adnet Communications (20)

Bitterroot Resources - Nighthawk Gold Project - April 30 2024
Bitterroot Resources - Nighthawk Gold Project - April 30 2024Bitterroot Resources - Nighthawk Gold Project - April 30 2024
Bitterroot Resources - Nighthawk Gold Project - April 30 2024
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
20240314 Calibre March 2024 Investor Presentation (FINAL).pdf
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
 
2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation2024.03 Strategic Resources Presentation
2024.03 Strategic Resources Presentation
 
TriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdfTriStar Gold- 03-13-2024 presentation pdf
TriStar Gold- 03-13-2024 presentation pdf
 
Strategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 UpdateStrategic Resources Corporate Presentation - March 2024 Update
Strategic Resources Corporate Presentation - March 2024 Update
 
2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf2024.03 Strategic Resources_Pub (1). pdf
2024.03 Strategic Resources_Pub (1). pdf
 
2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation2024.03 Strategic Resources_Pub presentation
2024.03 Strategic Resources_Pub presentation
 
https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/https://bitterrootresources.com/investors/presentations/
https://bitterrootresources.com/investors/presentations/
 
Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024Silver One Corporate Presentation March 2024
Silver One Corporate Presentation March 2024
 
TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024TriStar Gold Corporate Presentation Updated February 2024
TriStar Gold Corporate Presentation Updated February 2024
 
20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation20240222 Calibre February 2024 Investor Presentation
20240222 Calibre February 2024 Investor Presentation
 
TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024TriStar Gold Corporate Presentation February 2024
TriStar Gold Corporate Presentation February 2024
 
Q4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdfQ4 2023 Conference Call Presentation FINAL-v4.pdf
Q4 2023 Conference Call Presentation FINAL-v4.pdf
 
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
20240220 Calibre Q4 and FY 2023 Conference Call Present.pdf
 
Strategic Resources corporate presentation
Strategic Resources corporate presentationStrategic Resources corporate presentation
Strategic Resources corporate presentation
 

Recently uploaded

Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 

Recently uploaded (20)

Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 

Impact Silver Corporate Presentation - December 2021

  • 1. ` Purest Silver Publicly Listed Company +90% Revenues from Silver Corporate Presentation IPT:TSXV / ISVLF:US / IKL:FR 16 Years of Exploration & Production Success in Mexico DEC 2021
  • 2. Disclosure Forward-Looking Statements This presentation may contain certain “forward-looking” statements and information relating to IMPACT Silver Corp. (“IMPACT” or the “Company”) that are based on the beliefs of IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including but not limited to, exploration and development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality, technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT does not assume the obligation to update any forward-looking statement. The factors that could cause actual results to differ materially include, but are not limited to, the following: general economic conditions; changes in financial markets; the impact of exchange rates; political conditions and developments in countries in which the Company operates; changes in the supply, demand and pricing of the metal commodities which the Company mines or hopes to find and successfully mine; changes in regulatory requirements impacting the Company’s operations; the ability to properly and efficiently staff the Company’s operations; the sufficiency of current working capital and the estimated cost and availability of funding for the continued exploration and development of the Company’s exploration properties. This list is not exhaustive and these and other factors should be considered carefully, and readers should not place undue reliance on the Company’s forward-looking statements. As a result of the foregoing and other factors, no assurance can be given as to any such future results, levels of activity or achievements and neither the Company nor any other person assumes responsibility for the accuracy and completeness of these forward-looking statements. Cautionary Statement The Company’s decision to place a mine into production, expand a mine, make other production related decisions or otherwise carry out mining and processing operations, is largely based on internal non-public Company data and reports based on exploration, development and mining work by the Company’s geologists and engineers. The results of this work are evident in the discovery and building of multiple mines for the Company, and in the track record of mineral production and financial returns of the Company since 2006. Under NI43-101 the Company is required to disclose that it has not based its production decisions on NI43-101- compliant mineral resource or reserve estimates, preliminary economic assessments or feasibility studies, and historically such projects have increased uncertainty and risk of failure. NI 43-101 Qualified Person George Gorzynski, P. Eng., Vice President, Exploration and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the technical information in this presentation with the exception of the Capire project mineral resource estimate. Steven Ristorcelli, C.P.G. (U.S.A.), Principal Geologist for Mine Development Associates and a Qualified Person under the meaning of Canadian National Instrument 43-101, is responsible for the Capire mineral resource estimate and directly related information. www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 2
  • 3. ESG. Silver Capital of World. IPT. • Largest silver producer in the world. – Strong geological data and past production records to help IMPACT team find the next 10-100 million ounces silver. • Focus on ESG (Environmental, Social, Governance) – Staff is 99% local. Generated significant job opportunities 15+ years while adhering to high environmental standards. • Foreign companies can hold mineral title • Proximity to North America & ports to international customers • We are in a proven district with 500+ years of production records and have used just 2% of land package. www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 3 0.00 20.00 40.00 60.00 80.00 100.00 POLICY & MINING POTENTIAL INDEX 2020 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 INVESTMENT ATTRACTIVENESS 2020 MEXICO continues to rank near top of South America mining rich potential and investment attractiveness
  • 4. Royal Mines of Zacualpan 500+ Years of Production Production summary so far 0 ,/ / ,2 1 silver produced since 2006 One of the purest silver producers with of revenues from silver in Q1 2021 www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 4 457 349 636 824 750 834 621 683 726 950 953 908 744 664 647 307 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Q2 so  far Silver Production Since Acquiring the Project in 2006 (000 oz) Located NW-SE of large silver epithermal belt of Mexico. NW from Taxco district
  • 5. $0.00 $0.20 $0.40 $0.60 $0.80 $1.00 $1.20 $1.40 2015 ‐ 2021 IMPACT Share Price  Highly Leveraged to Silver Prices Silver vs IPT Share Price • One of the best leveraged silver plays in rising silver market – In 2016, 2019, and 2020’s recent silver rally, IMPACT’s share price generated significantly higher returns than holding silver bullion – Every $1 increment in silver prices represents direct increases to profit and value of ounces in ground www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 5 Jan 4 – Aug 2, 2016: 854% return Jan 4 – Aug 2, 2016: 50% return Jun 4 – July 30, 2019: 90% return Jun 4 – July 30, 2019: 12% return Mar 2 – July 26, 2020 149% return Mar 2 – July 26, 2020 37% return $0.00 $5.00 $10.00 $15.00 $20.00 $25.00 $30.00 $35.00 Silver Prices
  • 6. Royal Mines of Zacualpan Property Overview • 100% ownership of two contiguous mining districts covering 211 km² in south-central Mexico • A 3.5-hour drive southwest from Mexico City – Paved road access • Connected to a modern power grid with ample water supply and a skilled, 99% Mexican workforce www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 6 • 535 tpd Guadalupe Plant processing mineral from three underground mines (Guadalupe, San Ramon and Cuchara) and the Veta Negra open pit mine (all within close proximity) • 200 tpd Capire Pilot Plant is on care and maintenance – Most recently used to bulk test the processing of gold and copper feed from the Carlos Pacheco Zone
  • 7. Capital Structure Tickers TSXV:IPT, US:ISVLF, FR:IKL Share Price (Dec 7, 2021) C$0.45 52-Week Range C$0.43 – C$1.25 Shares Outstanding (basic) 143.8M Shares Outstanding (FD)* 161.7M Market Capitalization (basic) C$66.5M Cash Cash Equivalents (C$M) C $22.4 M Debt (C$M) None Capital Structure 12 Month Share Price Performance Share Ownership Retail 70% Institutional Funds (Sprott, GR Asset, BCV, Commodity Discovery, EOP, Crescat) 20% Management Insiders 10% *Includes 5,185,000 options outstanding with a weighted average exercise price of C$0.55 and 30,504,322 warrants outstanding with a weighted average exercise price of C$0.36 Source: Stockwatch / Yahoo Finance Dec 2021 www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 7
  • 8. Summary of Operating Results Production by Metal Value (Q3 2021) www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 8 Q3 2021 2020 Q4 2020 Q4 2019 2019 2018 2017 Tonnes processed 34,587 140,069 40,815 36,528 140,878 173,217 194,266 Throughput (tonnes/day) 376 383 444 397 386 475 532 Average grade (g/t Ag) 156 172 166 182 173 159 172 Silver production (oz) 147,597 646,534 184,303 180,670 664,056 743,950 907,848 Lead production (tonnes) 54 240 68 78 275 329 481 Gold production (oz) 69 321 92 113 376 469 540 Silver sales (oz) 152,026 633,357 156,885 182,670 667,628 733,267 907,848 Lead sales (tonnes) 51 225 53 76 287 344 481 Gold sales (oz) 60 293 69 112 367 489 540 Revenue per tonne of ore processed (US$) $114.52 $116.47 $131.87 $105.47 $92.82 $74.88 $79.62 Direct costs per tonne of ore processed (US$) $91.31 $80.82 $92.21 $82.60 $82.55 $83.63 $76.49 Mine-level EBITDA (C$M) $3.20 $2.70 $1.46 $0.87 $1.37 -$1.68 $0.47 Silver 90% Gold 5% Lead 5% • 2018 strategic change led to significant decline in operating costs per tonne and an improvement in average grade • Q3 2021 revenue mix from ore sites changed from previous quarters due to logistics and balancing exploration vs development at sites. Veta Negra • New small open pit operation which commenced production in September 2019 • 4 km northwest of the Guadalupe mill • 3% of Q3 2021 production San Ramon • Began production in 2004 • Current high- grade silver production from large vein at depth – San Ramon Deeps • 15% of Q3 2021 production Cuchara • Corridor of epithermal veins linking new and legacy mines • Production is from medium grade epithermal silver and lead-zinc veins • 35% of Q3 2021 production Guadalupe • Historic producer located beside Guadalupe mill • Epithermal silver-lead- zinc veins • 47% of Q3 2021 production Ore Feed Mine Sources (Q3 2021)
  • 9. Royal Mines of Zacualpan Prolific History of High-Grade Silver Mining • One of the oldest mining districts in the Americas – Almost 500 years of recorded mining history • IMPACT’s exploration work has catalogued over 5,000 old mine workings and 42 historic processing plants, indicating extensive historical mining, large exploration potential and forming an invaluable database for modern and effective exploration • Taxco has historical records of over 300 million ounces silver produced. (South of IMPACT projects) Nombre de Dios La Cadena La Zorra El Calvario La Fortuna Some of the 42 historic processing plants in the Zacualpan District Many acted as historical centralized processing centers for old mine workings www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 9 Guadalupe Processing Plant • 535 TPD • Currently processing all ore for IPT • Running below capacity 400TPD Q1 2021 Capire Processing Plant • 200TPD • On care and maintenance since 2014 • Currently checking XRT process to lower cost
  • 10. Experienced Management Board Frederick W. Davidson, CA, CPA President, CEO, Director • +35 years of mining experience, including holding various senior positions at Erickson Gold Mines Ltd. and Mt. Skukum Gold Mines. Former CEO of Energold Drilling Corp. and CFO of TOTAL Energold (a partially owned subsidiary of TOTAL Oil of France with oil, gas and gold production) • Former Director of Wheaten River Minerals (acquired by Goldcorp in 2014 for $2.4 billion) • MBA from TUBC and CA, CPA George Gorzynski, P. Eng. VP Exploration, Director • +37 years of exploration and mining experience • Director of Fireweed Zinc Ltd. Jerry Huang, MBA CFO • +12 years of venture capital markets experience raising over $120 million for various small cap companies. • Former advisor for HNW at CIBC, director of gold/copper and lithium projects on TSXV, banking advisory roles. • MBA from University of British Columbia and CPA PEP from CPABC. Armando Alexandri, P.Eng COO • +35 years of mining experience in underground and open-pit mines as well as flotation and cyanidation processing plants Victor Tanaka, P. Geo Director • +40 years of exploration experience • Current Director of Fjordland Exploration, Westhaven Ventures and Consolidated Woodjam Copper • Held senior positions at Asamera Inc., Freeport McMoRan Gold Corp., Cominco Ltd., and Aber Resources Richard Mazur, P. Geo, MBA Director • President and CEO of Forum Energy Metals Corp. and CEO of Alto Ventures Ltd. • Held senior positions at Canamax Resources and IMPACT Minerals Peter Tredger, P. Eng., MBA Director • Former Senior Officer of Thompson Creek Metals Company • Held senior positions at Glencairn Gold (now B2Gold) and Wheaton River Minerals (now Goldcorp) Robert W. Lishman Director • +40 years of investment industry and business experience with strong portfolio management and financing expertise • Currently Managing General Partner of investment fund Yellowjacket, LP www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 10
  • 11. Significant Exploration Upside • Exploration continues to evaluate the 5,000+ historic mine workings located on hundreds of mapped veins (red lines on map) on an extensive mineralizing system • Area 1: Brownfields exploration for silver veins within close trucking distance to the Guadalupe plant; area includes the San Ramon, Cuchara and Veta Negra mines • Area 2: Early stage exploration for Zacualpan southeast extension silver veins • Area 3: Brownfields and greenfields exploration on silver-rich VMS and vein targets; includes the open pit Capire mine • Area 4: Brownfields and greenfields exploration on copper-gold and silver vein targets www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 11
  • 12. Area 1 Guadalupe to Alacran Exploration Area • Fertile exploration area between two large historic Mines • The Guadalupe Mine to the north produced over 10 million ounces silver between 1972-1991, and much more since first recorded production in 1529; Sept 2018 drill results: – 2.61 m of 1,263 g/t Ag 8.82 m of 306 g/t Ag • The Alacran Mine to the south is marked by extensive underground workings with historic reports of very high-grade (1,000’s of g/t) silver and gold mining beginning before 1527 Guadalupe Mine +10M oz Ag historic production Drill Targets Guadalupe Deeps El Paso San Ignacio Remedios El Progresso Alacran Deeps Alacran Mine Large historic Ag/Au production 1,200 m zone Alacran Deeps Drill Target www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 12
  • 13. Area 1: Alacran Gold-Silver Mine Two historic reports indicate super high grades Lewis (1920) “…At enriched places,  lenses of silver sulphides are found, 30  to 70cm. wide, the ores carrying 20 to  60 kg. silver per metric tonne. The wall‐ rock for a short distance is also  impregnated to the point of making  good mill‐ore. The unenriched spaces  between the ore bodies usually assay  400 to 500 gm. Silver. All the high‐grade  ores carry gold, with a characteristic  accompaniment of iron and copper  sulphides……” Garcia (1921) reports “The Alacran Mine employed 500  workers who produced 8 to 10 tonnes per day of  direct shipping ore assaying 35kg/tonne which was  exported to Penoles in Toluca and 40 tonnes per day  of less than 10kg/tonne which was sent to the Cuchara  flotation plant. Do the math: 50 tpd operation producing about 7 million  ounces silver per year 13
  • 14. Area 1: Pachuqueno Recent Nov 2021 Exploration News 14 The Pachuqueno area is located in the west workings  of the Guadalupe Mine and is connected to the main  shaft by 900m of underground railroad on Level 195.  This area is host to a swarm of veins that were last  mined over 30 years ago.  ‐ Holes MPZ‐UG‐021‐21 to MPZ‐UG‐036‐21 intersected  the Dolores, Carolina and La Rata Veins from two  underground drill stations on Level 195. ‐ All vein intersections are located close to existing  mine infrastructure, favourable for near term mining,  and remain open for expansion.
  • 15. Area 2 Tasco North Pregones Exploration Areas • Area is synonymous with silver in Mexico – Taxco is the most famous silver mine in Mexico • To the north, IMPACT’s early exploration efforts have discovered numerous old mines and old processing plants • Taxco district still owned explored by majors (Grupo Mexico.) Old Mines Old Processing Plants Epithermal silver veins www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 15
  • 16. Area 3 Capire: Potential Quick Expansion of Production • 43-101openpitresourceof4.5MozSilver@79g/t+lead-zincinopenpitwithexpansion/explorationupside • 200tpdpilotplantoncaremaintenance;turnkeytorestartwithrisingsilverprices • Infrastructurepre-builtfor1,000tpdplant • VMSsilver-lead-zinc(-gold-copper)deposit;otherVMSprospectswithupsidenearby • XRT sorting technology has potential to materially reduce operating costs and extend mine life • 30k tonnes produced, 12 million oz silver eq 43-101 resource. Ability to fast-track production 200 tpd pilot plant Open-pit 3D model of planned open-pit Mill Tailings Facility Capire open-pit 3D model Capire open-pit mine and pilot plant on VMS Ag-Pb-Zn deposit (currently on standby) www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 16
  • 17. Area 4 Chapanial Gold Discovery • Located 7 km west of the Guadalupe processing plant southwest of Veta Negra Mine • Sampling results from 2020 exploration include: – 97.5 g/t Au and 97.9 g/t Ag over a true width of 0.8 m – 18.25 g/t Au and 75.4 g/t Ag over a true width of 0.2 m • Close to historic Chapanial mine which produced on three levels over 45 m depth and along strike for 100 m • Vein is associated with a major structure which hosts a sulphide bearing polymictic breccia up to 8m in width • Many other veins and anomalies are currently being explored Chapanial Highlighted Channel Sampling Results Chapanial Norte Chapania Sur www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 17
  • 18. 10.3 1.2 8.5 23 11 ‐16 24 ‐20 65 65 113 Silver Dollar Silver Elephant Silverbear IMPACT Excellon Santa Cruz Great Panther Americas Gold Silver Sierra Metals GoGold Endeavour Market Capitalization (C$M) Working Capital (C $M) www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 18 Source: SP Capital IQ and company filings May 2021 IPT – Undervalued Silver Miner Market Cap low despite higher Working Capital Efficient EPS 29 42 64 62 72 102 180 170 440 769 880 Silver Dollar Silver Elephant Silverbear IMPACT Excellon Santa Cruz Great Panther Americas Gold Silver Sierra Metals GoGold Endeavour Earnings Per Share (C$/Share) 0 ‐0.03 ‐0.01 0.02 ‐0.55 0.02 0 ‐0.24 0.14 0.19 0.01 Silver Dollar Silver Elephant Silverbear IMPACT Excellon Santa Cruz Great Panther Americas Gold Silver Sierra Metals GoGold Endeavour
  • 19. Rapid Exploration to Mine Development Exploration and mine development process flowchart RESEARCH Compile old mines/ prospects from historic maps DRILLING Drilling in phases based on success MINE DEVELOPMENT Mine Planning, Permitting and Construction FIELD WORK Surface underground sampling, mapping MINE PRODUCTION CASH FLOW www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 19 • Preliminary test from  Haylard Engineering for pre‐ mining treatment was  positive – 20‐30% reduction  in cost per ounces • well‐known that the  crushing and grinding of ore  consumes around 60 per  cent of a mine’s operating  and energy costs in addition  to creating most of the  greenhouse gas emissions Ongoing Cost Reduction through technology - XRT
  • 20. Why IMPACT Silver? www.impactsilver.com TSXV:IPT / OTCPK:ISVL.F / DB:IKL 20 Thank you. Questions? inquiries@impactsilver.com Twitter: @impact_silver One of the purest play silver producers ~90% of revenues from silver in Q1 2020 Long-term, stable production Over the last 12 months, sold ~695K oz Ag and generated C$1.7M in mine-level EBITDA Near-term development opportunity at Capire Expandable 200 tpd mill and 4.6M oz Ag open pit resource. Potential to lower costs through DMS technology District exploration upside Hundreds of epithermal vein targets and 5,000 historic workings across the property Exciting new Chapanial discovery Sampled 97.5 g/t Au and 97.9 g/t Ag over true width of 0.8 m
  • 21. Refurbishing Historic Infrastructure at Guadalupe • Refurbishing old assets and equipment – in this case the mine shaft and underground railroad to lower cost and speed up tonnage being hauled out of mine 21
  • 22. Area 1: Alacran Gold-Silver Mine 1918-1926 Mining Areas Long Section 1.2+ km zone 22
  • 23. Technical App: Guadalupe (Pachuqueno) Mine • Over 5,000 underground workings, digitized maps from Sept 1989 23
  • 24. Technical App: Guadalupe area • Vein system overhead view • Sampling and drilling then  determines an internal  tonnage model which then  moves the project to near‐ term production stage. 24
  • 25. Technical App: Long Section • IMPACT team visits projects and catalogues the  opportunity. • Sampling and drilling then determines an internal  tonnage model which then moves the project to  near‐term production stage. 25
  • 27. Photos • Refurbishing old assets and  equipments – in this case mine  shaft and railroad underground to  lower cost and speed up tonnage  being hauled out 27
  • 28. Veta Negra • Open pit low cost expansion  potential  • High grade and past major’s  project (Penoles) • Already contributing to feed in  Q1 2020 28
  • 29. Veta Negra Plan view • Plan view  Sample average grade  and widths • Example of how fast IPT team can explore,  develop, and produce   from vast amount of   geological data  29
  • 30. XRT Discussions • Preliminary test from Haylard Engineering  for pre‐mining treatment was positive – 20‐30% reduction in cost per ounces • well‐known that the crushing and  grinding of ore consumes around 60 per  cent of a mine’s operating and energy  costs in addition to creating most of the  greenhouse gas emissions • X‐ray transmission may be a good solution  if your rock has differences in density,  which usually translate to atomic density  differences. X‐ray transmission measures  how many x‐rays come through a particle  because when different minerals are x‐ rayed, a difference in the attenuation of  the mineral is found. 30
  • 31. XRT Steiner Facilities Cont.. • Example at MINSUR Peru’s large Tin operation, Osisko’s Cariboo, Fireweed, Renison tin,  Sokamo Silver, Rambler Metals XRT Discussions • Added value: XRT sensor‐based ore sorting is converting uneconomic waste material  into economic ore, as material below the cut‐off for the main plant can be treated with  lower operating costs and converted into reserves. • Increased capacity in the main plant, from 2,950 tpd before implementation to today’s  3,200 tpd, as a result of the crushing operation at the XRT‐sorting plant. • Significant improvement in the overall recovery in the main plant, from 90.5% to  92.5%. This is because sensor‐based ore sorting rejects particles with very fine  mineralized Cassiterite that is too small for detection ‐ resulting in higher grade and  size of mineralization. • Extended life‐of‐mine: today, about 24% of the feed to the sensor‐based ore sorting  plant is contributed by low grade ore from underground, which in the past would have  been excluded for being below cut‐off.  • Elimination of liabilities through the treatment and proper disposal of 100% of the  stockpile. • Decreased tailings disposal, as the sensor‐based ore sorting system reduces the  amount of waste by increasing the grade in the feed to the plant. 31